This amendment modifies a solicitation for construction services. The U.S. Army Corps of Engineers seeks to replace the Charenton Floodgate in St. Mary Parish, Louisiana with a new 380-foot flood wall and sector gate structure at an estimated cost of $25-100 million. The scope of work includes clearing, excavation, installation of sheet piling and H-piling, construction of retaining structures, placement of geotextiles and levee embankments, and establishment of turf. The response date for Phase I proposals was extended to April 5, 2022. The amendment also provides contractor questions and answers relating to small business plans and permits.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED 21-019
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Subject Solicitation: W912P822R0006 Atchafalaya River Levees, St. Mary Levee District, Charenton Floodgate, Replacement, St. Mary Parish, Louisiana (ED 21-019)
Volume I Proposal Submission date is 05 April 2022 @ 11:00am Local Time.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Mar-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P822R0006
X 9B. DATED (SEE ITEM 11)
14-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Mar-2022
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P822R0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0005
CONTRACTOR QUESTIONS AND GOVERNMENT RESPONSES
Q1. The documents are not clear as to the submittal of the Small Business Commitment and Small Business Plan, as they relate to pricing which is not part of the phase 1 submittal. Please clarify what portion of the small business plan is to be provided with the phase 1 submittal and what pricing information on the small business plan is to be submitted with phase 1.
Response: The Small Business Commitment Document submittal has been moved to Phase/Volume II. The Small Business Plan will be required after an award has been made.
Q2. It appears that the following statement in Amendment 0004 was inadvertently included (which would leave questions 1 through 49 unanswered):
"The following have been deleted:
AMENDMENT 0003"
Response: Amendment 0003 published on SAM.gov is valid. The message above is a system generated message that is not applicable.
Q3. Other than contractor-related permits (temporary building, SWPPP, DOTD, etc.), what is the status of all required permits for the project?
Response: All required permits have been obtained for the project per the current plans and specifications.
Q4. The answer to question 49 states that no barging would be allowed. Please clarify. Can equipment and material be delivered to the project site via water access as long as no additional permitting is required?
Response: The government has not considered barge access for this project.
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 29-Mar-2022 11:00 AM to 05-Apr-2022 11:00 AM.
(End of Summary of Changes)