PROJECT AREA
PROJECT AREA
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
SHEET INDEX
NN NN
LOCATION MAP VICINITY MAP
(N.T.S.) (N.T.S.)
PROJECT MANAGER
CHIEF, DESIGN BRANCH
DATE
DATEDATE
ALL DRAWINGS IN THIS SET.
INDICATE OFFICIAL RECOMMENDATION OF
REQUIRED BY ER 1110-1-8152. SIGNATURES
THE SCOPE OF THEIR EMPLOYMENT AS
ON THESE PROJECT DOCUMENTS WITHIN
TION DESIGNATIONS OF INDIVIDUALS APPEAR
INITIALS OR SIGNATURES AND REGISTRA-
CHICAGO DISTRICT CORPS OF ENGINEERS. THE
THIS PROJECT WAS DESIGNED BY THE
DRAWINGS CONTAINED IN THE SHEET INDEX.
RECOMMENDATION AND APPROVAL FOR ALL
SIGNATURE AFFIXED BELOW INDICATE OFFICAL
REVIEWED BY:
APPROVED BY:
APPROVAL RECOMMENDED BY:
ATR TEAM LEADER
/S/
/S//S/ of Engineers
US Army Corps
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE:
CHICAGO DISTRICT
CHICAGO, ILLINOIS
NORTH PIER REPAIRS
CHICAGO LOCK
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\COVER SHEET
3:01:47 PM 6/5/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
A N
S I
D
P R
O J E
C T I
D
F
IL
E N
A M
E
G-001
C H
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
S
E E
T I
N D
E X
L O
C A
T
IO
N
V
IC
IN
IT
Y M
A P A
N D
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
G -0
.d g n
W
IT
O L
D K
L U
Z A
SHEET SHEET TITLE
NUMBER REFERENCE
1. G-001 LOCATION, VICINITY MAP AND SHEET INDEX
2. G-002 LEGEND, ABBREVIATIONS AND SYMBOLS
3. V-001 SURVEY CONTROL AND BENCHMARKS
4.
5. CS101 SITE PLAN
6. CS102 SITE PLAN
7. CS103 SITE PLAN
8. CS301 CROSS SECTIONS STA. 0+00 TO STA. 1+50
9. CS302 CROSS SECTIONS STA. 2+00 TO STA. 3+50
10. CS303 CROSS SECTIONS STA. 4+00 TO STA. 5+50
11. CROSS SECTIONS STA. 6+00 TO STA. 7+50
12. CS305 CROSS SECTION STA. 8+00
13.
CS501 TYPICAL SECTION
14.
S-101
15.
S-102
16.
S-103
17.
S-301 TYPICAL CROSS SECTION
18.
S-302 PARKING LOT CROSS SECTION
19.
S-501 TIE ROD INSTALLATION DETAILS
20.
S-502 SHEET PILE ANCHOR WALL DETAILS
21.
S-503 TIE ROD DETAILS
22.
S-504
23.
R-001
24.
R-002
25.
R-003
26.
R-004
27.
R-005
28.
R-006
29.
R-007
30.
R-008
31.
R-009
ED-101
ED-102
ED-103
ED-104
ED-105
ED-106
32.
33.
34.
35.
36.
37.
38.
ELECTRICAL SITE PLAN - DEMOLITION
ELECTRICAL SITE PLAN - DEMOLITION
ELECTRICAL SITE PLAN - DEMOLITION
ELECTRICAL SITE PLAN - DEMOLITION
ELECTRICAL SITE PLAN - DEMOLITION
ELECTRICAL SITE PLAN - DEMOLITION
ES-101
ES-102
ES-103
ES-104
ES-105
ES-106
ELECTRICAL SITE PLAN
ELECTRICAL SITE PLAN
ELECTRICAL SITE PLAN
ELECTRICAL SITE PLAN
ELECTRICAL SITE PLAN
ELECTRICAL SITE PLAN
41.
42.
43.
44.
45.
39.
40.
46.
S-100
ANCHOR WALL DETAILS
SS-501
SS-302
SS-100
SS-101
SS-102
SS-103
SS-301 TYPICAL CROSS SECTION - NEW
PARKING LOT CROSS SECTION - NEW
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
STRUCTURAL PLAN - TIE ROD AND ANCHOR WALL
STRUCTURAL PLAN - TIE ROD AND ANCHOR WALL
STRUCTURAL PLAN - TIE ROD AND ANCHOR WALL
STRUCTURAL PLAN - TIE ROD AND ANCHOR WALL
STRUCTURAL PLAN NEW CONCRETE
STRUCTURAL PLAN NEW CONCRETE
STRUCTURAL PLAN NEW CONCRETE
STRUCTURAL PLAN NEW CONCRETE
SS-303
SS-304
EAST END CROSS SECTION SHOWING EXISTING SLAB
EAST END CROSS SECTION SHOWING NORTH BASIN WALL - NEW
TYPICAL CONCRETE CROSS SECTION AND REINFORCING
SS-401
SS-402
WEST END ENLARGED PLAN VIEW
EAST END ENLARGED PLAN VIEW
61.
62.
63.
64.
65.
EXISTING UTILITIES AND WORK LIMITSV-002
R-010
CS304
PROPOSED TYPICAL SECTION
CS503
CS502
WATER SERVICE AND SANITARY MAIN DETAIL
CS306
CS307
EXISTING CONDITIONS
WATER SERVICE AND SANITARY FORCE MAIN SECTIONS
67.
68.
66.
ES-301
69.
70.
R-015
72.
73.
71.
R-011
R-012
R-013
R-014
REFERENCE DRAWING 10 - EXISTING SANITARY LINES
REFERENCE DRAWING 11 - SHEET C17
REFERENCE DRAWING 13 - SHEET C19
REFERENCE DRAWING 1 - SHEET 1 OF 9
REFERENCE DRAWING 2 - SHEET 2 OF 9
REFERENCE DRAWING 3 - SHEET 3 OF 9
REFERENCE DRAWING 4 - SHEET 4 OF 9
REFERENCE DRAWING 5 - SHEET 5 OF 9
REFERENCE DRAWING 6 - SHEET 6 OF 9
REFERENCE DRAWING 7 - SHEET 7 OF 9
REFERENCE DRAWING 8 - SHEET 8 OF 9
REFERENCE DRAWING 9 - SHEET 9 OF 9
W912P6-19-C-00XX
W912P6-19-B-0007
W P -1
-B -0
W P -1
-C -0
X
X
CERTIFIED FINAL DOCUMENTS - RTA W912P6-18-B-0007
R A
N A M
IS
H
R A P .E
ES-501 DETAILS
74.
DUCK-BANK DETAILS
SD-100
SD-101
SD-102
SD-103
SD-301
SD-302
CONCRETE DEMOLITION
CONCRETE DEMOLITION
CONCRETE DEMOLITION
CONCRETE DEMOLITION
TYPICAL CROSS SECTION DEMOLITION
PARKING LOT CROSS SECTION DEMOLITION
SD-303 EAST END DEMOLITION
6 JUNE 2019
J
U N
E
REFERENCE DRAWING 12 - SHEET C18A
REFERENCE DRAWING 14 - SHEET S3
REFERENCE DRAWING 15 - SHEET S6
FRANK LEWANDOWSKI, P.E. 5/1/2019
MIKE NGUYEN 6/6/2019
JOHN GROBOSKI, P.E. 6/6/2019
DIRECTION OF CUT
DETAIL IS SHOWN
SHEET WHERE
SECTION IS SHOWN
SHEET WHERE
OF DETAIL
GRID LETTER/NUMBER
SECTION
GRID LETTER/NUMBER OF
GRID LETTER/NUMBER
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
LEGEND
STORM MANHOLE
WATER MANHOLE
FENCE
WORK LIMITS
STANDARD ABBREVIATIONS
MONITORING WELL
WATER VALVE VAULT
FIRE HYDRANT
CATCH BASIN
WATER LEVEL
ELECTRIC HANDHOLE
GUY WIRE
WORK POINTWP
WORK LIMITWL
WELL POINTSWLP
VERTICALV
VERIFY IN FIELDVIF
TYPICALTYP.
STEEL SHEET PILESSP
REINFORCED CONCRETE PIPERCP
PIPE SLOPES
OCEAN SURVEYS, INC.OSI
NOT TO SCALENTS
NORTH AMERICAN VERTICAL DATUMNAVD
NATURAL WATER LINENWL
NATIONAL GEODETIC VERTICAL DATUMNGVD
MONITORING WELLMW
MINIMUMMIN
MANHOLEMH
LOCAL CONTROL PANELLCP
ILLINOIS DEPARTMENT OF TRANSPORTATIONIDOT
HORIZONTALH
HIGH WATER ELEVATIONHWL
GRATED MANHOLEG.M.H.
GRATE DRAING.D.
GRADE AT FOUNDATIONGF
FIRE HYDRANTFH
FINISH FLOORFF
EXTRACTION WELLEN
EXPANSION JOINTEJ
ELEVATIONELEV
ELECTRICAL MAN HOLEEMH
ELECTRICAL HAND HOLEEHH
DUCTILE IRON PIPED.I.P.
DIGITAL TERRAIN MODELDTM
DIAMETER AT BREAST HEIGHTDBH
DIAMETERDIA.
CORRUGATED METAL PIPECMP
CORPS OF ENGINEERSCOE
CONTRACTING OFFICER'S REPRESENTATIVECOR
CONSTRUCTION JOINTCJ
CENTERLINECL
CATCH BASINCB
ARMY CORPS OF ENGINEERSACOE
TREE
TELEPHONE LINE
LINE STYLES
SYMBOLS
WATER DOMESTIC MAIN
STORM DRAIN
EDGE OF WATER
-10 DESIGN CONTOUR
EXISTING CONTOUR-11
H
W
ELECTRICAL MANHOLE UTILITY POLE
CB
CATCH BASIN ROUND
X-###
X#
DETAIL INDICATOR
X-###
X#
X# SCALE:
DRAWING AREA TITLE
TRIANGULATION POINT
SECTION INICATOR
D
W
E
MW
CB
W.L. AT '( )
ELECTRICAL PRIMARY
ELECTRICAL SECONDARY
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\LEGEND, ABBREVIATIONS AND SYMBOLS
3:41:17 PM 6/4/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
DRAWING AREA TITLE INDICATOR
GAS LINE
CONDUITS
ACCESS ROAD
CONCRETE
A N
S
O J E
C T I
D
F
IL
E N
A M
E
G-002
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
Y
M B
O L S
L E
G E
N D
A B
B R
E V
IA
T
IO
N S A
N D
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
G -0
.d g n
W
IT
O L
D K
L U
Z A
GENERAL NOTES
SANITARY FORCE MAIN
WATER MAIN
W P -1
-B -0
W P -1
-C -0
X
X
TELECOMFIBER OPTIC
MISC (AS NOTED)
LIGHT FIXTURE
WATER (PUBLIC MAIN)
R A
N A M
IS
H
R A P .E
M A
Y
RESCHEDULED.
SHOULD A RAINFALL EVENT POSE RISK OF A BACKFLOW OCCURRING, THEN UTILITY OUTAGES WILL BE
STAFF DURING SEWER AND WATER OUTAGES. AT THE DISCRETION OF THE LOCK MASTER AND COR, CONTRACTOR MUST SUPPLY PORTABLE WATER AND PORTABLE TOILETS FOR THE CHICAGO LOCK
OUTSIDE THE CDOT BRIDGE LIFT SEASON. UTILITY OUTAGES SHALL NOT EXCEED 48 HOURS. THE
NOTICE PRIOR TO ANY OUTAGE. ALL OUTAGES MUST OCCUR BETWEEN NOVEMBER AND APRIL
OUTAGES WITH THE CHICAGO LOCK LOCKMASTER, MWRD AND COR. PROVIDE A ONE (1) WEEK
17. DURING UTILITIES RELOCATION FROM THE TUNNEL THE CONTRACTOR MUST COORDINATE ALL UTILITY
CABLES SHALL NOT BE ALLOWED.
16. INSTALL CABLES AND WIRING IN ONE CONTINUOUS RUN FROM SOURCE TO LOAD. SPLICING OF
AND PEDESTRIAN TRAFFIC FOR LOCK OPERATORS AND MWRD EMPLOYEES.
15. DURING CONSTRUCTION, 10 FT WIDE ACCESS ROAD SHALL BE PROVIDED FOR EMERGENCY VEHICLES
TOP WILL BE REMOVED.
TUNNEL DEMOLITION. GROUTING OF THE WOODEN CRIB WILL BE COMPLETED BEFORE THE TUNNEL
ALLOWED WITH PRIOR ACCEPTANCE. UTILITY RELOCATION WILL BE COMPLETED BEFORE THE
WALLS AND CONNECTED TO NEW SHEET PILE WALL. ALTERNATIVELY OTHER METHODS WILL BE
TUNNEL SLAB SHALL BE DEMOLISHED UNTIL NEW TIE RODS ARE INSTALLED THROUGH THE TUNNEL
SHEET PILE USING TIE RODS. TO PREVENT SHEET PILE FAILURE, NO PORTION OF TUNNEL WALLS OR
14. CONSTRUCTION SEQUENCE: THE EXISTING CONCRETE TUNNEL IS CONNECTED WITH RIVERSIDE
BE CONTAINED IN THE PARKING AREA.
13. SEE SPECIFICATION SECTION 01 57 20 FOR EXCAVATION MONITORING REQUIREMENTS. THORIUM MAY
NORTH PIER STRUCTURE OR ON THE STRUCTURE.
12. NO LOADS OR EQUIPMENT ARE ALLOWED WITHIN 50 FEET OF THE FACES OF THE RIVER WALL AND THE
LOCK WALLS OR GATE BLOCK WITHOUT APPROVAL OF THE COR.
AXLE LOAD OF 3,000 LBS. CONTRACTOR SHALL NOT PLACE ANY CRANES OR HEAVY EQUIPMENT ON
11. ONLY ONE VEHICLE AT A TIME IS ALLOWED ON NORTH PIER TUNNEL. THE VEHICLE IS LIMITED TO AN
DESCRIBED IN SECTION 01 57 20 ENVIRONMENTAL PROTECTION OF ILLINOIS.
10. THE CONTRACTOR MUST KEEP ALL STREETS CLEAN AND CLEAR OD MUD, STONES, DEBRIS, ETC., AS
REQUIREMENTS MANUAL EM 385-1-1.
9. ALL WORK MUST BE IN ACCORDANCE WITH CORPS OF ENGINEERS SAFETY AND HEALTH
PRE-CONSTRUCTION CONDITION OR AS SPECIFIED IN THE PLANS AND SPECIFICATION.
8. ALL AREAS AND FACILITIES DISTURBED DUE TO CONSTRUCTION WORK MUST BE RESTORED TO
BECOME APPARENT, THE COR MUST BE NOTIFIED PRIOR TO TART OF WORK.
7. THE CONTRACTOR MUST VERIFY ALL ELEVATIONS SHOWN ON THE DRAWINGS. IF DISCREPANCIES
ADDITIONAL COST TO THE GOVERNMENT.
LIMITS. UTILITIES DAMAGED DURING CONSTRUCTION MUST BE REPAIRED OR REPLACED AT NO
6. THE CONTRACTOR MUST BE RESPONSIBLE FOR THE PROTECTION OF ALL UTILITIES WITHIN THE WORK
DISCREPANCIES TO THE COR.
BY THE CONTRACTOR IN THE FIELD. THE CONTRACTOR MUST IMMEDIATELY REPORT ANY
5. UTILITIES AND SITE FEATURES SHOWN ON THE DRAWINGS ARE APPROXIMATE AND MUST BE VERIFIED
PRIOR TO PERFORMING ANY EXCAVATION.
4. THE CONTRACTOR MUST CALL J.U.L.I.E AND DIGGER AT 811 TO LOCATE UNDERGROUND UTILITIES
OF CONSTRUCTION AND MUST COMPARE THE SITE CONDITIONS AS INDICATED ON THE DRAWINGS.
3. THE CONTRACTOR IS RESPONSIBLE FOR EXAMINING ALL SITE CONDITIONS PRIOR TO COMMENCEMENT
RECOMMENDATIONS AND AS APPROVED BY THE GOVERNMENT.
2. ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS
1. THE CONTRACTOR SHALL PERFORM ALL WORK WITHIN THE SPECIFIED WORK LIMITS.
LOCK PARKING LOT
CHICAGO HARBOR
GATE
WEST SECTOR
CONTROL HOUSE
CHICAGO LOCK
GATE
EAST SECTOR
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
N
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\SURVEY CONTROL AND BENCHMARKS
9:36:04 AM 5/24/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
F
IL
E N
A M
E
NAVD88
IL EAST NAD83 STATEPLANE COORDINATES
BRASS DISK
BRASS DISK
BRASS DISK
HORIZONTAL & VERTICAL CONTROL POINTS
POINT
NORTHING (Y) EASTING (X)
DESCRIPTION
ELEV.
C-7 1,903,091.14 1,181,013.77 588.024
MSD-1 1,903,092.51 1,181,777.02 587.659
N PIER 1953 1,903,088.56 1,181,339.68 587.862
GENERAL NOTES
NAVY PIER
ILLINOIS STREET
L A
K E S
H O
R E D
R
IV
E
C-7 N PIER 1953 MSD-1
100 0 100 200
SCALE IN FEET
5. CONVERSION FROM NAVD88-579.03 = CCD
TO NGS PIDS M33251, ME1961, AND AJ2806.
4. ALL HORIZONTAL AND VERTICAL CONTROL POINTS ARE REFERENCED
VERTICAL DATUM OF 1988 (NAVD88) U.S. FEET.
3. ALL ELEVATIONS SHOWN ARE REFERENCED TO THE NORTH AMERICAN
OF 1983 (NAD83) U.S. FEET.
PLANE COORDINATE SYSTEM, EAST ZONE, NORTH AMERICAN DATUM
2. ALL COORDINATES SHOWN ARE REFERENCED TO THE ILLINOIS STATE
TIME OF BIDDING, AND INCLUDE COST ACCORDINGLY IN THE BID.
NECESSARY ACTIONS TO ASSESS THE EXISTING CONDITIONS AT THE
DIFFER FROM THOSE SHOWN. THE CONTRACTOR SHALL TAKE ALL
TIME. EXISTING CONDITIONS DURING CONSTRUCTION MAY VARY AND
CHICAGO DISTRICT AND REPRESENTS CONDITIONS EXISTING AT THAT
2015 SURVEY PERFORMED BY US ARMY CORPS OF ENGINEERS,
1. THE CONTROL POINTS SHOWN ON THIS SHEET ARE FROM AN JUNE
GRAND AVE.
V-001
B E
N C
H M
A R
K S
S U
R V
E Y C
O N
T R
O L A
N D
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
V -0
.d g n
W
IT
O L
D K
L U
Z A
A N
S I
D
W P -1
-B -0
O J E
C T I
D
F
IL
E N
A M
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
W P -1
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
R A
N A M
IS
H
R A P .E
M A
Y
TP
8.
8.
8.
8.
64 8.
8.
388.
498.
9.
.3
9.
.1
.2
49.
9.
9.
9.
8.
8.
8.
8.
FH
SCC
STREETER DRIVE
RIPRAP
10" SEWER LINE
8" SEWER LINE
S
E W
E R L
IN
E
TP
JB
TP
JBJB
RPZ
ABOVE
GRADE
RPZ
METER
VAULT
GATE
ACCESS
MANHOLES
DUCT BANK
EXISTING
WORK LIMITS
EXISTING GENERATOR 6' X 17'
WORK LIMITS
NEW SEWER LINE
NEW WATER LINE
AREA 150'x50'
STORAGE/STAGING
LINES TO BE RELOCATED
TELECOMMUNICATION
LINES TO BE RELOCATED
WATER AND SEWER
N 1,903,115.20
E 1,181,186.28
TIE-IN POINT
NEW SEWER LINE
N 1,903,177.07
E 1,180,977.87
TIE-IN POINT
NEW WATER LINE
FORCE MAIN LINE
EXISTING SANITARY
SHEET PILE WALL
PROPOSED
SHEET PILE WALL
EXISTING
NEW WATER LINE
EXISTING WATER LINE
REMOVED
TO BE
MANHOLES
EXISTING
ALIGNMENT
SHEET PILE WALL
EXISTING
GATE TO BE RELOCATED
PROPOSED SHEET PILE WALL
CONCRETE PAD TO BE REMOVED
SHEET PILE TO REMAIN
RELOCATED
BOXES TO BE
CONEX
NEW A-STONE
BUILDING OFF LIMITS
MWRD CONTROL
WORK LIMITS
WL11
WL06
WL04
WL05
WL10
WL09
WL01 WL02
WL03
WL08
WL07
TPTP
JB
FH
SCC
TP
JBJB
10" SEWER LINE
8" SEWER LINE
S
E W
E R L
IN
E
GENERAL NOTES
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\OVERALL SITE PLAN'
4:00:11 PM 6/4/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E N
A M
A1
SCALE: 1" = 40'
N
40' 80'0
SITE PLAN
CHICAGO RIVER
V-002
A N
S I
D
W P -1
-B -0
O J E
C T I
D
R A
N A M
IS
H
R A P .E
W O
R K L
IM
IT
S
E X
IS
T
IN
G U
T
IL
IT
IE
S A
N D
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
V -0
.d g n
W
IT
O L
D K
L U
Z
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
W P -1
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
1,903,045.491,180,898.01WL11
1,903,045.491,181,783.00WL10
1,902,796.271,181,782.81WL09
1,902,796.241,181,968.03WL08
1,902,859.591,181,967.55WL07
1,902,859.271,181,853.32WL06
1,903,057.951,181,853.27WL05
1,903,153.341,181,859.26WL04
1,903,153.341,181,334.43WL03
1,903,199.971,181,334.43WL02
1,903,199.971,180,897.86WL01
EASTING NORTHINGNAME
WORK LIMITS
M A
Y
LAKE MICHIGAN
PILE INSTALLATION WITH SAME STONE SIZE.
9. REPLACE PARKING LOT GRAVEL (TOP 8") AFTER SHEET
MUST MATCH THE LARGER SIZE.
DELINEATED IN THE DRAWINGS, THE CONTRACTOR
VERIFIED TO DIFFER FROM PROPOSED SIZES
INSULATION. IF THE EXISTING PIPE SIZES ARE FIELD
MUST MATCH THE EXISTING PIPE SIZES, MATERIAL, AND
8. ALL WATER SERVICE AND SANITARY FORCE MAIN TIE-INS
MAY VARY IN THE FIELD.
ON THE BEST INFORMATION AVAILABLE. CONDITIONS
TIE-IN WITH THE COR. LOCATIONS PROVIDED ARE BASED
7. CONTRACTOR SHALL COORDINATE LOCATIONS FOR THE
CS307, SECTION D1.
DAYLIGHT VERTICALLY ABOVE GROUND. SEE SHEET
6. WATER SERVICE AND SANITARY FORCE MAIN TO
TUNNEL.
EXISTING SANITARY FORCE MAIN PENETRATING THE
33 31 23.0010 AND SHEET CS-503 FOR DETAILS). REMOVE
SANITARY FORCE MAIN. (SEE SPECIFICATION SECTION
CONNECTED TO THE EXISTING 4" DUCTILE IRON
DUCTILE IRON SANITARY FORCE MAIN IS TO BE
5. SANITARY FORCE MAIN TIE-IN LOCATION: THE NEW 4"
THE TUNNEL.
REMOVE EXISTING WATER SERVICE LINE PENETRATING
SECTION 33 11 00, AND SHEET CS503 FOR DETAILS.
FROM THE CITY AT THIS LOCATION. SEE SPECIFICATION
EXISTING 2" COPPER WATER SERVICE LINE COMING
WATER SERVICE LINE SHALL BE CONNECTED TO THE
4. WATER SERVICE TIE-IN LOCATION: THE NEW 2" COPPER
UTILITIES PRIOR TO CONSTRUCTION
3. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
WORK IN THE LOCK 24-HOURS A DAY.
2. PARKING/PIER TO BE SHARED WITH USACE EMPLOYEE
AND OFF LOADING TO MARINE BARGE.
DELIVERING CONCRETE PANELS ON FLATBED TRUCKS
ANOTHER CONTRACTOR WORKING ON SITE IN 2020
1. PARKING STORAGE/STAGING AREA TO BE SHARED WITH
TOP DUCTBANK MANHOLE 586.12 TOP OF TUNNEL 588.0
ELEV. 583.07
PILE APPROX. TOP
EXISTING SHEET
THROUGH SOUTH WALL
2'X2' TUNNEL ACCESS
WORK LIMITS
SHEET PILE WALL
PROPOSED
SHEET PILE WALL
EXISTING
SOUTH WALL INSTALLED 2003)
HEAT TRACED. MOUNTED ON
WATER LINE (2" COPPER
150' x 50'
STAGING AREA
STORAGE /
70'
LOT ELEV. +/- 587.4
TOP PARKING
MANHOLE +/- 585.4
AROUND DUCTBANK
TOP GROUND ELEV.
EXISTING SHEETPILE ELEV. +/- 585.19
+/- 582.5
RIVERSIDE APPROX.
SHEET PILE ELEV.
NEW HANDRAIL
BE REMOVED
EXISTING GATE TO
BOTTOM DUCT BANK APPROX. 582.01
GENERATOR TO BE RELOCATED SEE NOTE 1
PROPOSED SHEET PILEWALL
TOP OF TOE STONE CUT ALONG
WATER LINES
NEW SANITARY AND
TO BE REMOVED
SOUTH WALL
MOUNTED ON
LIFE RING
CAMERA #4
REMOVE CCTV
TO BE REMOVED
P8 - LIGHTPOLE (2 HEADS)
STAIRS TO BE REMOVED
TO BE REMOVED
BRICK RETAINING WALL
CONSTRUCT NEW STAIRS SEE SHEET CS503
6-1" PVC CONDUITS
BE REMOVED
MANHOLES TO
NEW WATER LINE
MANHOLE
ELECTRICAL
EXISTING
NEW SEWER LINE
TO BE REMOVED AND FILLED
ABANDONED UTILITY VAULT
EXISTING STACKED 2"x12" RETAINING WALL TO BE REMOVED
POWER CABLE 480V, SEE NOTE 11
APPROX. LOCATION FOR UNDERGROUND
A-STONE
20' CENTERS
20' CENTERS
10' CENTERS
18"
18"
FOUND BELOW BOTTOM OF THE LAKE
SHEETPILE WALL. TOE STONE MIGHT BE
SURFACE CUT ALONG PROPOSED
APPROXIMATE LAKE BOTTOM
CONCRETE PAD TO BE REMOVED
EXISTING ELECTRICAL DUCT BANK
PILE WALL
NEW SHEET
LOT ELEVATION
TO MATCH PARKING
AREA TO BE FILLED
NEW RETAINING WALL
AND VENT HOLE LAYOUT
SEE DETAIL 'A' GROUT
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
2+00 2+50 3+00 3+50 4+00
A1
SCALE: 1" = 10' 10' 20'0
EXISTING CONDITIONS - PROFILE
DETAIL "A"
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\SITE PLAN 1
4:30:28 PM 6/4/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E N
A M
M
T C
H L
IN
E T
O S
H E
E T C
S
E L E
V A
T
IO
N
GENERAL NOTES
B1
SCALE: 1" = 10' 10' 20'0
N
SITE PLAN
EL. 585.4
X
PARKING TOP ELEV. 587.4
ALIGNMENT TABLE
1903074.251181841.408+50
1903072.121181840.098+47
1903069.641181834.018+42
1903070.421181822.578+30
1903067.891181793.218+00
1903067.271181786.087+92
1903065.611181783.987+90
1903066.021181693.397+00
1903066.371181593.396+00
1903066.831181493.395+00
1903067.471181393.394+00
1903068.031181293.403+00
1903068.341181193.402+00
1903068.991181093.411+00
1903068.781180993.410+00
NORTHING EASTINGSTA.
ELEV. 587.4
APPROXIMATE
X
PROPOSED NEW ELEV. 585.4
G R
AD
E
GRADE
SEE
N
O
TE
TO
M
ATC
H E
L.
.5
CS101
S I
D
W P -1
-B -0
O J E
C T I
D
R A
N A M
IS
H
R A P
IT
E P
L A
N
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
C S .d g n
W
IT
O L
D K
L U
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K M
A Y
W P -1
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
STATIONS 2+00 TO STA. 8+25
VENT HOLE LAYOUT
DETAIL 'A' - TYPICAL GROUT AND
L
HOLES
C VENT
HOLES
C VENTL
X
L
HOLES
C GROUT
WITH GRASS MIX.
CONCRETE SIDEWALK. TOPSOIL FILL WILL BE SEEDED
WILL NEED TO BE GRADED TO MATCH EXISTING
12. AFTER RETAINING WALL WILL BE REMOVED, THE AREA
MORE DETAILS SEE ELECTRICAL DRAWINGS.
ENTRANCE GATE, IT WILL BE REMOVED / RELOCATED FOR
CONTRACTOR TO FIELD VERIFY. IT POWERS THE
11. POWER LINE APPROXIMATE LOCATION, THE
MATCH THE LARGER SIZE.
DELINEATED IN THE DRAWINGS, THE CONTRACTOR MUST
VERIFIED TO DIFFER FROM PROPOSED SIZES
INSULATION. IF THE EXISTING PIPE SIZES ARE FIELD
MUST MATCH THE EXISTING PIPE SIZES, MATERIAL, AND
10. ALL WATER SERVICE AND SANITARY FORCE MAIN TIE-INS
MAY VARY IN THE FIELD.
ON THE BEST INFORMATION AVAILABLE. CONDITIONS
TIE-IN WITH THE COR. LOCATIONS PROVIDED ARE BASED
9. CONTRACTOR SHALL COORDINATE LOCATIONS FOR THE
CS307, SECTION D1.
DAYLIGHT VERTICALLY ABOVE GROUND. SEE SHEET
8. WATER SERVICE AND SANITARY FORCE MAIN TO
TUNNEL.
EXISTING SANITARY FORCE MAIN PENETRATING THE
31 23.0010 AND SHEET CS-503 FOR DETAILS). REMOVE
SANITARY FORCE MAIN. (SEE SPECIFICATION SECTION 33
CONNECTED TO THE EXISTING 4" DUCTILE IRON
DUCTILE IRON SANITARY FORCE MAIN IS TO BE
7. SANITARY FORCE MAIN TIE-IN LOCATION: THE NEW 4"
THE TUNNEL.
REMOVE EXISTING WATER SERVICE LINE PENETRATING
SECTION 33 11 00, AND SHEET CS503 FOR DETAILS.
FROM THE CITY AT THIS LOCATION. SEE SPECIFICATION
EXISTING 2" COPPER WATER SERVICE LINE COMING
WATER SERVICE LINE SHALL BE CONNECTED TO THE
6. WATER SERVICE TIE-IN LOCATION: THE NEW 2" COPPER
UTILITIES PRIOR TO CONSTRUCTION.
5. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL
WORK IN THE LOCK 24-HOURS A DAY.
4. PARKING/PIER TO BE SHARED WITH USACE EMPLOYEE
DIFFERENT CONTRACT.
ANOTHER CONTRACTOR WORKING ON SITE UNDER
3. PARKING STORAGE/STAGING AREA TO BE SHARED WITH
DURING CONSTRUCTION IF ENCOUNTERED.
2. ANY UTILITIES WILL HAVE TO BE BRACED TEMPORARY
COMPLETE THE WORK.
TO BE RELOCATED TEMPORARY WITHIN WORKLIMITS TO
DURING INSTALLATION OF SHEET PILE WALL IT WILL HAVE
1. GENERATOR IS NOT CONNECTED TO POWER LINES
RIPRAP
BE REMOVED
WATER LINE TO
SHEET PILE WALL
PROPOSED
+/- 582.5
RIVERSIDE APPROX.
SHEET PILE ELEV.
WORK LIMITS
WATER VALVE (SPRINKLER)
70'
WORK LIMITS
ALONG PROPOSED SHEETPILE WALL
APPROX. LAKE BOTTOM SURFACE CUT
NORTH PIER TUNNEL
EXISTING ELECTRICAL DUCTBANK
30'
TOP PIER ELEV. +/- 588.0
NEW SANITARY FORCE SEWER MAIN
NEW HEAT TRACED WATER LINE
TO BE REMOVED
ON SOUTH WALL
LIFE RING MOUNTED
TO BE REMOVED
ON SOUTH WALL
LIFE RING MOUNTED
TO BE RELOCATED
CCTV CAMERA #4
APPROX. TOP ELEV. 583.07
EXISTING SHEET PILE WALLA-STONE
SHEET PILE WALL
EXISTING
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
4+50 5+00 5+50 6+00 6+50 7+00
C1
SCALE: 1" = 10'
SITE PLAN
10' 20'0
N
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\SITE PLAN 2
4:37:10 PM 6/4/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E N
A M
A1
SCALE: 1" = 10' 10' 20'0
M A
T C
H L
IN
E T
O S
H E
E T C
S
M A
T C
H L
IN
E T
O S
H E
E T C
S
PROFILE
GENERAL NOTES
ALIGNMENT TABLE
1903074.251181841.408+50
1903072.121181840.098+47
1903069.641181834.018+42
1903070.421181822.578+30
1903067.891181793.218+00
1903067.271181786.087+92
1903065.611181783.987+90
1903066.021181693.397+00
1903066.371181593.396+00
1903066.831181493.395+00
1903067.471181393.394+00
1903068.031181293.403+00
1903068.341181193.402+00
1903068.991181093.411+00
1903068.781180993.410+00
NORTHING EASTING STA
A N
S I
D
W P -1
-B -0
O J E
C T I
D
CS102
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K M
A Y
W P -1
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
R A
N A M
IS
H
R A P
E P
L A
N
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
C S .d g n
W
IT
O L
D K
L U
Z A
MUST MATCH THE LARGER SIZE.
THE DRAWINGS, THE CONTRACTOR
PROPOSED SIZES DELINEATED IN
FIELD VERIFIED TO DIFFER FROM
IF THE EXISTING PIPE SIZES ARE
SIZES, MATERIAL, AND INSULATION.
MUST MATCH THE EXISTING PIPE
SANITARY FORCE MAIN TIE-INS
10. ALL WATER SERVICE AND
FIELD.
CONDITIONS MAY VARY IN THE
INFORMATION AVAILABLE.
ARE BASED ON THE BEST
THE COR. LOCATIONS PROVIDED
LOCATIONS FOR THE TIE-IN WITH
9. CONTRACTOR SHALL COORDINATE
SHEET CS307, SECTION D1.
VERTICALLY ABOVE GROUND. SEE
FORCE MAIN TO DAYLIGHT
8. WATER SERVICE AND SANITARY
PENETRATING THE TUNNEL.
EXISTING SANITARY FORCE MAIN
CS503 FOR DETAILS). REMOVE
SECTION 33 31 23.0010 AND SHEET
MAIN. (SEE SPECIFICATION
4" DUCTILE IRON SANITARY FORCE
BE CONNECTED TO THE EXISTING
IRON SANITARY FORCE MAIN IS TO
LOCATION: THE NEW 4" DUCTILE
7. SANITARY FORCE MAIN TIE-IN
PENETRATING THE TUNNEL.
EXISTING WATER SERVICE LINE
CS503 FOR DETAILS. REMOVE
SECTION 33 11 00, AND SHEET
LOCATION. SEE SPECIFICATION
COMING FROM THE CITY AT THIS
COPPER WATER SERVICE LINE
CONNECTED TO THE EXISTING 2"
SERVICE LINE SHALL BE
THE NEW 2" COPPER WATER
6. WATER SERVICE TIE-IN LOCATION:
CONSTRUCTION
VERIFYING ALL UTILITIES PRIOR TO
5. CONTRACTOR IS RESPONSIBLE FOR
LOCK 24-HOURS A DAY.
USACE EMPLOYEE WORK IN THE
4. PARKING/PIER TO BE SHARED WITH
UNDER DIFFERENT CONTRACT.
CONTRACTOR WORKING ON SITE
TO BE SHARED WITH ANOTHER
3. PARKING STORAGE/STAGING AREA
CONSTRUCTION IF ENCOUNTERED.
BRACED TEMPORARY DURING
2. ANY UTILITIES WILL HAVE TO BE
CONSTRUCTION IF ENCOUNTERED.
BRACED TEMPORARY DURING
1. ANY UTILITIES WILL HAVE TO BE
WALL OF TUNNEL TO BE REMOVED
ELECTRIC CABLE MOUNTED ON NORTH
TELEPHONE AND 12KV COM ED
SHEET PILE WALL
EXISTING
WORK LIMITS
LINE
ALIGNMENT
WORK LIMITS
THROUGH SOUTH WALL
2'X2' TUNNEL ACCESS
STAIRS
ACCESS PANEL
20"x24"
EXISTING SHEET PILING
W/ GATES
SECURITY FENCE
LIGHTPOLE (2-HEADS)
(SPRINKLER)
WATER VALVE
STEPS
CONCRETE
PANEL WITH RAILING
2-8" O.D. INS PIPES
1"& 2" CONDUITS,
70'
+/- 582.5
RIVERSIDE APPROX.
SHEET PILE ELEV.
PROPOSED SHEETPILE WALL
SURFACE CUT ALONG
APPROXIMATE LAKE BOTTOM
TOP PIER ELEV. +/- 588.0
ELEV. +/- 583.02
TOP DUCTBANK
SHEET PILE WALL
PROPOSED
NEW SANITARY FORCE SEWER MAIN
NEW HEAT TRACED WATER LINE
TIE-IN (SEE NOTES)
TO BE REMOVED
SOUTH WALL INSTALLED 2003)
HEAT TRACED. MOUNTED ON
WATER LINE (2" COPPER
TO REMAIN
CCTV CAMERA #3
A-STONE
FOR MORE DETAILS
SEE SHEET ES-104
EXISTING HANDHOLE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
8+50
9+509+008+508+007+507+00
A1
SCALE: 1" = 10' 10' 20'0
PROFILE
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\SITE PLAN 3
4:43:38 PM 6/4/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
M
T C
H L
IN
E T
O S
H E
E T C
S
C1
SITE PLAN
SCALE: 1" = 10'
N
10' 20'0
ALIGNMENT TABLE
1903074.251181841.408+50
1903072.121181840.098+47
1903069.641181834.018+42
1903070.421181822.578+30
1903067.891181793.218+00
1903067.271181786.087+92
1903065.611181783.987+90
1903066.021181693.397+00
1903066.371181593.396+00
1903066.831181493.395+00
1903067.471181393.394+00
1903068.031181293.403+00
1903068.341181193.402+00
1903068.991181093.411+00
1903068.781180993.410+00
NORTHING EASTING STA
A N
S I
D
W P -1
-B -0
O J E
C T I
D
F
IL
E N
A M
E
CS103
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K M
A Y
W P -1
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
R A
N A M
IS
H
R A P
E P
L A
N
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
C S .d g n
W
IT
O L
D K
L U
Z A
CONTRACTOR MUST MATCH THE LARGER SIZE.
PROPOSED SIZES DELINEATED IN THE DRAWINGS, THE
THE EXISTING PIPE SIZES ARE FIELD VERIFIED TO DIFFER FROM
MATCH THE EXISTING PIPE SIZES, MATERIAL, AND INSULATION. IF
9. ALL WATER SERVICE AND SANITARY FORCE MAIN TIE-INS MUST
INFORMATION AVAILABLE. CONDITIONS MAY VARY IN THE FIELD.
WITH THE COR. LOCATIONS PROVIDED ARE BASED ON THE BEST
6. CONTRACTOR SHALL COORDINATE LOCATIONS FOR THE TIE-IN
VERTICALLY ABOVE GROUND. SEE SHEET CS307, SECTION D1.
5. WATER SERVICE AND SANITARY FORCE MAIN TO DAYLIGHT
THE TUNNEL.
DETAILS. REMOVE EXISTING WATER SERVICE LINE PENETRATING
SEE SPECIFICATION SECTION 33 31 23.0010, AND SHEET CS503 FOR
WATER SERVICE LINE COMING FROM THE CITY AT THIS LOCATION.
SERVICE LINE SHALL BE CONNECTED TO THE EXISTING 2" COPPER
4. WATER SERVICE TIE-IN LOCATION: THE NEW 2" COPPER WATER
THE TUNNEL.
DETAILS. REMOVE EXISTING WATER SERVICE LINE PENETRATING
SEE SPECIFICATION SECTION 33 11 00, AND SHEET CS503 FOR
WATER SERVICE LINE COMING FROM THE CITY AT THIS LOCATION.
SERVICE LINE SHALL BE CONNECTED TO THE EXISTING 2" COPPER
3. WATER SERVICE TIE-IN LOCATION: THE NEW 2" COPPER WATER
PRIOR TO CONSTRUCTION
2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL UTILITIES
CONSTRUCTION IF ENCOUNTERED.
1. ANY UTILITIES WILL HAVE TO BE BRACED TEMPORARY DURING
NOTES:
TO REMAIN
SSP WALL
EXISTING
TO REMAIN
SSP WALL
EXISTING
TO REMAIN
SSP WALL
EXISTING
TO REMAIN
SSP WALL
EXISTING
RIVER BOTTOM
EXISTING SURFACE
TUNNEL STRUCTURE
EXISTING
TUNNEL STRUCTURE
EXISTING
RIVER BOTTOM
TUNNEL STRUCTURE
EXISTING
RIVER BOTTOM
TUNNEL STRUCTURE
EXISTING
RIVER BOTTOM
EXISTING SURFACE
EXISTING SURFACE
EXISTING SURFACE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
0+00.0000
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
0+50.0000
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
1+00.0000
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
1+50.0000
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
CS301
S
O J E
C T I
D
F
IL
E N
A M
E
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg10:19:41 AM 5/24/2019
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\CROSS SECTION Sta. 0+00 to Sta. 1+50
O S
S S
E C
T
IO
N S
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
W
IT
O L
D K
L U
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
C S .d g n
S T
A T
O S
T A
H-SCALE: 1" = 20' | V-SCALE: 1"=10'
A2
CROSS SECTIONS
10' 20'0
VERTICAL SCALE
20' 40'0
HORIZONTAL SCALE
R A
N A M
IS
H
R A P .E
W P -1
-B -0
W P -1
-C -0
X
X
NO WORK IN THIS AREA
NO WORK IN THIS AREA
NO WORK IN THIS AREA
NO WORK IN THIS AREA
M A
Y
RIVERSIDEPARKING
PARKING RIVERSIDE
PARKING RIVERSIDE
70'
70'
70'
1' LANDSCAPING FILL
SSP WALL
PROPOSED
TOE STONE
APPROX. EXISTING
ELEV 568 (MIN)
NEW TOE STONE
DRIVE LINE LIMITS
TOE STONE CLEAR
APPROXIMATE
35' LONG
SSP WALL
EXISTING
NEW CA1 STONE
TIE ROD
TO REMAIN
SSP WALL
EXISTING
1' CA-6 STONE
SSP WALL
PROPOSED
STRUCTURAL DRAWINGS
FOR TIP ELEV. SEE
TO REMAIN
SSP WALL
EXISTING
SSP WALL
PROPOSED
STRUCTURAL DRAWINGS
FOR TIP ELEV. SEE
TO REMAIN
SSP WALL
EXISTING
SSP WALL
PROPOSED
TO REMAIN
SSP WALL
EXISTING
STRUCTURAL DRAWINGS
FOR TIP ELEV. SEE
EXISTING SURFACE
FILL
2 TO 1 SLOPE
REUSED A-STONE
RIVER BOTTOM
EXISTING SURFACE
RIVER BOTTOM
RIVER BOTTOM
RIVER BOTTOM
EXISTING SURFACE
EXISTING SURFACE
SEE NOTE #1
LAKE BOTTOM
APPROX.
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
2+00.0000
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
2+50.0000
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
3+00.0000
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
3+50.0000
TIP ELEV 534.5
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
CS302
S
O J E
C T I
D
F
IL
E N
A M
E
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg5:12:40 PM 6/4/2019
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\CROSS SECTION Sta 2+00 to Sta. 3+50
O S
S S
E C
T
IO
N S
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
W
IT
O L
D K
L U
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
C S .d g n
S T
A T
O S
T A
A2
H-SCALE: 1" = 20' | V-SCALE: 1"=10'
CROSS SECTIONS
20' 40'0 10' 20'0
VERTICAL SCALE HORIZONTAL SCALE
GENERAL NOTES
1.5
R A
N A M
IS
H
R A P .E
W P -1
-B -0
W P -1
-C -0
X
X
M A
Y
TEMPORARY SEEDING MIX.
EROSION CONTROL SILT FENCE AND
3. LANDSCAPING FILL TO BE PROTECTED BY
PILE WALL OR BEHIND IT.
BELOW WATER LINE IN FRONT OF NEW SHEET
SHALL BE REUSED ON SITE BY PLACING IT
STONE REMOVED TO CLEAR THE DRIVE LINE
2. IN ORDER TO INSTALL SHEET PILE WALL ANY
BE REPLACED WITH NEW CA-6 STONE.
SAME MATERIAL THE PARKING SURFACE SHALL
TO BE EXCAVATED AND BACKFILLED WITH THE
CONSTRUCTED IN THE PARKING AREA. AREA
DETAILS ABOUT THE STRUCTURE TO BE
1. SEE STRUCTURAL DRAWINGS FOR MORE
RIVERSIDE
LAKESIDE
PARKING RIVERSIDE
70'
70'
TO REMAIN
SSP WALL
EXISTING
TIE ROD
NEW CA1 STONE
35' LONG
SSP WALL
EXISTING
ELEV 568 (MIN)
NEW TOE STONE
SSP WALL
PROPOSED
1' LANDSCAPING FILL
1' CA-6 STONE
DRIVE LINE LIMITS
TOE STONE CLEAR
APPROXIMATE
ELEV 568 (MIN)
NEW TOE STONE
SSP WALL
PROPOSED
1' LANDSCAPING FILL
1' CA-6 STONE
TO REMAIN
SSP WALL
EXISTING
TIE ROD
NEW CA1 STONE
35' LONG
SSP WALL
EXISTING
DRIVE LINE LIMITS
TOE STONE CLEAR
APPROXIMATE
ELEV 568 (MIN)
NEW TOE STONE
SSP WALL
PROPOSED
1' LANDSCAPING FILL
1' CA-6 STONE
TO REMAIN
SSP WALL
EXISTING
TIE ROD
NEW CA1 STONE
35' LONG
SSP WALL
EXISTING
DRIVE LINE LIMITS
TOE STONE CLEAR
APPROXIMATE
ELEV 568 (MIN)
NEW TOE STONE
SSP WALL
PROPOSED
1' LANDSCAPING FILL
1' CA-6 STONE
TO REMAIN
SSP WALL
EXISTING
TIE ROD
NEW CA1 STONE
35' LONG
SSP WALL
EXISTING
DRIVE LINE LIMITS
TOE STONE CLEAR
APPROXIMATE
TOE STONE
APPROX. EXISTING
TOE STONE
APPROX. EXISTING
EXISTING SURFACE
EXISTING SURFACE
EXISTING SURFACE
EXISTING SURFACE
A-STONE
APPROX. EXISTING
2 TO 1 SLOPE
REUSED A-STONE
2 TO 1 SLOPE
REUSED A-STONE
2 TO 1 SLOPE
REUSED A-STONE
TOE STONE
APPROX. EXISTING
2 TO 1 SLOPE
REUSED A-STONE
FILL
FILL
FILL
FILL
RIVER BOTTOM
RIVER BOTTOM
RIVER BOTTOM
RIVER BOTTOM
LAKE BOTTOM
EXISTING
LAKE BOTTOM
EXISTING
LAKE BOTTOM
EXISTING
LAKE BOTTOM
EXISTING
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
4+00.0000
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
4+50.0000
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
5+00.0000
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
5+50.0000
TIP ELEV 534.5
TIP ELEV 534.5
TIP ELEV 534.5
TIP ELEV 534.5
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
CS303
S
O J E
C T I
D
F
IL
E N
A M
E
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:44:39 AM 5/24/2019
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\CROSS SECTION Sta 4+00 to Sta. 5+50
O S
S S
E C
T
IO
N S
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
W
IT
O L
D K
L U
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
C S .d g n
S T
A T
O S
T A
A2 10' 20'020' 40'0
VERTICAL SCALE HORIZONTAL SCALE
H-SCALE: 1" = 20' | V-SCALE: 1"=10'
CROSS SECTIONS
GENERAL NOTES
1.5
1.5
R A
N A M
IS
H
R A P .E
W P -1
-B -0
W P -1
-C -0
X
X
1.5
1.5
M A
Y
TEMPORARY SEEDING MIX.
EROSION CONTROL SILT FENCE AND
2. LANDSCAPING FILL TO BE PROTECTED BY
PILE WALL OR BEHIND IT.
BELOW WATER LINE IN FRONT OF NEW SHEET
SHALL BE REUSED ON SITE BY PLACING IT
STONE REMOVED TO CLEAR THE DRIVE LINE
1. IN ORDER TO INSTALL SHEET PILE WALL ANY
RIVERSIDE
LAKESIDE
RIVERSIDE
LAKESIDE
RIVERSIDE
LAKESIDE
RIVERSIDE
LAKESIDE
70'
1' CA-6 STONE
1' LANDSCAPING FILL
SSP WALL
PROPOSED
ELEV 577 (MIN)
NEW TOE STONE
DRIVE LINE LIMITS
TOE STONE CLEAR
APPROXIMATE
35' LONG
SSP WALL
EXISTING
NEW CA1 STONE
TIE ROD TO REMAIN
SSP WALL
EXISTING
EXISTING SURFACE
1' CA-6 STONE
1' LANDSCAPING FILL
SSP WALL
PROPOSED
ELEV 568 (MIN)
NEW TOE STONE
DRIVE LINE LIMITS
TOE STONE CLEAR
APPROXIMATE
35' LONG
SSP WALL
EXISTING
NEW CA1 STONE
TIE ROD TO REMAIN
SSP WALL
EXISTING
EXISTING SURFACE
1' CA-6 STONE
1' LANDSCAPING FILL
SSP WALL
PROPOSED
ELEV 568 (MIN)
NEW TOE STONE
DRIVE LINE LIMITS
TOE STONE CLEAR
APPROXIMATE
35' LONG
SSP WALL
EXISTING
NEW CA1 STONE
TIE ROD TO REMAIN
SSP WALL
EXISTING
EXISTING SURFACE
A-STONE
APPROX. EXISTING
A-STONE
APPROX. EXISTING
2 TO 1 SLOPE
REUSED A-STONE
TOE STONE
APPROX. EXISTING
FILL
FILL
FILL
2 TO 1 SLOPE
REUSED A-STONE
2 TO 1 SLOPE
REUSED A-STONE
RIVER BOTTOM
RIVER BOTTOM
RIVER BOTTOM
LAKE BOTTOM
EXISTING
LAKE BOTTOM
EXISTING
LAKE BOTTOM
EXISTING
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID550
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
6+00.0000
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150 6+50.0000
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
7+00.0000
TIP ELEV 534.5
TIP ELEV 534.5
TIP ELEV 534.5
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
CS304
S
O J E
C T I
D
F
IL
E N
A M
E
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:47:00 AM 5/24/2019
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\CROSS SECTION Sta. 6+00 to Sta. 7+50
O S
S S
E C
T
IO
N S
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
W
IT
O L
D K
L U
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
C S .d g n
S T
A T
O S
T A
A2
H-SCALE: 1" = 20' | V-SCALE: 1"=10'
CROSS SECTIONS
20' 40'0
HORIZONTAL SCALE
10' 20'0
VERTICAL SCALE
1.5
1.5
1.5
GENERAL NOTES
R A
N A M
IS
H
R A P .E
W P -1
-B -0
W P -1
-C -0
X
X
M A
Y
TEMPORARY SEEDING MIX.
EROSION CONTROL SILT FENCE AND
2. LANDSCAPING FILL TO BE PROTECTED BY
PILE WALL OR BEHIND IT.
BELOW WATER LINE IN FRONT OF NEW SHEET
SHALL BE REUSED ON SITE BY PLACING IT
STONE REMOVED TO CLEAR THE DRIVE LINE
1. IN ORDER TO INSTALL SHEET PILE WALL ANY
RIVERSIDE
LAKESIDE
RIVERSIDE
LAKESIDE
1' CA-6 STONE
1' LANDSCAPING FILL
SSP WALL
PROPOSED
ELEV 577 (MIN)
NEW TOE STONE
DRIVE LINE LIMITS
TOE STONE CLEAR
APPROXIMATE
35' LONG
SSP WALL
EXISTING
NEW CA1 STONE
TO REMAIN
SSP WALL
EXISTING
EXISTING SURFACE
1' CA-6 STONE
1' LANDSCAPING FILL
SSP WALL
PROPOSED
ELEV 577 (MIN)
NEW TOE STONE
DRIVE LINE LIMITS
TOE STONE CLEAR
APPROXIMATE
35' LONG
SSP WALL
EXISTING
NEW CA1 STONE
TIE ROD TO REMAIN
SSP WALL
EXISTING
EXISTING SURFACE
FILL
FILL
2 TO 1 SLOPE
REUSED A-STONE
TOE STONE
APPROX. EXISTING
2 TO 1 SLOPE
REUSED A-STONE
TOE STONE
APPROX. EXISTING
RIVER BOTTOM
LAKE BOTTOM
EXISTING
TUNNEL STRUCTURE
EXISTING
RIVER BOTTOM
LAKE BOTTOM
EXISTING
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
E L E
V A
T
IO
N
0 20 40 60 80 100 120 140 150-20-40-60-80-100-120-140-150
7+50.0000
E L E
V A
T
IO
N
0 20 40 60 80 100 120
140 150
-20-40-60-80-100-120-140-150
8+00.0000
TIP ELEV 534.5
TIP ELEV 534.5
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R
CS305
S
O J E
C T I
D
F
IL
E N
A M
E
DS: AEC_Screen.dscriptPD: AEC_pdf.pltcfg11:53:19 AM 5/24/2019
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\CROSS SECTION Sta. 8+00
B A
N K
H E
A D
D S
C H
IE
M A
N N
W
IT
O L
D K
L U
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
C S .d g n
20' 40'0
HORIZONTAL SCALE
10' 20'0
VERTICAL SCALE
A2
H-SCALE: 1" = 20' | V-SCALE: 1"=10'
CROSS SECTIONS
C R
O S
S S
E C
T
IO
N
S T
A
GENERAL NOTES
1.5
1.5
R A
N A M
IS
H
R A P .E
W P -1
-B -0
W P -1
-C -0
X
X
M A
Y
TEMPORARY SEEDING MIX.
EROSION CONTROL SILT FENCE AND
2. LANDSCAPING FILL TO BE PROTECTED BY
PILE WALL OR BEHIND IT.
BELOW WATER LINE IN FRONT OF NEW SHEET
SHALL BE REUSED ON SITE BY PLACING IT
STONE REMOVED TO CLEAR THE DRIVE LINE
1. IN ORDER TO INSTALL SHEET PILE WALL ANY
RIVERSIDELAKESIDE
TREES/VEGETATION WAS REMOVED IN SUMMER 2017
TIE-IN WATER AND SEWER PIPES
SEWER LINE
PROPOSED
WATER LINE
PROPOSED
EXISTING
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
D1
A1 A6
END OF PIER LOOKING EAST
UTILITY BOX ON END OF PIER RAILING, PIPING AND STAIRS AT END OF PIER
D6
SITE MAP END OF PIER
S I
D
W P -1
-B -0
O J E
C T I
D
F
IL
E N
A M
E
CS306
A D
A M K
A
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
W P -1
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
R A
N A M
IS
H
R A P
X
IS
T
IN
G C
O N
D
IT
IO
N S
S R
T
C S .d g n
W
IT
O L
D K
L U
Z A
M A
Y
8+50
HEAT TRACED
WATER MAIN
INSULATED PIPE
FORCE MAIN
SANITARY
DUCKBANK
INSULATED PIPE
MATCH ADJACENT PIPE SUPPORT
NEW SHEET PILE
ACCESS HATCHABANDON IN PLACE, COORDINATE WITH COR
SANITARY FORCE MAIN TIE IN TO EXISTING HORIZONTAL RUNS
SEE NOTE 1
WATER SERVICE TIE IN TO EXISTING HORIZONTAL RUNS
WITH FOUNDATION
TYPICAL SUPPORT
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\SECTIONS
11:55:43 AM 5/24/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E N
A M
D1
SCALE: 1/2" = 1' 0 2' 4'1'C-103
D SECTION D - WATER SERVICE AND FORCE MAIN PIER TIE-IN
GENERAL NOTES
CS307
S I
D
W P -1
-B -0
O J E
C T I
D
F
IL
E N
A M
E
R A
N A M
IS
H
R A P
O
R C
E M
A
IN
S
E C
T
IO
N S
W A
T E
R S
E R
V
IC
E A
N D S
A N
IT
A R
Y
K P
C
S R
T
C S .d g n
W
IT
O L
D K
L U
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
W P -1
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
THE TOP OF PIPE IS 5' FROM GRADE. COR TO VERIFY.
APPROXIMATELY 5' HORIZONTALLY FROM THE 90° PIPE BEND OR WHEN
NEW UNDERGROUND WATER SERVICE AND SANITARY PIPING
TRACE INSULATED PIPING SYSTEMS TO END AND TRANSITION TO THE
APPROVED FOR WATERTIGHT BELOW GROUND INSTALLATION. HEAT
4. PROVIDE MANUFACTURER'S RECOMMENDED JACKETING COVERS
3. PROVIDE MANUFACTURERS RECOMMENDED PIPE BEDDING.
BE LOCATED WITHIN 3' OF ELBOWS.
2. PROVIDE APPROPRIATE PIPING SUPPORTS EVERY 10'. A SUPPORT SHALL
SYSTEM PER SPECIFICATION 33 31 23.00 10.
1. WATER AND SANITARY FORCE MAIN PIER TIE-IN POINTS. MATCH EXISTING
M A
Y
18'-0"
CROSS-SECTIONS
FOR MORE DETAILS SEE
50' LONG
EVERY 3RD PILE
PILE 35' LONG
EXISTING SHEET
TOP CONCRETE CAP ±581.5
HANDRAIL
EXISTING
STRUCTURE
TUNNEL
EXISTING
BE RELOCATED
UTILITIES TO
ANCHORS TO REMAIN
WALL, WALE AND
EXISTING MZ-38 SSP
EXISTING 12" CONCRETE WALL CAP
EXISTING UTILITY DUCTBANK TO REMAIN
ELEVATION
UNKNOWN
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\EXISTING TYPICAL SECTION
12:03:07 PM 5/24/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
E N
A M
E
FINAL
0 4' 8'2'
EL. 531.7 (EVERY THIRD PILE)
EL. 546.7
LAKESIDE
RIVERSIDE
TOP OF SSP EL. 582.5
BOTTOM OF EXISTING SSP EL. 534.75
GENERAL NOTES
DRIVELINE CLEARING AND ANCHOR WALL INSTALLATION.
WALL CAP, SHEET PILE, AND EXISTING UTILITY DUCT BANK DURING
TO PROTECT AND PREVENT ANY MOVEMENT OF THE EXISTING LAKESIDE
CONTRACTOR SHALL PROVIDE ANY TEMPORARY BRACING NECESSARY
THE INTEGRITY OF THE EXISTING SHEET PILE AND TIMBER CRIB.
CONTRACTOR SHALL LIMIT LENGTH OF DRIVELINE CLEARING TO MAINTAIN
REQUIRED TO BE CLEARED ALL THE WAY TO THE SHOWN TIP ELEVATION.
LAKESIDE SHEET PILE ANCHOR WALL. EXISTING TOE STONE MAY BE
4. CONTRACTOR SHALL CLEAR DRIVELINE AS REQUIRED TO INSTALL NEW
INTEGRITY OF EXISTING STRUCTURES TO REMAIN.
3. CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PROTECT
THE EXISTING WALE.
THRU THE EXISTING TUNNEL WALLS SHALL MATCH THE CENTERLINE OF
RIVERSIDE SHEET PILE WALL. CENTERLINES OF HOLES TO BE DRILLED
ADJUSTED TO MATCH ELEVATION OF EXISTING WALE ON EXISTING
SHEET PILE WALL. NEW WALE ON NEW ANCHOR WALL SHALL BE
OF EXISTING WALE MAY VARY ALONG THE LENGTH OF THE EXISTING
INSTALLATION OF NEW SHEET PILE ANCHOR WALL AND WALE. ELEVATION
TO DRILLING HOLES THRU EXISTING TUNNEL CROSS SECTION AND
2. CENTERLINE ELEVATION OF EXISTING WALE SHALL BE VERIFIED PRIOR
INCLUDING ALL DIMENSIONS SHOWN IN REFERENCE DRAWINGS.
1. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO START OF WORK
CS501
N A M
IS
H
R A P
X
IS
T
IN
G T
Y P
IC
A L S
E C
T
IO
N
D A
R L E
N E B
A N
K H
E A
D
W
IT
O L
D K
L U
Z A
C S .d g n
W
IT
O L
D K
L U
Z A
A N
S I
D
W P -1
-B -0
O J E
C T I
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K M
A Y
W P -1
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
A1
SCALE: 1" = 4'-0"
TYPICAL CROSS SECTION (EXISTING)
SHEET PILE
EXISTING
SHEET PILE WALL
NEW
F O
R M
O R
E D
E T
A
IL
S S
E E C
R O
S S S
E C
T
IO
N S
E L E
V A
T
IO
N V
A R
IE
S
SEE NOTE 3
70'-0"
26'-1"1'-5"12'-0"18'-0"12'-6"
10'-0" 3'-6"
(SEE NOTE 5)
EL. 568
CONTROL SILT FENCE
INSTALL EROSION
CA6 STONE
1 FT
NEW WALL
WATER MAIN
HEAT TRACED
DUCTBANK
EXISTING
NEW TIE ROD
TOE STONE
EXISTING
(SEE NOTE 1)
A-STONE
FILL SEEDED
1 FT LANDSCAPING
1 FT
STONE
NEW CA-1
ON SHEET CS101
SEE DETAIL 'A'
GROUT HOLES
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
EL. 548.5 +/- EL. 548.5
EL. 582.5 +/-
LAKESIDE RIVERSIDE
EL. 581.5 +/-
EL. 588.5
EL. 583.83
TOP OF CONCRETE
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\PROPOSED TYPICAL SECTION
5:47:16 PM 6/4/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
NOTES:
3' 6'0
EXISTING FILL
2.5
EL. 554.0
APPROX. LAKE BOTTOM
EXISTING FILL
SLOPE 1%
EL. 534.5
MORE DETAILS
SEE SHEET CS503 FOR
NEW FORCE SEWER MAIN
(SEE NOTE 2)
FILL
MANAGEMENT MANUAL.
INSTALLATION AND SEWER AND STORM WATER
SHALL FOLLOW CITY OF CHICAGO WATER MAIN
4. INSTALLATION OF THE SEWER AND WATER MAINS
AND REPLACED WITH CA-1.
3. ANY EXCAVATED MATERIAL WILL BE HAULED OFFSITE
TO -1 FT FROM NEW TIE-RODS.
2. FILL: THE EXISTING TOE STONE SHALL BE FILLED UP
19.45 03 AND 35 31 20 00.03.
MORE DETAILS SEE SPECIFICATION SECTIONS 35 31
7+00 AND 577 FROM STA. 7+00 TO STA. 8+25. FOR
2:1 SLOPE (H:V) TO EL. 568 (+3,-0) FROM STA. 3+50 TO
1. PLACE A-STONE AT LAKESIDE TOE OF SHEET PILE IN A
CS502
S I
D
W P -1
-B -0
O J E
C T I
D
F
IL
E N
A M
E
R A
N A M
IS
H
R A P
O P
O S
E D T
Y P
IC
A L S
E C
T
IO
N
D A
R L E
N E B
A N
K H
E A
D
W
IT
O L
D K
L U
Z A
C S .d g n
W
IT
O L
D K
L U
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K M
A Y
W P -1
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
NEW CONCRETE
A1
SCALE: 1" = 3'-0"
TYPICAL SECTION (PROPOSED)
EL. 582.5
MATERIAL
6" BEDDING
MATERIAL
6" BEDDING
SEWER MAIN
FORCED
EXISTING DUCTBANK
NEW TIE RODS
MATERIAL
BACKFILL
1' BACKFILL MATERIAL
HEAT TRACED WATER MAIN
10' 0"
M
IN
6'-6"
WALKWAY
CONCRETE
EXISTING
INSTALL TYPICAL RAILING
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
®of Engineers
US Army Corps
CARRIER PIPE
POLYURETHANE FOAM INSULATION
3/4" HEATING CABLE TUBE
8" INSULATION JACKET
...\Chicago Lock North Pier Repair - 114419\40 - Geospatial Data\Drawings\CAD_BIM\_Sheets\MECHANICAL DETAILS
1:40:14 PM 5/24/2019 PD: AEC_pdf.pltcfg DS: AEC_Screen.dscript
A8
SCALE: 3" = 1' 6"0 3" 1'
PIPE INSULATION AND HEAT TRACE DETAIL
EXISTING GROUND
B1
SCALE: 1" = 1'
0 1' 2'6"
SECTION
A N
S I
D
W P -1
-B -0
O J E
C T I
D
F
IL
E N
A M
E
CS503
IC
A G
O
IL
L
IN
O
IS
N O
R T
H P
IE
R R
E P
A
IR
S
C H
IC
A G
O L
O C
K
W P -1
-C -0
X
X
C H
IC
A G
O
IL
L
IN
O
IS
S L
A S
A L L E S
T S
U
IT
E
C H
IC
A G
O D
IS
T R
IC
T
R A
N A M
IS
H
R A P
W
T E
R S
E R
V
IC
E A
N D S
A N
IT
A R
Y M
A
IN
D
E T
A
IL
D
B A
N K
H E
A D
D S
C H
IE
M A
N N
C S .d g n
W
IT
O L
D K
L U
Z A
RIVERSIDE
ELEV. 588
LAKESIDE
E1
SCALE: NTS
STAIRS AND RAILING
GENERAL NOTES
EXISTING BASE FOR PIPE SUPPORTS.
3. CONCRETE SLABS TO BE REINFORCED AND POURED IN LOCATIONS WITH NO
PER SPECIFICATIONS 33 11 00 AND 33 31 23.0010.
2. INSTALL INSULATED HEAT TRACED WATER SERVICE AND SANITARY FORCE MAINS
ON THIS SHEET.
JACKETING AND CABLE TUBE. SEE THE PIPE INSULATION AND HEAT TRACE DETAIL
SANITARY FORCE MAIN CONSISTS OF A 3" CARRIER PIPE WITH THE SAME SIZE
OF A 2" COPPER CARRIER PIPE, 3/4" HEATING CABLE TUBE, AND AN 8" JACKET. THE
SANITARY LINES. THE EXISTING PRE-INSULATED WATER SERVICE PIPING CONSISTS
AND MATERIAL OF THE EXISTING ABOVE GROUND INSULATED WATER SERVICE AND
1. INSULATED PIPE: PIPING, INSULATION, AND HEAT TRACE SHALL MATCH THE SIZE
M A
Y
TUNNEL
L A
K E
S
ID
E
T U
N N
E L
BE GRADED AS SHOWN ON SHEET CS101
EXISTING PARKING LOT ELEVATION TO