AMENDMENT NO 0007 W912P620B0002 LEVEE 37 PUMP STATION REPAIRS rgb.pdf

PDF 405 KB Posted

Attached to
LEVEE 37 PUMP STATION UPGRADE, VILLAGE OF MOUNT PROSPECT, COOK COUNTY, ILLINOIS (USACE ACQUISITION)
Solicitation number
W912P620B0002
Issued by

About this file

This document provides details for Amendment No. 0007 to the solicitation for the Levee 37 Pump Station Upgrade project in Mount Prospect, Illinois. The amendment extends the bid opening and submission date to October 27, 2020 at 1:00pm Central Time. It also replaces a portion of Specification Section 01 22 00.00 10 that was previously omitted. Bidders are instructed to remove the prior version of this specification section and replace it with the revised version enclosed in this amendment. The point of contact for questions is provided.

The related federal contract opportunity notice is for solicitation number W912P620B0002 for the construction project to upgrade Levee 37 Pump Station in Mount Prospect, Illinois. Competition is reserved for small businesses under NAICS code 237110 with a size standard of $39.5 million. The construction cost is estimated between $1-5 million. The solicitation is available for download as PDF files. The due date for bids was October 6, 2020 by 2:00pm Central Time. Bidders must be registered in SAM to submit a bid. The point of contact is provided for any questions.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6693097811

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. The Bid Opening Date and Time is NOT EXTENDED by this Amendment. Therefore, Bidders are required to submit their Bid packages prior to 1:00p.m. (CDT) on October 27, 2020. For further details regarding bid submission, please refer to Solicitation Section 00 22 13 –“ Supplementary Instructions to Bidders.”

B. By w ay of this Amendment, the government is providing the portion of Specification Section 01 22 00.00 10, w hich w as revised and inadvertently omitted from the previously issued Amendment No. 0006. Accordingly, bidders shall remove and replace the relevant Section w ith the Revised Section enclosed hereunder.

C. The Point of Contact for this Amendment is Regina G. Blair at regina.g.blair@usace.army.mil.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Oct-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P620B0002

X 9B. DATED (SEE ITEM 11)

04-Sep-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Oct-2020

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P620B0002

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

THE AFOREMENTIONED REVISED

SPECIFICATION SECTION FOLLOWS -

Levee 37 Pump Station Upgrade, Village of Mount Prospect W912P620B0002

1.2.2 Flap Gate (Base Bid Item 0010)

1.2.2.1 Payment

Payment will be made for all material, fabrication, delivery, installation, testing procedures, and disposal associated with the installation of the flap gates as shown on the contract drawings and as described in Section 33 61 13.19 VALVES, PIPING, SUMP PUMPS, AND EQUIPMENT IN VALVE MANHOLES. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.2.2.2 Measurement

The measurement will be per each flap gates installed and accepted at locations shown on drawings.

1.2.2.3 Unit of Measure

Unit of Measure: Each (EA)

1.2.3 Duckbill Valve (Base Bid Item 0011)

1.2.3.1 Payment

Payment will be made for all material, fabrication, delivery, installation, testing procedures, and disposal associated with the installation of the duckbill valve as shown on the contract drawings and as described in Section 33 61 13.19 VALVES, PIPING, SUMP PUMPS, AND EQUIPMENT IN VALVE MANHOLES. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, and incidentals necessary to complete the work.

1.2.3.2 Measurement

The measurement will be per each duckbill valve installed and accepted at locations shown on drawings.

1.2.3.3 Unit of Measure

Unit of Measure: Each (EA)

1.2.4 5 Foot by 5 Foot Culvert (Base Bid Item 0016)

1.2.4.1 Payment

Payment will be made for costs associated with construction of the 5 foot by 5 foot culvert as shown on the drawings, including all excavation and backfill and structural connections to existing structures. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, bypass piping/pumping, and incidentals necessary to complete the work.

1.2.4.2 Measurement

The payment will be per linear foot of work completed and accepted at locations shown on drawings.

SECTION 01 22 00.00 10 Page 9

AMD #0007 - 10/22/20

Levee 37 Pump Station Upgrade, Village of Mount Prospect W912P620B0002

1.2.4.3 Unit of Measure

Unit of Measure: Linear Feet (LF)

1.2.5 6 Foot by 4 Foot Culvert (Base Bid Item 0018 and Option Bid Item 0023)

1.2.5.1 Payment

Payment will be made for costs associated with construction of the 6 foot by 4 foot culvert as shown on the drawings, including all excavation and backfill and structural connections to existing structures. Payment constitutes full compensation for all plant, labor, materials, equipment, tools, bypass piping/pumping, and incidentals necessary to complete the work.

1.2.5.2 Measurement

The payment will be per linear foot of work completed and accepted at locations shown on drawings.

1.2.5.3 Unit of Measure

Unit of Measure: Linear Feet (LF)

PART 2 PRODUCTS (NOT USED)

PART 3 EXECUTION

3.1 CONTRACT COST BREAKDOWN

The Contractor must furnish within 30 calendar days after the date of Notice to Proceed, and prior to the submission of its first partial payment estimate, a breakdown of its single job pay item or items which will be reviewed by the Contracting Officer as to propriety of distribution of the total cost to the various accounts. Any unbalanced items as between early and late payment items or other discrepancies will be revised by the Contracting Officer to agree with a reasonable cost of the work included in the various items. This contract cost breakdown will then be utilized as the basis for progress payments to the Contractor.

-- End of Section --

SECTION 01 22 00.00 10 Page 10

AMD #0007 - 10/22/20

REV SPECW912P620B0002_113244_Levee_37_Pump_Station_Upgrade_Village_Mt_Prospect_AMD0007_SPECS_(22-Oct-20).pdf
01 22 00.00 10 - PRICE AND PAYMENT PROCEDURES
01 22 00.00 10 - PRICE AND PAYMENT PROCEDURES
PART 1 GENERAL
1.1 SINGLE JOB PAYMENT ITEMS
1.1.1 Mobilization Base Bid Item 0001
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.2 Demobilization Base Bid Item 0002
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.3 Temporary Construction Facilities Base Bid Item 0003
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.4 Maintenance of Traffic Base Bid Item 0004
1.1.4.1 Payment
1.1.4.2 Unit of Measure
1.1.5 Demolition and Removal Base Bid Item 0005 and Option Bid Item 0021
1.1.5.1 Payment
1.1.5.2 Unit of Measure
1.1.6 Reinforced Concrete Structure and Miscellaneous Metal Base Bid Item
1.1.6.1 Payment
1.1.6.2 Unit of Measure
1.1.7 Axial Flow Propeller Pump Base Bid Item 0008
1.1.7.1 Payment
1.1.7.2 Unit of Measure
1.1.8 Sump Pump Base Bid Item 0009
1.1.8.1 Payment
1.1.8.2 Unit of Measure
1.1.9 Electrical Components Base Bid Item 0012
1.1.9.1 Payment
1.1.9.2 Unit of Measure
1.1.10 Seeding Base Bid Item 0013 and Option Bid Item 0024
1.1.10.1 Payment
1.1.10.2 Unit of Measure
1.1.11 Topsoil Base Bid Item 0014 and Option Bid Item 0025
1.1.11.1 Payment
1.1.11.2 Unit of Measure
1.1.12 Closure Structure 6 Modifications Base Bid Item 0015
1.1.12.1 Payment
1.1.12.2 Unit of Measure
1.1.13 Pump Station #2 Modifications Base Bid Item 0017
1.1.13.1 Payment
1.1.13.2 Unit of Measure
1.1.14 Pump Station Outlet Base Bid Item 0019
1.1.14.1 Payment
1.1.14.2 Unit of Measure
1.1.15 Backflow Structure #1 Modifications Option Bid Item 0022
1.1.15.1 Payment
1.1.15.2 Unit of Measure
1.1.16 Primary Duct Bank Option Bid Item 0026
1.1.16.1 Payment
1.1.16.2 Unit of Measure
1.1.17 750 kVA Pad Mount Service Transformer Option Bid Item 0027
1.1.17.1 Payment
1.1.17.2 Unit of Measure
1.1.18 GOVERNMENT PRICE ALLOWANCE FOR COMED TRANSFORMER CONNECTION FEE
1.1.18.1 Payment
1.1.18.2 Unit of Measure
1.1.19 Performance and Payment Bond Base Bid Item 00210 and Option Bid
1.1.19.1 Payment
1.1.19.2 Unit of Measure
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Clearing and Grubbing Base Bid Item 0006
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measure
1.2.2 Flap Gate Base Bid Item 0010
1.2.2.1 Payment
1.2.2.2 Measurement
1.2.2.3 Unit of Measure
1.2.3 Duckbill Valve Base Bid Item 0011
1.2.3.1 Payment
1.2.3.2 Measurement
1.2.3.3 Unit of Measure
1.2.4 5 Foot by 5 Foot Culvert Base Bid Item 0016
1.2.4.1 Payment
1.2.4.2 Measurement
1.2.4.3 Unit of Measure
1.2.5 6 Foot by 4 Foot Culvert Base Bid Item 0018 and Option Bid Item
1.2.5.1 Payment
1.2.5.2 Measurement
1.2.5.3 Unit of Measure
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION
3.1 CONTRACT COST BREAKDOWN