A12._Questions_and_Answers_I.pdf

PDF 326 KB Posted

Attached to
Fiber Optic Cable Retermination Federal contract opportunity
Solicitation number
W912P919T0042
Issued by
Department of the Army Corps of Engineers Engineering District St Louis

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Question- Will all or portions of the 10,000LF of supplied fiber optic cable have to be installed by the contractor?

Answer- No, supply only.

2. Question- Is the Pre-Bid Mandatory? (the Government assumes this is referring to the Site Visit)

Answer- No.

3. Question- No Bid Submittal Instructions other than the Project Pricer Sheet are provided. Is this the only Bid Submittal Required?

Answer – Yes. The Bid Schedule (Section B) needs to be filled out completely.

4. Question- The Project Specific Davis- Bacon Wage Determination?

Answer- This is not considered a construction contract. Davis Bacon Wage Determinations don’t apply.

5. Question- Is a Bid Bond and Performance and Payment Bond Required with Bid Submittal?

Answer- No.

6. Question- Finally, the Preliminary Solicitation, indicates this is a Fiber Distribution Panel Installation, Splicing, And Testing Project only. Please confirm that the Switch Equipment, Racks, and Powering Equipment shown in the Project Diagrams, and all the Distribution Fiber is provided and installed by others.

Answer- Confirmed. The scope of the project only includes “Fiber Distribution Panel Installation, Splicing, and Testing.” Other equipment is existing or installed by others.

File details come from the government source that posted it.