W912P822R0006 Am 04.pdf
PDF 573 KB Posted
- Attached to
- Atchafalaya River Levees, St. Mary Levee District. Charenton Floodgate - Replacement. St. Mary, Louisiana
- Solicitation number
- W912P822R0006
About this file
This document is an amendment to a solicitation for the replacement of the Charenton Floodgate on the Atchafalaya River Levees in St. Mary Parish, Louisiana. The work includes clearing and grubbing, excavation, installation of sheet piling, H-piling and pipe piling, construction of a new 380-foot floodwall and sector gate structure, placement of geotextile and levee embankment, miscellaneous metal work, painting, scour protection and turf establishment. The estimated construction value is between $25 million and $100 million.
The amendment provides revisions to proposal submission requirements and evaluation criteria. Offerors must now submit their past performance, technical approach, and key personnel information under Volume I, due by March 29, 2022. Volume II will include pricing and small business commitment documents. Evaluation will consider past performance, technical approach, key personnel, small business commitment, and price. The solicitation is issued as full and open competition by the USACE New Orleans District.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ED 21-019
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Subject Solicitation: W912P822R0006 Atchafalaya River Levees, St. Mary Levee District, Charenton Floodgate, Replacement, St. Mary Parish, Louisiana (ED 21-019)
Volume I Proposal Submission date is 29 March 2022 @ 11:00am Local Time.
1. CONTRACT ID CODE PAGE OF PAGES
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Mar-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P822R0006
X 9B. DATED (SEE ITEM 11)
14-Jan-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Mar-2022
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P822R0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0004
SECTION 00130 PROPOSAL EVALUATION CRITERIA
1. 1.3 EVALUATION FACTORS is deleted in its entirety and replaced with:
a) TECHNICAL NON-COST FACTORS:
FACTOR 1. Past Performance FACTOR 2. Technical Approach FACTOR 3. Key Personnel and Project Management Plan (PMP) FACTOR 4. Small Business Commitment Document (SBCD)
b) COST FACTOR:
FACTOR 5. Price
2. 1.6 SUBMITTAL REQUIREMENTS is deleted in its entirety and replaced with:
Volume I FACTOR 1. Past Performance FACTOR 2. Technical Approach FACTOR 3. Key Personnel and Project Management Plan (PMP)
Volume II FACTOR 4. Small Business Commitment Document (SBCD) FACTOR 5. Price
3. 1.4.1 Evaluation Criteria. Move paragraph 2 and 3 to 1.4 RELATIVE IMPORTANCE OF PRICE TO THE
TECHNICAL EVALUATION FACTORS.
4. 1.5 DEFINITIONS. Delete #1 and replace with the following:
1. Adverse past performance is defined as past performance information that supports a less than satisfactory rating
5. 1.7.1 Table 1b. Description of Substantial Confidence is deleted in its entirety and replaced with the following:
Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.
6. 1.7.1 NON-COST FACTORS 2, 3, 4 AND 5 SHALL BE RATED AS FOLLOWS is changed to NON-
COST FACTORS 2, 3 AND 4 SHALL BE RATED AS FOLLOWS.
7. 1.9.1 Volume I and Volume II inclusions is deleted in its entirety and replaced with:
Volume I shall include:
i. Past Performance: Submittals as stated in Factor 1.
ii. Technical Approach: Submittals as stated in Factor 2.
iii. Key Personnel and Project Management Plan: Submittals as stated in Factor 3.
Items that must be included in VOLUME I, but are EXCLUDED from the page limitation, are:
i. Title sheets and indices
ii. Table of Contents
iii. OSHA forms
iv. CCASS or CPARS, Past Performance Questionnaires (See Attachment 1), and other Contracting
Agency evaluation forms
v. Drawings requested under Factor 2, Technical Approach
vi. Resumes of key personnel
vii. Schedule (additionally Schedules/Gantt Charts are not subject to the 8.5” x 11” size requirement).
viii. Letters of Recommendation, commendation, ratings, etc.
ix. Letter Confirming Availability of Parent/Affiliate Resources (if applicable).
All other items are subject to the 35-page limitation as described above.
Volume II shall include:
i. Small Business Commitment Document: Submittals as stated in Factor 4. (See Attachment 2) (NOTE: Required from both small and large businesses)
ii. Letters of Commitment of Key Subcontractors. (See Attachment 3)
iii. SF 295, Summary Subcontract Report (if applicable).
iv. Standard Form 1442, Solicitation, Offer and Award.
v. Section 00010, Bidding Schedule.
vi. Standard Form 24, Bid Bond.
vii. Section 00600, Representations & Certifications.
Items in Volume II are EXCLUDED from the page number limitation.
CONTRACTOR QUESTIONS AND GOVERNMENT RESPONSES
1. With pricing assumed to be a second submittal down the road, how are we to enter the $ figures required with the small business paperwork?
Response: See revision to SECTION 00130 in this Amendment.
2. Without quantities to price, how are bidders supposed to generate the required Small Business Commitment
Document required for Volume I submittal?
a. Similarly, how are bidders supposed to generate an accurate schedule?
3. Per the Instructions to Bidders from the RFP, only the Volume I of the proposal is due February 14, 2022. It is our opinion that some of the requested information for Volume I cannot be provided until the 100% plans and specifications are released and the pricing for Volume II is completed. The Technical Approach, Small
Business Commitment, and Letters of Commitment of Key Subcontractors cannot be completed until means and methods are identified, and solicitation and selection of subcontractors is completed, which will not be known until the pricing is put together in Volume II. We request that Volume I be limited to Past Performance and Key Personnel and Project Management Plan, and that the remainder of the items requested in Volume I be due with Volume.
4. Can you confirm that what is due on February 14th is only the Volume I package consisting of :
1. Past Performance
2. Technical Approach
3. Key Personnel and Project Management Plan
4. Small Business Commitment Document
5. Will there be an evaluation of these documents and then “qualified” contractors selected or is it simply that we must submit Volume I first?
Response: Per SECTION 00130 para. 1.7.2, any proposal that receives an ‘Unacceptable’ rating is not eligible for award.
6. Do we submit only the Small Business commitment document or do we submit the small business plan as well?
Response: The Small Business Commitment Document is required from all Offerors at time of proposal submission.
5. Will a separate questions period be allowed during the pricing phase?
Response: An Offeror may submit additional questions; however, there is no a guarantee of a response before the bid submission date.
6. Please provide a summary of what is to be included in proposal to meet the requirements of Phase I submittal. It refers to different requirements in different section of the specs.
7. Can the question period be extended as well as the bid date to clarify any answers that may come from Contractors?
Response: An Offeror may submit additional questions; however, there is no guarantee of a response before the bid submission date.
8. 00130-10. Are 11x17 (Tabloid) size pages allowed for graphics (i.e., Project-specific Organizational Chart
(Factor 3), construction sequencing (Factor 2), etc.)? If so, will an 11x17 count as 1-page or 2-pages?
Response: One page.
9. 00130-10. Regardless of size (8.5x111 or 11x17), will the Corps consider eliminating the Project-specific
Organizational Chart from the page-count?
Response: No.
10. 00130-13. The RFP requests a copy of the Offerors Summary Subcontracting Report (SSR) (SF295). Would you please consider excluding the SSR (SF295) from the page count?
11. 00130-13. The RFP requests that the Offeror include “Small business utilization for each of the projects submitted under Factor 1, Past Performance.“ Would you consider excluding the requested Small Business Utilization information from the page limitation.
12. 00130-12 and 00130-15. Would you please consider excluding the Small Business Commitment Document
(Attachment 2) from the page limitation?
13. 00130-12 and 00130-15. Would you please consider excluding the Letters of Commitment of Key
Subcontractors (Attachment 3) from the page limitation?
14. Will USACE consider excluding Factor 4 from the 35-page page-count?
The following have been deleted:
AMENDMENT 0003
(End of Summary of Changes)