Text version
CSSC Dispersal Barrier, Permanent Barrier 1, Water Structures W912P6-13-B-0002 repaired by a blend of portland cement and white cement properly proportioned so that the final color when cured will be the same as adjacent concrete.
2.3.5.2 Major Defects
Major defects are those which involve more than 36 square inches of concrete or expose reinforcing steel. If one or more major defects appear in a member, it shall be rejected. Cracks of a width of more than0.01 inch shall be cause for rejection of the member.
PART 3 EXECUTION
3.1 EXAMINATION
Prior to erection, and again after installation, precast members shall be checked for damage, such as cracking, spalling, and honeycombing. As directed by the Contracting Officer, precast members that do not meet the surface finish requirements specified in Part 2 in paragraph entitled "Surface Finish" shall be repaired, or removed and replaced with new precast prestressed members.
3.2 ERECTION
Precast concrete sleepers shall be lifted in accordance with the shop drawings and moved into position in the canal, guided by divers. Care shall be taken to orient the sleepers with the slots for the bundle of eight billets at the correct end. Sleepers shall align across the canal within 1/2-inch so that the electrodes will seat in the slots provided.
Sleepers shall be locally shimmed with adjacent loose bottom material or imported gravel so that the elevation to the top of sleepers measured at slots is 552.50 feet plus 0.08 feet minus zero. Material must be placed under the entire sleeper. Spacing of sleepers measured across the canal shall be within plus or minus 3 inches of the plan locations.
3.3 CONSTRUCTION RECORDS
Complete construction records shall be kept of the manufacturing, handling, and erection of the precast-prestressed concrete members. Records shall be kept for, but not limited to, the following items:
a. Specifications of material used in the manufacture of the members.
b. Time-temperature history of the concrete members from casting to the transfer of the prestress force.
c. Records of the tendon stressing operation including initial prestress force, measured elongation, how it was measured, and how the tendonswere stressed and destressed.
d. Records of inspection of the members before and after the prestress force is transferred to the members.
e. Records of the inspection of the members each time they are moved.
f. Records of any defects in the member and any corrective measures taken.
-- End of Section --
SECTION 03 45 33 Page 8
AMD-0005
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 05 19.00 10
INSULATED CABLE FOR ELECTRODES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, STORAGE, AND HANDLING
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Submarine cable
2.1.2 Conductors
2.1.2.1 Material for Conductors
2.1.2.2 Conductor Shielding
2.1.3 Insulation
2.1.3.1 Insulation Material
2.1.3.2 Insulation Thickness
2.1.3.3 Inner jacket
2.1.3.4 Aramid Fiber Reinforcement
2.1.4 Outer Jacket
2.1.4.1 Outer Jacket Thickness
2.1.4.2 Outer Jacket Printing
2.1.4.3 Finished Cable Diameter
2.1.5 Active/Parasitic Electrode Cable Connection
PART 3 EXECUTION
3.1 INSTALLATION INSTRUCTIONS
3.2 TESTS, INSPECTIONS, AND VERIFICATIONS
3.2.1 Cable Data
3.2.2 Inspection and Tests
3.2.2.1 Tests on Cables
3.2.2.2 Independent Tests
3.2.2.3 Reports
-- End of Section Table of Contents --
SECTION 26 05 19.00 10 Page 1
SECTION 26 05 19.00 10
INSULATED CABLE FOR ELECTRODES
PART 1 GENERAL
This Section provides specifications for the submarine electrical cable to be provided between the pulsator building and the underwater electrodes.
The general configuration consists of 250 kcmil stranded tinned copper conductor, extruded semi-conducting cross-linked polyolyfin (XLPO) conductor shield, ethylene propylene rubber (EPR) high voltage insulation, high density polypropylene (HDPE) inner jacket, aramid fiber (Kevlar) reinforcement, and a HDPE jacket overall.
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B33 (2010) Standard Specification for Tinned Soft or Annealed Copper Wire for Electrical Purposes
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA WC 71 (1999) Standard for Nonshielded Cables Rated 2001-5000 Volts
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION
01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Active/Parasitic Electrode Cable Connection; G,DT
SD-03 Product Data
Installation Instructions - Dimensions and sketches of cable construction, material data for each layer; G
SD-06 Test Reports
Tests, Inspections, and Verifications; G
SECTION 26 05 19.00 10 Page 2
1.3 DELIVERY, STORAGE, AND HANDLING
Furnish cables on reels or coils. Each cable and the outside of each reel or coil, shall be plainly marked or tagged to indicate the cable length, voltage rating, conductor size, and manufacturer's lot number and reel number. Each coil or reel of cable shall contain only one continuous cable without splices. Shielded cables rated 2,001 volts and above shall be reeled and marked. Reels shall remain the property of the Contractor.
Cable ends shall be suitably sealed to prevent moisture from entering the conductor core area during shipment and storage only.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Submarine cable
Provide submarine cable in accordance with the specifications below.
2.1.2 Conductors
2.1.2.1 Material for Conductors
Conductors shall conform to all the applicable requirements of NEMA WC 71, as applicable, and shall be 250 kcmil 37/w 2450/w tinned copper. Conductor wires shall be annealed coated copper in accordance with ASTM B33.
Conductors shall be stranded in accordance with ASTM B8 ASTM B173, class "B" "K" stranding and Section 2 of NEMA WC 71.
2.1.2.2 Conductor Shielding
The stranded conductor shall be directly covered with an extruded semi-conducting cross-linked polyolefin conductor shield in compliance with Part 3 of NEMA WC 71.
2.1.3 Insulation
2.1.3.1 Insulation Material
Conductor insulation shall be extruded high voltage grade ethylene propylene rubber (EPR). The EPR insulation shall be bonded to the underlying semi-conductor shield. The EPR insulation shall meet the requirements of Type E-1 in Part 4 of NEMA WC 71.
2.1.3.2 Insulation Thickness
Minimum average of 0.105 inches, and never less than 0.095 inches.
Insulation thickness shall meet the requirements of Part 4 of NEMA WC 71.
2.1.3.3 Inner jacket
The insulation shall be covered with a homogeneous layer of high density polyethylene (HDPE) in accordance with Part 4 of NEMA WC 71.
The inner jacket wall thickness shall be 0.080 inches.
The inner jacket shall be sunlight and weather-resistant.
SECTION 26 05 19.00 10 Page 3
2.1.3.4 Aramid Fiber Reinforcement
Two (2) layers of double reversed aramid fibers applied helically prior to application of the outer jacket.
2.1.4 Outer Jacket
The cable assembly shall have a jacket of ultraviolet and weather-resistant homogeneous high density polyethylene in accordance with Part 4 of NEMA WC 71 applied over the aramid fiber reinforcement.
2.1.4.1 Outer Jacket Thickness
The thickness of the jacket at any point shall be not less than 80 percent of 0.080 inches nominal thickness.
2.1.4.2 Outer Jacket Printing
The jacket shall be permanently printed with a sequential footage marking every three (3) feet maximum. The print shall begin with the actual footage of the outside cable end and shall descend to zero at the cable end at the reel center.
2.1.4.3 Finished Cable Diameter
The finished cable diameter shall be 1.25 1.40 inches, +/-0.03 inches. Lug must be sized to fit OD of conductor.
2.1.5 Active/Parasitic Electrode Cable Connection
Provide electrode cable connection as indicated and approved.
PART 3 EXECUTION
3.1 INSTALLATION INSTRUCTIONS
The following information shall be provided by the cable manufacturer:
a. Minimum bending radius, in inches, if greater than 7 inches.
b. Pulling tension and sidewall pressure limits, in pounds.
c. Instructions for stripping semiconducting insulation shields, if furnished, with minimum effort without damaging the insulation.
3.2 TESTS, INSPECTIONS, AND VERIFICATIONS
3.2.1 Cable Data
Manufacture of the wire and cable shall not be started until all materials to be used in the fabrication of the finished wire or cable have been approved by the Contracting Officer. Cable data shall be submitted for approval including dimensioned sketches showing cable construction, and sufficient additional data to show that these specifications will be satisfied. Cable shall be Draka Submarine Cable SR-02 or equal.
3.2.2 Inspection and Tests
Inspection and tests of wire and cable provided under these specifications
SECTION 26 05 19.00 10 Page 4 shall be made by and at the plant of the manufacturer, and shall be witnessed by the Contracting Officer or his authorized representative, unless waived in writing. The Government may perform further tests before or after installation. Specific tests required for particular materials, components, and completed cables shall be as specified in the sections of the above standards applicable to those materials, components, and cable types. Tests shall also be performed in accordance with the additional requirements specified below.
3.2.2.1 Tests on Cables
The following tests shall be performed in addition to those specified above.
a. The EPR insulated 250 kcmil conductor shall be AC (rms) voltage tested to 25.0 kV.
b. The EPR insulated 250 kcmil conductor shall be immersed in water for one (1) hour and then tested with AC (rms) to 13.0 kV for five (5) minutes, and DC to 35 kV for five (5) minutes.
c. The finished insulated 250 kcmil cable shall withstand in accordance with NEMA WC 71 an AC (rms) test to 13.0 kV for five (5) minutes, then a DC test to 35 kV for five (5) minutes.
d. The insulation resistance shall be measures after the completed cable voltage teste. The measurement shall be in accordance with Part 7 of NEMA WC 71. The insulation resistance constant (IRK) for EPR insulation shall be 20,000 in accordance Part 4 of with NEMA WC 71:
IR = (IRK)log10(D/d) where IR = Insulation resistance in Mohms-1000 ft IRK = constant for the insulation D = Diameter over the insulation d = Diameter under the insulation
e. The DC restistance of the conductor shall be measured and shall comply with Part 2 of NEMA WC 71.
3.2.2.2 Independent Tests
The Government may at any time make visual inspections, continuity or resistance checks, insulation resistance readings, power factor tests, or dc high-potential tests at field test values. A cable's failure to pass these tests and inspections, or failure to produce readings consistent with acceptable values for the application, will be grounds for rejection of the cable.
3.2.2.3 Reports
Furnish results of tests made. No wire or cable shall be shipped until authorized. Lot number and reel or coil number of wire and cable tested shall be indicated on the test reports.
-- End of Section --
SECTION 26 05 19.00 10 Page 5
SECTION TABLE OF CONTENTS
DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT
SECTION 41 00 01
PREPARATION AND INSTALLATION OF ELECTRODES
PART 1 GENERAL
1.1 SCOPE
1.2 SUBMITTALS
1.3 EQUIPMENT
1.4 CALCULATIONS
1.5 RECORDS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 INSPECTION
3.2 CONDUCT OF WORK
3.2.1 Coordination With Navigation
3.3 PREPARATION OF CANAL BOTTOM
3.4 ATTACHMENT OF ELECTRICAL CABLES
3.5 INSTALLATION OF ELECTRODES
-- End of Section Table of Contents --
SECTION 41 00 01 Page 1
SECTION 41 00 01
PREPARATION AND INSTALLATION OF ELECTRODES
PART 1 GENERAL
1.1 SCOPE
This Section includes specifications for the attachment of electrical cable to the electrodes and the installation of electrodes on the sleepers near the canal bottom.
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Equipment; G,AE
SD-05 Design Data
Calculations; G,AE
SD-06 Test Reports
Inspection
SD-11 Closeout Submittals
Records; G,AE
1.3 EQUIPMENT
Submit details of equipment to handle electrodes or electrode bundles from the preparation area near the canal bank to their final location near the canal bottom.
1.4 CALCULATIONS
Submit calculations to demonstrate that the support locations along the electrodes during lifting and handling are sufficient to keep steel stresses at or below 18,000 psi.
1.5 RECORDS
Submit records of each electrode (string), its final location in the array near the bottom of the canal, and the tags on its attached electrical cables.
SECTION 41 00 01 Page 2
PART 2 PRODUCTS
Provide the electrical cable and connection hardware indicated.
PART 3 EXECUTION
3.1 INSPECTION
Inspect the work, keep records of work performed, and ensure that electrical connections are installed as indicated in the drawings. All connections are subject to inspection by the Contracting Officer.
3.2 CONDUCT OF WORK
3.2.1 Interference with Coordination With Navigation
The Sanitary and Ship Canal provides passage for barges and other craft.
The Contractor shall schedule in-water work around such traffic.The U.S.
Coast Guard enforces a Regulated Navigation Area (RNA) in the vicinity of the existing electric fish barriers (33 C.F.R. § 165.92). The contractor must coordinate with the Coast Guard to obtain any variances from the RNA desired for construction of the project.
3.3 PREPARATION OF CANAL BOTTOM
All man-made materials shall be removed from the canal bottom in areas below and between all of the electrodes, parasitics, and sleepers.
At the locations of the precast concrete sleepers, the canal bottom shall be suitable for placement of the sleepers to within 0.05 feet of their specified top elevation. At other locations below the electrodes and parasitics, the bottom of the canal shall be graded to Elevation 550.00 plus 1 foot.
3.4 ATTACHMENT OF ELECTRICAL CABLES
Complete electrical cable attachments in the dry before placing the electrodes in the water. The connections are designed to be shielded from galvanic corrosion. All parts shall be assembled, the protective compound installed, and the connections sealed.
Where electrodes are bundled, the connections shall be placed on the top of the top layer of electrodes.
The bottom layer of electrodes shall be turned over so that the connections are on the bottom.
Tag all cables for identification.
Protect electrical cables and connections from damage during handling of the electrodes.
3.5 INSTALLATION OF ELECTRODES
Electrodes and their attached electrical cables shall be lifted, transported, and then placed underwater into the slots in the precast sleepers. This operation shall be carried out using divers in the water.
No aids for installation are allowed to be welded to the electrodes or drilled into the electrodes.
SECTION 41 00 01 Page 3
Electrodes are not fastened to the sleepers.
Straighten each installed electrode to within 0.5 inches of a straight line from end to end. Provided each electrode meets this tolerance, incidental gaps between stacked electrodes are acceptable.
Electrical cables from the far end on the electrodes shall be laid directly on the bottom of the canal. Care shall be taken to move such cables away from the sleepers to avoid placing subsequent electrodes on them.
The electrical cables shall be collected and coiled in preparation for pulling them up the lined boreholes.
-- End of Section --
SECTION 41 00 01 Page 4
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 1 PAGES
W912P6-13-B-0002
CSSC Dispersal Barrier, Permanent Barrier 1, Water Structures
26 05 19.00 10 SD-02 Shop Drawings
2.1.5 G DTActive/Parasitic Electrode Cable
Connection SD-03 Product Data
GInstallation Instructions - Dimensions and sketches of cable construction, material data for each layer
SD-06 Test Reports 3.2Tests, Inspections, and
Verifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
| 03 45 33_Page 8 |
| 26 05 19.00 10 |
| 26 05 19.00 10 - INSULATED CABLE FOR ELECTRODES |
| 26 05 19.00 10 - INSULATED CABLE FOR ELECTRODES |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, STORAGE, AND HANDLING |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Submarine cable |
| 2.1.2 Conductors |
| 2.1.2.1 Material for Conductors |
| 2.1.2.2 Conductor Shielding |
| 2.1.3 Insulation |
| 2.1.3.1 Insulation Material |
| 2.1.3.2 Insulation Thickness |
| 2.1.3.3 Inner jacket |
| 2.1.3.4 Aramid Fiber Reinforcement |
| 2.1.4 Outer Jacket |
| 2.1.4.1 Outer Jacket Thickness |
| 2.1.4.2 Outer Jacket Printing |
| 2.1.4.3 Finished Cable Diameter |
2.1.5 Active/Parasitic Electrode Cable Connection
| PART 3 EXECUTION |
| 3.1 INSTALLATION INSTRUCTIONS |
| 3.2 TESTS, INSPECTIONS, AND VERIFICATIONS |
| 3.2.1 Cable Data |
| 3.2.2 Inspection and Tests |
| 3.2.2.1 Tests on Cables |
| 3.2.2.2 Independent Tests |
| 3.2.2.3 Reports |
| 41 00 01 |
| 41 00 01 - PREPARATION AND INSTALLATION OF ELECTRODES |
| 41 00 01 - PREPARATION AND INSTALLATION OF ELECTRODES |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 SUBMITTALS |
| 1.3 EQUIPMENT |
| 1.4 CALCULATIONS |
| 1.5 RECORDS |
| PART 2 PRODUCTS |
| PART 3 EXECUTION |
| 3.1 INSPECTION |
| 3.2 CONDUCT OF WORK |
| 3.2.1 Interference with Coordination With Navigation |
| 3.3 PREPARATION OF CANAL BOTTOM |
| 3.4 ATTACHMENT OF ELECTRICAL CABLES |
| 3.5 INSTALLATION OF ELECTRODES |
Submittal Register for Section 26 05 19.00 10