A21 AMENDMENT 0008_02SEP2020_PORTFOLIO.pdf
PDF 25 MB Posted
- Solicitation number
- W912P820R0021
About this file
This document summarizes a federal contract solicitation for Mississippi River levee construction work. The solicitation was issued by the U.S. Army Corps of Engineers New Orleans District and seeks contractors to perform excavation, embankment construction, clearing and grubbing, geotextile placement, sheet pile or slurry cut-off installation, and groundwater relief well work between $25 million and $100 million annually. The solicitation is set aside for small businesses with a NAICS code of 237990 and size standard of $39.5 million. Responses were due between July 7th and August 7th, 2020. Task orders will be issued on an individual basis under the multiple award contract and performance periods for each task order could extend beyond the base contract term.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
W912P8-20-R-0021 Project: Mutiple Award task Order Contract (MATOC)
Mississippi River and Tributaries Project (MR&T) Mississippi River Levees Multiple Parishes, Louisiana
Unit Estimated Item Description Quantity
0001 JOB 1
0002 Truck Wash Down Racks JOB 1
0003 Traffic Control and Coordination JOB 1
0004 Clearing and Grubbing AC 2.2
0005 Degrading Existing Levee CY 3500
0006 CY 6500
(doesn't include clearing and grubbing loss)
0007 EA 2
LF 152'
LF 118'
CY 500
CY 82
CY 5.2
CY 2.2
SY 25
0008 JOB 1
CY 477
CY 376
SY 4288
4" wearing Superpave (4"x10'x3859') 3" Base Course (3"x10'x3859') Geogrid (10'x3859')
JOB QTO PAGE 1 OF 1
Mobilization and Demobilization
Embankment, Compacted Fill
Temporary access road Ramp A Ramp B Compacted Fill 7" Surfacing
Asphalt Apron 6" Wearing Course (10'x 14') 3" Base Course (10'x12') Geogrid (10'x10')
4"Asphaltic Pavement
During the lifetime of this project, only one mobilization and demobilization will be required.
Traffic Control and Coordination shall be implemented in accordance with the plans andspecifications and LaDOTD
It is expressly understood that the accuracy of these estimates is in no wise warranted and that the furnishing of this information to a bidder will not relieve him/her of his/hers responsibility to estimate the quantities involved. It is further to be expressly understood in no case will such estimate be used as a basis of a claim against the Government.
sendout
Section 00010 - Solicitation Contract Form
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
NO PRICE REQUIREMENT
AMOUNT
NO PRICE
REQUIREMENT
0001 1 Job Base Period - MR Levee - MATOC
FFP
Base Period - Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) supporting the flood control through the Mississippi River (MR) Levee Construction Project in support of the U.S. Army Corps of Engineers, New Orleans District.
FOB: Destination
PSC CD: Y1QA
NET AMT
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE
AMOUNT
NO PRICE
0002 1 Job 2nd year - MR Levee - MATOC
FFP
2nd Period - Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) supporting the flood control through the Mississippi River (MR) Levee Construction Project in support of the U.S. Army Corps of Engineers, New Orleans District.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Job
3rd year - MR Levee - MATOC
FFP
3rd year Period - Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) supporting the flood control through the Mississippi River (MR) Levee Construction Project in support of the U.S. Army Corps of Engineers, New Orleans District.
0004 1 Job
4th year - MR Levee - MATOC
4th year Period - Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) supporting the flood control through the Mississippi River (MR) Levee Construction Project in support of the U.S. Army Corps of Engineers, New Orleans District.
NO PRICE REQUIREMENT NO PRICE
0005 1 Job
5th year - MR Levee - MATOC
5th year Period - Indefinite Delivery, Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) supporting the flood control through the Mississippi River (MR) Levee Construction Project in support of the U.S. Army Corps of Engineers, New Orleans District.
0006 6 Months
OPTION OPTION TO EXTEND THE TERM OF THE CONTRAC
The purpose of Option CLIN 0006 is to provide the Government the option to extend the term of this contract by written notice to the Contractor within 7 days;
provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 30 days before the contract expires.
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
DRAWINGS
SHEET IDENTIFICATION Nos. G-03, C-01, and C-06. Delete these drawings in their entirety and substitute the attached revised drawings SHEET IDENTIFICATION Nos. G-03, C-01, and C-06 therefore.
:1
G-03
H -8 -4
G -0
.d g n
E
N
R A
L
O T
S
D
IN
X
F
W
B
C
M
K
.L .K
P
V
IA
IO
IS
NEW ORLEANS DISTRICT
IC
IT
IL
Y
IG
IP
2 3
4 5
U
IZ
IDENTIFICATION
SHEET
®of Engineers
US Army Corps
.S
I
P .E
J
P
-1
-B
/L
IV
IB
IE
/0
/2
97-41M
CB
INDEX OF DRAWINGSNO.
DESCRIPTION
MARKS
BENCH ELEVATION
COVER SHEETG-01
G-02
G-03
G-04 TABULATIONS
GENERAL CROSS-REFERENCING SYMBOLS
SECTION/DETAIL)
(CENTERED UNDER
ON SAME DRAWING
SECTION/DETAIL TITLE
SECTION/DETAIL)
ON ANOTHER DRAWING
SECTION/DETAIL TITLE
EACH VIEW)
VIEW SUBTITLE
SCALE:
SUPPLEMENTAL INFORMATION
DETAIL/SECTION
99/999
DETAIL/SECTION
SCALE:
TOP FRONT SIDE
ELEVATION SECTION
SAME DRAWING
VIEW SHOWN ON
SECTION CUT W/
ANOTHER DRAWING
SECTION CUT W/
ANOTHER DRAWING
DETAIL SYMBOL W/
SAME DRAWING
DETAIL SYMBOL W/
99/999
ABBREVIATIONS
* UNLESS OTHERWISE NOTED ON EACH SHEET
GENERAL LEGEND
P.I. POINT
FIRE HYDRANT
MANHOLE
CATCHBASIN
FILL
CUT
SHEETPILE
LEVEE
EXISTING GAS
EXISTING FENCE
OVERHEAD P0WER
EXISTING
WATERMAIN
SANITARY SEWER
LINE (TELEPHONE)
EXISTING COMMUN.
CONSTRUCTION
LIMIT OF
PIPE
EXISTING CULVERT
POWER POLE
C-01
C-02
C-03
GENERAL SOIL BORING
BORING LOCATION
UNDISTURB
C/L
GENERAL NOTES:
LOCATION AND VICINITY MAPS
(B/L)
PROJECT BASELINE
EXIST
MAX
MIN
SST
TYP
MAXIMUM
MINIMUM
MISCELLANEOUS
STAINLESS STEEL
TYPICAL
UNLESS NOTED OTHERWISE
APPROXIMATE
BASELINE
FLOOD SIDE
VERTICAL
DIAMETER
L/S
FS&M
EXPANSION JOINT
STATION
DRAWINGDWG
HEIGHT
NUMBER
SPECIFICATIONS
APPROX
B/L
EL.
EX
DIA
EJ
FT
HT
MISC
MI
OC
NO
OS
SPEC
BOR
UNO
S/P
MISC
AZ AZIMUTH
F/S
LAND SIDE
FERTILIZE, SEED AND MULCH
ELEVATION
EXIST EXISTING
H HORIZONTAL
DIST DISTANCE
P.I.
STA
FEET
SHEET PILE
N.T.S. NOT TO SCALE
P/L PIPELIINE
R/W RIGHT OF WAY
MISCELLANEOUS
ALD
DOTD DEPT. OF TRANS. & DEVELOP.
(CPT)
CONE PENETROMETER
TABULATION OF BENCHMARK (VERTICAL CONTROL)
OFFSET
ON CENTER
"PRIMARY"
EL. 25.70'
B-01
B-04
H-01
CS-01 CROSS SECTIONS
SILT FENCE
EXISTING R/W
BENCHMARK
LIMIT OF CONSTRUCTIONL.O.C.
POINT OF INTERSECTION
C-05
B-02 SOIL BORING LOGS
B-03 SOIL BORING LOGS
TYPICAL DESIGN SECTION
BCITY
EL. 26.67'
LONG: 90° 09' 20.55''
LAT: 29° 56' 58.32''
Y = 529,055.78 X = 3,653,771.72
C-04
WEST JEFFERSON LEVEE DISTRICT
ALGIERS LEVEE DISTRICT
C-06
C-07
C-08
PLAN AND PROFILE, B/L STA. 481+50 TO B/L STA. 494+50
PLAN AND PROFILE, B/L STA. 494+50 TO B/L STA. 507+00
PLAN AND PROFILE, B/L STA. 507+00 TO B/L STA. 520+00
PLAN AND PROFILE, B/L STA. 520+00 TO B/L STA. 524+70
MISCELLANEOUS DETAILS
INDEX OF DRAWINGS, BENCHMARKS, GENERAL NOTES AND LEGEND
STAGE HYDROGRAPH, CARROLLTON AT NEW ORLEANS, LA.
TEMPORARY WORK AREA EASEMENT, "STAGING AREA"
CONCRETE SLOPE PAVEMENTCSP
SOIL BORING LEGEND
SOIL BORING LOGS
CS-02 CROSS SECTIONS
CS-10 CROSS SECTIONS
CS-03 CROSS SECTIONS
CS-04 CROSS SECTIONS
CS-05 CROSS SECTIONS
CS-06 CROSS SECTIONS
CS-07 CROSS SECTIONS
CS-08 CROSS SECTIONS
CS-09 CROSS SECTIONS
C-09 TEMPORARY ACCESS RAMP DETAIL
CS-11
CS-12
CS-13
CS-14
TEMPORARY ACCESS RAMP (A), CROSS SECTIONS
TEMPORARY ACCESS RAMP (B), CROSS SECTIONS
AREA EASEMENT
TEMPORARY WORK
EL. 6.25'
LMS-115
09-185C-1
LONG: 90° 10' 31.88''
LAT: 29° 55' 56.12''
Y = 522,708.87 X = 3,647,560.65
LONG: 90° 10' 28.96''
LAT: 29° 55' 59.73''
Y = 523,075.96 X = 3,647,813.06
NORTHEAST OF A LEVEE RAMP. THE STAMPING ON THE MONUMENT IS UNREADABLE
ON TOP OF THE LEVEE, 13.3 FEET EAST OF A YIELD SIGN, 39.6 FEET SOUTH OF A CHAINLINK FENCE, AND 53.6 FEET
TURN RIGHT; TRAVEL 1.1 MILES TO THE STATION ON THE LEFT. THE STATION IS FOUND IN THE LIMESTONE ROAD
OF HWY 90 AND RIVER ROAD IN AVONDALE, LA, TRAVEL WEST ON RIVER ROAD FOR 0.5 MILES TO HWY 541 AND
OF WESTWEGO, LA, AND 1.8 MILES SOUTHEAST OF HARAHAN, LA. TO REACH THE STATION FROM THE INTERSECTION
THE STATION IS LOCATED IN JEFFERSON PARISH, 2.4 MILES NORTHEAST OF AVONDALE, LA, 2.7 MILES NORTHWEST
OF CENTERLINE OF WALKING PATH ON LEVEE CROWN.
ON HIGHWAY 541 (RIVER ROAD) AND FOLLOW 2.66 MILES TO STATION ON LEFT. STATION IS 9.3 FEET NORTHWEST
HIGHWAY 18. TURN LEFT ON HIGHWAY 18 AND CONTINUE ANOTHER 0.5 MILE TO HIGHWAY 541. TURN RIGHT
THE WESTBANK EXPRESSWAY AND U.S. HIGHWAY 90, PROCEED NORTHEAST ON HIGHWAY 90 0.5 MILE TO
THE STATION IS LOCATED NEAR NEW ORLEANS, LOUISIANA. TO REACH MONUMENT FROM THE INTERSECTION OF
CS-15 TEMPORARY ACCESS RAMP (B), CROSS SECTIONS
SHEET PILE DETAIL
U.S.A.C.E. UNTIED STATE ARMY CORPS OF ENGINEERS
COE CORPS OF ENGINEERS
MILE
88.3 FT EAST OF A POWER POLE
THE PROTECTED SIDE TOE OF THE LEVEE. MARK IS 8.0 FT NW OF THE NW EDGE OF RIVER RD, TURN RIGHT AND PROCEED NE FOR 0.22 MI (0.35 KLM) TO THE MARK ON THE LEFT NEAR
BRIDGE CITY RD FOR 0.73 MI (1.18 KLM) TO THE INTERSECTION OF BRIDGE CITY RD AND RIVER RD, TO REACH THE MARK FROM THE INTERSECTION OF BRIDGE CITY RD AND US HWY 90 PROCEED WEST ON
RD ROAD
BORING
W.J.L.D.
LSSRB
ROAD AND BRIDGES
SPECIFICATIONS FOR
LOUISIANA STANDARD
OVER TO THE NON FEDERAL SPONSOR.
THROUGHOUT THE LIMITS OF THE WORK UNTIL THE COMPLETED PROJECT IS TURNED
THE TURF MAINTENANCE OF THE ENTIRE LEVEE (FLOOD SIDE, LAND SIDE AND BERMS)
21. ONCE GIVEN THE NTP, CONTRACTOR SHALL BE RESPONSIBLE FOR
LAWS AND ORDINANCES INCLUSIVE OF POSTED WEIGHT LIMITS.
20. ALL CONTRACTOR HAULING OPERATIONS SHALL ABIDE BY FEDERAL, STATE AND LOCAL
DURING CONSTRUCTION.
19. CONTRACTOR SHALL KEEP ALL STATE AND FEDERAL HIGHWAYS CLEAN
TO END OF CONTRACT.
18. CONTRACTOR SHALL CLEAN AND REMOVE ALL TRASH WITHIN PROJECT LIMITS PRIOR
LISTED AS LT. (LEFT) OR RT. (RIGHT), UNLESS OTHERWISE NOTED.
17. OFFSETS REFLECT A PERPENDICULAR OFFSET (90 DEGREES) FROM THE B/L
BEEN PREVIOUSLY SET TO ESTABLISH THE PROJECT BASELINE.
ARE 1" PIPES AND 3 1/2" BRASS DISKS. THESE DISKS HAVE
16. ALL BRASS DISKS FOUND IN THE FIELD AND MARKED "COE"
AFFECT THE PERFORMANCE OF THE WORK.
AND INVESTIGATIONS AS NECESSARY TO DETERMINE CONDITIONS WHICH WILL
LOCATIONS. THE CONTRACTOR, AT HIS OWN EXPENSE, MAY MAKE ADDITIONAL SURVEYS
CONDITION OF THE MATERIALS WHICH WILL BE ENCOUNTERED BETWEEN THE BORING
15. THE CONTRACTOR SHALL MAKE HIS OWN INTERPRETATION OF THE CHARACTER AND
OSHA AND ENTERGY REQUIREMENTS, AND USACE SAFETY MANUAL "EM-385-1-1"
14. ALL WORK AROUND HIGH VOLTAGE POWER LINES SHALL BE IN ACCORDANCE WITH
CONSTRUCTION.
HERSELF RELATIVE TO THE EXISTING CONDITIONS PRIOR TO THE START OF
13. CONTRACTOR SHALL VISIT THE SITE OF WORK AND COMPLETELY INFORM HIMSELF /
MOIST TO PREVENT BLOWING.
WITHIN THE LEVEE RIGHT-OF-WAY. THE EMBANKMENT SHALL BE KEPT
UNNECESSARY DUST WHILE TRANSPORTING EARTHEN MATERIAL
12. DUST CONTROL - CONTRACTOR SHALL TAKE MEASURES TO PREVENT
WITH EFFICIENT PERFORMANCE OF THE WORK.
AND OPERATED IN A MANNER TO CAUSE THE LEAST NOISE, CONSISTENT
VEHICLES SHALL BE EQUIPPED WITH STANDARD SOUND MUFFLING DEVICES,
IN THE AREA DURING WORKING HOURS. ALL CONSTRUCTION MACHINERY &
UNNECESSARY NOISE APPROPRIATE FOR THE AMBIENT SOUND LEVELS
11. NOISE CONTROL - CONTRACTOR SHALL TAKE MEASURES TO AVOID
DAMAGE SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
UTILITIES IF DAMAGE OCCURS AS A RESULT OF THEIR NEGLEGENCE. THE
10. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING
A LIST OF ALL UTILITY CONTACTS.
PRIOR TO CONSTRUCTION. SEE SPECIFICATIONS FOR
THE CONTRACTOR'S RESPONSIBILITY TO VERIFY ALL EXISTING UTILITY LOCATIONS
ON INFORMATION PROVIDED BY THE RESPECTIVE UTILITY COMPANIES. IT IS
ARE SHOWN FOR INFORMATIONAL PURPOSES ONLY AND ARE BASED, IN PART,
9. LOCATION OF EXISTING UTILITIES INDICATED ON THE PLAN SHEETS
ADJUSTED LEVELING (2004.65), UNLESS OTHERWISE STATED.
8. ALL ELEVATIONS ARE EXPRESSED IN FEET AND REFER TO NAVD 88
ALL DIMENSIONS AND ELEVATIONS MARKED N.T.S. ARE "NOT TO SCALE".
7. DRAWINGS ARE GENERALLY TO SCALE, BUT SHOULD NOT BE SCALED.
DIMENSIONS IN THE FIELD.
APPROXIMATE READING. THE CONTRACTOR SHALL VERIFY ACTUAL
6. DIMENSIONS AND/OR ELEVATIONS MARKED PLUS OR MINUS (+/-) ARE
5. AERIAL PHOTOGRAPHY FLOWN IN 2016.
NAD 83, STATE PLANE, LA SOUTH, ZONE 1702, US FEET.
4. XY COORDINATES USED IN DRAWINGS REFER TO HORIZONTAL DATUM:
PROJECTION ARE PRESENT.
AMERICAN DATUM AND LAMBERT CONFORMAL CONIC
3. INSIDE PLAN AREAS, POLYCONIC PROJECTION 1983 NORTH
OTHERWISE NOTED.
2. ORIGINAL DATA COMPILED NAD 83 US SURVEY FOOT UNLESS
SURVEY SECTION (504) 862-1852.
POINTS ARE AVAILABLE FROM THE NEW ORLEANS DISTRICT
1. THE DESCRIPTIONS OF HORIZONTAL AND VERTICAL CONTROL
2004.65
(NAVD88)
:1
C-06
.d g n
EXISTING R/W
CONSTRUCTION
LIMIT OF
1V ON 3.5H
B/L
LEVEE
C/L NEW
FOR SEALANT INSTALLATION AND DRIVING PILES WITH THE PRODUCT.
4. THE CONTRACTOR SHALL FOLLOW MANUFACTURER'S RECOMMENDATIONS
THE TYPICAL DESIGN SECTION.
3. SEE PLAN AND PROFILE DWG FOR TRANSITIONS AT THE LIMITS OF
2. EXISTING LEVEE CROWN ASPHALT SURFACING SHALL BE REMOVED FROM SITE.
REMOVED FROM SITE.
1. EMBANKMENT EXCAVATED FROM THE EXISTING LEVEE SHALL BE
NOTES:
DISTANCE VARIES (SEE TABULATIONS DWG.)
LIMITS OF CLEARING
LIMITS OF FERTILIZING, SEEDING & MULCHING10'
5'
EL. 24.0'
NOT TO SCALE
TYPICAL DESIGN SECTION
(SEE MISC. DETAIL SHEET C-08)
SILT FENCE
TOE OF LEVEE
TIP, EL. -20.0
FLOOD SIDE
B/L STA. TOP OF SHEET PILE
483+70 TO 506+20
507+00 TO 522+10
24.0'
24.0'
-20.0'
-20.0'
BOTTOM OF SHEET PILE
(SEE MISCELLANEOUS DETAILS SHEET C-08)
LEVEE CROWN / BIKE PATH
5'
SEEDING AND MULCHING
LIMITS OF FERTILIZING,
TOP OF SHEET PILE, EL. 24.0'
DEGRADE (SEE NOTE 1).
EXISTING LEVEE, LIMIT OF
COMPACTED FILL
1V ON 2H
VARIES
TOP OF CSP
EL. VARIES,
(DO NOT DISTURB)
EXISTING CONCRETE SLOPE PAVEMENT TO REMAIN
AND DETAIL, SHEET C-07.)
(SEE SHEETPILE TABLE
44', PZ-22 SHEET PILE,
EL. 26.5'
TOP OF ASPHALT,
LAND SIDE
LIMIT OF MOWING OPERATIONS
40'
OPERATIONS
LIMIT OF MOWING
LIMIT OF MOWING OPERATIONS
(SEE NOTE 4).
(WWW.PILEPROGROUP.COM) OR APPROVED EQUAL.
BY THE PILE PRO GROUP (WWW.WADIT.COM) OR
INTERLOCKS WITH "WADIT" AS MANUFACTURED
THE CONTRACTOR SHALL SEAL ALL SHEET PILE
NEW ORLEANS DISTRICT
2 3
4 5
IZ
IDENTIFICATION
SHEET
®of Engineers
US Army Corps
.S
P .E
P
-B
IB
IE
/0
/2
MATOC Revised Sample DRAWINGS.pdf
Pages from MATOC Sample Project Changes.pdf
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0008 is the follow ing:
1) To provide the Government Responses to Industry Questions. Please see the Continuation Page.
2) To provide Revised Job Quantity. Please see attachment.
3) To provide Revised Draw ings. Please see attachment.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Sep-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820R0021
X 9B. DATED (SEE ITEM 11)
09-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Sep-2020
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P820R0021
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMEND. 0008 CONT. PAGE
02 SEP 2020 Government Responses to Industry Questions for the:
Mississippi River Levee Project Solicitation #: W912P8-20-R-0021 Amendment 0008
1) Industry Question: What do you fill out on the bid form? As the amendments should be sequential, do we just put the number and voided as the date?
Government Response: Please write Amendment 0005 in the Amendment Box, below it in the Date box, please write VOID.
2) Industry Question: The sample project that the offeror is required to price is from a solicitation that was issued in 2018. Prior to Government receiving bids in 2018, numerous questions were asked which resulted in many changes to both the drawings and specifications by amendment. Since the changes made are not currently included in the sample project, are we to ask the same questions again are can the Government make the necessary changes to the Drawings and specifications by amendment to the MATOC Solicitation?
Government Response: The specifications for the sample project have had the previous changes incorporated prior to solicitation and are considered biddable as is. There are 3 revised drawings that will be replaced by amendment.
3) Industry Question: Sample Project - Please provide estimated quantities for lump sum items for the sample project.
Government Response: Estimated quantities are attached.
4) Industry Question: Sample Project - Can the degraded material from the existing levee be used in the construction of the new levee?
Government Response: For the purposes the Sample Project, use of degraded material from the existing levee for construction of the new levee will not be considered. On task order specific projects, degraded material may be used only if the material meets the requirements in the Embankment specifications.
5) Industry Question: Sample Project - Are new American made sheet piles required for the sample project or can used sheets be considered?
W912P820R0021
Government Response:
As per the specifications, new sheet pile are required.
All sheet pile shall comply with the Buy American Act.
6) Industry Question: Specification section 00010 – Solicitation Contract Form. Please reference the attached forms to answer the following question as I believe your answer in Amendment 4 (Question 8) and Amendment 6 (Questions 4 and 6) reference the correlation between the SAMPLE PROJECT BID FORM and the solicitation BINDING PRICES BID FORM found on page 12 of 129.
7) Industry Question: There are 6 bid items for IDIQ however there are no descriptions of what needs to be supplied – Page 1 to Page 5. Please advise.
Government Response: there is no requirement for the 6 bid items on pages 3-5
8) Industry Question: There is no direct correlation between the attached forms and the binding prices bid schedule, nor there is a correlation between the attached forms and the bid schedule in the sample project. Please advise.
Government Response: there is no requirement for the 6 bid items on pages 3-5. The 6 bids items are not part of the bid schedule for either the sample project or the binding prices.
9) Industry Question: What do the NET AMOUNTS constitute? Example: Item 0001 on the attached forms – Is the NET AMOUNT the sum of all of the YEAR 1 pricing from the Binding Prices Form? Silt Fence Year 1 + Lime Year1 + Sulfur Year 1, etc….
Government Response: there is no requirement for the 6 bid items on pages 3-5.
10) Industry Question: Please explain Item 0006 OPTION TO EXTEND THE CONTRACT on the attached forms. What do you expect us to place at the AMOUNT and NET AMOUNT for this item? This CLIN is not quantifiable given the information in the solicitation. Please advise.
Government Response: there is no requirement for the 6 bid items on pages 3-5
11) Industry Question: 01100 – General Provisions Items 24 and 25 - Is any form of Railroad Insurance required to be submitted with this package?
Government Response: No, Railroad Insurance is not required to be submitted with this package. Railroad Insurance may be required for task order specific projects.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .