SOLICITATION_AM03_W912P8-15-B-0039.pdf
PDF 48 KB Posted
- Solicitation number
- W912P8-15-B-0039
About this file
Amendment 03
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W42HEM51008026
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Solicitation No. W912P8-15-B-0039 for New Orleans to Venice Hurricane Protection Project, NOV-NF-W-06a3 West Pointe a la Hache to St. Jude Levee Plaquemines Parish, Louisiana. The Bid opening Schedule remains the same at 10 May 2016, time 2:00pm CST. The subject soliciation is amended as follow s:
See continuation page for changes.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-May-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-15-B-0039
X 9B. DATED (SEE ITEM 11)
02-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-May-2016
CODE
VICKSBURG DISTRICT CONTRACTING OFFICE
4155 CLAY ST.
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P8-15-B-0039
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 03
PROJNET QUESTIONS AND ANSWERS
Final ProjNet questions and answers are incorporated by this amendment.
SPECIFICATIONS
The pages below are revised and replaced in their entirety with this amendment:
SECTION 00010 PAGES 10-3 THROUGH 10-6
Specifications revised by this amendment have the notation "Revised by Amendment 0003" at the bottom of the page. Text added by this amendment is shown as underlined. Text deleted by this amendment is shown as overstruck.
The following have been deleted:
SUMMARY OF CHANGES
(End of Summary of Changes)
00010-3 ED 14-026
Revised By Amendment 0003
SECTION 00010 - BIDDING SCHEDULE
New Orleans to Venice Hurricane Protection Project, NOV-NF-W- 06a3 West Pointe a la Hache to St. Jude Levee
Plaquemines Parish, Louisiana
Item Description Estimated Quantity
Unit Unit Price Estimated Amount
BASE WORK
Mobilization and Demobilization 1 JOB
0002 Truck Wash-Down Racks 1 JOB
Traffic Control and Coordination
1 JOB
Clearing and Grubbing (Phase I)
1 JOB
Embankment, Compacted Fill (Phase I)
400,000 CY
0006 Surfacing
0006AA First 500 CY 500 CY
0006AB All Over 500 CY 200 CY
Excavation - New Drainage Ditch
64,200 CY
0008 Silt Fence
0008AA First 10,500 LF 10,500 LF
0008AB All Over 10,500 LF 2,500 LF
Seeding and Mulching (Phase I)
50 AC
0010++ Lime Soil Amendment (Phase I)
50 TON
0011++ Sulfur Soil Amendment (Phase I)
25 TON
0012 Fertilizer (Phase I)
0012AA First 15,000 LBS 15,000 LBS
0012AB All Over 15,000 LBS 7,500 LBS
0013 Separator Geotextile 2,200 SY
00010-4 ED 14-026
0014 Corrugated Metal Arch Pipes 1 JOB
0015 Asphaltic Pavement 1 JOB
0016 Pipeline Bridges 1 JOB
TOTAL BASE WORK: $
OPTIONAL WORK (OW)
0017 Clearing (Phase II) - OW 1 JOB
Embankment, Compacted Fill (Phase II) - OW
0018AA First 25,000 CY 25,000 CY
0018AB All Over 25,000 CY 10,000 CY
Seeding and Mulching (Phase II) - OW
25 AC
0020++ Lime Soil Amendment (Phase II) - OW
25 TON
0021++ Sulfur Soil Amendment (Phase II) - OW
13 TON
0022 Fertilizer (Phase II) - OW
0022AA First 7,500 LBS 7,500 LBS
0022AB All Over 7,500 LBS 3,800 LBS
TOTAL OPTIONAL WORK $
TOTAL BASE WORK+OPTIONAL WORK $
++Items not subject to the requirements of FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY.
**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.
Award will be made as a whole to one bidder.
NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED
TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE DECLARED NON-
RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD.
NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or
00010-5 ED 14-026
sub line items are materially unbalanced (See FAR 14.404-2).
NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.
NOTE 4: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTION WORK Items by written notice to the Contractor. If implemented, the Government will exercise the optional work no later than 400 calendar days after issuance of the Notice to Proceed. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid. If implemented by the Contracting Officer’s Representative, all required work for Phase II (Optional) construction shall be performed by the Contractor as described herein and as shown on the drawings, at any time during the contract period.
NOTE 5: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). ** If an option is to be exercised at the time of contract award FAR17.208 shall be used in place of FAR 52.217-5
NOTE 6: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF OPTIONAL WORK. In the event that OPTION WORK items are exercised under the terms of the contract, the time required for completion of the contract shall be 540 calendar days in addition to the original contract duration of 500 calendar days established for the BASE WORK items specified in the Contract Clause entitled
“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-211-10 – APR 1984)”.
The time adjustment given as a result of exercising the option includes the one (1) year wait period as described in Section 01100 GENERAL PROVISIONS paragraph CONSTRUCTION SEQUENCE.
The time adjustment given as a result of exercising the option includes the one (1) year wait period between the completion of the base work and commencement of the option work.
NOTE 7: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;
http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx
00010-6 ED 14-026
EVALUATION OF SUBDIVIDED ITEMS.
Item Nos. 0006, 0008, 0012, 0018, and 0022 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.
(End of Clause)
VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS.
The Variations in Estimated Quantities Subdivided Items clause is applicable only in Item Nos. 0006, 0008, 0012, 0018, and 0022.
a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.
b. Where the actual quantity of work performed for Item Nos. 0006, 0008, 0012, 0018, and 0022 is less than 85% of the quantity of the first sub-item listed under such items, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment in contract price shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
c. If the quantity of work performed under Item Nos. 0006, 0008, 0012, 0018, and 0022 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.
(End of Clause)
| D03_RELEASED W912P8-15-B-0039-P0003 NOV-NF-06a3 |
| AM03 ED 14-026_Amend0003_NOV-NF-W-06a3 (002) |
| Am_0003 |
| 00010 - BIDDING SCHEDULE |
File details come from the government source that posted it. Updated .