AMD_0005.pdf
PDF 134 KB Posted
- Attached to
- ROSEWOOD PARK CONSTRUCTION PROJECT Federal contract opportunity
- Solicitation number
- W912P6-13-B-0004
About this file
AMD 0005
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMD_0006.pdf | ||
| Rosewood_Spec_Section_01_22_00_Amendment_5.pdf | ||
| REGISTER.pdf | ||
| 35_31_19.45.pdf | ||
| Rosewood_Revised_Plans_for_Amendment_4.pdf | ||
| AMD_0004.pdf | ||
| AMD_0003.pdf | ||
| W912P6-13-B-0004_Rosewood_Park_Coastal_Ecosystem_Restoration_-_GLFER_AMD0003_Specifications.pdf | ||
| AMD_0002.pdf | ||
| W912P6-13-B-0004_Rosewood_Park_Coastal_Ecosystem_Restoration_-_GLFER_AMD0001_Specifications.pdf | ||
| AMD_0001.pdf | ||
| Rosewood_Amendment_1_Revised_Plans.pdf | ||
| Pre-Bid_Meeting_Sign-In_Sheet.pdf | ||
| W912P6-13-B-0004_Rosewood_Specs.pdf | ||
| W912P6-13-B-0004_Rosewood_Plan_Set.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6631514155
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
REFERENCE: SOLICITATION W912P6-13-B-0004; ROSEWOOD PARK CONSTRUCTION, HIGHLAND PARK, ILLINOIS
A. This Amendment is being issued to inform interested bidders of the status of funding, change the bid opening date, answ er contractors’ questions, revise the bid schedule, revise the option terms and revise specifications.
B. Point of Contact: Elizabeth New ell at 312-846-5370
--THIS AMENDMENT CONTINUES ON THE FOLLOWING PAGE—
1. CONTRACT ID CODE PAGE OF PAGES
J 1 23
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Sep-2013
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-13-B-0004
X 9B. DATED (SEE ITEM 11)
09-Aug-2013
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Sep-2013
CODE
U. S. ARMY ENGINEER DISTRICT, CHICAGO
231 SOUTH LASALLE STREET SUITE 1500
CHICAGO IL 60604-1437
W912P6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P6-13-B-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
The following items are applicable to this modification:
SUMMARY OF CHANGES
C. BID OPENING: The bid opening date is hereby changed to September 23, 2013. Bids remain due by 11:00 AM CDT. The designated bid opening room remains the Fort Dearborn Room, located on the 16th floor at 231 South LaSalle Street, Chicago, Illinois 60604.
D. DELIVERY OF BIDS: Section 00010, “Important Notes” Paragraph 5.f is hereby revised to read as follows:
Hand-carried Bids Delivered on the Day of the Bid Opening: For bids being hand-carried after 9:00 AM12: NOON on the date of the bid opening, the bidder shall contact the Contracting Branch at 312-846-5373 or 312-846-5370 to have its bid retrieved from the Lobby Area of the District’s facility, located at 231 S. LaSalle St., Suite 1500, Chicago, Il. 60604. Prior to 9:00 AM 12: NOON on the date of the bid opening, it is the responsibility of each bidder to ensure that its Bid is received by the Chicago District’ – USACE Contracting Branch, located at 231 S. LaSalle St., Suite 1500, Chicago, Il. 60604 prior to the date and time set of the opening of bids.
E. FUNDING STATUS: The required funding approval has not been acquired. Pursuant to the Contingency Statement provided in Amendment 0002, the USACE is under no obligation to receive bids for this project until the required funding approval has been acquired. The USACE has not acquired said approval; when said approval is acquired, offerors will be notified by another Amendment.
F. USACE’s RESPONSES TO CONTRACTOR’S INQUIRIES: Provided below are the USACE’s responses to all questions received from contractors.
Question 1. This question pertains to Question 2 in Amendment #3. We understand that the contractor is responsible for the proposed disposal location plan and that all the testing of the material and certifications are our responsibility. We don’t understand what costs we need to include in our proposal. Should we presume for bidding that the material is “clean” fill and can be disposed of in a CCDD facility? If we do that and environmental testing shows the material to be contaminated will the contractor be awarded a change order for the additional cost to landfill the material?
USACE Response 1: The bidder should assume CCDD disposal for all material except for soil. As part of this amendment two option bid items have been added for the disposal of excess soil at either a CCDD facility or landfill. These option bid items are cost reimbursable and payment will be executed based on the results of the testing required in specification section 01 57 20.01.
Question 2. Response 21, in Amendment #1, stated that Section 3.5 of the Specs addresses the compaction requirements for the beach replenishment materials. According to Spec Section 310000, 3.5 Degree of Compaction, wetland or native plant areas are not compacted and pathways are compacted to 95% of Standard Proctor. Is the entire beach area considered wetland area or pathway area? Please define “pathway area” and “wetland area” as they apply to the beach.
USACE Response 2: Subpart 3.5 goes on to state "...or at least minimized in order to promote native plant growth." Unless the Contract plans have areas designated as "pathway" (which shall be compacted to 95% Standard Proctor density in accordance with ASTM D 698) the beach replenishment material should be placed within the beach area in order to promote native plant growth whether or not the areas will be planted.
In areas that will be planted, please note that per Spec Section 32 93 03, subpart 3.1.1 "The Contractor shall prepare the planting area for optimal germination and establishment of native plant species and so that the performance standards are met."
Question3. Addendum #4, Summary of Changes part D., references bids being Hand Carried after noon on the date of the bid opening. However, this conflicts with the bid time which is 11:00 am. Please clarify the bid opening time.
USACE Response 2: Delivery of Bids language has been revised via this Amendment.
See “D” above.
G. SPECIFICATIONS: The text of the below listed specification section has been revised and is attached hereto. Deletions are struck through and additions are underlined.
01 22 00 MEASUREMENT AND PAYMENT
H. SECTION 00010 BID SCHEDULE: The bid schedule has been revised and is attached hereto.
Contractors shall use the revised bid schedule to submit their Bids.
I. AWARDING OF OPTIONS: Section 00010, “Important Notes” Paragraph 4 is hereby revised to read as follows:
4. AWARDING OF OPTIONS: At the government’s discretion, any, all or none of the Option Line Items (CLINS 0012 through 00140015, and 0017) may be awarded no later than 182 days after the Notice to Proceed has been acknowledged by the contractor. At the government’s discretion, any, all or none of Option Line Items 0015 through 0016, and 0017 may be awarded within 30 days following Government approval for the Contractor’s Disposal Plan. No additional time will be added to the contract for award of Option CLINS. Should the government determine it necessary to exercise an Option (Line Items 0012 through 00160014), Options may be awarded in any order at the government’s discretion. The order of awarding the Options does not apply to the Payment and Performance Bond (Line Item 0017 0015); additional bonding is required any time the contract value is increased, meaning Option Item 0017 0015 must be awarded if any of the options are exercised.
(End of Summary of Changes)
Section 00010 - Solicitation Contract Form (REVISED BY AMENDMENT 0005)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum Mobilization and Demobilization
FFP
FFP = FIRM FIXED PRICE
PURCHASE REQUEST NUMBER: W81G6631514155
NET AMT
Groynes
FFP
This Item identifies information that relates directly to Sub-Items 0002AA through 0002AD; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0002AA through
0002AD.
0002AA 1 Lump Sum Sheetpile Groyne Removal
FFP
0002AB 1 Lump Sum Concrete Pier Removal
0002AC 16,800 Square
Foot
Sheetpile Groyne Installation
0002AD 1,042 Net Ton
(2,000 LB)
Northern Groyne Armor Stone - 1.5-3T
Stone Breakwaters
FFP
This Item identifies information that relates directly to Sub-Items 0003AA through 0003AD; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0003AA through
0003AD.
0003AA 16,150 Net Ton
Armor Stone - 3-5T
0003AB 9,240 Net Ton
Armor Stone - 1.5-3T
0003AC 5,415 Net Ton
Filter Stone
0003AD 4,805 Net Ton
Core Stone
Beach Revetment
FFP
This Item identifies information that relates directly to Sub-Items 0004AA through 0004AE; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0004AA through
0004AE.
0004AA 511 Net Ton
Armor Stone - A4
0004AB 252 Net Ton
Armor Stone - A5
0004AC 249 Net Ton
Filter Stone
0004AD 89 Net Ton
Bedding Stone
0004AE 1 Lump Sum Geotextile Fabric
Beach Replenishment
FFP
This Item identifies information that relates directly to Sub-Items 0005AA through 0005AB; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0005AA through
0005AB.
0005AA 45,000 Cubic
Yard
Beach Nourishment
0005AB 9,000 Cubic
Yard
Bypass Wedge Nourishment
Stream Restoration
FFP
This Item identifies information that relates directly to Sub-Items 0006AA through 0006AG; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0006AA through
0006AG.
0006AA 4 Each Remove Concrete Weirs
0006AB 220 Linear
Foot
Remove Box Culvert
0006AC 1 Lump Sum Remove Existing Parking Lot
0006AD 1 Lump Sum Permeable Concrete Parking Lot
0006AE 1 Lump Sum Invasive Species Removal
0006AF 1 Acre Native Planting
0006AG 1 Acre Native Plant Establishment (YR 3-5)
Bluff Restoration
FFP
This Item identifies information that relates directly to Sub-Items 0007AA through 0007AC; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0007AA through
0007AC.
0007AA 1 Lump Sum Invasive Species Removal
0007AB 2 Acre Native Planting
0007AC 2 Acre Native Plant Establishment (YR 3-5)
Ravine Restoration
FFP
This Item identifies information that relates directly to Sub-Items 0008AA through 0008AC; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0008AA through
0008AC.
0008AA 1 Lump Sum Invasive Species Removal
0008AB
BID ITEM DELETED
0008AC Acre
BID ITEM DELETED
Savanna Restoration
FFP
This Item identifies information that relates directly to Sub-Items 0009AA through 0009AC; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0009AA through
0009AC.
0009AA 1 Lump Sum Invasive Species Removal
0009AB 2 Acre Native Planting
0009AC 2 Acre Native Plant Establishment (YR 3-5)
Beach Restoration
FFP
This Item identifies information that relates directly to Sub-Items 0010AA through 0010AC; it is not to be scheduled separately for delivery, identified separately for shipment or performance, or priced separately for payment purposes. In that regard, the Offeror shall set forth its pricing at Sub-Items 0010AA through
0010AC.
0010AA 1 Lump Sum Invasive Species Removal
0010AB 1.15 Acre Native Planting
0010AC 1.15 Acre Native Plant Establishment (YR 3-5)
0011 1 Lump Sum Performance and Payment Bonds
FFP
FOR LINE ITEMS 0001 THROUGH 0010AC
THIS IS A COST REIMBURSABLE LINE ITEM - The government will reimburse the contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will be modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with the contract changes.
0012 1 Lump Sum OPTION Porous Paver Parking Lot
0013 1 Lump Sum OPTION Concrete Cap for Sheetpile Groyne
0014 3,033 Net Ton
OPTION Groyne Armor Stone - 1.5-3T
0015 1 Lump Sum OPTION Landfill Disposal of Excess Soil
FFP
THIS IS A COST REIMBURSABLE LINE ITEM that will be compensated in accordance with specification section 01 22 00. Any unused balance will be de-obligated at contract completion. The COR must receive evidence of actual costs incurred.
0016 1 Lump Sum OPTION CCDD Disposal of Excess Soil
FFP
THIS IS A COST REIMBURSABLE LINE ITEM that will be compensated in accordance with specification section 01 22 00. Any unused balance will be de-obligated at contract completion. The COR must receive evidence of actual costs incurred.
0017 1 Lump Sum OPTION Performance and Payment Bonds
FFP
FOR OPTION LINE ITEMS 0012 THROUGH 0016
THIS IS A COST REIMBURSABLE LINE ITEM - The government will reimburse the contractor for the actual cost of acceptable performance and payment bonds, upon receiving evidence of payment (paid invoice) from the bonding company or agency, not to exceed the total amount of the contract line item. The Government will not pay more than the total line item amount for the performance and payment bonds. If the actual cost of the bonds is less than the line item amount, the contract will be modified to adjust the line item accordingly.
Adjustment(s) to the line item will also be made for any revisions to the actual bond costs associated with the contract changes.
TOTAL
TOTAL BID PRICE (LINE ITEMS 0001 THROUGH 0017): $ ___________________