This document is an amendment to a solicitation for construction services related to flood protection infrastructure along the Mississippi River in New Orleans, Louisiana. The scope of work includes clearing, excavation, installation of sheet piling and concrete floodwalls, concrete scour protection, asphalt paving, fencing, and turf establishment. The amendment provides responses to contractor questions to clarify requirements and project details. The bid opening date remains July 14, 2020. Key issues addressed include utility relocations, allowable parking impacts during construction, pile driving separation from concrete work, and confirmation that domestic source requirements comply with applicable FAR clauses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B01_Bid Abstract_W912P820B0042(s).pdf | ||
| A21_W912P820B0042_Am_0005.pdf | ||
| A21_W912P820B0042_Am_0004.pdf | ||
| A21_W912P820B0042_Am_0002.pdf | ||
| A21_W912P820B0042_Am_0001.pdf | ||
| A21_W912P820B0042_Plans.pdf | ||
| A21_W912P820B0042.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The subject solicitation for East Bank, Mississippi River Floodw all, Mississippi River andTributaries Project (MR&T), Orleans Levee District, Carrolton Phase III - District Floodw all Project Orleans Pariish, LA is hereby amended as follow s:
1. To answ er additional contractors questions received. (See attached)
The bid opening date of Tuesday, 14 July 2020 at 1:00 pm local time remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Jul-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P820B0042
X 9B. DATED (SEE ITEM 11)
02-Jun-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Jul-2020
CODE
USACE, CONTRACTING DIVISION
ATTN: CEMVN-CT, ROOM 172
7400 LEAKE AVE.
NEW ORLEANS LA 70118-3651
W912P8 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P820B0042
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
The following items are applicable to this modification:
AMENDMENT 0003
Carrollton Phase III: District Floodwall Solicitation W912P820-B-0042
Contractor Questions & USACE Responses
1. Can you provide a schedule of trains that could affect the north and south gate entrances or furnish contact info for owner/operation of that track?
The schedule and POC for operation of the track will not be provided. Any coordination needed for construction of this project will be performed by the COR.
2. Ref. Section 13 30 25 par. 2.2 – Does this paragraph take precedence over FAR 52.225-11 and FAR 52.225-12?
The statement "All manufacturing shall be done in the United States using domestic materials" is in compliance with the FAR Clauses. These clauses state that only US or US Trade Agreement country materials are to be used unless a waiver is given by the Contracting Officer.
3. Ref. drawing sheet C-204 Table of Existing Utilities and Amendment 2, Answer to Question 69: The required removal, relocation and/or replacement of existing electrical power lines will result in major disruptions (shutdowns) of service to the main district, day care and maintenance buildings:
a. To understand the magnitude of these shutdowns, are any of these main distribution or transmission lines feeding the entire physical plant? and office & daycare complex?
The work under this contract will not impact the electrical or telecommunication supply distribution to the Main Office Building, Child Care Facility, or Shops Building.
Refer to Sheets E-101, E-102 and E-103 to determine facilities that will be impacted.
b. Can you provide an allowable timeframe or duration of required shutdowns?
Timeframe and duration of outage to be coordinated with the COR.
c. What about for fiber optic communication lines as well?
See response to question 3a above.
4. Ref. Amendment No. 2, Answer to Question 55 – Please more clearly define “minimum reinforcement” Minimum reinforcement is defined per ACI.
5. Ref. Amendment No. 2, Answer to Question 75 – Approximately, how many non-secure offices are in the main building?
The contractor will be escorted at all times and should assume the entire 400,000 sq ft campus, including 6 major buildings, will be videotaped with the exception of a small number of restricted access areas.
6. Please provide details of electronic bid submission. Are documents simply to be scanned and emailed to the government POC?
Electronic bidding instructions were provided in solicitation W912P820B0042, Section 0800 - Special Instructions. No, documents are not simply to be scanned and emailed to the government POC, but submitted as instructed in Section 0800 - Special Instructions of solicitation.
W912P820B0042
7. Drawings do not provide the sizes, depths or material of construction of the water and sewer lines that are required to be relocated. From the responses to questions released on 6/30/20, it appears that the government does not have that information. We recommend that an allowance be provided for this item, as it is impossible for contractors to accurately estimate the cost to relocate lines when we do not know the size, depth or pipe material involved.
Contractor shall assume all sewer pipes are 6 to 8 –inch diameter and all water lines are 4-inch diameter.
Sprinkler mains (W-14) are 8-inch diameter. All other water lines are assumed to be 4-inch diameter.
8. Paragraph 2.2 under specification 13 30 25 for the Deployable Flood Wall states “All manufacturing shall be done in the United States using only domestic materials.” This requirement conflicts with FAR 52.225-12, Notice of Buy American Requirement – Construction Materials Under Trade Agreements, that is included in the solicitation. Please clarify.
The statement "All manufacturing shall be done in the United States using domestic materials" is in compliance with the FAR Clauses. These clauses state that only US or US Trade Agreement country materials are to be used unless a waiver is given by the Contracting Officer.
9. Note 3 for the Sequencing and Phasing requirements listed on drawing C-103 states that the parking spot impacts should not be any greater than what is shown in Note 2 at any one time. The largest impact at any one time is 93 parking spots. Please confirm that 93 parking spots being impacted during a single phase is what he contractor can base its construction sequencing plan on. If this is not correct, then please provide additional guidance for contractor planning as the parking spot impacts shown in Note 2 vary widely based on the proposed sequencing.
93 spots during a single phase is correct. However, location of sequencing and ability to maintain traffic flow across the district will more than likely dictate the number of parking spots impacted.
10. For contractor construction sequencing, what is the minimum distance that pile installation operations must be from concrete installation operations?
See Spec 31 41 16.00 12, Para 3.1.1.2, for driving of sheet piling, and Spec 31 62 16.00 12, Para 3.2 for H-piling.