W42HEM51008026

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Reference Solicitation No. W912P8-15-B-0039 for New Orleans to Venice Hurricane Protection Project, NOV-NF-W- 06a3 West Pointe a la Hache to St. Jude Levee Plaquemines Parish, Louisiana. Bid opening scheduled for 3 May 2016 at 2:00pm. The subject solicitation is amended as follow s:

See continuation page for changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Apr-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P8-15-B-0039

X 9B. DATED (SEE ITEM 11)

02-Apr-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Apr-2016

CODE

USACE, CONTRACTING DIVISION

ATTN: HPO CT VICKSBURG

4155 CLAY STREET

VICKSBURG MS 39183-3435

W912P8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P8-15-B-0039

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SOLICITATION:

This is a Sealed Bid, Invitation for Bid, procurement to result in one Firm, Fixed price contract. Any reference to Request for Proposals has been changed to Invitation for Bids.

The following solicitation sections or pages are revised and replaced in their entirety to correct inconsistencies, typos, and to add the requirement for a Bid Bond:

- Title/ Cover Sheet

- Opening Letter (page 2)

- Standard Form (SF) 1442

- Table of Contents

- Notes behind Bidding Schedule

- General Notices

- Section 00100

- Section 00600

- Section 00700

(The sections above changed by Amendment 0001 will have “Revised by Amendment 0001” in the footer) The section entitled, Special Notices, was deleted in its entirety.

SPECIFICATIONS:

The following technical specification sections are revised and replaced:

SECTION 01100

SECTION 31 24 00.00 12

SECTION 33 40 01.00 12

DRAWINGS:

SHEET IDENTIFICATION No. C-13. Delete this drawing in its entirety and substitute the revised drawing SHEET IDENTIFICATION No. C-13 included in Amendment 0001.

All other terms and conditions remain unchanged.

(End Summary of Changes)

ED 14-026

US Army Corps Of Engineers

District

New Orleans to Venice, Hurricane Protection Project

NOV-NF-W-06a3 West Pointe a La Hache To St. Jude Levee Plaquemines Parish, Louisiana

Construction Solicitation and Specifications

April 2016

DEPARTMENT OF THE ARMY

DISTRICT, CORPS OF ENGINEERS

ED 14-026

REPLY TO

ATTENTION OF

282828282828282828282828282828282828282828

April 2016

SOLICITATION: W912P8-15-B-0039

FOR: New Orleans to Venice, Hurricane Protection Project, NOV-NF-W- 06a3, West Pointe a La Hache to St. Jude Levee, Plaquemines Parish, Louisiana (ED 14-026)

TO OPEN:

I. NOTE THE AFFIRMATIVE ACTION PROGRAM REQUIREMENT OF THE EQUAL OPPORTUNITY

CLAUSE WHICH MAY APPLY TO THE CONTRACT RESULTING FROM THIS SOLICITATION.

II. NOTE THE CERTIFICATION OF NONSEGREGATED FACILITIES IN THIS SOLICITATION.

Bidders, offerors and applicants are cautioned to note the "Certification of Non-segregated Facilities" in the solicitation. Failure of a bidder or offeror to agree to the certification will render his bid or offer non-responsive to the terms of solicitations involving awards of contracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause.

III. Prospective contractors must register in the System for Award Management (SAM). See FAR Clause 52.204-7 for required information. The website for SAM is https://www.sam.gov. You will be required to provide your company’s Dun and Bradstreet (D&B) -U-N-S number. If you do not already have a D&B

-U-N-S number, one can be requested at http://fedgov.dnb.com/webform.

BIDDERS MUST PROVIDE FULL, ACCURATE AND COMPLETE INFORMATION AS REQUIRED BY THIS

SOLICITATION AND ITS ATTACHMENTS. THE PENALTY FOR MAKING FALSE STATEMENTS IN BIDS

IS PRESCRIBED IN 18 U.S.C. 1001. (FAR 52.214-4 APR 1984)

DESCRIPTION AND MAGNITUDE OF WORK: The work consists of clearing, grubbing, excavation for new drainage ditch, new culvert placement, new levee/ ramp crossing embankment placement in phases, geotextile and surfacing, turf establishment and all other related incidental work.

NOTE: ALL WORK UNDER THESE SPECIFICATIONS SHALL BE PERFORMED IN ACCORDANCE WITH

THE PROVISIONS OF EM 385-1-1 "CORPS OF ENGINEERS SAFETY AND HEALTH REQUIREMENTS

MANUAL".

W42HEM51008026

HUBZONE for New Orleans to Venice, LA, NOV-06a3, West Pointe A La Hache to St. Jude Levee Plaquemines Parish, Louisiana

The estimated value of the proposed w ork is betw een $1 ,000,000.00 and $2 ,000,000.00.

X

KELLY A TURCOTTE 601-631-5379

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

02-Apr-2016

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______7 calendar days and complete it w ithin ________500 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section 00700

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

VICKSBURG DISTRICT CONTRACTING OFFICE

4155 CLAY ST.

VICKSBURG MS 39183-3435

W912EE

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

(hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

PTC-i ED 14-026

PROJECT TABLE OF CONTENTS

Division 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00010

00100 00600 00700

Solicitation, Offer and Award (SF-1442) Bidding Schedule Instructions to Bidders Representations and Certifications Contract Clauses

Division 01 - GENERAL REQUIREMENTS

01100 General Provisions 01 32 17.00 20 Network Analysis Schedules (NAS) 01 33 00 Submittal Procedures 01 42 00 Sources for Reference Publications 01 45 02.00 10 Quality Control System (QCS) 01 45 04.00 10 Contractor Quality Control 01 55 26.00 12 Traffic Control and Coordination 01 57 20.00 12 Environmental Protection 01 57 23.00 12 Storm Water Pollution Prevention Measures 01 57 23.01 12 Truck Wash-Down Racks 01 78 02.00 10 Closeout Submittals

Division 31 – EARTHWORK

31 05 19.04 12 Separator Geotextile 31 11 00.00 12 Clearing and Grubbing 31 23 00.00 12 Excavation 31 24 00.00 12 Embankment

Division 32 – EXTERIOR IMPROVEMENTS

32 12 16.00 12 Asphaltic Pavement 32 15 00.00 12 Surfacing (Granular) 32 92 19.04 12 Turf Establishment and Maintenance

Division 33 – UTILITIES

33 40 01.00 12 Corrugated Metal Arch Pipe

00010-3 ED 14-026

SECTION 00010 - BIDDING SCHEDULE

New Orleans to Venice Hurricane Protection Project, NOV-NF-W- 06a3 West Pointe a la Hache to St. Jude Levee

Plaquemines Parish, Louisiana

Item Description Estimated Quantity Unit Unit Price Estimated Amount

BASE WORK

0001 Mobilization and Demobilization 1 JOB

0002 Truck Wash-Down Racks 1 JOB

0003 Traffic Control and Coordination 1 JOB

0004 Clearing and Grubbing (Phase I) 1 JOB

0005 Embankment, Compacted Fill (Phase I) 400,000 CY

0006 Surfacing

0006AA First 500 CY 500 CY

0006AB All Over 500 CY 200 CY

0007 Excavation - New Drainage Ditch 64,200 CY

0008 Silt Fence

0008AA First 10,500 LF 10,500 LF

0008AB All Over 10,500 LF 2,500 LF

0009 Seeding and Mulching (Phase I) 50 AC

0010++ Lime Soil Amendment (Phase I) 50 TON

0011++ Sulfur Soil Amendment (Phase I) 25 TON

0012 Fertilizer (Phase I)

0012AA First 15,000 LBS 15,000 LBS

0012AB All Over 15,000 LBS 7,500 LBS

0013 Separator Geotextile 2,200 SY

0014 Corrugated Metal Arch Pipes 1 JOB

00010-4 ED 14-026

0015 Asphaltic Pavement 1 JOB

0016 Pipeline Bridges 1 JOB

TOTAL BASE WORK: $

OPTIONAL WORK (OW)

0017 Clearing (Phase II) - OW 1 JOB

0018 Embankment, Compacted Fill (Phase II) - OW

0018AA First 25,000 CY 25,000 CY

0018AB All Over 25,000 CY 10,000 CY

0019 Seeding and Mulching (Phase II) - OW 25 AC

0020++ Lime Soil Amendment (Phase II) - OW 25 TON

0021++ Sulfur Soil Amendment (Phase II) - OW 13 TON

0022 Fertilizer (Phase II) - OW

0022AA First 7,500 LBS 7,500 LBS

0022AB All Over 7,500 LBS 3,800 LBS

TOTAL OPTIONAL WORK $

TOTAL BASE WORK+OPTIONAL WORK $

++Items not subject to the requirements of FAR 52.211-18 VARIATION IN ESTIMATED QUANTITY.

**The unit "JOB" as used in this Bidding Schedule is synonymous with the term "Lump Sum" used elsewhere within these plans and specifications.

Award will be made as a whole to one bidder.

NOTE 1: Bidders shall furnish unit prices for each item listed in the Schedule requiring a unit price. If the bidder fails to insert a unit price in the appropriate blank for required item(s), but does furnish an extended total, or an estimated amount for such item(s), the Government shall deem the unit price to be the quotient obtained by dividing the extended amount for that line item by the quantity. IF A BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED

TOTAL OR ESTIMATED AMOUNT FOR ANY ITEM, ITS BID SHALL BE DECLARED NON-

RESPONSIVE AND THEREFORE INELIGIBLE FOR AWARD.

NOTE 2: Any bid may be rejected if the Contracting Officer determines in writing that it is unreasonable as to price. Unreasonableness of price includes not only total price of bid, but the price for individual line items as well. Any bid may be rejected if the prices for any line items or sub line items are materially unbalanced (See FAR 14.404-2).

00010-5 ED 14-026

NOTE 3: THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

NOTE 4: OPTIONAL WORK ITEMS. The Government may require the delivery of the numbered line item(s), identified in the schedule as OPTIONAL WORK Items, in the quantities and prices stated in the schedule. The Contracting Officer may exercise the OPTION WORK Items by written notice to the Contractor. If implemented, the Government will exercise the optional work no later than 400 calendar days after issuance of the Notice to Proceed. Bidders shall bid on all items including optional items (see “Evaluation of Options” FAR 52.217-5). Failure to bid on all items will result in a non-responsive bid. If implemented by the Contracting Officer’s Representative, all required work for Phase II (Optional) construction shall be performed by the Contractor as described herein and as shown on the drawings, at any time during the contract period.

NOTE 5: EVALUATION OF OPTIONS (FAR 52.217-5 JUL 1990). Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for this basic requirement. Evaluation of options will not obligate the Government to exercise the option(s). ** If an option is to be exercised at the time of contract award FAR17.208 shall be used in place of FAR 52.217-5

NOTE 6: TIME ADJUSTMENT IN THE EVENT OF THE EXERCISE OF OPTIONAL WORK. In the event that OPTION WORK items are exercised under the terms of the contract, the time required for completion of the contract shall be 540 calendar days in addition to the original contract duration of 500 calendar days established for the BASE WORK items specified in the Contract Clause entitled

“COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (FAR 52-211-10 – APR 1984)”.

The time adjustment given as a result of exercising the option includes the one (1) year wait period between the completion of the base work and commencement of the option work.

NOTE 7: RAPID VENDOR PAYMENT: Web based instructions for the submission of invoices;

http://www.mvn.usace.army.mil/BusinessWithUs/Contracting/RapidVendorPayment.aspx

00010-6 ED 14-026

EVALUATION OF SUBDIVIDED ITEMS.

Item Nos. 0006, 0008, 0012, 0018, and 0022 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

(End of Clause)

VARIATIONS IN ESTIMATED QUANTITIES - SUBDIVIDED ITEMS.

The Variations in Estimated Quantities Subdivided Items clause is applicable only in Item Nos. 0006, 0008, 0012, 0018, and 0022.

a. Variations from the estimated quantity in the actual work performed under any second or subsequent sub-item or elimination of all work under such a second or subsequent sub-item will not be the basis for an adjustment in contract unit price.

b. Where the actual quantity of work performed for Item Nos. 0006, 0008, 0012, 0018, and 0022 is less than 85% of the quantity of the first sub-item listed under such items, the Contractor will be paid at the contract unit price for that sub-item for the actual quantity of work performed and, in addition, an equitable adjustment in contract price shall be made in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.

c. If the quantity of work performed under Item Nos. 0006, 0008, 0012, 0018, and 0022 exceeds 115% or is less than 85% of the total estimated quantity of the sub-items under that item, and/or if the quantity of work performed under the second sub-item or any subsequent sub-item under Item No. NONE exceeds 115% or is less than 85% of the estimated quantity of any such sub-item, and if such variation causes an increase or a decrease in the time required for performance of this contract, the contract completion time will be adjusted in accordance with the clause FAR 52.211-18, Variation in Estimated Quantity.

(End of Clause)

NOTES

(A) THIS PROCUREMENT IS A TOTAL HUB ZONE SET ASIDE

(B) LACK OF REGISTRATION IN THE SAM DATABASE WILL MAKE AN OFFEROR

INELIGIBLE FOR AWARD. SEE CONTRACT CLAUSE 52.204-7 ENTITLED, "SYSTEM FOR

AWARD MANAGEMENT".

(C) THE SF1442, BIDDING SCHEDULE, AND SECTION 00600 (REPRESENTATIONS AND

CERTIFICATIONS) MUST BE ACCURATELY COMPLETED AND RETURNED WITH YOUR BID

OR IT MAY BE REJECTED AS NONRESPONSIVE.

(D) THE OFFEROR SHALL FURNISH UNIT PRICES FOR ALL ITEMS LISTED ON THE

SCHEDULE OF BID ITEMS WHICH REQUIRE UNIT PRICES. IF THE OFFEROR FAILS TO

INSERT A UNIT PRICE IN THE APPROPRIATE BLANK FOR REQUIRED ITEMS, BUT DOES

FURNISH AN EXTENDED TOTAL OR AN ESTIMATED AMOUNT FOR SUCH ITEMS, THE

GOVERNMENT WILL DEEM HIS UNIT PRICE TO BE THE QUOTIENT OBTAINED BY

DIVIDING THE EXTENDED ESTIMATED AMOUNT FOR THAT LINE ITEM BY THE

QUANTITY. IF THE OFFEROR OMITS BOTH THE UNIT PRICE AND THE EXTENDED

ESTIMATED AMOUNT FOR ANY ITEM, HIS PROPOSAL WILL BE DECLARED

NONRESPONSIVE.

(E) ANY BID MAY BE REJECTED IF THE CONTRACTING OFFICER DETERMINES IN WRITING

THAT IT IS UNREASONABLE AS TO PRICE. UNREASONABLENESS OF PRICE INCLUDES

NOT ONLY TOTAL PRICE OF BID, BUT THE PRICE FOR INDIVIDUAL LINE ITEMS AS WELL.

ANY BID MAY BE REJECTED IF THE PRICES FOR ANY LINE ITEMS OR SUB LINE ITEMS

ARE MATERIALLY UNBALANCED (SEE FAR 14.404-2).

(F) THE NOTICE TO PROCEED (NTP): THE SUCCESSFUL BIDDER IS ADVISED THAT

PERFORMANCE AND PAYMENT BONDS SHALL BE SUBMITTED IN ACCORDANCE WITH

THE TIME FRAME IN BLOCK 12B OF SF 1442. THE NTP WILL BE ISSUED IMMEDIATELY

AFTER VERIFICATION OF ACCEPTABLE PERFORMANCE AND PAYMENT BONDS. WITHIN

( ) DAYS AFTER ISSUANCE OF THE NTP, THE CONTRACTOR SHALL INITIATE A

MEETING TO DISCUSS THE SUBMITTAL PROCESS WITH THE AREA OR RESIDENT

ENGINEER OR HIS AUTHORIZED REPRESENTATIVE. PHYSICAL WORK CANNOT START

UNTIL THE ACCIDENT PREVENTION PROGRAM, CONTRACTOR QUALITY CONTROL PLAN,

AND OTHER SUBMITTALS WHICH MAY BE REQUIRED, HAVE BEEN SUBMITTED AND

APPROVED AND ALL PRELIMINARY MEETINGS CALLED FOR UNDER THE CONTRACT,

HAVE BEEN CONDUCTED.

(G)

VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

IN ADDITION TO COMPLYING WITH THE REQUIREMENTS OUTLINED IN FAR PART 22.13,

FAR PROVISION 52.222-38, FAR CLAUSE 52.222-35, FAR CLAUSE 52.222-37, DFARS 222.13

AND DEPARTMENT OF LABOR REGULATIONS, U.S. ARMY CORPS OF ENGINEERS (USACE)

CONTRACTORS AND SUBCONTRACTORS AT ALL TIERS ARE ENCOURAGED TO PROMOTE

THE TRAINING AND EMPLOYMENT OF U.S. VETERANS WHILE PERFORMING UNDER A

USACE CONTRACT. WHILE NO SET-ASIDE, EVALUATION PREFERENCE, OR INCENTIVE

APPLIES TO THE SOLICITATION OR PERFORMANCE UNDER THE RESULTANT CONTRACT,

USACE CONTRACTORS ARE ENCOURAGED TO SEEK OUT HIGHLY QUALIFIED VETERANS

TO PERFORM SERVICES UNDER THIS CONTRACT. THE FOLLOWING RESOURCES ARE

AVAILABLE TO ASSIST USACE CONTRACTORS IN THEIR OUTREACH EFFORTS:

FEDERAL VETERAN EMPLOYMENT INFORMATION AT

HTTP://WWW.FEDSHIREVETS.GOV/INDEX.ASPX

DEPARTMENT OF LABOR VETERANS EMPLOYMENT ASSISTANCE

HTTP://WWW.DOL.GOV/VETS/

DEPARTMENT OF VETERANS AFFAIRS–VOW TO HIRE HEROS ACT

HTTP://BENEFITS.VA.GOV/VOW/

ARMY WOUNDED WARRIOR PROGRAM –

HTTP://WTC.ARMY.MIL/MODULES/EMPLOYERS/INDEX.HTML

U.S. CHAMBER OF COMMERCE FOUNDATION–HIRING OUR HEROS

HTTP://WWW.HIRINGOURHEROES.ORG/

GUIDE TO HIRING VETERANS – REFERENCE MATERIAL

HTTP://WWW.WHITEHOUSE.GOV/SITES/DEFAULT/FILES/DOCS/WHITE_HOUSE_BUSINESS_

COUNCIL_-

_GUIDE_TO_HIRING_VETERANS_0.PDF

Section 00100 - Bidding Schedule/Instructions to Bidders

GENERAL NOTICES

FOR: NEW ORLEANS TO VENICE, HURRICANE PROTECTION PROJECT, NOV-NF-

W-06a3, WEST POINTE TO A LA HACHE TO ST. JUDE LEVEE, PLAQUEMINES

PARISH, LOUISIANA

BIDS SHALL BE MAILED, OR HAND DELIVERED, TO THE U.S. ARMY CORPS OF

ENGINEERS, VICKSBURG DISTRICT HEADQUARTERS BUILDING, CONTRACTING

OFFICE, 4155 CLAY STREET, VICKSBURG, MISSISSIPPI 39183-3435.

ATTN: KELLY TURCOTTE.

BIDS SHALL NOT BE ACCEPTED NOR BE WITHDRAWN TELEGRAPHICALLY. BID

OPENING MAY BE ATTENDED IN PERSON OR VIEWED ONLINE AT

http://155.76.244.230/bids/bids.htm

ESTIMATED QUANTITIES ARE AVAILABLE UPON WRITTEN/EMAIL REQUEST TO

THE VICKSBURG CONTRACTING OFFICE (WITH THE SUBJECT TITLE: REQUEST

FOR ESTIMATED QUANTITIES, 06a3).

WRITTEN/EMAIL REQUESTS SHALL BE SENT TO ALL THREE INDIVIDUALS

LISTED BELOW:

ROBIN.L.GREEN@USACE.ARMY.MIL, FANNIE.M.ROBERTSON@USACE.ARMY.MIL,

and KELLY.A.TURCOTTE@USACE.ARMY.MIL

1. AUTHORITY & APPROPRIATION INFORMATION PROGRAM DATA

AUTHORITY: (a) Original Authorization: Section 203 of the Flood Control Act of 1962, Public Law 87-874 (76 Stat. 1173)

(b) Supplemental Authorization: New Orleans to Venice, LA- Under the Flood Control and Coastal Emergencies (FC&CE) heading, Chapter 3, Title I, Division B of Public Law 109 148 (119 Stat.

2762-2763) (3rd FC&CE Supplemental); under the FC&CE heading, Chapter 3, Title III of Public Law 110-552 (122 Stat. 2349-2350) (6th FC&CE Supplemental): and under the FC&CE heading, Chapter 3, Title I, Division 3 of Public Law 110-329 (122 Stat. 3590) (7th

FC&CE Supplemental)

APPROPRIATION: 4th and 6th Supplemental appropriations for the Non-Federal Levees. 3rd, 4th and 6th Supplemental appropriations for New Orleans to Venice, LA

FUNDING CITATION: 96X3125

2. BID, PERFORMANCE AND PAYMENT BONDS.

Revised by Amendment 0001

A BID BOND IS REQUIRED WITH THE BID PACKAGE AND IS TO BE

EXECUTED ON STANARD FORM (SF) 24. PERFORMANCE AND PAYMENT

BONDS WILL BE REQUIRED AFTER AWARD. SEE SECTION 00700,

CONTRACT CLAUSES 52.228-1, BID GUARANTEE and 52.228-15, PERFORMANCE AND PAYMENT BONDS – CONSTRUCTION.

3. AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS.

THE RIGHT IS RESERVED, AS THE INTEREST OF THE GOVERNMENT MAY

REQUIRE, TO REVISE OR AMEND THE SPECIFICATIONS AND/OR DRAWINGS

PRIOR TO THE DATE SET FOR OPENING BIDS. SUCH REVISIONS OR

AMENDMENTS, IF ANY, WILL BE ANNOUNCED BY AMENDMENT OR AMENDMENTS

TO THIS INVITATION FOR BIDS. COPIES OF SUCH AMENDMENTS AS MAY BE

ISSUED WILL BE FURNISHED TO ALL PROSPECTIVE BIDDERS. IF THE

REVISIONS OR AMENDMENTS ARE OF A NATURE WHICH REQUIRE MATERIAL

CHANGES IN QUANTITIES OR PRICES OR BOTH, THE DATE SET FOR

OPENING BIDS MAY BE POSTPONED BY SUCH NUMBER OF DAYS AS IN THE

OPINION OF THE DISTRICT ENGINEER WILL ENABLE BIDDERS TO REVISE

THEIR BIDS. IN SUCH CASE, THE AMENDMENTS WILL INCLUDE AN

ANNOUNCEMENT OF THE NEW DATE FOR OPENING BIDS.

4. BUSINESS INTEGRITY.

THE SUCCESSFUL BIDDER AS A CONDITION FOR AWARD OF ANY

CONTRACT RESULTING FROM THIS SOLICITATION MAY BE REQUIRED TO

EXECUTE A CERTIFICATE RELATED TO BUSINESS INTEGRITY.

5. CONDITIONS AFFECTING THE WORK.

BIDDERS SHOULD VISIT THE SITE AND TAKE SUCH OTHER STEPS AS MAY

BE REASONABLY NECESSARY TO ASCERTAIN THE NATURE AND LOCATION OF

THE WORK, AND THE GENERAL AND LOCAL CONDITIONS WHICH CAN AFFECT

THE WORK OR THE COST THEREOF. FAILURE TO DO SO WILL NOT RELIEVE

BIDDERS FROM RESPONSIBILITY FOR ESTIMATING PROPERLY THE

DIFFICULTY OR COST OF SUCCESSFULLY PERFORMING THE WORK. THE

GOVERNMENT WILL ASSUME NO RESPONSIBILITY FOR ANY UNDERSTANDING

OR REPRESENTATIONS CONCERNING CONDITIONS MADE BY ANY OF ITS

OFFICERS OR AGENTS PRIOR TO THE EXECUTION OF THE CONTRACT,

UNLESS INCLUDED IN THE INVITATION FOR BIDS, THE

SPECIFICATIONS, OR RELATED DOCUMENTS.

6. BIDDERS'S QUALIFICATIONS/PREAWARD SURVEY.

BEFORE A BID IS CONSIDERED FOR AWARD, THE BIDDER MAY BE

REQUESTED BY THE GOVERNMENT TO SUBMIT A STATEMENT REGARDING

HIS PREVIOUS EXPERIENCE IN PERFORMING COMPARABLE WORK, HIS

BUSINESS AND TECHNICAL ORGANIZATION, FINANCIAL RESOURCES, AND

THE PLANT AVAILABLE TO BE USED IN PERFORMING THE WORK.

7. SITE OF THE WORK.

BIDDERS ARE ADVISED THAT FOR PURPOSE OF APPLICABILITY OF THE

DAVIS-BACON ACT AND OTHER CONTRACT LABOR STANDARD PROVISIONS,

"THE SITE OF THE WORK" UNDER THE CONTRACT TO BE AWARDED

PURSUANT TO THIS INVITATION MAY NOT BE LIMITED TO THE PHYSICAL

PLACE(S) WHERE THE CONSTRUCTION CALLED FOR IN THE CONTRACT WILL

REMAIN WHEN WORK ON IT HAS BEEN COMPLETED.THE "SITE OF THE

WORK" MAY INCLUDE OTHER ADJACENT OR NEARBY PROPERTY USED BY THE

CONTRACTOR OR SUBCONTRACTORS DURING SUCH CONSTRUCTION. FOR

EXAMPLE, FABRICATION PLANTS, MOBILE FACTORIES, BATCH PLANTS,

BORROW PITS, JOB HEADQUARTERS, TOOL YARDS, ETC., WILL BE

CONSIDERED PART OF THE SITE OF THE WORK PROVIDED THEY ARE

DEDICATED EXCLUSIVELY OR NEARLY SO TO PERFORMANCE ON THE

CONTRACT AND ARE SO LOCATED IN PROXIMITY TO THE ACTUAL

CONSTRUCTION LOCATION THAT IT WOULD BE REASONABLE TO INCLUDE

THEM.

8. INFORMATION REGARDING BIDDING MATERIAL, AND BONDS.

A. SPECIFICATIONS, INVITATION NO. W912P8-15-B-0039, BIDDING

SCHEDULE, PRE-AWARD INFORMATION/DESCRIPTION OF WORK/BID

EVALUATION, EQUIPMENT SCHEDULE, CONSTRUCTION CONTRACT CLAUSES,

AND WAGE DETERMINATION DECISION NO. LA160007 03/04/2016 LA7 OF

THE SECRETARY OF LABOR, IS PART OF THIS INVITATION.

B.

(1) AN OFFEROR (BIDDER) ELECTING TO USE INDIVIDUAL SURETIES FOR

EITHER BID GUARANTEES OR PERFORMANCE AND PAYMENT BONDS MUST

SUBMIT, CONCURRENTLY WITH THE BONDS AND REQUIRED AFFIDAVITS, A

STATEMENT OF BOTH THE BUSINESS AND PERSONAL NAMES OF THE

PERSONS AND/OR BROKERAGES FIRMS THROUGH WHOM THE BONDS OR THE

GUARANTEES WERE OBTAINED, TOGETHER WITH THE ADDRESS AND

TELEPHONE NUMBER OF THE PERSONS AND/OR BROKERAGE FIRMS.

(2) BIDDERS SHOULD NOTE THAT SOME INDIVIDUAL SURETIES

AND BROKERS OF INDIVIDUAL SURETIES HAVE BEEN DEBARRED OR

SUSPENDED FROM OFFERING THEMSELVES OR OTHERS AS SURETIES TO THE

GOVERNMENT. OFFERORS OR BIDDERS ARE RESPONSIBLE FOR ASCERTAINING

THE CURRENT STATUS OF THEIR SURETIES AND BROKERS.

(3) FAILURE TO PROVIDE THE REQUIRED INFORMATION OR THE

SUBMISSION OF BID GUARANTEES OBTAINED FROM DEBARRED OR

SUSPENDED SURETIES OR BROKERS MAY CAUSE REJECTION OF THE OFFER

(BID).

9. DEFINITIONS

(A) THE TERM "HEAD OF THE AGENCY" OR "SECRETARY" AS USED

HEREIN MEANS THE SECRETARY OF THE ARMY; AND THE TERM "HIS DULY

AUTHORIZED REPRESENTATIVE" MEANS THE CHIEF OF ENGINEERS,

DEPARTMENT OF THE ARMY, OR AN INDIVIDUAL OR BOARD DESIGNATED

BY HIM.

(B) "CONTRACTING OFFICER" MEANS A PERSON WITH THE AUTHORITY

TO ENTER INTO, ADMINISTER, AND/OR TERMINATE CONTRACTS AND

MAKE RELATED DETERMINATIONS AND FINDINGS. THE TERM INCLUDES

CERTAIN AUTHORIZED REPRESENTATIVES OF THE CONTRACTING OFFICER

ACTING WITHIN THE LIMITS OF THEIR AUTHORITY AS DELEGATED BY

THE CONTRACTING OFFICER.

(C) THE AGENCY BOARD OF CONTRACT APPEALS HAVING JURISDICTION

OVER ALL APPEALS FROM FINAL DECISIONS OF THE CONTRACTING OFFICER

UNDER THE CONTRACT DISPUTES ACT OF L978 IS THE ARMED SERVICES

BOARD OF CONTRACT APPEALS, ADDRESSED AS FOLLOWS:

RECORDER, ARMED SERVICES BOARD OF CONTRACT APPEALS, SKYLINE 6,

7TH FLOOR, 5109 LEESBURG PIKE, FALLS CHURCH, VIRGINIA

22041-3208.

(D) "SMALL BUSINESS CONCERN" MEANS A CONCERN INCLUDING ITS

AFFILIATES, THAT IS INDEPENDENTLY OWNED AND OPERATED, NOT

DOMINANT IN THE FIELD OF OPERATION IN WHICH IT IS BIDDING ON

GOVERNMENT CONTRACTS, AND QUALIFIED AS A SMALL BUSINESS UNDER

THE CRITERIA AND SIZE STANDARDS IN 13 CFR 121.

(1) SIZE STANDARDS FOR CONSTRUCTION AND SPECIAL TRADES.

(A) CONSTRUCTION. A CONCERN IS SMALL IF ITS AVERAGE

ANNUAL RECEIPTS FOR ITS PRECEDING 3 FISCAL YEARS DID

NOT EXCEED $36.5 MILLION.

(B) DREDGING. A CONCERN IS SMALL IF (1) ITS

AVERAGE ANNUAL RECEIPTS FOR ITS PRECEDING 3

FISCAL YEARS DID NOT EXCEED $27.5 MILLION, AND

(2) AT LEAST 40 PERCENT OF THE YARDAGE IN THE

CONTRACT'S PLANS AND SPECIFICATIONS IS DREDGED

WITH EQUIPMENT OWNED BY THE CONCERN OR OBTAINED

FROM ANOTHER SMALL BUSINESS DREDGING CONCERN.

10) TECHNICAL INQUIRIES AND QUESTIONS

ALL TECHNICAL INQUIRIES AND QUESTIONS RELATING TO THIS

SOLICITATION ARE TO BE SUBMITTED VIA BIDDER INQUIRY IN PROJNET

(HTTPS://WWW.PROJNET.ORG) NO LATER THAN 5 DAYS PRIOR TO DUE

DATE IN ORDER TO ENSURE ADEQUATE TIME IS ALLOTED TO FORM AN

APPROPRIATE RESPONSE AND AMEND THE SOLICITATION IF NECESSARY.

TO SUBMIT AND REVIEW INQUIRY ITEMS, PROSPECTIVE VENDORS WILL

NEED TO USE THE BIDDER INQUIRY KEY PRESENTED BELOW AND FOLLOW

THE INSTRUCTIONS LISTED BELOW THE KEY FOR ACCESS. A

PROSPECTIVE VENDOR WHO SUBMITS A COMMENT /QUESTION WILL

RECEIVE AN ACKNOWLEDGEMENT OF THEIR COMMENT/QUESTION VIA

EMAIL, FOLLOWED BY AN ANSWER TO THE COMMENT/QUESTION AFTER IT

HAS BEEN PROCESSED BY OUR TECHNICAL TEAM. ALL TIMELY QUESTIONS

AND APPROVED ANSWERS WILL BE MADE AVAILABLE THROUGH PROJNET.

APPROVED ANSWERS TO ALL TIMELY QUESTIONS WILL ALSO BE

POSTED ON THE FEDBIZOPS IN THE FORM OF A REPORT GENERATED FROM

PROJNET AS SOON AS THE COMMENT/QUESTION ENTERING PERIOD IS

OVER AND ALL ANSWERS ARE ALL FINALIZED.

THE SOLICITATION NUMBER IS: W912P8-15-B-0039

THE BIDDER INQUIRY KEY IS: WC2UKG-MNH7H5

SPECIFIC INSTRUCTIONS FOR PROJNET BID INQUIRY ACCESS:

1. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON

QUICK ADD ON THE UPPER RIGHT SIDE OF THE SCREEN.

2. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.

3. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.

4. EMAIL. ENTER THE EMAIL ADDRESS YOU WOULD LIKE TO

USE FOR COMMUNICATION.

5. CLICK CONTINUE. A PAGE WILL THEN OPEN SAYING THAT A

USER ACCOUNT WAS NOT FOUND AND WILL ASK YOU TO CREATE

ONE USING THE PROVIDED FORM.

6. ENTER YOUR FIRST NAME, LAST NAME, COMPANY, CITY, STATE,

PHONE, EMAIL, SECRET QUESTION, SECRET ANSWER, AND TIME

ZONE. MAKE SURE TO REMEMBER YOUR SECRET QUESTION AND

ANSWER AS THEY WILL BE USED FROM THIS POINT ON TO ACCESS

THE PROJNET SYSTEM.

7. CLICK ADD USER. ONCE THIS IS COMPLETED YOU ARE NOW

REGISTERED WITHIN PROJNET AND ARE CURRENTLY LOGGED

INTO THE SYSTEM.

SPECIFIC INSTRUCTIONS FOR FUTURE PROJNET BID INQUIRY ACCESS:

1. FOR FUTURE ACCESS TO PROJNET, YOU WILL NOT BE EMAILED

ANY TYPE OF PASSWORD. YOU WILL UTILIZE YOUR SECRET

QUESTION AND SECRET ANSWER TO LOG IN.

2. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON

QUICK ADD ON THE UPPER RIGHT SIDE OF THE SCREEN.

3. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.

4. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.

5. EMAIL. ENTER THE EMAIL ADDRESS YOU USED

TO REGISTER PREVIOUSLY IN PROJNET.

6. CLICK CONTINUE. A PAGE WILL THEN OPEN ASKING YOU

TO ENTER THE ANSWER TO YOUR SECRET QUESTION.

7. ENTER YOUR SECRET ANSWER AND CLICK LOGIN. ONCE

THIS IS COMPLETED YOU ARE NOW LOGGED INTO THE

SYSTEM.

THE CALL CENTER OPERATES WEEKDAYS FROM 8AM TO 5PM U.S.

CENTRAL TIME ZONE (CHICAGO). THE TELEPHONE NUMBER FOR THE

CALL CENTER IS 800-428-HELP.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management JUL 2013 52.214-3 Amendments To Invitations For Bids DEC 1989 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids MAR 1997 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-2 Audit and Records--Negotiation OCT 2010 52.222-38 Compliance With Veterans' Employment Reporting FEB 2016

Requirements 52.225-12 Notice of Buy American Requirement - Construction MAY 2014

Materials Under Trade Agreements

CLAUSES INCORPORATED BY FULL TEXT

52.211-5000 EVALUATION OF SUBDIVIDED ITEMS (MAR 1995)—UAI

Item Nos. 0006, 0008, 0012, 0018, and 0022 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its sub-items.

(End of clause)

CLAUSES INCORPORATED BY FULL TEXT

52.214-5000 Apparent clerical mistakes.

ARITHMETIC DISCREPANCIES

(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

(End of statement)

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.

(End of provision)

CLAUSES INCORPORATED BY FULL TEXT

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is SMSA Counties MS, SMSA Parishes LA, Non-SMSA Counties, MS, LA

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

Goals for minority participation for each trade

Goals for female participation for each trade

SMSA Counties MS 19.2% SMSA Counties LA 31.0% Non-SMSA Counties 27.7%

6.9% 6.9% 6.9%

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be _twenty (20%)_ percent of the bid price or $3,000,000.00, whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of provision)

CLAUSES INCORPORATED BY FULL TEXT

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S Army Corps of Engineers Attn: Robin Green

CEMVK-CT-S

4155 Clay Street Vicksburg, MS 39183

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

CLAUSES INCORPORATED BY FULL TEXT

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) Site visits may be arranged during normal duty hours by contacting:

Name: STEPHEN HINKAMP Address: U.S. ARMY CORPS OF ENGINEERS, P.O. BOX 60267 Telephone: (PRIMARY) 504-628-5090 or 504-862-2268

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/

(End of provision)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any (48 CFR Chapter) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision)

WAGE RATE

General Decision Number: LA160007 03/04/2016 LA7

Superseded General Decision Number: LA20150007

State: Louisiana

Construction Type: Heavy

Counties: Jefferson, Orleans, Plaquemines, St Bernard, St Charles, St James, St John the Baptist and St Tammany Counties in Louisiana.

HEAVY CONSTRUCTION PROJECTS (Includes flood control, water & sewer lines, and water wells. Also includes elevated storage tanks in all listed parishes except Plaquemines and St. James.

Excludes industrial construction-chemical processing, power plants, and refineries.)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/08/2016 1 02/26/2016 2 03/04/2016

CARP0729-001 07/01/2012

Rates Fringes

MILLWRIGHT.......................$ 25.80 9.50

CARP1846-006 07/01/2015

Rates Fringes

CARPENTER

(formbuilding/formsetting and Piledrivers).....................$ 24.26 8.20

ELEC0130-005 06/01/2015

JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.

JAMES, AND ST. JOHN THE BAPTIST PARISHES

Rates Fringes

ELECTRICIAN (including low Revised by Amendment 0001 voltage wiring)..................$ 29.85 10.53

ELEC1077-002 06/01/2014

ST. TAMMANY PARISH

Rates Fringes

ELECTRICIAN (including low voltage wiring)..................$ 22.80 7.50

ENGI0406-018 07/01/2009

Rates Fringes

OPERATOR: Power Equipment Bulldozer...................$ 21.26 6.70 Mechanic....................$ 23.31 6.70

PLAS0567-003 07/01/2014

JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.

JOHN THE BAPTIST, and ST. TAMMANY PARISHES

Rates Fringes

Cement Mason/Concrete Finisher...$ 21.43 6.19

PLAS0812-003 06/01/2004

ST. JAMES PARISH

Rates Fringes

Cement Mason/Concrete Finisher...$ 21.85 0.00

PLUM0060-002 11/30/2015

JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.

JAMES (Southeastern Portion), ST. JOHN THE BAPTIST, and ST.

TAMMANY PARISHES

Rates Fringes

Plumbers (excluding pipe laying)..........................$ 28.58 12.18

* PLUM0198-005 01/01/2016

ST. JAMES PARISH (Northwestern Portion)

Rates Fringes

PLUMBER (excluding pipe laying)..........................$ 29.38 11.40

SULA2004-007 05/13/2004

Rates Fringes

CARPENTER (all other work).......$ 13.75 2.60

Laborers: Revised by Amendment 0001

Common/Landscape............$ 9.88 0.00 Fence.......................$ 11.24 0.00 Flagger.....................$ 8.58 0.00 Mason Tender................$ 7.25 0.00 Pipelayer...................$ 9.84 0.00

PIPEFITTER (excluding pipelaying)......................$ 17.52 4.51

Power equipment operators:

Backhoe/Excavator...........$ 14.42 0.00 Crane.......................$ 16.34 3.30 Dragline....................$ 16.50 0.00 Front End Loader............$ 13.89 0.00 Oiler.......................$ 10.03 0.00

Truck drivers:

Dump........................$ 11.01 0.00 Pickup......................$ 12.25 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state.