Attachment 3 - Exhibit Line Item Number sheet (ELINs).xlsx

XLSX spreadsheet 32 KB Posted

Attached to
POL Separators Inspection and Maintenance Services at USAG Bavaria Hohenfels, Tower Barracks Grafenwoehr, Rose Barracks Vilseck and Garmisch-Partenkirchen.
Solicitation number
W912PB24R3000
Issued by

About this file

This document contains an exhibit line item number (ELIN) sheet for a solicitation to provide inspection and maintenance services for petroleum, oil, and lubricant (POL) separators at various U.S. Army Garrison Bavaria locations in Germany. The contractor shall perform monthly inspections and maintenance, cleaning, water sampling, and replacement of defective sensors, alarm systems, and coalescing filter materials for POL separators ranging in size from nominal gauge 3 to 130. Services will be provided at Hohenfels, Tower Barracks Grafenwoehr, Rose Barracks Vilseck, and Garmisch-Partenkirchen over a one-year base period and four one-year option periods. The ELIN sheet provides descriptions and estimated quantities for recurring maintenance tasks and replacement items but lists unit prices as TBD, as this appears to be a requirements-type solicitation rather than a firm-fixed-price contract.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Basic Period

CLINELINDescriptionQTYUNITUNIT PriceTotal Amount
0001Inspection and Maintenance of POL Separators Systems at Hohenfels - Basic Year
A001Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA- 0 €
A002Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.145Net Ton- 0 €
A003Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.65EA- 0 €
A004Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.6EA- 0 €
A005Replacement of defective alarm systems, including all required labor, materials, tools, etc.2EA- 0 €
A006Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 102EA- 0 €
A007Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 203EA- 0 €
A008Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
A009Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
A010Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA- 0 €
CLIN 0001 Total- 0 €
0002Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - Basic Year
A011Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
A012Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.650Net Ton- 0 €
A013Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.149EA- 0 €
A014Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.13EA- 0 €
A015Replacement of defective alarm systems, including all required labor, materials, tools, etc.4EA- 0 €
A016Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 104EA- 0 €
A017Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 206EA- 0 €
A018Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 402EA- 0 €
A019Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1302EA- 0 €
A020Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

30EA- 0 €
CLIN 0002 Total- 0 €
0003Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilsek- Basic Year
A021Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
A022Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.260Net Ton- 0 €
A023Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.40EA- 0 €
A024Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.4EA- 0 €
A025Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
A026Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA- 0 €
A027Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 202EA- 0 €
A028Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
A029Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
A030Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

8EA- 0 €
CLIN 0003 Total- 0 €
0004Inspection and Maintenance of POL Separators Systems at Garmisch-Partenkirchen- Basic Year
A031Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
A032Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.10Net Ton- 0 €
A033Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.6EA- 0 €
A034Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
A035Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
A036Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA- 0 €
A037Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 201EA- 0 €
A038Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
A039Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
A040Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA- 0 €
CLIN 0004 Total- 0 €
Total:- 0 €

1st Option Period

CLINELINDescriptionQTYUNITUNIT PriceTotal Amount
1001Inspection and Maintenance of POL Separators Systems at Hohenfels - 1st Option Year
B001Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA- 0 €
B002Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.145Net Ton- 0 €
B003Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.65EA- 0 €
B004Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.6EA- 0 €
B005Replacement of defective alarm systems, including all required labor, materials, tools, etc.2EA- 0 €
B006Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 102EA- 0 €
B007Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 203EA- 0 €
B008Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
B009Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
B010Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA- 0 €
CLIN 1001 Total- 0 €
1002Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 1st Option Year
B011Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
B012Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.650Net Ton- 0 €
B013Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.149EA- 0 €
B014Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.13EA- 0 €
B015Replacement of defective alarm systems, including all required labor, materials, tools, etc.4EA- 0 €
B016Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 104EA- 0 €
B017Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 206EA- 0 €
B018Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 402EA- 0 €
B019Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1302EA- 0 €
B020Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

30EA- 0 €
CLIN 1002 Total- 0 €
1003Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilsek- 1st Option Year
B021Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
B022Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.260Net Ton- 0 €
B023Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.40EA- 0 €
B024Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.4EA- 0 €
B025Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
B026Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA- 0 €
B027Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 202EA- 0 €
B028Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
B029Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
B030Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

8EA- 0 €
CLIN 1003 Total- 0 €
1004Inspection and Maintenance of POL Separators Systems at Garmisch-Partenkirchen- 1st Option Year
B031Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
B032Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.10Net Ton- 0 €
B033Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.6EA- 0 €
B034Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
B035Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
B036Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA- 0 €
B037Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 201EA- 0 €
B038Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
B039Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
B040Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA- 0 €
CLIN 1004 Total- 0 €
Total:- 0 €

2nd Option Period

CLINELINDescriptionQTYUNITUNIT PriceTotal Amount
2001Inspection and Maintenance of POL Separators Systems at Hohenfels - 2nd Option Year
C001Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA- 0 €
C002Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.145Net Ton- 0 €
C003Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.65EA- 0 €
C004Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.6EA- 0 €
C005Replacement of defective alarm systems, including all required labor, materials, tools, etc.2EA- 0 €
C006Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 102EA- 0 €
C007Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 203EA- 0 €
C008Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
C009Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
C010Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA- 0 €
CLIN 2001 Total- 0 €
2002Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 2nd Option Year
C011Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
C012Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.650Net Ton- 0 €
C013Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.149EA- 0 €
C014Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.13EA- 0 €
C015Replacement of defective alarm systems, including all required labor, materials, tools, etc.4EA- 0 €
C016Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 104EA- 0 €
C017Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 206EA- 0 €
C018Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 402EA- 0 €
C019Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1302EA- 0 €
C020Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

30EA- 0 €
CLIN 2002 Total- 0 €
2003Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilsek- 2nd Option Year
C021Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
C022Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.260Net Ton- 0 €
C023Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.40EA- 0 €
C024Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.4EA- 0 €
C025Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
C026Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA- 0 €
C027Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 202EA- 0 €
C028Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
C029Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
C030Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

8EA- 0 €
CLIN 2003 Total- 0 €
2004Inspection and Maintenance of POL Separators Systems at Garmisch-Partenkirchen- 2nd Option Year
C031Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
C032Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.10Net Ton- 0 €
C033Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.6EA- 0 €
C034Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
C035Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
C036Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA- 0 €
C037Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 201EA- 0 €
C038Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
C039Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
C040Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA- 0 €
CLIN 2004 Total- 0 €
Total:- 0 €

3rd Option Period

CLINELINDescriptionQTYUNITUNIT PriceTotal Amount
3001Inspection and Maintenance of POL Separators Systems at Hohenfels - 3rd Option Year
D001Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA- 0 €
D002Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.145Net Ton- 0 €
D003Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.65EA- 0 €
D004Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.6EA- 0 €
D005Replacement of defective alarm systems, including all required labor, materials, tools, etc.2EA- 0 €
D006Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 102EA- 0 €
D007Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 203EA- 0 €
D008Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
D009Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
D010Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA- 0 €
CLIN 3001 Total- 0 €
3002Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 3th Option Year
D011Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
D012Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.650Net Ton- 0 €
D013Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.149EA- 0 €
D014Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.13EA- 0 €
D015Replacement of defective alarm systems, including all required labor, materials, tools, etc.4EA- 0 €
D016Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 104EA- 0 €
D017Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 206EA- 0 €
D018Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 402EA- 0 €
D019Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1302EA- 0 €
D020Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

30EA- 0 €
CLIN 3002 Total- 0 €
3003Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilsek- 3th Option Year
D021Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
D022Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.260Net Ton- 0 €
D023Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.40EA- 0 €
D024Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.4EA- 0 €
D025Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
D026Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA- 0 €
D027Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 202EA- 0 €
D028Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
D029Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
D030Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

8EA- 0 €
CLIN 3003 Total- 0 €
3004Inspection and Maintenance of POL Separators Systems at Garmisch-Partenkirchen- 3th Option Year
D031Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description0EA- 0 €
D032Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.10Net Ton- 0 €
D033Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.6EA- 0 €
D034Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
D035Replacement of defective alarm systems, including all required labor, materials, tools, etc.1EA- 0 €
D036Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 101EA- 0 €
D037Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 201EA- 0 €
D038Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
D039Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
D040Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

1EA- 0 €
CLIN 3004 Total- 0 €
Total:- 0 €

4th Option Period

CLINELINDescriptionQTYUNITUNIT PriceTotal Amount
4001Inspection and Maintenance of POL Separators Systems at Hohenfels - 4th Option Year
E001Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description12EA- 0 €
E002Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum.320Net Ton- 0 €
E003Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed.65EA- 0 €
E004Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc.6EA- 0 €
E005Replacement of defective alarm systems, including all required labor, materials, tools, etc.2EA- 0 €
E006Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 102EA- 0 €
E007Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 203EA- 0 €
E008Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 401EA- 0 €
E009Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 1301EA- 0 €
E010Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6

for light media separators and high efficiency separators, sizes between NG3 and NG 130

65EA- 0 €
CLIN 4001 Total- 0 €
4002Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - Basic Year

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .