A02._Section_B_-_Locks_and_Dam_24_and_25_Fiber_Optic_Retermination_Bidding_Schedule.pdf
PDF 73 KB Posted
- Attached to
- Fiber Optic Cable Retermination
- Solicitation number
- W912P919T0042
About this file
Bidding Schedule
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-1
Section B BIDDING SCHEDULE
Item
No.
Description
Estimated
Quantity
Unit Unit
Price
Estimated
Amount
0001 Supply fiber optic cable for Lock and Dam 25
5,000 LF $______ $______
0002 Supply fiber optic cable for Lock and Dam 24
5,000 LF $______ $______
0003 Supply fiber optic patch panels for Lock and Dam
1 JB $______ $______
0004 Supply fiber optic patch panels for Lock and Dam
1 JB $______ $______
0005 Install patch panels in
MCCs and lock at Lock and Dam 25
1 JOB $______ $______
0006 Install patch panels in
MCCs and lock at Lock and Dam 24
1 JOB $______ $______
0007 Install patch panels on dam at Lock and Dam 25
1 JOB $______ $______
0008 Install patch panels on dam at Lock and Dam 24
1 JOB $______ $______
0009 Fiber optic cable testing
1 JOB $______ $______
TOTAL $______
ABBREVIATIONS
JOB Job
EA Each
(See BIDDING SCHEDULE NOTES)
B-2
BIDDING SCHEDULE NOTES
1. The delivery date for completion of all of the items in the Bid Schedule is 31 May, 2020.
2. All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit is shown as job "JOB".
3. When bids are solicited on a unit price basis, bidders shall insert in the spaces provided therefore in the SCHEDULE both the "unit price" and the "estimated amount" resulting from applying the said unit price to the estimated quantity shown. In event the bidder quotes only a total price
("estimated amount") in its bid and fails to quote the unit price, the
Government will determine such unit price by dividing the total price quoted by the quantity of the item set out in the SCHEDULE. The bidder agrees that the unit price so determined shall be used for the purpose of bid evaluation, award and all payments to the Contractor including final payment.
4. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid and the extension will be corrected accordingly.
5. If a modification to a bid based on unit prices is submitted, which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to each unit price in the bid schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
6. Bidders are required to bid on all items listed on the Bidding Schedule in addition to inserting a total quoted bid in the appropriate space provided. Failure to do so will be considered cause to disqualify the bid.
File details come from the government source that posted it.