W912P613B0002_Dispersal_Barrier_1B_InWater_AMD0005_Drawings.pdf
PDF 2 MB Posted
- Solicitation number
- W912P6-13-B-0002
About this file
Amendment 0005 Revised Drawing Sheets
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
A
B
D
C
N
BORING LOCATIONS
SCALE: 1" = 20'-0"
10' 0 10' 20' 30'
SITE LOCATION (N.I.C.)
PROPOSED BUILDING
BH01
BH02 BH03
WESTERN EDGE OF CANAL
EASTERN EDGE OF CANAL
C03
C02
* MEASURED AT THE BOTTOM OF ACCESS PITS (SEE SHEET C02 & C03)
BH04 BH05
SEE SHEET S02 (N.I.C.-FUTURE)
PARASITIC CONDUIT RACEWAY
SEE DETAIL 1/S03 (N.I.C.-FUTURE)
PARASITIC CONTROL CABINET
(N.I.C.-FUTURE)
VAULT SEE DETAIL 4/S02
PARASITIC ACCESS
7'-0"
7'-0"
7'-0"
SITE LOCATIONS
MARK
IL. EAST NAD83 STATEPLANE COORDINATES
GRADE
FINISHED
DESCRIPTION NOTES
NORTHING EASTING
BH01 N 1,812,844.05' E 1,059,079.32' -
SEPARATE CONTRACT
(NIC) TO BE COMPLETED PREVIOUSLY IN
BH02 N 1,812,939.77' E 1,059,086.62' -
SEPARATE CONTRACT
(NIC) TO BE COMPLETED PREVIOUSLY IN
BH03 N 1,813,035.50' E 1,059,093.91' -
SEPARATE CONTRACT
(NIC) TO BE COMPLETED PREVIOUSLY IN
BH04 N 1,812,763.92' E 1,058,876.87' -
(PARASITIC ELECTRODE WIRING)
SLEEVED 8" ID BORE HOLE
SEPARATE CONTRACT
(NIC) TO BE COMPLETED PREVIOUSLY IN
BH05 N 1,813,144.80' E 1,058,905.91' -
(PARASITIC ELECTRODE WIRING)
SLEEVED 8" ID BORE HOLE
SEPARATE CONTRACT
(NIC) TO BE COMPLETED PREVIOUSLY IN
(ACTIVE ELECTRODE WIRING)
SLEEVED 25.29" ID BORE HOLE
(ACTIVE ELECTRODE WIRING)
SLEEVED 25.29" ID BORE HOLE
(ACTIVE ELECTRODE WIRING)
SLEEVED 25.29" ID BORE HOLE
S O
L
IC
IT
A T
IO
N N o
F
IL
E N
A M
E
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N o
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C H
IC
A G
O D
IS
T R
IC
T
C H
IC
A G
O
IL
L
IN
O
IS
of Engineers
US Army Corps
Chicago District
A Q
U A
T
IC
N
U
IS
A N
C E D
IS
P E
R S
A L B
A R
R
IE
R I
C H
IC
A G
O S
A N
IT
A R
Y S
H
IP
C
A N
A L
W P -1
-C -0
P R
E P
A R
E D B
Y
V A
N C
O U
V E
R
W A
N .E S
A L
M O
N C
R E
E K A
V E
P L
O T D
A T
E
W P -1
-R -0
A N
S I
D
C K
D B
Y
C01
B O
R
IN
G L
O C
A T
IO
N S
D M L
C
S L
M c
J P
K M
A S S
H O
W N
/1
/2
/1
/2
C
ID
D
IA
C H
A N
G E
D J
U L
Y
O
L
IC
IT
A T
IO
N N o
F
IL
E N
A M
E
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N o
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C H
IC
A G
O D
IS
T R
IC
T
C H
IC
A G
O
IL
L
IN
O
IS
of Engineers
US Army Corps
Chicago District
A Q
U A
T
IC
N
U
IS
A N
C E D
IS
P E
R S
A L B
A R
R
IE
R I
C H
IC
A G
O S
A N
IT
A R
Y S
H
IP
C
A N
A L
W P -1
-C -0
P R
E P
A R
E D B
Y
V A
N C
O U
V E
R
W A
N .E S
A L
M O
N C
R E
E K A
V E
P L
O T D
A T
E
W P -1
-R -0
A N
S I
D
C K
D B
Y
(BH01 THRU BH03)ELECTRODE BORE HOLE SECTION
SCALE: 3/8" = 1'-0"
MINIMUM WATER (ELEV: 569')
ORDINARY (HIGH) WATER (ELEV: 579')
(ELEV: 588.5' APPROX.)
TOP OF SLAB
BY U.S. ARMY CORPS OF ENGINEERS
PROPOSED CONTROL BUILDING (N.I.C.)
BORE HOLE
CENTER OF
ELEV: 550'
WORK POINT
EXISTING GRADE
12" 0 1' 2' 3'
CABLE BUNDLE
ELECTRODE
(SEE DETAIL 3/S02)
HOLE ACCESS VAULT
ELECTRODE BORE
26 DEG.
THAT IT VARIES FROM SOFT SILT TO ROCK.
MATERIAL IS UNKNOWN AND ITS ASSUMED
IN SPECIFICATIONS (FINAL ELEV: 550')
RELOCATE OBSTRUCTIONS AS NOTED
OF SLAB AND PATCH FLUSH.
OF WIRES TO EQUIPMENT, CUT OFF THE RACKS TWO INCHES BELOW THE TOP
AFTER COMPLETION OF THE BUILDING, AND IN COORDINATION WITH CONNECTION9.
OF THE RACKS, INCORPORATING BLOCKOUTS FOR FUTURE CUTTING & PATCHING.
PROTECT THE WIRES & POUR THE BUILDING SLAB, EMBEDDING THE BOTTOM PART8.
CONSTRUCTION CONTRACT
TO THE RACKS IN SEQUENCE (AS SHOWN ON SHEET E04).
PULL THE WIRES AS ELECTRODES ARE INSTALLED, AND FASTEN THEM7.
CONSTRUCT TEMPORARY WIRE SUPPORT RACKS (SEE SHEET E04)6.
BEFORE PULLING ELECTRICAL WIRES, REMOVE THE VAULT COVER.5.
INSTALL VAULT COVER TO PROTECT BOREHOLE.4.
INSTALL ACCESS VAULT.3.
IN-WATER CONTRACT
(COMPLETED BY OTHERS)
NON-CONDUCTIVE PLASTIC AND SEAMLESS INSIDE.
DRILL BOREHOLE AND INSTALL LINER, THE LINER WILL BE 2.
GRADE SURFACE TO ELEV. 586.5' (COMPLETED BY OTHERS).1.
BOREHOLE CONTRACT
SEQUENCE
BOREHOLE (25.29" ID)
EXISTING SLEEVED
C03
B O
R E H
O L E S
E C
T
IO
L
C
S L
M c
J P
K M
A S S
H O
W N
/1
/2
/1
/2
C
N O
T E A
D D
E D
ID
D
IA
C H
A N
G E
D J
U L
L
IC
IT
A T
IO
N N o
F
IL
E N
A M
E
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N o
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C H
IC
A G
O D
IS
T R
IC
T
C H
IC
A G
O
IL
L
IN
O
IS
of Engineers
US Army Corps
Chicago District
A Q
U A
T
IC
N
U
IS
A N
C E D
IS
P E
R S
A L B
A R
R
IE
R I
C H
IC
A G
O S
A N
IT
A R
Y S
H
IP
C
A N
A L
W P -1
-C -0
P R
E P
A R
E D B
Y
V A
N C
O U
V E
R
W A
N .E S
A L
M O
N C
R E
E K A
V E
P L
O T D
A T
E
W P -1
-R -0
A N
S I
D
C K
D B
Y
ACTIVE / PARASITIC ELECTRODE CABLE CONNECTION
SCALE: 2" = 1'-0"
ACTIVE / PARASITIC ELECTRODE THREADED HOLE PATTERN AT CABLE CONNECTIONS
SCALE: 2" = 1'-0"
CONNECTION AT FAR END CONNECTION AT NEAR END
(4) 1/4-20 UNC 3/4"
7/16" DIA. X 90 DEG.
(10) 3/8-16 UNC 3/4"(2) 3/8-16 UNC 5/8"
5/8"
2 3/8"
5 3/4"
11 1/2"
1'-2 1/2"
1'-6 1/2"
2'-2"
2'-3 1/2"3'-1"
/4
/4
HEX CAP S.S.
(4)-SCREW,1/4-20 x 3"
(BASE PLATE)
1.25"x4"x21.5"
1.25" UHMWP.
(CLAMP PLATE)
1/4" GFRP 4 HOLES
(CLAMP BLOCK)
1.25"x4"x8"
1.25" UHMWP.
(SEE SHEET E01 FOR LAYOUT)
ELECTRODE / PARASITIC
(2) HOLE ILSCO CLND-250-38-134
COMPRESSION LUG 250MCM
AND LOCK WASHER 318 S.S.
(2) 3/8-16 x 1" BOLT, WASHER
DP 5 W5 S.S.
(2)-COVER PLATE STAUFF,
VENT
FILL
3/4"4 11/16"
(SEE SHEET E01 FOR LAYOUT)
ELECTRODE / PARASITIC
(4) 1/4-20 UNC 3/4"
7/16" DIA. X 90 DEG.
(10) 3/8-16 UNC 3/4"(2) 3/8-16 UNC 5/8"
5/8"
2 3/8"
5 3/4"
11 1/2"
1'-2 1/2"
1'-6 1/2"
2'-2"
2'-3 1/2"
/4
/4
5'-3"
CABLE TO ELECTRODE ATTACHMENT PROCEDURE
OPERATIONS 2-4 MAY BE COMPLETED PRIOR TO DELIVERY OF ELECTRODE MATERIAL AND FLASH WELDING OF1.
COMPLETE ELECTRODE
DRILL AND TAP 10 LOCATIONS FOR 3/8-16 SS CAP SCREWS. SEE SH3.2.
DRILL AND TAP 2 LOCATIONS FOR 3/8-16 BOLTS THAT ATTACH COMPRESSION LUG. SEE SH3.3.
DRILL AND TAP 4 LOCATIONS FOR 1/4-20 BOLTS THAT ATTACH CABLE CLAMPS. SEE SH3.4.
FOLLOWING OPERATIONS MUST BE PERFORMED IN AN ENCLOSED WEATHERPROOF AREA WHICH MAINTAINS5.
ADHESIVE, WORKPIECE AND WORKAREA AMBIENT TEMPERATURE OF 60 DEGREES F OR HIGHER UNTIL ASSEMBLY IS
COMPLETE.
STRIP CABLE INSULATION APPROX 6 7/8IN AND CRIMP COMPRESSION LUG SECURELY TO END OF CONDUCTOR. BEAD6.
BLAST EXPOSED CONDUCTOR AND LUG WITH #100ALOX OR EQUIVALENT. THOROUGHLY SCUFF END OF CABLE
INSULATION FOR 20IN WITH 100GRIT SANDPAPER. THOROUGHLY CLEAN EXPOSED CONDUCTOR, COMPRESSION LUG
AND ABRADED AREA OF INSULATION WITH ALCOHOL
VERIFY THAT WORK AREA OF ELECTRODE IS LEVEL WITHIN 2 DEGREES. GRIND ELECTRODE SURFACE AREA THAT WILL7.
RECEIVE BASE PLATE AND CABLE CLAMPS TO REMOVE ANY EXISTING FINISH. THOROUGHLY CLEAN AND DEGREASE
ANY OIL, DIRT AND RUST FROM THIS AREA OF ELECTRODE. CLEAN WITH ALCOHOL.
ENSURE THAT BASE PLATE,TOP PLATE,CLAMP BLOCK,ALL FASTENERS, CABLE CLAMPS AND CLAMP COVER PLATES8.
HAVE BEEN BEAD BLASTED WITH #100ALOX OR EQUIVALENT AND THOROUGHLY CLEANED. DEGREASE WITH
ALCOHOL.
INSTALL BASE PLATE, CABLE, TOP PLATE, CLAMP BLOCK, CABLE CLAMPS AND ALL FASTENERS. DO NOT TIGHTEN9.
FASTENERS. ENSURE THAT CABLE JACKET OVERHANGS INTERNAL EDGE OF BASE PLATE BY AT LEAST 1/2IN.
KEEP INTERNAL CAVITY FORMED BY BASE PLATE AND TOP PLATE FREE OF ANY DEBRIS AND MOISTURE DURING THE10.
ENTIRE PROCESS. ENSURE THAT ALL TOOLS WHICH CONTACT FASTENERS ARE THOROUGHLY CLEANED AND
DEGREASED AND DO NOT CONTAMINATE FASTENERS.
TIGHTEN (2) 3/8 BOLTS AT COMPRESSION LUG TO 18FTLB. MAINTAIN LUG ALIGNMENT WITH ELECTRODE.11.
TIGHTEN (6) 3/8-16 SOCKET HEAD CAP SCREWS AT TOP PLATE 10-12FTLB FOLLOWED BY (4) 3/8-16 SOCKET HEAD CAP12.
SCREWS AT CLAMP BLOCK 10-12FTLB. MAINTAIN ALIGNMENT OF COMPONENTS WITH ELECTRODE
TIGHTEN (4) 1/4-20 BOLTS AT CABLE CLAMPS 4-5 FTLB.13.
SEAL ALL EXTERNAL JOINTS BETWEEN ELECTRODE,BASE PLATE,TOP PLATE,CLAMP BLOCK AND CABLE WITH SILICONE14.
ADHESIVE SUFFICIENT TO RETAIN ANY LEAKAGE DURING FILLING OF INTERNAL CAVITIES. DO NOT ALLOW SILICONE TO
INTRUDE INTO GAPS FARTHER THAN 1/4". ALLOW SILICONE TO CURE COMPLETELY PER MANUFACTURER'S
INSTRUCTIONS.
CLEAN ALL EXPOSED FASTENER HEADS, TOP PLATE, CLAMP BLOCK, CAVITY, COMPRESSION LUG, EXPOSED CABLE15.
AND CABLE CLAMP ASSEMBLIES WITH ALCOHOL AND ALLOW TO DRY. KEEP ASSEMBLY FREE OF MOISTURE AND
CONDENSATION PRIOR TO AND DURING ADDITION OF ADHESIVE
FOLLOWING MANUFACTURERS INSTRUCTIONS FOR PREPARATION AND APPLICATION MIX TWO PART RELTEK B-482TH16.
EPOXY USING BEST PRACTICES TO MINIMIZE GAS ENTRAPMENT IN ADHESIVE. APPROXIMATELY ONE QUART OF
ADHESIVE WILL BE REQUIRED PER ASSEMBLY INCLUDING COVERAGE OF CABLE CLAMPS.
POURING SLOWLY TO AVOID GAS ENTRAPMENT, FILL INTERNAL CAVITY, ALL FASTENER COUNTERBORES AT TOP PLATE17.
AND CLAMP BLOCK INCLUDING A 1 INCH DIAMETER SURROUNDING AREA AND FILL HOLES AT CLAMP BLOCK WITH
RELTEK EPOXY UNTIL INTERNAL CAVITY IS COMPLETELY FILLED AND EPOXY IS VISIBLE AT VENT AND FILL HOLES. VERIFY
THAT NO LEAKS ARE PRESENT AT ANY EXTERNAL JOINTS. BRUSH ON OR OTHERWISE COMPLETELY COAT CABLE
CLAMPS, TOP PLATES AND FASTENERS WITH EPOXY ENSURING SEALING BETWEEN CLAMP BLOCK HALVES. CONTINUE
TO ADD EPOXY ADHESIVE AS NECESSARY TO MAINTAIN FULL LEVEL AT CAVITY WHILE EPOXY REMAINS LIQUID.
ALLOW COMPLETED ASSEMBLY TO REMAIN UNDISTURBED UNTIL EPOXY HAS CURED FOR 24 HOURS.18.
(TOP PLATE)
1.25"x4"x13.5"
1.25" UHMWP.
McMASTER PART 92185A635 or EQUIV.
SOCKET HEAD CAP S.S.
(10)-SCREW, 3/8-16 x 2 3/4"
STAUFF 5 35PP
(2)-CABLE CLAMP
3'-0"
NEAR END
1 1/2"
3'-7"1'-9 1/2"
FAR END
3'-0" 1'-9 1/2" 5 1/2" 1 1/2"
CENTER OF ELECTRODE
E03
A C
T
IV
E P
A R
A S
IT
IC
E
L E
C T
R O
D E
W
IR
IN
G C
O N
N E
C T
IO
L
C
S L
M c
J P
K M
A S S
H O
W N
/1
/2
/1
/2
E
C
A B
L E C
L A
M P C
H A
N G
E D
J
U L
SHEET INDEX
IN-WATER CONTRACT
SHEET TITLE
GENERAL
G01 COVER SHEET
G02 GENERAL NOTES & INDEX
G03 GENERAL SITE LAYOUT
CIVIL
C01 BORING LOCATIONS
C02 BORE HOLE SECTION
C03 BORE HOLE SECTION
ELECTRICAL
E01 ELECTRODES & PARASITICS LAYOUT
E02
ACTIVE ELECTRODES
CROSS SECTIONS @ PARASITICS &
E03
WIRING CONNECTION
ACTIVE / PARASITIC ELECTRODE
E04
ELECTRODE WIRING LAYOUT (BH01 THRU BH03)
TEMPORARY WIRING SUPPORT &
E05
ELECTRODE SECTIONS
BORE HOLE (BH01) THRU (BH03)
E06
PARASITIC SECTIONS
BORE HOLE (BH04) & (BH05)
STRUCTURAL
S01 ELECTRODE & PARASITIC SLEEPER LAYOUT
S02 ELECTRODE & PARASITIC CONCRETE SLEEPERS
S03
BURIED CONDUIT
PARASITIC CONTROL CABINET SLAB &
SHEET INDEX
CONSTRUCTION CONTRACT
SHEET TITLE
ELECTRICAL
E07
POWER DISTRIBUTION (ONE LINE DIAGRAM)
GENERAL ROOM LAYOUT &
E08 CONTROL / MONITORING ROOM LAYOUT
E09 CONTROL / MONITORING ROOM SECTIONS
E10 CONTROL ROOM SENSOR & CONTROLLER BOX
E11 CONTROL BLOCK DIAGRAM (ONE LINE DIAGRAM)
E12 SPANG / PULSER ROOM #1 EQUIPMENT LAYOUT
E13a
LAYOUT SECTIONS
SPANG / PULSER ROOM #1 EQUIPMENT
E13b
LAYOUT SECTIONS
SPANG / PULSER ROOM #1 EQUIPMENT
E14 SPANG / PULSER ROOM #2 EQUIPMENT LAYOUT
E15a
LAYOUT SECTIONS
SPANG / PULSER ROOM #2 EQUIPMENT
E15b
LAYOUT SECTIONS
SPANG / PULSER ROOM #2 EQUIPMENT
E16 SPANG / PULSER ROOM #3 EQUIPMENT LAYOUT
E17a
LAYOUT SECTIONS
SPANG / PULSER ROOM #3 EQUIPMENT
E17b
LAYOUT SECTIONS
SPANG / PULSER ROOM #3 EQUIPMENT
E18 EQUIPMENT SCHEDULE
E19 PULSER CONNECTION DETAILS
E20 EQUIPMENT CONNECTION DETAILS
E21 CONDUIT SCHEDULE
E22
CONDUIT LAYOUT
SPANG / PULSER ROOM #1
E23a
CONDUIT LAYOUT SECTIONS
SPANG / PULSER ROOM #1
E23b
CONDUIT LAYOUT SECTIONS
SPANG / PULSER ROOM #1
E24
CONDUIT LAYOUT
SPANG / PULSER ROOM #2
E25a
CONDUIT LAYOUT SECTIONS
SPANG / PULSER ROOM #2
E25b
CONDUIT LAYOUT SECTIONS
SPANG / PULSER ROOM #2
E26
CONDUIT LAYOUT
SPANG / PULSER ROOM #3
E27a
CONDUIT LAYOUT SECTIONS
SPANG / PULSER ROOM #3
E27b
CONDUIT LAYOUT SECTIONS
SPANG / PULSER ROOM #3
E28 CONDUIT CONNECTION DETAILS
E29
SENSOR & CONTROL BOX
SPANG / PULSER ROOM #1
E30
SENSOR & CONTROL BOX
SPANG / PULSER ROOM #2
E31
SENSOR & CONTROL BOX
SPANG / PULSER ROOM #3
E32
(ONE LINE DIAGRAM)
PARASITIC POWER DISTRIBUTION
E33
POLARITY SWITCH (ONE LINE DIAGRAM)
ELECTRODE ELEMENT POWER DISTRIBUTION &
E34
CONTROL DIAGRAM
PATENTED ELEMENTS INTERCONNECTION
E35
(LAYOUT)
INTER-ROOM COMMUNICATION CONDUITS
E35a
(CONTROL ROOM & MECHANICAL ROOM LAYOUT)
INTER-ROOM COMMUNICATION CONDUITS
E35b
(POD ROOM #1 LAYOUT)
INTER-ROOM COMMUNICATION CONDUITS
E35c
(POD ROOM #1 COOLING LAYOUT)
INTER-ROOM COMMUNICATION CONDUITS
E35d
(POD ROOM #2 LAYOUT)
INTER-ROOM COMMUNICATION CONDUITS
E35e
(POD ROOM #2 COOLING LAYOUT)
INTER-ROOM COMMUNICATION CONDUITS
E35f
(POD ROOM #3 LAYOUT)
INTER-ROOM COMMUNICATION CONDUITS
E35g
(POD ROOM #3 COOLING LAYOUT)
INTER-ROOM COMMUNICATION CONDUITS
E36
BLOCK DIAGRAM (POD ROOMS #1 THRU #3)
ELECTRODE CURRENT MONITOR
E37
EMF SHIELDING LAYOUT
SPANG / PULSER ROOM #1
E38
EMF SHIELDING LAYOUT
SPANG / PULSER ROOM #2
E39
EMF SHIELDING LAYOUT
SPANG / PULSER ROOM #3
E40 EQUIPMENT GROUNDING LAYOUT & DETAILS
E41 a-d DESIGN LOADS & CALCULATIONS
N.I.C. NOT IN CONTRACT
ABBREVIATIONS
UNAUTHORIZED PERSONNEL IS PREVENTED.
AND FENCE WITHIN THE PROJECT WORK LIMITS AS LONG AS SITE ACCESS BY
11. THE CONTRACTOR MAY TEMPORARILY RELOCATE THE PRECAST BARRIER WALL
PROJECT DURATION.
TEMPORARY AND PERMANENT ROADWAY WILL BE USED BY OTHERS DURING THE
TRAFFIC DURING THE CONSTRUCTION DURATION OF THE PROJECT. BOTH
CONTRACTOR SHALL PROVIDE AT LEAST ONE OPEN LANE FOR TWO WAY TRUCK 10.
ALLOWED TO BE SHUT DOWN DURING CONSTRUCTION.
CONTRACTOR SHALL NOTE THAT THE ROAD ADJACENT TO THE BARRIERS IS NOT 9.
WORK LIMITS AND FENCE LINE.
SERVICES OF A REGISTERED LAND SURVEYOR ARE REQUIRED FOR LAYOUT OF 8.
EXISTING AT THAT TIME. ACTUAL CONDITIONS MAY VARY.
THE TOPOGRAPHIC AND PLANIMETRIC INFORMATION REPRESENTS CONDITIONS 7.
AND AROUND THE CANAL.
DURING CONSTRUCTION AND SHOULD PROCEED WITH CAUTION WHILE WORKING IN
CONTRACTOR SHALL BE AWARE THAT THE ELECTRIC BARRIER WILL BE ACTIVE 6.
MANUFACTURERS RECOMMENDATIONS AND AS APPROVED BY THE GOVERNMENT.
ALL MECHANICAL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH 5.
WORK LIMITS AND FENCE LINE.
SERVICES OF A REGISTERED LAND SURVEYOR ARE REQUIRED FOR LAYOUT OF 4.
THE CONTRACTOR SHALL PERFORM ALL WORK WITHIN THE SPECIFIED WORK LIMITS.3.
VERTICAL DATUMS.
SEE SHEET G-03 FOR MORE INFORMATION ABOUT SURVEY HORIZONTAL AND 2.
DOCUMENT "CHICAGO SANITARY AND SHIP CANAL FISH BARRIER 1: SPECIFICATIONS".
FOR MATERIAL AND INSTALLATION SPECIFICATIONS REFER TO THE SEPARATE 1.
GENERAL NOTES
S O
L
IC
IT
A T
IO
N N o
F
IL
E N
A M
E
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N o
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C H
IC
A G
O D
IS
T R
IC
T
C H
IC
A G
O
IL
L
IN
O
IS
of Engineers
US Army Corps
Chicago District
A Q
U A
T
IC
N
U
IS
A N
C E D
IS
P E
R S
A L B
A R
R
IE
R I
C H
IC
A G
O S
A N
IT
A R
Y S
H
IP
C
A N
A L
W P -1
-C -0
P R
E P
A R
E D B
Y
V A
N C
O U
V E
R
W A
N .E S
A L
M O
N C
R E
E K A
V E
P L
O T D
A T
E
W P -1
-R -0
A N
S I
D
C K
D B
Y
G02
S H
E E
T I
N D
E X
G E
N E
R A
L N
O T
E
L
C
S L
M c
J P
K M
A S S
H O
W N
/1
/2
/1
/2
G
A D
D E
D A
B B
R E
V
IA
T
IO
N A
N D N
O T
E
J
U L
L
IC
IT
A T
IO
N N o
F
IL
E N
A M
E
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
C O
N T
R A
C T N o
IDENTIFICATION
SHEET
D A
T E
A P
P R
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C H
IC
A G
O D
IS
T R
IC
T
C H
IC
A G
O
IL
L
IN
O
IS
of Engineers
US Army Corps
Chicago District
A Q
U A
T
IC
N
U
IS
A N
C E D
IS
P E
R S
A L B
A R
R
IE
R I
C H
IC
A G
O S
A N
IT
A R
Y S
H
IP
C
A N
A L
W P -1
-C -0
P R
E P
A R
E D B
Y
V A
N C
O U
V E
R
W A
N .E S
A L
M O
N C
R E
E K A
V E
P L
O T D
A T
E
W P -1
-R -0
A N
S I
D
C K
D B
Y
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
A
B
D
C
N
GENERAL SITE LAYOUT
SCALE: 1" = 30'-0"
10' 0 10' 20' 30'
EXISTING SERVICE ROAD
SITE LOCATION (N.I.C.)
PROPOSED BUILDING
FISH BARRIER 2A & 2B BARRIER
DEMONSTRATION
EXISTING POWER POLES
WESTERN EDGE OF CANAL
EASTERN EDGE OF CANAL
SEE SHEET S02 (N.I.C.-FUTURE)
PARASITIC CONDUIT RACEWAY
SEE SHEET E01 FOR LAYOUT
STEEL ACTIVE ELECTRODE
SEE SHEET E01 FOR LAYOUT
STEEL PARASITIC ELECTRODE
SEE SHEET E01 FOR LAYOUT
STEEL PARASITIC ELECTRODE
SEE SHEET S03 (N.I.C.-FUTURE)
PARASITIC CONTROL CABINET SLAB
(N.I.C.-FUTURE)
SEE DETAIL 1/S03
PARASITIC CONTROL CABINET
SEE SHEET C01
EXISTING BORE HOLE
(N.I.C.-FUTURE)
SEE DETAIL 4/S02
PARASITIC ACCESS VAULT
SEE SHEET C01
EXISTING BOREHOLE
SEE SHEET C01
EXISTING BOREHOLE
SEE SHEET C01
EXISTING BORE HOLE
SEE SHEET C01
EXISTING BORE HOLE
WL01 WL02
WL03 WL04
/ STAGING AREA
EXTENT OF WORK LIMITS
FACE OF CANAL
FACE OF CANAL
40'90'
EXTENT OF WORK LIMITS
MARK
IL. EAST NAD83 STATEPLANE COORDINATES
NORTHING EASTING
WL01 N 1,812,675.13' E 1,058,687.62'
WL02 N 1,813,211.40' E 1,058,728.49'
WL03 N 1,812,640.60' E 1,059,140.53'
WL04 N 1,813,176.88' E 1,059,181.41'
55' 6"
DEMONSTRATION BARRIER
G03
G E
N E
R A
L S
IT
E L
A Y
O U
T
L
C
S L
M c
J P
K M
A S S
H O
W N
/1
/2
/1
/2
G
D A
T E
A D
D E
D D
IM
E N
S
IO
N A
N D S
IT
E D
E T
A
IL
| C01 |
| C03 |
| E03 |
| G02 |
| G03 |
File details come from the government source that posted it. Updated .