This file contains Amendment No 0003, containing the USACE -Chicago District's clarifications to Contractor's Inquiries. Bidders may email an acknowledged copy of this particular amendment to Anita Simpkins at anita.r.simpkins@usace.army.mil with a copy furnished to Regina Blair at regina.g.blair@usace.army.mil. All bids must be mailed or hand-carried per the provisions set forth in the Solicitation document and via this Amendment No. 0003.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6671718317

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: CLARIFICATIONS TO CONTRACTOR'S INQUIRIES - RE: INVITATION FOR BIDS W912P619B0007, “CHICAGO LOCK NORTH PIER

REPAIRS, CHICAGO, ILLINOIS”

The government is issuing this Amendment Number 0003 to its previously issued Solicitation W912P619B0007 for the purpose of providing

CLARIFICATIONS TO CONTRACTOR’S INQUIRIES VIA THIS AMENDMENT NO. 0003.

POINT OF CONTACT: Regina G. Blair, Contracting Officer 312-846-5371 or regina.g.blair@usace.army.mil.

THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES -

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 24-Jul-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0007

X 9B. DATED (SEE ITEM 11)

13-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Jul-2019

CODE

U.S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604-1437

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P619B0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT PARTICULARS

A. The BID OPENING DATE REMAINS July 25, 2019; therefore, BIDS are due prior to 2:00 pm CST on July 25, 2019. Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document.

B. Bidders may email an acknowledged copy of this particular Amendment No.

0003 to Anita Simpkins at anita.r.simpkins@usace.army.mil with a copy furnished to Regina Blair at regina.g.blair@usace.army.mil. All bids must be mailed or hand-carried per the provisions set forth in the Solicitation document.

C. “CLARIFICATIONS” TO CONTRACTOR’S INQUIRIES FOLLOW:

THE USACE-CHICAGO DISTRICT PROVIDES THE FOLLOWING CLARIFICATIONS TO

CONTRACTOR’S INQUIRIES VIA THIS AMENDMENT NO. 0003

--NOTE: THE RESPONSES (CLARIFICATIONS) ARE PROVIDED IN RED TEXT

1. The utility conduits that are shown – are we furnishing and installing the 12KV cable in this conduit or is ComEd?

If we are installing that cable can you clarify what we are pulling because we cannot find it in the drawings. 12kV cable to be installed by ComEd. Please refer to specification section 33 71 02, paragraph 1.2 'Installation of 12.47kV cable through conduit by ComEd...'

a. The drawings call for us re-feeding the power and controls for the gate from the source, can you please clarify where the source is located for these cables and what the cables are?

Re-feed cable as per Note 8, Sheet ES-102.

b. The are a couple of camera towers that are being relocated to the north and is to be re-fed back to the source, can you please clarify where this is?

Verify source in the field, see Note 4, Sheet ED-101.

2. Specification section 31 32 23 paragraph 3.3.5 “Grout Mix” states a sand and Portland cement- based consolidation grout containing some combination of viscosity modifiers, fulisifiers, and other admixtures having an average slump of eight inches plus/minus .5 inches” Based on this statement we have the following questions:

a. Can the slump of the grout be increased above 8” to allow for better pumpability?

b. Are viscosity modifiers, fulisifiers and or other admixtures required to be part of the contractors mix design?

Based on the specification 31 32 23, paragraph 3.3.5, slump can be increased 0.5”. The specs also covers requirements for modifiers, and other admixtures. Bid as specified.

4. Additionally, please provide geotechnical reports for sheet pile installation.

Provided with amendment #2.

5. What are the depths of excavation for the tie-in points for the municipal and sanitary?

Refer to Sheet V002 to see notes about the sewer and water tie-ins.

6. Where are the electric tie-in point for the heat trace?

Refer to Sheet V002 to see notes about the sewer and water tie-ins.

7. In reference to the parking lot excavation for the proposed tie rods:

Sheet CS302 Note 1. States “Area to be excavated and backfilled with the same material”

Sheet SS-501 Note 1. States “Any soil excavated in the parking lot for installation of the tie rods…shall be disposed of offsite

What if the intent of pay item 0007AB - Excavate & Backfill For Tie-Rods? Are we to haul the material off and import stone, or stockpile and reuse the excavated material?

Bid as specified.

8. The cross sections in the plan sheets CS-303, CS-304 and CS-305 clearly show the approximate existing A-stone elevations and also the new tow stone elevations and slope in front of the new sheet pile wall. Per the quantities taken off of cross sections there will be a surplus of excavated A-stone. Is it the intent of the USACE for the contractor to place all of the excavated material in front of and behind the new sheet pile wall? If this is the case, is the “new toe stone” proposed line on these cross sections incorrect? How does the USACE intend on checking permanent grade during the backfill of this new toe stone? Will the contractor be able to place all of the surplus excavated material, not placed behind the sheet pile wall, in front of (on the lake side) the new sheet pile wall?

Bid as specified. Since the quantities depend on how much material will be excavated during toe clearing, Current contract does not specify removal off site any stone recovered when clearing the drive line. Specs section 35 31

19.45 03 para 2.3.2 says that existing granite “Red Stone” on site meets the requirements of this contract for A- Stone. Sheet CS502 note 2 says, the existing toe stone shall be filled up to 1 ft below new tie-rods. Stone removed during clearing the drive line, based on the specification Section 35 31 20.00 03 can be used as a Toe Berm Stone as well.

Electrical Site Plan – Demolition Sheet ED-104 Note 14 states to install (2) 5” conduit. Should this conduit be GS PVC Coated? Are these (2) 5” conduits in addition to the (8) 5” shown on Sheets ES-104 through ES-106? If they are for temporary use, will they be required to be removed after the new conduits are installed?

Bid as specified.

END OF CLARIFICATIONS TO CONTRACTOR’S INQUIRIES