This document is an Exhibit Line Item Number (ELIN) sheet for a federal contract opportunity related to the inspection and maintenance of petroleum, oil, and lubricant (POL) separators at various locations within the U.S. Army Garrison (USAG) Bavaria in Germany.
The contract requires the contractor to provide all personnel, equipment, and services necessary to perform monthly maintenance and inspection, cleaning, water sample collection, and replacement of defective components for POL separators ranging in size from NG 3 to NG 130. The work is mandated by German wastewater disposal laws and includes a base year and four one-year option periods. Pricing is provided for specific line items at each location, including Hohenfels, Tower Barracks Grafenwoehr, Rose Barracks Vilseck, and Garmisch-Partenkirchen. The contract is being solicited by the Department of the Army Materiel Command Army Contracting Command under Solicitation Number W912PB24R3000.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POL Separators Basic Year
| ITEM | ELIN | Description | QTY | UNIT | UNIT Price | Total Amount |
| 0001 | Inspection and Maintenance of POL Separators Systems at Hohenfels - Basic Year | |||||
| A001 | Monthly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | |||
| A002 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 145 | Net Ton | |||
| A003 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 56 | EA | |||
| A004 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 6 | EA | |||
| A005 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 2 | EA | |||
| A006 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 2 | EA | |||
| A007 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 3 | EA | |||
| A008 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| A009 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| A010 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 56 | EA | |||||
| CLIN 0001 Total | - 0 € | |||||
| 0002 | Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - Basic Year | |||||
| A011 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | |||
| A012 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 650 | Net Ton | |||
| A013 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 125 | EA | - 0 € | ||
| A014 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 13 | EA | |||
| A015 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 4 | EA | |||
| A016 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 4 | EA | |||
| A017 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 6 | EA | |||
| A018 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 2 | EA | |||
| A019 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 2 | EA | |||
| A020 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 85 | EA | |||||
| CLIN 0002 Total | - 0 € | |||||
| 0003 | Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilseck- Basic Year | |||||
| A021 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | |||
| A022 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 260 | Net Ton | |||
| A023 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 42 | EA | |||
| A024 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 4 | EA | |||
| A025 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| A026 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | |||
| A027 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 2 | EA | |||
| A028 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| A029 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| A030 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 23 | EA | |||||
| CLIN 0003 Total | - 0 € | |||||
| 0004 | Inspection and Maintenance of POL Separators Systems at Garmisch-Patenkirchen- Basic Year | |||||
| A031 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | |||
| A032 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 10 | Net Ton | |||
| A033 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 7 | EA | |||
| A034 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| A035 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| A036 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | |||
| A037 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 1 | EA | |||
| A038 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| A039 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| A040 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 7 | EA | ||
| CLIN 0004 Total | - 0 € | ||
| Total: | - 0 € |
POL Separators 1st Option Year
| ITEM | ELIN | Description | QTY | UNIT | UNIT Price | Total Amount |
| 1001 | Inspection and Maintenance of POL Separators Systems at Hohenfels - 1st Option Year | |||||
| B001 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | |||
| B002 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 145 | Net Ton | |||
| B003 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 56 | EA | |||
| B004 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 6 | EA | |||
| B005 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 2 | EA | |||
| B006 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 2 | EA | |||
| B007 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 3 | EA | |||
| B008 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| B009 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| B010 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | |||||
| CLIN 1001 Total | - 0 € | |||||
| 1002 | Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 1st Option Year | |||||
| B011 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | |||
| B012 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 650 | Net Ton | |||
| B013 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 125 | EA | |||
| B014 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 13 | EA | |||
| B015 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 4 | EA | |||
| B016 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 4 | EA | |||
| B017 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 6 | EA | |||
| B018 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 2 | EA | |||
| B019 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 2 | EA | |||
| B020 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | |||||
| CLIN 1002 Total | - 0 € | |||||
| 1003 | Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilseck- 1st Option Year | |||||
| B021 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | |||
| B022 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 260 | Net Ton | |||
| B023 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 42 | EA | |||
| B024 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 4 | EA | |||
| B025 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| B026 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | |||
| B027 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 2 | EA | |||
| B028 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| B029 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| B030 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 9 | EA | |||||
| CLIN 1003 Total | - 0 € | |||||
| 1004 | Inspection and Maintenance of POL Separators Systems at Garmisch-Patenkirchen- 1st Option Year | |||||
| B031 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | |||
| B032 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 10 | Net Ton | |||
| B033 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 7 | EA | |||
| B034 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| B035 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| B036 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | |||
| B037 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 1 | EA | |||
| B038 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| B039 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| B040 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | ||
| CLIN 1004 Total | - 0 € | ||
| Total: | - 0 € |
POL Separators 2nd Option Year
| ITEM | ELIN | Description | QTY | UNIT | UNIT Price | Total Amount |
| 2001 | Inspection and Maintenance of POL Separators Systems at Hohenfels - 2nd Option Year | |||||
| C001 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | |||
| C002 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 145 | Net Ton | |||
| C003 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 56 | EA | |||
| C004 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 6 | EA | |||
| C005 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 2 | EA | |||
| C006 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 2 | EA | |||
| C007 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 3 | EA | |||
| C008 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| C009 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| C010 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | |||||
| CLIN 2001 Total | - 0 € | |||||
| 2002 | Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 2nd Option Year | |||||
| C011 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | |||
| C012 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 650 | Net Ton | |||
| C013 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 125 | EA | |||
| C014 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 13 | EA | |||
| C015 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 4 | EA | |||
| C016 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 4 | EA | |||
| C017 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 6 | EA | |||
| C018 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 2 | EA | |||
| C019 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 2 | EA | |||
| C020 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 10 | EA | |||||
| CLIN 2002 Total | - 0 € | |||||
| 2003 | Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilseck- 2nd Option Year | |||||
| C021 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | |||
| C022 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 260 | Net Ton | |||
| C023 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 42 | EA | |||
| C024 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 4 | EA | |||
| C025 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| C026 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | |||
| C027 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 2 | EA | |||
| C028 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| C029 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| C030 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 8 | EA | |||||
| CLIN 2003 Total | - 0 € | |||||
| 2004 | Inspection and Maintenance of POL Separators Systems at Garmisch-Patenkirchen- 2nd Option Year | |||||
| C031 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | |||
| C032 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 10 | Net Ton | |||
| C033 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 7 | EA | |||
| C034 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| C035 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| C036 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | |||
| C037 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 1 | EA | |||
| C038 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| C039 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| C040 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | ||
| CLIN 2004 Total | - 0 € | ||
| Total: | - 0 € |
POL Separators 3rd Option Year
| ITEM | ELIN | Description | QTY | UNIT | UNIT Price | Total Amount |
| 3001 | Inspection and Maintenance of POL Separators Systems at Hohenfels - 3rd Option Year | |||||
| D001 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | |||
| D002 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 145 | Net Ton | |||
| D003 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 56 | EA | |||
| D004 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 6 | EA | |||
| D005 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 2 | EA | |||
| D006 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 2 | EA | |||
| D007 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 3 | EA | |||
| D008 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| D009 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| D010 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | |||||
| CLIN 3001 Total | - 0 € | |||||
| 3002 | Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 3rd Option Year | |||||
| D011 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | |||
| D012 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 650 | Net Ton | |||
| D013 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 125 | EA | |||
| D014 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 13 | EA | |||
| D015 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 4 | EA | |||
| D016 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 4 | EA | |||
| D017 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 6 | EA | |||
| D018 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 2 | EA | |||
| D019 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 2 | EA | |||
| D020 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 15 | EA | |||||
| CLIN 3002 Total | - 0 € | |||||
| 3003 | Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilseck- 3rd Option Year | |||||
| D021 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | |||
| D022 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 260 | Net Ton | |||
| D023 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 42 | EA | |||
| D024 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 4 | EA | |||
| D025 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| D026 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | |||
| D027 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 2 | EA | |||
| D028 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| D029 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| D030 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 2 | EA | |||||
| CLIN 3003 Total | - 0 € | |||||
| 3004 | Inspection and Maintenance of POL Separators Systems at Garmisch-Patenkirchen- 3rd Option Year | |||||
| D031 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | |||
| D032 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 10 | Net Ton | |||
| D033 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 7 | EA | |||
| D034 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| D035 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | |||
| D036 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | |||
| D037 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 1 | EA | |||
| D038 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| D039 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| D040 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | ||
| CLIN 3004 Total | - 0 € | ||
| Total: | - 0 € |
POL Separators 4th Option Year
| ITEM | ELIN | Description | QTY | UNIT | UNIT Price | Total Amount |
| 4001 | Inspection and Maintenance of POL Separators Systems at Hohenfels - 4th Option Year | |||||
| E001 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | |||
| E002 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 320 | Net Ton | |||
| E003 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 56 | EA | |||
| E004 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 6 | EA | |||
| E005 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 2 | EA | |||
| E006 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 2 | EA | |||
| E007 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 3 | EA | |||
| E008 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | |||
| E009 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | |||
| E010 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | |||||
| CLIN 4001 Total | - 0 € | |||||
| 4002 | Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 4th Option Year | |||||
| E011 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | |||
| E012 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 650 | Net Ton | |||
| E013 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 125 | EA | |||
| E014 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 13 | EA |