Attachment 3 - Exhibit Line Item Number sheet (ELINs) rev-01 20240328.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
POL Separators Inspection and Maintenance Services at USAG Bavaria Hohenfels, Tower Barracks Grafenwoehr, Rose Barracks Vilseck and Garmisch-Partenkirchen.
Solicitation number
W912PB24R3000
Issued by

About this file

This document is an Exhibit Line Item Number (ELIN) sheet for a federal contract opportunity related to the inspection and maintenance of petroleum, oil, and lubricant (POL) separators at various locations within the U.S. Army Garrison (USAG) Bavaria in Germany.

The contract requires the contractor to provide all personnel, equipment, and services necessary to perform monthly maintenance and inspection, cleaning, water sample collection, and replacement of defective components for POL separators ranging in size from NG 3 to NG 130. The work is mandated by German wastewater disposal laws and includes a base year and four one-year option periods. Pricing is provided for specific line items at each location, including Hohenfels, Tower Barracks Grafenwoehr, Rose Barracks Vilseck, and Garmisch-Partenkirchen. The contract is being solicited by the Department of the Army Materiel Command Army Contracting Command under Solicitation Number W912PB24R3000.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POL Separators Basic Year

ITEMELINDescriptionQTYUNITUNIT PriceTotal Amount
0001Inspection and Maintenance of POL Separators Systems at Hohenfels - Basic Year
A001Monthly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA
A002Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.145Net Ton
A003Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.56EA
A004Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.6EA
A005Replacement of defective alarm systems, including all required labor, materials, tools, etc.2EA
A006Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 102EA
A007Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 203EA
A008Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
A009Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
A010Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

56EA
CLIN 0001 Total- 0 €
0002Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - Basic Year
A011Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA
A012Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.650Net Ton
A013Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.125EA- 0 €
A014Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.13EA
A015Replacement of defective alarm systems, including all required labor, materials, tools, etc.4EA
A016Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 104EA
A017Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 206EA
A018Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 402EA
A019Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1302EA
A020Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

85EA
CLIN 0002 Total- 0 €
0003Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilseck- Basic Year
A021Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA
A022Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.260Net Ton
A023Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.42EA
A024Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.4EA
A025Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA
A026Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA
A027Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 202EA
A028Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
A029Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
A030Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

23EA
CLIN 0003 Total- 0 €
0004Inspection and Maintenance of POL Separators Systems at Garmisch-Patenkirchen- Basic Year
A031Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA
A032Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.10Net Ton
A033Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.7EA
A034Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.1EA
A035Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA
A036Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA
A037Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 201EA
A038Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
A039Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
A040Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

7EA
CLIN 0004 Total- 0 €
Total:- 0 €

POL Separators 1st Option Year

ITEMELINDescriptionQTYUNITUNIT PriceTotal Amount
1001Inspection and Maintenance of POL Separators Systems at Hohenfels - 1st Option Year
B001Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA
B002Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.145Net Ton
B003Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.56EA
B004Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.6EA
B005Replacement of defective alarm systems, including all required labor, materials, tools, etc.2EA
B006Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 102EA
B007Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 203EA
B008Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
B009Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
B010Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA
CLIN 1001 Total- 0 €
1002Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 1st Option Year
B011Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA
B012Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.650Net Ton
B013Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.125EA
B014Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.13EA
B015Replacement of defective alarm systems, including all required labor, materials, tools, etc.4EA
B016Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 104EA
B017Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 206EA
B018Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 402EA
B019Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1302EA
B020Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA
CLIN 1002 Total- 0 €
1003Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilseck- 1st Option Year
B021Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA
B022Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.260Net Ton
B023Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.42EA
B024Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.4EA
B025Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA
B026Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA
B027Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 202EA
B028Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
B029Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
B030Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

9EA
CLIN 1003 Total- 0 €
1004Inspection and Maintenance of POL Separators Systems at Garmisch-Patenkirchen- 1st Option Year
B031Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA
B032Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.10Net Ton
B033Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.7EA
B034Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.1EA
B035Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA
B036Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA
B037Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 201EA
B038Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
B039Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
B040Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA
CLIN 1004 Total- 0 €
Total:- 0 €

POL Separators 2nd Option Year

ITEMELINDescriptionQTYUNITUNIT PriceTotal Amount
2001Inspection and Maintenance of POL Separators Systems at Hohenfels - 2nd Option Year
C001Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA
C002Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.145Net Ton
C003Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.56EA
C004Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.6EA
C005Replacement of defective alarm systems, including all required labor, materials, tools, etc.2EA
C006Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 102EA
C007Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 203EA
C008Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
C009Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
C010Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA
CLIN 2001 Total- 0 €
2002Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 2nd Option Year
C011Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA
C012Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.650Net Ton
C013Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.125EA
C014Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.13EA
C015Replacement of defective alarm systems, including all required labor, materials, tools, etc.4EA
C016Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 104EA
C017Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 206EA
C018Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 402EA
C019Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1302EA
C020Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

10EA
CLIN 2002 Total- 0 €
2003Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilseck- 2nd Option Year
C021Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA
C022Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.260Net Ton
C023Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.42EA
C024Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.4EA
C025Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA
C026Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA
C027Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 202EA
C028Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
C029Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
C030Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

8EA
CLIN 2003 Total- 0 €
2004Inspection and Maintenance of POL Separators Systems at Garmisch-Patenkirchen- 2nd Option Year
C031Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA
C032Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.10Net Ton
C033Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.7EA
C034Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.1EA
C035Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA
C036Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA
C037Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 201EA
C038Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
C039Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
C040Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA
CLIN 2004 Total- 0 €
Total:- 0 €

POL Separators 3rd Option Year

ITEMELINDescriptionQTYUNITUNIT PriceTotal Amount
3001Inspection and Maintenance of POL Separators Systems at Hohenfels - 3rd Option Year
D001Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA
D002Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.145Net Ton
D003Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.56EA
D004Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.6EA
D005Replacement of defective alarm systems, including all required labor, materials, tools, etc.2EA
D006Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 102EA
D007Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 203EA
D008Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
D009Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
D010Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA
CLIN 3001 Total- 0 €
3002Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 3rd Option Year
D011Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA
D012Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.650Net Ton
D013Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.125EA
D014Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.13EA
D015Replacement of defective alarm systems, including all required labor, materials, tools, etc.4EA
D016Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 104EA
D017Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 206EA
D018Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 402EA
D019Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1302EA
D020Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

15EA
CLIN 3002 Total- 0 €
3003Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilseck- 3rd Option Year
D021Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA
D022Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.260Net Ton
D023Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.42EA
D024Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.4EA
D025Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA
D026Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA
D027Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 202EA
D028Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
D029Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
D030Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

2EA
CLIN 3003 Total- 0 €
3004Inspection and Maintenance of POL Separators Systems at Garmisch-Patenkirchen- 3rd Option Year
D031Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA
D032Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.10Net Ton
D033Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.7EA
D034Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.1EA
D035Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA
D036Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA
D037Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 201EA
D038Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
D039Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
D040Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA
CLIN 3004 Total- 0 €
Total:- 0 €

POL Separators 4th Option Year

ITEMELINDescriptionQTYUNITUNIT PriceTotal Amount
4001Inspection and Maintenance of POL Separators Systems at Hohenfels - 4th Option Year
E001Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA
E002Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.320Net Ton
E003Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.56EA
E004Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.6EA
E005Replacement of defective alarm systems, including all required labor, materials, tools, etc.2EA
E006Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 102EA
E007Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 203EA
E008Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA
E009Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA
E010Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA
CLIN 4001 Total- 0 €
4002Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 4th Option Year
E011Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA
E012Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.650Net Ton
E013Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.125EA
E014Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.13EA