Attachment 3 - Exhibit Line Item Number sheet (ELINs).xlsx
XLSX spreadsheet 32 KB Posted
- Solicitation number
- W912PB24R3000
About this file
This document contains an exhibit line item number (ELIN) sheet for a solicitation to provide inspection and maintenance services for petroleum, oil, and lubricant (POL) separators at various U.S. Army Garrison Bavaria locations in Germany. The contractor shall perform monthly inspections and maintenance, cleaning, water sampling, and replacement of defective sensors, alarm systems, and coalescing filter materials for POL separators ranging in size from nominal gauge 3 to 130. Services will be provided at Hohenfels, Tower Barracks Grafenwoehr, Rose Barracks Vilseck, and Garmisch-Partenkirchen over a one-year base period and four one-year option periods. The ELIN sheet provides descriptions and estimated quantities for recurring maintenance tasks and replacement items but lists unit prices as TBD, as this appears to be a requirements-type solicitation rather than a firm-fixed-price contract.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Basic Period
| CLIN | ELIN | Description | QTY | UNIT | UNIT Price | Total Amount |
| 0001 | Inspection and Maintenance of POL Separators Systems at Hohenfels - Basic Year | |||||
| A001 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | - 0 € | ||
| A002 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 145 | Net Ton | - 0 € | ||
| A003 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 65 | EA | - 0 € | ||
| A004 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 6 | EA | - 0 € | ||
| A005 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 2 | EA | - 0 € | ||
| A006 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 2 | EA | - 0 € | ||
| A007 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 3 | EA | - 0 € | ||
| A008 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| A009 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| A010 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | - 0 € | ||||
| CLIN 0001 Total | - 0 € | |||||
| 0002 | Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - Basic Year | |||||
| A011 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| A012 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 650 | Net Ton | - 0 € | ||
| A013 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 149 | EA | - 0 € | ||
| A014 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 13 | EA | - 0 € | ||
| A015 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 4 | EA | - 0 € | ||
| A016 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 4 | EA | - 0 € | ||
| A017 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 6 | EA | - 0 € | ||
| A018 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 2 | EA | - 0 € | ||
| A019 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 2 | EA | - 0 € | ||
| A020 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 30 | EA | - 0 € | ||||
| CLIN 0002 Total | - 0 € | |||||
| 0003 | Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilsek- Basic Year | |||||
| A021 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| A022 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 260 | Net Ton | - 0 € | ||
| A023 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 40 | EA | - 0 € | ||
| A024 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 4 | EA | - 0 € | ||
| A025 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| A026 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | - 0 € | ||
| A027 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 2 | EA | - 0 € | ||
| A028 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| A029 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| A030 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 8 | EA | - 0 € | ||||
| CLIN 0003 Total | - 0 € | |||||
| 0004 | Inspection and Maintenance of POL Separators Systems at Garmisch-Partenkirchen- Basic Year | |||||
| A031 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| A032 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 10 | Net Ton | - 0 € | ||
| A033 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 6 | EA | - 0 € | ||
| A034 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| A035 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| A036 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | - 0 € | ||
| A037 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 1 | EA | - 0 € | ||
| A038 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| A039 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| A040 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | - 0 € | ||
| CLIN 0004 Total | - 0 € | |||
| Total: | - 0 € |
1st Option Period
| CLIN | ELIN | Description | QTY | UNIT | UNIT Price | Total Amount |
| 1001 | Inspection and Maintenance of POL Separators Systems at Hohenfels - 1st Option Year | |||||
| B001 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | - 0 € | ||
| B002 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 145 | Net Ton | - 0 € | ||
| B003 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 65 | EA | - 0 € | ||
| B004 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 6 | EA | - 0 € | ||
| B005 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 2 | EA | - 0 € | ||
| B006 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 2 | EA | - 0 € | ||
| B007 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 3 | EA | - 0 € | ||
| B008 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| B009 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| B010 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | - 0 € | ||||
| CLIN 1001 Total | - 0 € | |||||
| 1002 | Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 1st Option Year | |||||
| B011 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| B012 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 650 | Net Ton | - 0 € | ||
| B013 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 149 | EA | - 0 € | ||
| B014 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 13 | EA | - 0 € | ||
| B015 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 4 | EA | - 0 € | ||
| B016 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 4 | EA | - 0 € | ||
| B017 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 6 | EA | - 0 € | ||
| B018 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 2 | EA | - 0 € | ||
| B019 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 2 | EA | - 0 € | ||
| B020 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 30 | EA | - 0 € | ||||
| CLIN 1002 Total | - 0 € | |||||
| 1003 | Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilsek- 1st Option Year | |||||
| B021 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| B022 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 260 | Net Ton | - 0 € | ||
| B023 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 40 | EA | - 0 € | ||
| B024 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 4 | EA | - 0 € | ||
| B025 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| B026 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | - 0 € | ||
| B027 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 2 | EA | - 0 € | ||
| B028 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| B029 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| B030 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 8 | EA | - 0 € | ||||
| CLIN 1003 Total | - 0 € | |||||
| 1004 | Inspection and Maintenance of POL Separators Systems at Garmisch-Partenkirchen- 1st Option Year | |||||
| B031 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| B032 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 10 | Net Ton | - 0 € | ||
| B033 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 6 | EA | - 0 € | ||
| B034 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| B035 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| B036 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | - 0 € | ||
| B037 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 1 | EA | - 0 € | ||
| B038 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| B039 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| B040 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | - 0 € | ||
| CLIN 1004 Total | - 0 € | |||
| Total: | - 0 € |
2nd Option Period
| CLIN | ELIN | Description | QTY | UNIT | UNIT Price | Total Amount |
| 2001 | Inspection and Maintenance of POL Separators Systems at Hohenfels - 2nd Option Year | |||||
| C001 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | - 0 € | ||
| C002 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 145 | Net Ton | - 0 € | ||
| C003 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 65 | EA | - 0 € | ||
| C004 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 6 | EA | - 0 € | ||
| C005 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 2 | EA | - 0 € | ||
| C006 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 2 | EA | - 0 € | ||
| C007 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 3 | EA | - 0 € | ||
| C008 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| C009 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| C010 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | - 0 € | ||||
| CLIN 2001 Total | - 0 € | |||||
| 2002 | Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 2nd Option Year | |||||
| C011 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| C012 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 650 | Net Ton | - 0 € | ||
| C013 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 149 | EA | - 0 € | ||
| C014 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 13 | EA | - 0 € | ||
| C015 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 4 | EA | - 0 € | ||
| C016 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 4 | EA | - 0 € | ||
| C017 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 6 | EA | - 0 € | ||
| C018 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 2 | EA | - 0 € | ||
| C019 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 2 | EA | - 0 € | ||
| C020 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 30 | EA | - 0 € | ||||
| CLIN 2002 Total | - 0 € | |||||
| 2003 | Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilsek- 2nd Option Year | |||||
| C021 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| C022 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 260 | Net Ton | - 0 € | ||
| C023 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 40 | EA | - 0 € | ||
| C024 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 4 | EA | - 0 € | ||
| C025 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| C026 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | - 0 € | ||
| C027 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 2 | EA | - 0 € | ||
| C028 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| C029 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| C030 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 8 | EA | - 0 € | ||||
| CLIN 2003 Total | - 0 € | |||||
| 2004 | Inspection and Maintenance of POL Separators Systems at Garmisch-Partenkirchen- 2nd Option Year | |||||
| C031 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| C032 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 10 | Net Ton | - 0 € | ||
| C033 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 6 | EA | - 0 € | ||
| C034 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| C035 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| C036 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | - 0 € | ||
| C037 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 1 | EA | - 0 € | ||
| C038 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| C039 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| C040 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | - 0 € | ||
| CLIN 2004 Total | - 0 € | |||
| Total: | - 0 € |
3rd Option Period
| CLIN | ELIN | Description | QTY | UNIT | UNIT Price | Total Amount |
| 3001 | Inspection and Maintenance of POL Separators Systems at Hohenfels - 3rd Option Year | |||||
| D001 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | - 0 € | ||
| D002 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 145 | Net Ton | - 0 € | ||
| D003 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 65 | EA | - 0 € | ||
| D004 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 6 | EA | - 0 € | ||
| D005 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 2 | EA | - 0 € | ||
| D006 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 2 | EA | - 0 € | ||
| D007 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 3 | EA | - 0 € | ||
| D008 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| D009 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| D010 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | - 0 € | ||||
| CLIN 3001 Total | - 0 € | |||||
| 3002 | Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - 3th Option Year | |||||
| D011 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| D012 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 650 | Net Ton | - 0 € | ||
| D013 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 149 | EA | - 0 € | ||
| D014 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 13 | EA | - 0 € | ||
| D015 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 4 | EA | - 0 € | ||
| D016 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 4 | EA | - 0 € | ||
| D017 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 6 | EA | - 0 € | ||
| D018 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 2 | EA | - 0 € | ||
| D019 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 2 | EA | - 0 € | ||
| D020 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 30 | EA | - 0 € | ||||
| CLIN 3002 Total | - 0 € | |||||
| 3003 | Inspection and Maintenance of POL Separators Systems at Rose Barracks Vilsek- 3th Option Year | |||||
| D021 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| D022 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 260 | Net Ton | - 0 € | ||
| D023 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 40 | EA | - 0 € | ||
| D024 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 4 | EA | - 0 € | ||
| D025 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| D026 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | - 0 € | ||
| D027 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 2 | EA | - 0 € | ||
| D028 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| D029 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| D030 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 8 | EA | - 0 € | ||||
| CLIN 3003 Total | - 0 € | |||||
| 3004 | Inspection and Maintenance of POL Separators Systems at Garmisch-Partenkirchen- 3th Option Year | |||||
| D031 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 0 | EA | - 0 € | ||
| D032 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 10 | Net Ton | - 0 € | ||
| D033 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 6 | EA | - 0 € | ||
| D034 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| D035 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 1 | EA | - 0 € | ||
| D036 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 1 | EA | - 0 € | ||
| D037 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 1 | EA | - 0 € | ||
| D038 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| D039 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| D040 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 1 | EA | - 0 € | ||
| CLIN 3004 Total | - 0 € | |||
| Total: | - 0 € |
4th Option Period
| CLIN | ELIN | Description | QTY | UNIT | UNIT Price | Total Amount |
| 4001 | Inspection and Maintenance of POL Separators Systems at Hohenfels - 4th Option Year | |||||
| E001 | Montly Maintenance and Inspection of Slidge and POL Separators, recording, preparation of logbooks in accordance with the service description | 12 | EA | - 0 € | ||
| E002 | Cleaning of sludge traps, POL separators-inlets and oil separators of different manufactureas and of different rated sizes, as well as the disposal of oil separator residues at certified disposal and recycling plants in accordance with the PWS. This is a fixed price ELIN that will be paid based on the actual quantity disposed in accordance with 52.211-18 and the addendum. | 320 | Net Ton | - 0 € | ||
| E003 | Collection of water samples from each POL separator once a year, including provision of lab analysis and generation of lab results in accordance with the PWS. Cost per sample collected and analysed. | 65 | EA | - 0 € | ||
| E004 | Replacement of defective sensor for alarm systems, including all required labor, materials, tools, etc. | 6 | EA | - 0 € | ||
| E005 | Replacement of defective alarm systems, including all required labor, materials, tools, etc. | 2 | EA | - 0 € | ||
| E006 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 3 to NG 10 | 2 | EA | - 0 € | ||
| E007 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 15 to NG 20 | 3 | EA | - 0 € | ||
| E008 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 30 to NG 40 | 1 | EA | - 0 € | ||
| E009 | Replacement of coalescence filter materials. Included is the removal of the old filter material from the separator, installation of new filter material, including all necessary side work, labor, tools and equipment. Also included is the disposal of the old filter material. Payment will be done per unit (separator) replace, pament is done per Nominal size from NG 50 to NG 130 | 1 | EA | - 0 € | ||
| E010 | Performance of General Inspection, 5-yearly examination after DIN1999-100, point 14.6 |
for light media separators and high efficiency separators, sizes between NG3 and NG 130
| 65 | EA | - 0 € | ||||
| CLIN 4001 Total | - 0 € | |||||
| 4002 | Inspection and Maintenance of POL Separators Systems at Tower Barracks Grafenwoehr - Basic Year |