This document provides an amendment to a solicitation for a multiple award task order contract for Mississippi River Levee construction work in the New Orleans District of Louisiana. The amendment responds to industry questions by clarifying that offerors should provide details of 3 to 5 relevant prime contractor contracts valued at a minimum of $2 million each, as well as 1 to 3 significant subcontractor contracts for any subcontractors responsible for 30% or more of the work. The solicitation seeks to award small business set-aside contracts for excavation, embankment construction, clearing, geotextile placement, seepage cut-offs, and groundwater relief well installation valued between $25-100 million to support Mississippi River levee projects. The response deadline was August 7, 2020, with the question submission period running from July 16 to 30, 2020. The solicitation was issued by the New Orleans District of the Army Corps of Engineers.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is the follow ing:

1) To provide the Government Response to Industry Question. Please see the Continuation Page.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820R0021

X 9B. DATED (SEE ITEM 11)

09-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Sep-2020

CODE

USACE, CONTRACTING DIVISION

ATTN: CEMVN-CT, ROOM 172

7400 LEAKE AVE.

NEW ORLEANS LA 70118-3651

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P820R0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0023

Government Responses to Industry Questions for the: 29 SEP 2020 Mississippi River Levee Project Solicitation #: W912P8-20-R-0021 Amendment 0023

(1) INDUSTRY QUESTION: Reference Q&A #1 under Amendment 0022 issued 09/25/21. The Government’s response did not clarify the ambiguity in the solicitation requirements. Please clarify how many contracts total can be submitted under Sub-factor A – Experience, including the prime offeror contracts and significant subcontractors contracts.

GOVERNMENT RESPONSE:

3 to 5 contracts - prime contractor experience 1 to 3 contracts - significant subcontractor experience

Section L states the following:

The offeror shall provide a minimum of three (3) to a maximum of five (5) contracts and/or efforts demonstrating relevant experience within the past ten (10) years that is of same or similar scope, complexity and magnitude (a minimum of $2M) to the work described. Projects must be at least 70% completed to be considered.

Additionally, the Offeror shall identify each significant subcontractor (significant subcontractor meaning a subcontractor responsible for 30% or more of the performance required) planned to be utilized and shall provide a minimum of one (1) to a maximum of three (3) contracts and/or efforts within the past ten (10) years that is of the same or similar scope, complexity and magnitude (a minimum of $2M) to the work described. If no significant subcontractors will be utilized, please indicate that in the proposal.

The following have been deleted:

AMENDMENT 0010

(End of Summary of Changes)