AMENDMENT_NO_0001_W912P619B0007_CHICAGO_LOCK_NORTH_PIER_REPAIRS_16JUL2019.pdf
PDF 2 MB Posted
- Attached to
- Chicago Lock North Pier Repairs - Chicago, IL
- Solicitation number
- W912P619B0007
About this file
This file contains Amendment No. 0001, which includes the attachments/enclosures stated therein the amendment document.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6671718317
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
SUBJECT: REVISIONS TO INVITATION FOR BIDS W912P619B0007, “CHICAGO LOCK NORTH PIER REPAIRS, COUNTY OF COOK, CITY OF
CHICAGO, STATE OF ILLINOIS”
The government is issuing this Amendment Number 0001 to its previously issued Solicitation W912P619B0007 for the purpose of amending the areas of the Solicitation delineated on the follow ing pages. This Amendment also responds to a Contractor’s inquiries.
THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGES
1. CONTRACT ID CODE PAGE OF PAGES
1 21
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 16-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P619B0007
X 9B. DATED (SEE ITEM 11)
13-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Jul-2019
CODE
U.S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P619B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
AMENDMENT PARTICULARS
A. CONTINGENCY STATEMENT: The Contingency Statement entered at Page 1, Block No. 10 of the Solicitation document, is NO LONGER APPLICABLE AND IS LIFTED VIA THIS AMENDMENT. Accordingly, the government hereby informs bidders that the government is in receipt of the required 401 Certification and thus, permits the acceptance of bids. Enclosed within the manners described at the below paragraph D is said certification.
B. The BID OPENING DATE IS EXTENDED BY THIS AMENDMENT; therefore, BIDS are due prior to 2:00 pm CST on July 24, 2019. Detailed information regarding the submission of bids is located at Section 00 22 13 of the Solicitation document.
C. AMENDED SOLICITATION SECTIONS:
(1) Block Number 3 of the SF 1442 (Page 1 of the Solicitation Document) is changed to correct the issuance date of the Solicitation. Accordingly, the issue date has changed from 12- Jun-2019 to 13-Jun-2019.
(2) Block Number 9 of the SF 1442 (Page 1 of the Solicitation Document), changes the point of contact to Harrell Hooks at 312-846-5376.
(3) SECTION 00 10 00 - SOLICITATION is revised as follows: This Amendment replaces the previously issued Bid Schedule in its entirety, which was furnished via the Solicitation issuance date of 13 Jun 2019. The revised schedule incorporates quantity adjustments made to Sub- Contract Line Item Numbers 0006AC and 0006F (see below). Hereunder is the REVISED BID SCHEDULE; therefore, Bidders shall utilize the Revised Bid Schedule to submit their bid prices.
SUBCLIN 0006AC
The pricing detail quantity has decreased by 852.00 from 3,673.00 to 2,821.00.
SUBCLIN 0006AF
The pricing detail quantity has increased by 852.00 from 532.00 to 1,384.00.
(4) At SECTION 00 22 13 –SUPPLEMENTARY INSTRUCTIONS TO BIDDERS, the following have been modified to incorporate the most current wage determination; thus,
- General Decision Number IL20190009 06/21/2019 is herewith incorporated (note: the General Decision IL18, which is also applicable to this project, remains unchanged and still applies)
D. AMENDED SPECIFICATION SECTION: Specification Section 01 57 20 “Environmental Protection for Illinois,” para 3.1 has been amended to incorporate the 401 certification (the certification is enclosed herewith). Note: Under the resulting contract, the 401 certification will be attached to the end of said Specification Section.
E. ATTENDEES – PRE BID MEETING/SITE VISIT: The USACE issues with this Amendment, an Interested vendors lists via the attached “Attendee’s Sign-in Sheet” from the pre-BID Meeting/Site Visit held on June 25, 2019.
F. USACE RESPONSES TO THE CONTRACTOR’s INQUIRIES: In response to a contractor’s inquiries, the following response is provided. NOTE: Additional inquiries will be addressed via a subsequent Amendment.
INQUIRIES: One of the Sub-contractors indicated that, the bid quantities in general are significantly higher (Up to 30%) than the takeoff quantities. Can you please verify the bid quantities or provide guidance on how the discrepancy will be handled?
USACE RESPONSE: The Revised bid schedule included herewith has addressed the aforementioned inquiries.
G. POINTs OF CONTACT: The point of contact for this Amendment is Harrell Hooks at (312) 846-5376 and Regina Blair at (312) 846-5371.
(End of Amendment 0001 – THE AFOREMENTIONED ENCLOSURES/ATTACHMENTS FOLLOW)
Section 00 10 00 – Solicitation –
REVISED BID SCHEDULE VIA AMENDMENT NO. 0001
THE SOLICITATION CONTRACT FORM CONTAINED AT THIS SECTION 00 10 00 OF THE
SOLICITATION DOCUMENT SHALL BE USED BY BIDDERS TO SUBMIT THEIR BIDS; SAID FORM IS
CONSIDERED THE “BID SCHEDULE” AS TERMED THROUGHOUT THIS SOLICITATION.
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
MOBILIZATION
FFP
Under this CLIN, the contractor is required to perform mobilization activities. The contractor will be compensated for the totality of its activities needed to mobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the mobilization of all of the Contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
MILSTRIP: W81G6671718317
PURCHASE REQUEST NUMBER: W81G6671718317
NET AMT
0002 1 Job
DEMOBILIZATION
FFP
Under this CLIN, the contractor is required to perform demobilization activities.
The contractor will be compensated for the totality of its activities needed to demobilize its equipment and labor force to the project site.
Payment Provisions:
The Government will pay all costs for the demobilization of all of the Contractor's plant and equipment at the unit price for this item. The Contracting Officer or its Representative may require the Contractor to furnish cost data to justify its bid price for this item if the Contracting Officer deems there's no reasonable relationship to the cost of the work in this contract. Failure to justify the line item price to the satisfaction of the Contracting Officer will result in payment determined by the Contracting Officer of the actual costs, which is not subject to appeal.
0003 1 Job
TEMPORARY CONSTRUCTION FACILITIES
FFP
0004 1 Job
TURBIDITY CURTAIN (SILT/SEDIMENT)
LAKESIDE SHEET PILE WALL AND TIE-RODS
FFP
This is a parent Contract Line Item, linking its Sub-Items 0005AA through 0005AD. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required servicesshall be provided therein Items 0005AA through 0005AD, wherein the sub-line items themselves identify the quantities required to perform said work.
0005AA 1 Job
CLEAR DRIVE LINE
0005AB 25,200 Square
Foot
SHEET PILE INSTALLATION (PZ 27)
0005AC 444 Linear
STEEL WALES (2 - C9 X 20)
0005AD 74 Each
TIE-ROD INSTALLATION
(PVC Sleeves, EX SSP Penetration, Tunnel Wall Cutting & PCC Esplenade )
LAKESIDE SHEET PILE WALL BACKFILL
FFP
This is a parent Contract Line Item, linking its Sub-Items 0006AA through 0006AH. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required servicesshall be provided therein Items 0006AA through 0006AH, wherein the sub-line items themselves identify the quantities required to perform said work
0006AA 1 Job Toe Stone Placement in Water
0006AB 1 Job Re-use Balance of Driveline Clearing Mat
0006AC 2,821 Cubic
Yard
CA1 Stone Placement Behind Sheet Pile
0006AD 532 Cubic
CA6 Stone 1' Top Layer
0006AE 1,437 Cubic
Excavate Embankment
0006AF 1,384 Cubic
Landscaping fill
0006AG 905 Cubic
Disposal Off Site Clean Fill
0006AH .25 Acre Landscaping Fill Seeding
PARKING LOT SHEET PILE ANCHOR WALL AND
FFP
TIE-RODS
This is a parent Contract Line Item, linking its Sub-Items 0007AA through 0007AH. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services hall be provided therein Items 0007AA through 0007AH, wherein the sub-line items themselves identify the quantities required to perform said work.
0007AA 326 Cubic
Excavate Aggregate Parking Lot Surface
Course Layer and Dispose Off Site
0007AB 1,597 Cubic
Excavate and Backfill for Tie-Rods
0007AC 1 Job Thorium Monitoring
0007AD 3,276 Square
Sheet Pile Installation PZ-27
0007AE 156 Linear
Steel Wales (2 - C9 x 20)
0007AF 26 Each Tie-Rods Installation (PVC Sleeves, Tunnel Wall Cutting, & PCC Esplenade )
0007AG 521 Net Ton
(2,000
LB).
Backfill / Grade Parking Lot Aggregate
Surface Layer CA-6
0007AH 1 Job Parking Lot Grading
TUNNEL UTILITY RELOCATE
FFP
This is a parent Contract Line Item, linking its Sub-Items 0008AA through 0008AD. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required servicesshall be provided therein Items 0008AA through 0008AD wherein the sub-line items themselves identify the quantities required to perform said work
0008AA 925 Linear
New Heat Traced Water Main
0008AB 650 Linear
New Forced Sewer Main
0008AC 1 Job New Electrical Lines
0008AD 1 Job New Communication Lines
0009 600 Linear
TUNNEL & ESPLANADE DEMOLITION
TUNNEL & ESPLANADE DEMOLITION AND REMOVAL
CRIB GROUTING
FFP
This is a parent Contract Line Item, linking its Sub-Items 0010AA through 0010AE. The actual work to be performed is described under the aforementioned Sub-Items. In that regard, the Contractor's pricing to perform the required services shall be provided therein Items 0010AA through 0010AE wherein the sub-line items themselves identify the quantities required to perform said work. Note: Sub- Items 0010AB and 0010AC are SUBDIVIDED ITEMS whereby the estimated quantities are subdivided and are to be separately priced.
0010AA 124 Each Drilling Grout/Vent Holes
0010AB 24 Cubic
Sanded Grout Initial 24 Cubic Yards
This Sub-item 0010AB is a subdivided line item, wherein the initial and biddable quantity is 24 Cubic Yards and shall be priced as such. The government will evaluate this item on the basis of its total price provided hereunder. Reference USACE ACQUISITION INSTRUCTION (UAI) Clause 5152.211-9000 Evaluation of Subdivided Items (See Section 00 21 13 of this Solicitation document).
0010AC 100 Cubic
Sanded Grout Over 24 Cubic Yards
This Sub-item 0010AC is a subdivided line item, wherein the biddable quantity is 100 Cubic Yards, which is OVER the initial 24 Cubic Yards and shall be priced as such. The government will evaluate this item on the basis of its total price provided hereunder. Reference USACE ACQUISITION INSTRUCTION (UAI) Clause 5152.211-9000 Evaluation of Subdivided Items (See Section 00 21 13 of this Solicitation document).
0010AD 24 Hours Placing Sanded Grout Initial
0010AE 100 Hours Placing Sanded Grout
0011 600 Linear
BULKHEAD STORAGE PAD
0012 580 Linear
PCC RETAINING WALL
0013 1 Job
ABESTOS REMOVAL
0014 1 Job
DEMOLITION
0015 1 Lot
PERFORMANCE AND PAYMENT BONDS
FFP
(PRICING FOR BONDS SHALL INCLUDE ALL QUANTITIES PRICED IN
THE ABOVE BID SCHEDULE - LINE ITEMS 0001 THROUGH 0014 (TO
INCLUDE THE RESPECTIVE SUB-ITEMS)
THIS IS A COST-REIMBURSABLE LINE ITEM - The government will reimburse the Contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with contract changes.
SUMMATION OF BID PRICES
OVERALL BID PRICE (ITEMS 0001 THROUGH 0015
(INCLUDES ALL RESPECTIVE SUBITEMS):
END OF REVISED BID SCHEDULE VIA AMENDMENT NO. 0001
Chi cago Har bor Lock Nor t h Pi er St abi l i zat i on W912P619B0007
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 57 20. 01 03
ENVI RONMENTAL PROTECTI ON FOR I LLI NOI S
06/2015
PART 1 GENERAL
1. 1 REFERENCES
1. 2 DEFI NI TI ONS
1. 2. 1 Envi r onment al Pol l ut i on and Damage
1. 2. 2 Envi r onment al Pr ot ect i on
1. 2. 3 Cont r act or Gener at ed Hazar dous Wast e
1. 2. 4 Cl ean Const r uct i on and Demol i t i on Debr i s ( CCDD)
1. 2. 5 Hazar dous Wast e
1. 2. 6 Land Appl i cat i on f or Di schar ge Wat er
1. 2. 7 Sur f ace Di schar ge
1. 2. 8 Wat er s of t he Uni t ed St at es
1. 2. 9 Wet l ands
1. 3 GENERAL REQUI REMENTS
1. 4 SUBCONTRACTORS
1. 5 PAYMENT
1. 6 SUBMI TTALS
1. 7 ENVI RONMENTAL PROTECTI ON PLAN
1. 7. 1 NPDES Pr ocedur e and Compl i ance
1. 7. 2 Envi r onment al Compl i ance
1. 7. 3 Envi r onment al Pr ot ect i on Pl an Cont ent s
1. 7. 4 Appendi x
1. 8 PROTECTI ON FEATURES
1. 9 SPECI AL ENVI RONMENTAL REQUI REMENTS
1. 10 ENVI RONMENTAL ASSESSMENT OF CONTRACT DEVI ATI ONS
1. 11 NOTI FI CATI ON
PART 2 PRODUCTS ( NOT USED)
PART 3 EXECUTI ON
3. 1 ENVI RONMENTAL PERMI TS AND COMMI TMENTS
3. 2 LAND RESOURCES
3. 2. 1 Wor k Ar ea Li mi t s
3. 2. 2 Landscape
3. 2. 3 Er osi on and Sedi ment Cont r ol s
3. 2. 4 Cont r act or Faci l i t i es and Wor k Ar eas
3. 3 WATER RESOURCES
3. 3. 1 Cof f er dams, Di ver si ons, and Dewat er i ng Oper at i ons
3. 3. 2 St r eam Cr ossi ngs
3. 3. 3 Wet l ands
3. 3. 4 Cont r ol of Aquat i c Nui sance Speci es
3. 4 AI R RESOURCES
3. 4. 1 Par t i cul at es
3. 4. 2 Odor s
3. 4. 3 Sound I nt r usi ons
3. 4. 4 Bur ni ng
SECTI ON 01 57 20. 01 03 Page 1
AMD #0001 - 07/ 11/ 19
3. 5 CHEMI CAL MATERI ALS MANAGEMENT AND WASTE DI SPOSAL
3. 5. 1 Sol i d Wast es ( Excl udi ng CCDD)
3. 5. 2 Cl ean Const r uct i on and Demol i t i on Debr i s
3. 5. 3 Chemi cal s and Chemi cal Wast es
3. 5. 4 Cont r act or Gener at ed Hazar dous Wast es/ Excess Hazar dous Mat er i al s
3. 5. 5 Fuel and Lubr i cant s
3. 5. 6 Wast e Wat er
3. 6 NON- HAZARDOUS SOLI D WASTE REPORT
3. 7 HI STORI CAL, ARCHAEOLOGI CAL, AND CULTURAL RESOURCES
3. 8 BI OLOGI CAL RESOURCES
3. 9 PREVI OUSLY USED EQUI PMENT
3. 10 MAI NTENANCE OF POLLUTI ON FACI LI TI ES
3. 11 TRAI NI NG OF CONTRACTOR PERSONNEL
3. 12 POST CONSTRUCTI ON CLEANUP
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 57 20. 01 03 Page 2
SECTI ON 01 57 20. 01 03
ENVI RONMENTAL PROTECTI ON FOR I LLI NOI S
06/2015
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o i n t he t ext by basi c desi gnat i on onl y.
U. S. ARMY CORPS OF ENGI NEERS ( USACE)
EM 385- 1- 1 ( 2014) Saf et y and Heal t h Requi r ement s Manual
WETLAND MANUAL Cor ps of Engi neer s Wet l ands Del i neat i on Manual Techni cal Repor t Y- 87- 1
U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)
33 CFR 328 Def i ni t i ons of Wat er s of t he Uni t ed St at es
40 CFR 261 I dent i f i cat i on and Li st i ng of Hazar dous Waste
40 CFR 262 St andar ds Appl i cabl e t o Gener at or s of Hazar dous Wast e
40 CFR 279 St andar ds f or t he Management of Used Oi l
40 CFR 302 Desi gnat i on, Repor t abl e Quant i t i es, and Notification
40 CFR 355 Emer gency Pl anni ng and Not i f i cat i on
40 CFR 68 Chemi cal Acci dent Pr event i on Pr ovi s i ons
49 CFR 171 - 178 Hazar dous Mat er i al s Regul at i ons
ASSOCI ATI ON OF I LLI NOI S SOI L AND WATER CONSERVATI ON DI STRI CTS
(AISWCD)
IUM ( 2013) I l l i noi s Ur ban Manual
I LLI NOI S ENVI RONMENTAL PROTECTI ON AGENCY ( I EPA)
35 I AC 900- 901 Ti t l e 35 of I l l i noi s Admi ni st r at i ve Code, Subt i t l e H: Noi se, Chapt er I : Pol l ut i on Cont r ol Boar d
SECTI ON 01 57 20. 01 03 Page 3
1. 2 DEFINITIONS
1. 2. 1 Envi r onment al Pol l ut i on and Damage
Envi r onment al pol l ut i on and damage i s t he pr esence of chemi cal , physi cal , or bi ol ogi cal el ement s or agent s whi ch adver sel y af f ect human heal t h or wel f ar e; unf avor abl y al t er ecol ogi cal bal ances of i mpor t ance t o human l i f e;
af f ect ot her speci es of i mpor t ance t o humanki nd; or degr ade t he envi r onment aest het i cal l y , cul t ur al l y and/ or hi st or i cal l y .
1. 2. 2 Envi r onment al Pr ot ect i on
Envi r onment al pr ot ect i on i s t he pr event i on/ cont r ol of pol l ut i on and habi t at di sr upt i on t hat may occur t o t he envi r onment dur i ng const r uct i on. The cont r ol of envi r onment al pol l ut i on and damage r equi r es consi der at i on of l and, wat er , and ai r ; bi ol ogi cal and cul t ur al r esour ces; and i ncl udes management of v i sual aest het i cs; noi se; sol i d, chemi cal , gaseous, and l i qui d wast e; r adi ant ener gy and r adi oact i ve mat er i al as wel l as ot her pollutants.
1. 2. 3 Cont r act or Gener at ed Hazar dous Wast e
Cont r act or gener at ed hazar dous wast e means mat er i al s t hat , i f abandoned or di sposed of , may meet t he def i ni t i on of a hazar dous wast e. These wast e st r eams woul d t ypi cal l y consi st of mat er i al br ought on s i t e by t he Cont r act or t o execut e wor k, but ar e not f ul l y consumed dur i ng t he cour se of const r uct i on. Exampl es i ncl ude, but ar e not l i mi t ed t o, excess pai nt t hi nner s ( i . e. , met hyl et hyl ket one and t ol uene) , wast e t hi nner s, excess pai nt s, excess sol vent s, wast e sol vent s, excess pest i c i des, and cont ami nat ed pest i c i de equi pment r i nse wat er .
1. 2. 4 Cl ean Const r uct i on and Demol i t i on Debr i s ( CCDD)
As def i ned by t he I l l i noi s Envi r onment al Pr ot ect i on Agency, CCDD i s uncont ami nat ed br oken concr et e wi t hout pr ot r udi ng met al bar s, br i cks, r ock, st one, or r ecl ai med asphal t pavement gener at ed f r om const r uct i on or demol i t i on act i v i t i es. When uncont ami nat ed soi l i s mi xed wi t h any of t hese mat er i al s, t he uncont ami nat ed soi l i s consi der ed CCDD.
1. 2. 5 Hazar dous Wast e
Wast es desi gnat ed by t he U. S. Envi r onment al Pr ot ect i on Agency as hazar dous, as def i ned i n 40 CFR 261.
1. 2. 6 Land Appl i cat i on f or Di schar ge Wat er
The t er m " Land Appl i cat i on" f or di schar ge wat er i mpl i es t hat t he Cont r act or must di schar ge wat er at a r at e whi ch al l ows t he wat er t o per col at e i nt o t he soi l . No sheet i ng act i on, soi l er osi on, di schar ge i nt o st or m sewer s, di schar ge i nt o def i ned dr ai nage ar eas, or di schar ge i nt o t he " wat er s of t he Uni t ed St at es" shal l occur . Land appl i cat i on must be i n compl i ance wi t h al l appl i cabl e Feder al , St at e, and l ocal l aws and r egul at i ons.
1. 2. 7 Sur f ace Di schar ge
The t er m " Sur f ace Di schar ge" i mpl i es t hat t he wat er i s di schar ged wi t h possi bl e sheet i ng act i on and subsequent soi l er osi on may occur . Wat er s t hat ar e sur f ace di schar ged may t er mi nat e i n dr ai nage di t ches, st or m sewer s, cr eeks, and/ or " wat er s of t he Uni t ed St at es" and woul d r equi r e a
SECTI ON 01 57 20. 01 03 Page 4 per mi t t o di schar ge wat er f r om t he gover ni ng agency. Al l pr oj ect s wi t h l and di st ur bances gr eat er t han or equal t o one acr e i n t ot al ar ea must have a Nat i onal Pol l ut i on Di schar ge El i mi nat i on Syst em ( NPDES) Const r uct i on Si t e Act i v i t y St or m Wat er Per mi t t o di schar ge sur f ace wat er f r om a const r uct i on s i t e, i ssued by t he I l l i noi s Envi r onment al Pr ot ect i on Agency. Al l pr oj ect s wi t h di schar ge of dr edged or f i l l mat er i al t o wat er s of t he Uni t ed St at es must have been i ssued a Cl ean Wat er Act Sect i on 401 Wat er Qual i t y Cer t i f i cat i on ( per mi t ) by t he I l l i noi s Envi r onment al Pr ot ect i on Agency.
1. 2. 8 Wat er s of t he Uni t ed St at es
Al l wat er s whi ch ar e under t he j ur i sdi ct i on of t he Cl ean Wat er Act , as def i ned i n 33 CFR 328.
1. 2. 9 Wetlands
Wet l ands means t hose ar eas t hat ar e i nundat ed or sat ur at ed by sur f ace or gr ound wat er at a f r equency and dur at i on suf f i c i ent t o suppor t , and t hat under nor mal c i r cumst ances do suppor t , a pr eval ence of veget at i on t ypi cal l y adapt ed f or l i f e i n sat ur at ed soi l condi t i ons. Wet l ands gener al l y i ncl ude swamps, mar shes, and bogs. Of f i c i al det er mi nat i on of whet her or not an ar ea i s c l assi f i ed as a wet l and must be done i n accor dance wi t h
WETLAND MANUAL.
1. 3 GENERAL REQUI REMENTS
Mi ni mi ze envi r onment al pol l ut i on and damage t hat may occur as t he r esul t of const r uct i on oper at i ons. The envi r onment al r esour ces wi t hi n t he pr oj ect boundar i es and t hose af f ect ed out s i de t he l i mi t s of per manent wor k must be pr ot ect ed dur i ng t he ent i r e dur at i on of t hi s cont r act . Compl y wi t h al l appl i cabl e envi r onment al Feder al , St at e, and l ocal l aws and r egul at i ons and be r esponsi bl e f or any del ays r esul t i ng f r om f ai l ur e t o compl y wi t h envi r onment al l aws and r egul at i ons.
1. 4 SUBCONTRACTORS
Ensur e compl i ance wi t h t hi s sect i on by subcont r act or s.
1. 5 PAYMENT
No separ at e payment wi l l be made f or wor k cover ed under t hi s sect i on. The Cont r act or shal l be r esponsi bl e f or payment of f ees associ at ed wi t h envi r onment al per mi t s, appl i cat i on, and/ or not i ces obt ai ned by t he Cont r act or . Al l cost s associ at ed wi t h t hi s sect i on shal l be i ncl uded i n t he cont r act pr i ce. The Cont r act or shal l be r esponsi bl e f or payment of al l f i nes/ f ees f or v i ol at i on or non- compl i ance wi t h Feder al , St at e, Regi onal and l ocal l aws and r egul at i ons.
1. 6 SUBMITTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . The f ol l owi ng must be submi t t ed i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES.
SD- 01 Pr econst r uct i on Submi t t al s
Envi r onment al Pr ot ect i on Pl an, G, DH
SECTI ON 01 57 20. 01 03 Page 5
SD- 11 Cl oseout Submi t t al s
Non- Hazar dous Sol i d Wast e Repor t G, DH
1. 7 ENVI RONMENTAL PROTECTI ON PLAN
No l at er t han 30 cal endar days af t er not i ce t o pr oceed ( NTP) and pr i or t o commenci ng const r uct i on s i t e act i v i t i es or del i ver y of mat er i al s t o t he s i t e, submi t a s i t e- and pr oj ect - speci f i c Envi r onment al Pr ot ect i on Pl an ( EPP) f or r evi ew and appr oval by t he Cont r act i ng Of f i cer . The pur pose of t he EPP i s t o pr esent a compr ehensi ve over vi ew of known or pot ent i al envi r onment al i ssues whi ch t he Cont r act or must addr ess dur i ng const r uct i on. I ssues of concer n must be def i ned wi t hi n t he EPP as out l i ned i n t hi s sect i on. Addr ess each t opi c at a l evel of det ai l commensur at e wi t h t he envi r onment al i ssue and r equi r ed const r uct i on t ask( s) . Topi cs or i ssues whi ch ar e not i dent i f i ed i n t hi s sect i on, but whi ch t he Cont r act or consi der s necessar y, must be i dent i f i ed and di scussed af t er t hose i t ems f or mal l y i dent i f i ed i n t hi s sect i on. Pr i or t o submi t t al of t he EPP, meet wi t h t he Cont r act i ng Of f i cer f or t he pur pose of di scussi ng t he i mpl ement at i on of t he i ni t i al EPP; possi bl e subsequent addi t i ons and r evi s i ons t o t he pl an i ncl udi ng any r epor t i ng r equi r ement s; and met hods f or admi ni st r at i on of t he Cont r act or ' s EPP. The EPP must be cur r ent and mai nt ai ned onsi t e by t he Cont r act or . Appr oval of t he Cont r act or ' s EPP wi l l not r el i eve t he Cont r act or of hi s r esponsi bi l i t y f or adequat e and cont i nui ng cont r ol of pol l ut ant s and ot her envi r onment al pr ot ect i on measures.
Pr ovi de a compl et e copy of t he submi t t al , i ncl udi ng al l gr aphi cs, at t achment s, and f i gur es, el ect r oni cal l y i n pdf f or mat .
1. 7. 1 NPDES Pr ocedur e and Compl i ance
The EPP must i nc l ude a St or mwat er Pol l ut i on Pr event i on Pl an ( SWPPP) , r egar dl ess of whet her t he pr oj ect wi l l cause a l and di st ur bance gr eat er t han or equal t o one acr e i n t ot al ar ea. The Gover nment wi l l r evi ew t he EPP, i ncl udi ng t he St or mwat er Pol l ut i on Pr event i on Pl an, and t hen, i f t he pr oj ect wi l l cause a l and di st ur bance gr eat er t han or equal t o one acr e i n t ot al ar ea, t he Gover nment wi l l submi t a Not i ce of I nt ent ( NOI ) t o t he I l l i noi s Envi r onment al Pr ot ect i on Agency ( I EPA) af t er t he pl an has been appr oved. As not ed above i n t he par agr aph t i t l ed " Sur f ace Di schar ge" , al l pr oj ect s wi t h l and di st ur bances gr eat er t han or equal t o one acr e i n t ot al ar ea must have a NPDES Const r uct i on Si t e Act i v i t y St or m Wat er Per mi t t o di schar ge sur f ace wat er f r om a const r uct i on s i t e, i ssued by t he I EPA. I f t he pr oj ect r equi r es a NPDES per mi t , no ear t h movi ng or l and di st ur bance act i v i t i es wi l l t ake pl ace bef or e t he submi ssi on of t he NOI ; appr oval of t he NPDES per mi t r equi r es 30 cal endar days af t er t he submi ssi on of t he NOI . The Cont r act or may NOT begi n any ear t h movi ng or l and di st ur bance act i v i t i es unt i l 30 cal endar days af t er t he submi ssi on of t he NOI .
Appr oval of t he Cont r act or ' s pl an by t he Gover nment wi l l not r el i eve t he Cont r act or of hi s r esponsi bi l i t y f or adequat e and cont i nui ng cont r ol of pol l ut ant s and ot her envi r onment al pr ot ect i on measur es. I f appl i cabl e, t he Cont r act or must addr ess al l comment s t o t he SWPPP gener at ed by t he I EPA wi t hi n seven cal endar days of r ecei pt of comment s. The Cont r act or must cer t i f y , i n wr i t i ng, t hat al l r ecommended changes have been made t o t he SWPPP, and must submi t t he cer t i f i cat i on t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) . Mor eover , i f t he pr oj ect i s r equi r ed t o compl y wi t h a NPDES per mi t , t he Cont r act or wi l l be r equi r ed t o post , i n a v i s i bl e l ocat i on accessi bl e f or publ i c v i ewi ng, t he I EPA r esponse l et t er , t o be
SECTI ON 01 57 20. 01 03 Page 6 pr ovi ded by t he Gover nment , and t he cur r ent I LR10 per mi t at t he pr oj ect site.
1. 7. 2 Envi r onment al Compl i ance
No r equi r ement i n t hi s Sect i on shal l be const r ued as r el i evi ng t he Cont r act or of any appl i cabl e Feder al , St at e, and l ocal envi r onment al pr ot ect i on l aws and r egul at i ons. Dur i ng const r uct i on, t he Cont r act or shal l be r esponsi bl e f or i dent i f y i ng, i mpl ement i ng, and submi t t i ng f or appr oval any addi t i onal r equi r ement s t o be i ncl uded i n t he EPP.
1. 7. 3 Envi r onment al Pr ot ect i on Pl an Cont ent s
The EPP must i nc l ude, but i s not l i mi t ed t o, al l of t he f ol l owi ng:
a. Name( s) and appr opr i at e qual i f i cat i ons of per son( s) wi t hi n t he Cont r act or ' s or gani zat i on who i s( ar e) r esponsi bl e f or ensur i ng adher ence t o t he EPP. For each i ndi v i dual wi l l be consi der ed qual i f i ed i f t hey possess a mi ni mum of t wo year s exper i ence ensur i ng compl i ance wi t h envi r onment al r egul at i ons and devel opi ng and super vi s i ng envi r onment al pr ot ect i on pl ans f or const r uct i on s i t es. The i ndi v i dual needs t o be pr of i c i ent at t he i mpl ement at i on of envi r onment al pr ot ect i on pl ans f or const r uct i on s i t es, f ami l i ar i t y wi t h desi gn and i nspect i ons of er osi on and sedi ment cont r ol measur es, spi l l pr event i on and cont r ol measur es, and knowl edge of ot her , appl i cabl e, r el evant , and appr opr i at e envi r onment al r egul at i ons and si t e saf et y i ssues.
b. Name( s) and qual i f i cat i ons of per son( s) r esponsi bl e f or mani f est i ng hazar dous wast e t o be r emoved f r om t he s i t e, i f appl i cabl e.
c. Name( s) and qual i f i cat i ons of per son( s) r esponsi bl e f or t r ai ni ng t he Cont r act or ' s envi r onment al pr ot ect i on per sonnel .
d. Descr i pt i on of t he Cont r act or ' s envi r onment al pr ot ect i on per sonnel t r ai ni ng pr ogr am, i ncl udi ng t r ai ni ng f or subcont r act or s.
e. A map of t he s i t e, showi ng s i t e boundar i es, wat er ways on or adj acent t o t he s i t e, 100- year f l ood pl ai ns, soi l t ypes, l ocat i on of veget at i ve cover , l ocat i on and di mensi ons of st or m wat er dr ai nage syst ems and nat ur al dr ai nage pat t er ns on and adj acent t o t he s i t e, l ocat i ons of ut i l i t i es st r uct ur es and r oads, s i t e t opogr aphy ( exi st i ng and pl anned) , and any pot ent i al ar eas wher e poi nt sour ces may ent er t he groundwater.
f . A St or mwat er Pol l ut i on Pr event i on Pl an whi ch i dent i f i es t he t ype and l ocat i on of t he er osi on and sedi ment cont r ol s t o be pr ovi ded. The pl an must meet t he r equi r ement s of t he cur r ent I l l i noi s NPDES Per mi t No. I LR10 ( i ncl uded at t he end of t hi s sect i on) . The management pr act i ces, cont r ol s, and ot her pr ovi s i ons cont ai ned i n t he pl an must be as pr ot ect i ve as t he r equi r ement s i n t he I l l i noi s Ur ban Manual , IUM.
The cont ent s of t he pl an must addr ess al l i t ems l i s t ed i n Par t I V of t he per mi t , i ncl udi ng but not l i mi t ed t o:
( 1) Si t e descr i pt i on, cont r ol s, mai nt enance, i nspect i ons, and non- st or mwat er di schar ges.
( 2) A map of t he f i nal s i t e condi t i ons.
( 3) A s i t e const r uct i on pl an t hat i ncl udes t he l ocat i ons and
SECTI ON 01 57 20. 01 03 Page 7 di mensi ons of l and di st ur bi ng act i v i t i es, l ocat i ons of soi l s t ockpi l es, l ocat i ons and di mensi ons of er osi on cont r ol measur es, and a schedul e wi t h t he st ar t and f i ni sh dat es of each l and di st ur bi ng act i v i t y, i ncl udi ng t he i nst al l at i on of er osi on cont r ol measur es. Pr ovi s i ons and a schedul e f or mai nt enance of t he er osi on cont r ol measur es dur i ng const r uct i on must al so be i ncl uded i n t he pl an.
( 4) Name and qual i f i cat i ons of t he per son( s) r esponsi bl e f or i nspect i ng t he s i t e i n accor dance wi t h t he r equi r ement s gi ven i n
ILR10.
( 5) A copy of t he bl ank i nspect i on checkl i st t hat wi l l be used dur i ng I LR10 si t e i nspect i ons.
( 6) The pl an must cont ai n t he cer t i f i cat i on st at ement cont ai ned i n Par t I V( F) of t he NPDES Per mi t No. I LR10.
g. Dr awi ngs showi ng l ocat i ons of pr oposed t empor ar y excavat i ons or embankment s f or haul r oads, st r eam cr ossi ngs, mat er i al st or age ar eas, st r uct ur es, sani t ar y f aci l i t i es, and st ockpi l es of excess or spoi l mat er i al s i ncl udi ng met hods t o cont r ol r unof f and t o cont ai n mat er i al s on t he s i t e.
h. Tr af f i c cont r ol pl ans t hat i ncl udes measur es t o r educe er osi on of t empor ar y r oadbeds by const r uct i on t r af f i c , especi al l y dur i ng wet weat her . Pl an must i ncl ude measur es t o mi ni mi ze t he amount of mud t r anspor t ed ont o paved publ i c r oads by vehi c l es or r unof f . Shoul d mud or di r t be t r anspor t ed ont o paved publ i c r oads by vehi c l es or r unof f , as needed or di r ect ed by t he Cont r act i ng Of f i cer , r emove t he mud or di r t f r om t he pavement usi ng commer ci al st r eet c l eani ng equi pment , such as a " st r eet sweeper " , or ot her equi pment appr oved by t he Cont r act i ng Of f i cer ' s Repr esent at i ve.
i . Wor k ar ea pl an showi ng t he pr oposed act i v i t y i n each por t i on of t he ar ea and i dent i f y i ng t he ar eas of l i mi t ed use or nonuse. Pl an shoul d i ncl ude measur es f or mar ki ng t he l i mi t s of use ar eas i ncl udi ng met hods f or pr ot ect i on of f eat ur es t o be pr eser ved wi t hi n aut hor i zed wor k ar eas.
j . Dr awi ng showi ng t he l ocat i on of pr oposed bor r ow ar eas.
k. The Spi l l Cont r ol Pl an must i ncl ude t he pr ocedur es, i nst r uct i ons, and r epor t s t o be used i n t he event of an unf or eseen spi l l of a subst ance r egul at ed by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/ or r egul at ed under St at e or Local l aws and r egul at i ons. The Spi l l Cont r ol Pl an suppl ement s t he r equi r ement s of EM 385- 1- 1. Thi s pl an must i ncl ude as a mi ni mum:
( 1) The name of t he i ndi v i dual who wi l l r epor t any spi l l s or hazar dous subst ance r el eases and who wi l l f ol l ow up wi t h compl et e document at i on. Thi s i ndi v i dual must i mmedi at el y not i f y t he Cont r act i ng Of f i cer and t he l ocal f i r e depar t ment or emer gency r esponse agency i n addi t i on t o t he l egal l y r equi r ed Feder al , St at e, and l ocal r epor t i ng channel s ( i ncl udi ng t he Nat i onal Response Cent er 1- 800- 424- 8802) i f a r epor t abl e quant i t y i s r el eased t o t he envi r onment . The pl an must cont ai n a l i s t of t he r equi r ed r epor t i ng channel s and t el ephone number s.
( 2) The name and qual i f i cat i ons of t he i ndi v i dual who wi l l be
SECTI ON 01 57 20. 01 03 Page 8 r esponsi bl e f or i mpl ement i ng and super vi s i ng t he cont ai nment and cleanup.
( 3) Tr ai ni ng r equi r ement s f or Cont r act or ' s per sonnel and any subcont r act or s, and met hods of accompl i shi ng t he t r ai ni ng.
( 4) A l i s t of mat er i al s and equi pment t o be i mmedi at el y avai l abl e at t he j ob s i t e, t ai l or ed t o c l eanup wor k of t he pot ent i al hazar d( s) i dent i f i ed. Not e t hat t he det ai l s r egar di ng any pot ent i al hazar d( s) t o be used on t he j ob s i t e ar e t o be pr ovi ded i n t he cont ami nant pr event i on pl an, and t he r equi r ement s f or t he cont ami nant pr event i on pl an ar e descr i bed i n a subsequent subpar agr aph bel ow.
( 5) The names, l ocat i ons, and cont act i nf or mat i on f or suppl i er s of cont ai nment mat er i al s and l ocat i ons of addi t i onal f uel oi l r ecover y, c l eanup, r est or at i on, and mat er i al - pl acement equi pment avai l abl e i n case of an unf or eseen spi l l emer gency.
( 6) The speci f i c met hods and pr ocedur es t hat ar e t o be f ol l owed f or expedi t i ous cont ami nant c l eanup and not i f i cat i on of appr opr i at e i ndi v i dual s i f a r epor t abl e quant i t y or ot her spi l l i s r el eased t o t he envi r onment ( sur r oundi ng l and or wat er sur f ace) .
l . A non- hazar dous sol i d wast e di sposal pl an i dent i f y i ng met hods and l ocat i ons f or sol i d wast e di sposal , i ncl udi ng c l ear i ng and demol i t i on debr i s. The sol i d wast e di sposal pl an must i ncl ude schedul es f or di sposal . I dent i f y any subcont r act or s r esponsi bl e f or t he t r anspor t at i on and di sposal of wast e. The Cont r act or must i ncl ude t he name and l ocat i on of di sposal s i t e( s) . Evi dence of t he di sposal f aci l i t y ' s accept ance of t he wast e must be at t ached t o t hi s pl an dur i ng t he const r uct i on. At t ach a copy of each of t he Non- hazar dous Sol i d Wast e Di ver si on Repor t s t o t he di sposal pl an. The r epor t must i ndi cat e t he t ot al amount of wast e gener at ed and t ot al amount of wast e di ver t ed in cubi c yar ds or t ons al ong wi t h t he per cent t hat was di ver t ed.
m. A r ecycl i ng and sol i d wast e mi ni mi zat i on pl an wi t h a l i s t of measur es t o r educe consumpt i on of ener gy and nat ur al r esour ces. The pl an must det ai l t he Cont r act or ' s act i ons t o compl y wi t h and t o par t i c i pat e i n Feder al , St at e, Regi onal , and l ocal gover nment sponsor ed r ecycl i ng pr ogr ams t o r educe t he vol ume of sol i d wast e at t he sour ce.
n. An ai r pol l ut i on cont r ol pl an det ai l i ng pr ovi s i ons t o assur e t hat dust , debr i s, mat er i al s, t r ash, et c. , do not become ai r bor ne and t r avel of f t he pr oj ect s i t e. The ai r pol l ut i on cont r ol pl an must i ncl ude a dust cont r ol pl an.
o. A cont ami nant pr event i on pl an t hat : i dent i f i es pot ent i al l y hazar dous subst ances t o be used on t he j ob s i t e; i dent i f i es t he i nt ended act i ons t o pr event i nt r oduct i on of such mat er i al s i nt o t he ai r , wat er , or gr ound; and det ai l s pr ovi s i ons f or compl i ance wi t h Feder al , St at e, and l ocal l aws and r egul at i ons f or st or age and handl i ng of t hese mat er i al s. I n accor dance wi t h EM 385- 1- 1, a copy of t he Saf et y Dat a Sheet s ( SDS) and t he maxi mum quant i t y of each hazar dous mat er i al t o be on s i t e at any gi ven t i me must be i ncl uded i n t he cont ami nant pr event i on pl an. As new hazar dous mat er i al s ar e br ought on s i t e or r emoved f r om t he s i t e, t he pl an must be updat ed. As di scussed l at er i n t hi s sect i on, f or t he Chi cago Har bor Nor t h Pi er Repai r s pr oj ect , t he cont ami nant pr event i on pl an must i ncl ude i nf or mat i on on
SECTI ON 01 57 20. 01 03 Page 9 t he Cont r act or ' s pl an f or t est i ng and anal ysi s, di sconnect i on, r emoval , and di sposal of t he ol d, abandoned el ect r i cal t r ansf or mer s on t he east er n s i de of t he pi er . The pl an f or addr essi ng asbest os shoul d be a separ at e submi t t al , but must be i dent i f i ed and r ef er enced i n t he Envi r onment al Pr ot ect i on Pl an or i ncl uded f or i nf or mat i on as a separ at e appendix.
p. A wast e wat er management pl an t hat i dent i f i es t he met hods and pr ocedur es f or management and/ or di schar ge of wast e wat er s whi ch ar e di r ect l y der i ved f r om const r uct i on act i v i t i es, such as concr et e cur i ng wat er , hor i zont al or ver t i cal dr i l l i ng, c l ean- up wat er , dewat er i ng of gr ound wat er , di s i nf ect i on wat er , hydr ost at i c t est wat er , and wat er used i n f l ushi ng of l i nes. I f a set t l i ng/ r et ent i on pond i s r equi r ed, t he pl an must i ncl ude t he desi gn of t he pond i ncl udi ng dr awi ngs, r emoval pl an, and t est i ng r equi r ement s f or possi bl e pol l ut ant s. I f l and appl i cat i on wi l l be t he met hod of di sposal f or t he wast e wat er , t he pl an must i ncl ude a sket ch showi ng t he l ocat i on f or l and appl i cat i on al ong wi t h a descr i pt i on of t he pr et r eat ment met hods t o be i mpl ement ed. I f sur f ace di schar ge wi l l be t he met hod of di sposal , a copy of t he per mi t and associ at ed document s must be i ncl uded as an at t achment pr i or t o di schar gi ng t he wast e wat er . I f di sposal i s t o a sani t ar y sewer , t he pl an must i nc l ude document at i on t hat t he Wast e Wat er Tr eat ment Pl ant Oper at or has appr oved t he f l ow r at e, vol ume, and t ype of di schar ge. For any pl acement or usage of concr et e, t he pl an must det ai l t he speci f i c met hods and pr ocedur es t hat wi l l be used t o manage t he associ at ed l i qui d and sol i d wast es ( e. g. , concr et e washout f aci l i t i es) . Al l pr oposed met hods and pr ocedur es must pr event on- s i t e or of f - s i t e pol l ut i on and shal l be equi val ent or mor e pr ot ect i ve t han t he st andar d pr act i ce( s) and pol l ut i on pr event i on measur es descr i bed i n t he I l l i noi s Ur ban Manual , IUM.
q. A hi st or i cal , ar chaeol ogi cal , cul t ur al r esour ces, bi ol ogi cal r esour ces, and wet l ands pl an t hat def i nes pr ocedur es f or i dent i f y i ng and pr ot ect i ng hi st or i cal , ar chaeol ogi cal , cul t ur al r esour ces, bi ol ogi cal r esour ces and wet l ands known t o be on t he pr oj ect s i t e:
and/ or i dent i f i es pr ocedur es t o be f ol l owed i f hi s t or i cal ar chaeol ogi cal , cul t ur al r esour ces, bi ol ogi cal r esour ces and wet l ands not pr evi ousl y known t o be onsi t e or i n t he ar ea ar e di scover ed dur i ng const r uct i on. The pl an must i ncl ude met hods t o assur e t he pr ot ect i on of known or di scover ed r esour ces and must i dent i f y l i nes of communi cat i on bet ween Cont r act or per sonnel and t he Cont r act i ng Of f i cer .
r . The Cont r act or must i dent i f y t he cur r ent quar ant i ne ar eas, t he speci f i c pest s, and t he met hod( s) f or compl i ance wi t h al l quar ant i nes.
The Cont r act or i s r esponsi bl e f or obt ai ni ng any per mi t s or appr oval s necessar y f or pl ant pur chase, movement , or di sposal wi t hi n a quar ant i ne ar ea, and must have a pl an f or any pl ant ( i ncl udi ng t r ees, r oot s, veget at i on) mat er i al and ot her r egul at ed mat er i al s t hat wi l l be r emoved f r om wi t hi n or associ at ed wi t h a quar ant i ned ar ea.
s. The Cont r act or must compl y wi t h t he U. S. Envi r onment al Pr ot ect i on Agency' s Nat i onal Pol l ut ant Di schar ge El i mi nat i on Syst em ( NPDES) Vessel Gener al Per mi t f or Di schar ges I nci dent al t o t he Nor mal Oper at i on of a Vessel ( VGP) f or al l r egul at ed vessel s t o be used on t he pr oj ect . For each vessel t hat meet s t he r equi r ement s i n t he per mi t , i ncl ude i n t he Envi r onment al Pr ot ect i on Pl an a copy of t he Not i ce of I nt ent ( NOI ) and associ at ed document at i on or ver i f i cat i on f r om t he U. S. Envi r onment al Pr ot ect i on Agency t hat t he vessel i s i n compl i ance wi t h t he per mi t .
The Cont r act or i s r esponsi bl e f or per mi t compl i ance.
SECTI ON 01 57 20. 01 03 Page 10 t . The Cont r act or must pr ovi de t he Cont r act i ng Of f i cer ' s Repr esent at i ve wi t h a copy of t he per mi t appl i cat i on CDPH ROW 03 t hat t he Cont r act or submi t t ed t o t he Ci t y of Chi cago as wel l as copi es of al l r el evant cor r espondence, per mi t s, or document at i on submi t t ed by t he Cont r act or or r ecei ved f r om or r equi r ed by t he Ci t y of Chi cago. Thi s suppl ement al i nf or mat i on i s f or i nf or mat i on onl y and must be submi t t ed as an appendi x or amendment t o t he Envi r onment al Pr ot ect i on Pl an.
1. 7. 4 Appendix
Copi es of al l envi r onment al per mi t s, per mi t appl i cat i on packages, appr oval s t o const r uct , not i f i cat i ons, cer t i f i cat i ons, r epor t s, and t er mi nat i on document s must be at t ached, as an appendi x, t o t he EPP.
1. 8 PROTECTI ON FEATURES
Thi s par agr aph suppl ement s t he Cont r act Cl ause PROTECTI ON OF EXI STI NG VEGETATI ON, STRUCTURES, EQUI PMENT, UTI LI TI ES, AND I MPROVEMENTS. Pr i or t o t he st ar t of any onsi t e const r uct i on act i v i t i es, t he Cont r act or and t he Cont r act i ng Of f i cer must make a j oi nt condi t i on sur vey. I mmedi at el y f ol l owi ng t he sur vey, pr epar e a br i ef r epor t i ncl udi ng a pl an descr i bi ng t he f eat ur es r equi r i ng pr ot ect i on under t he pr ovi s i ons of t he Cont r act Cl auses, whi ch ar e not speci f i cal l y i dent i f i ed on t he dr awi ngs as envi r onment al f eat ur es r equi r i ng pr ot ect i on al ong wi t h t he condi t i on of t r ees, shr ubs and gr assed ar eas i mmedi at el y adj acent t o t he s i t e of wor k and adj acent t o t he Cont r act or ' s assi gned st or age ar ea and access r out e( s) , as appl i cabl e. Thi s sur vey r epor t must be s i gned by bot h t he Cont r act or and t he Cont r act i ng Of f i cer upon mut ual agr eement as t o i t s accur acy and compl et eness. Pr ot ect t hose envi r onment al f eat ur es i ncl uded i n t he sur vey r epor t and any i ndi cat ed on t he dr awi ngs, r egar dl ess of i nt er f er ence whi ch t hei r pr eser vat i on may cause t o t he Cont r act or ' s wor k under t he cont r act .
1. 9 SPECI AL ENVI RONMENTAL REQUI REMENTS
A " Thor i um Moni t or i ng Ar ea" encompasses a por t i on of t he Chi cago Lock pr oper t y, and t he Chi cago Har bor Nor t h Pi er pr oj ect wi l l r equi r e some excavat i on wi t hi n t hi s ar ea. As par t of an agr eement wi t h t he U. S.
Envi r onment al Pr ot ect i on Agency ( USEPA) , t he Ci t y of Chi cago, Depar t ment of Publ i c Heal t h, r equi r es a per mi t i n advance and r adi at i on moni t or i ng f or excavat i on, and t he Cont r act or must obt ai n and compl y wi t h t hi s per mi t .
The Cont r act or i s r esponsi bl e f or moni t or i ng f or r adi at i on dur i ng excavat i on and must coor di nat e wi t h t he Ci t y of Chi cago, Depar t ment of Publ i c Heal t h. One or mor e f or ms may need t o be compl et ed and submi t t ed t o t he Ci t y of Chi cago Depar t ment of Publ i c Heal t h i n or der t o obt ai n t he per mi t . Di f f er ent f or ms ar e used t o appl y f or const r uct i on wor k on pr i vat e pr oper t y or wi t hi n t he publ i c Ri ght of Way ( ROW) i n St r eet er vi l l e ( see t he f or ms at t he end of t hi s sect i on) . None of t he past r adi ol ogi cal measur ement s at t he Chi cago Har bor Lock have exceeded t he act i on l evel s.
I f r equest ed, t he Cont r act i ng Of f i cer ' s Repr esent at i ve ( COR) can pr ovi de a coupl e of past r epor t s t hat cont ai n moni t or i ng r esul t s f r om pr evi ous excavat i on wor k f or t he Chi cago Har bor Lock. Fur t her i nf or mat i on r egar di ng t hor i um i n t he St r eet er vi l l e nei ghbor hood i s avai l abl e f r om t he f ol l owi ng websi t es on t he I nt er net :
ht t ps: / / www. chi cago. gov/ c i t y/ en. ht ml ( Sear ch f or St r eet er vi l l e Ri ght - of - Way or Pr oper t y Per mi t ) https://www.epa.gov/lindsay-light
SECTI ON 01 57 20. 01 03 Page 11
I n addi t i on, t he Cont r act or wi l l need t o coor di nat e wi t h t he Ci t y of Chi cago t o compl y wi t h al l appl i cabl e r ul es and r egul at i ons and t o acqui r e appl i cabl e per mi t s f or wat er and sewer pi pel i nes and connect i ons. Fur t her i nf or mat i on i s avai l abl e f r om t he f ol l owi ng I nt er net s i t e:
ht t ps: / / www. chi cago. gov/ c i t y/ en. ht ml ( Sear ch f or Sewer Per mi t s)
The Cont r act or al so must compl y wi t h t he St at e of I l l i noi s ' r ul es and r egul at i ons r egar di ng Cl ean Const r uct i on and Demol i t i on Debr i s ( CCDD) , det ai l ed i n 415 I LCS 5/ 3. 160 and 415 I LCS 5/ 22. 51. The name, addr ess, and cont act i nf or mat i on f or t he pot ent i al t r anspor t and pl acement of CCDD mat er i al s f r om t he pr oj ect must be det ai l ed wi t hi n t he Envi r onment al Pr ot ect i on Pl an.
Al l excess soi l excavat ed f r om t he Thor i um ar ea t hat cannot be r e- used on s i t e…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.