About this file

THIS FILE CONTAINS AMENDMENT 0006.

View the file

Other files

File Type Posted
BID_RESULTS_W912P6-13-B-0002.pdf PDF
W912P613B0002_Dispersal_Barrier_1B_InWater_AMD0005_Specifications.pdf PDF
Amendment_0005_Description_SF30.pdf PDF
W912P613B0002_Dispersal_Barrier_1B_InWater_AMD0005_Drawings.pdf PDF
AMD_0004_W912P6-13-B-0002.pdf PDF
AMENDMENT_0003_BID_OPENING_EXTENSION_IFB_W912P613B0002.pdf PDF
Combined_June_Report.pdf PDF
NEDU_TR_08-01_Fish_Barrier.pdf PDF
Fish_Barrier_Letter_Report _Man_Overboard_(2006-02-15).pdf PDF
Barrier_IIA_Feb_07_Testing_Report_061207.pdf PDF
USCG_SAIC_Final_Report_Sep2011.pdf PDF
W912P6-13-B-0002_AMD_0002.pdf PDF
CERL-TR-11-23.pdf PDF
IIA_Safety_Testing_Summary_1Dec08.pdf PDF
2012_Performance_Testing_Report_Draft_2013-03-15.pdf PDF
Pre-Bid_Meeting_Attendance_Sheet__W912P6-13-B-0002.pdf PDF
TAR_24_-_SAFETY_TESTING_FINAL_REPORT_-_Feb2011_SafetyTesting.pdf PDF
CSSC_Barriers_PIW_Hazard_Letter_Report_21Jan11.pdf PDF
Currents_Investigation_Final_ReportReducedSize.pdf PDF
AMD_0002_Specification_changes.pdf PDF
Letter_Report_Fish_Barrier_Sparking_(2005-05-31)_report.pdf PDF
Long_Tow_Testing_Summary.pdf PDF
Barrier_IIA_Testing_Summary_Rpt_102406.pdf PDF
P00001_W912P6-13-B-0002_W_Spec_Changes.pdf PDF
W912P613B0002_Dispersal_Barrier_1B_InWater_Solicitation_Plans.pdf PDF
W912P613B0002_Dispersal_Barrier_1B_InWater_Solicitation_Specifications.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6630423130

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SUBJECT: W9`2P6-13-B-0002, PROJECT TITLE: Chicago Sanitary and Ship Canal (CSSC) Permanent Dispersal Barrier I, Water Structures Project, Romeoville, IL

SEE THE FOLLOWING PAGES------

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Jul-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P6-13-B-0002

X 9B. DATED (SEE ITEM 11)

21-Jun-2013

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Jul-2013

CODE

U. S. ARMY ENGINEER DISTRICT, CHICAGO

231 SOUTH LASALLE STREET SUITE 1500

CHICAGO IL 60604

W912P6 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P6‐13‐B‐0002

This Amendment is issued to respond to contractor’s inquires.

A. BID OPENING DATE: The bid opening date and time is NOT EXTENDED. The Bid Opening date remains 29 July 2013 and the Bid Opening Time is still 4:00 p.m. CDT.

Therefore, Bids are due no later than 4:00 p.m. CDT on 29 July 2013. Detailed information regarding the submission of bids is located in SECTION 00010 of the Solicitation.

B. POINT OF CONTACT: The point of contact for this Amendment is Anita Simpkins at 312‐846‐5372.

USACE

1. The existing borehole sleeves are shown protruding from the cnal wall near the bottom of the canal. Since there are numerous cables that must be pulled through these sleeves the sleeve geometry at this critical location can have a significant impact on the level of effort for cable pulling. It would be more desirable to have the sleeves stop short of the face of the canal rather than protruding to help facilitate “training” the cables as they funnel into the sleeve. Please verify whether the sleeves could be installed in this manner.

Response: The borehole sleeves will be installed so that they do not protrude from the canal wall near the bottom of the canal.

2. It appears a bathymetric survey was utilized for the Site Location Plan on the Cover Sheet G01. Would this data be available for the contractor’s use?

Response: All bathymetric survey data that USACE has will be made available for the selected contractor’s use.

3. Clause 52.219.22 mentions that bidders with small disadvantaged business status obtain a benefit on this solicitation. Please provide the percentage of such advantage or quantity as applicable.

Response: The Clause is hereby deleted and was inadvertently added by mistake.

4. The description of work on Form 1442 indicates the scope of work includes concrete duct bank while the drawings indicate this work as future. The scope also mentions manholes but there are no manholes on the drawings, only access vaults. Lastly, the description indicates additional connections and wiring at concrete duct bank and manholes but this work does not appear on the drawings. Please clarify.

Response: Bidders should prepare their prices based on the drawings and specifications presented in the solicitation.

5. Detail 1/C02 shows a slab as part of the work. However, this is shown as NIC on G03 & S03. Please verify.

Response: The slabs at the top of the borings for the cables from the parasitic on the west side of the canal are not included in this contract. The cables will have to be brought up through the borings and pigtailed.

6. Detail 1/C02 shows trenches that are not labeled. Are they part of this contract?

Response: These trenches are not included in this contract.

h6ct9rgb Typewritten Text h6ct9rgb Typewritten Text h6ct9rgb

's RESPONSES TO CONTRACTOR'S INQUIRIES:

W912P6-13-B-0002

7. E01 shows electrode arrays and refers to Sections 1/E05 and 2/E05. Dimensions scaled from the plan from centerline of the boreholes to the nearest electrode do not match the sections. This will affect cable lengths.

Please verify which arrangement is correct.

Response: The string dimensions provided on the drawings should be used for measurements.

8. E03 indicates a scale of 2”=1’‐“0. It appears the scale is 3”=1’‐0”. Please verify.

Response: The string dimensions provided on the drawings should be used for measurements.

9. Detail 1/E04 does not show the access vault shown on C03 & 3/S02. In addition the detail shows cables arranged in a spatial orientation while detail 3/S02 shows a cover with a 12” hole for cables. Please clarify.

Response: The cover is temporary until a permanent fixture is installed. Tie, clearly label, and organize the wires to a temporary pipe type structure according to the sequence show on detail 1/E04. The pipe type structure is a suggested solution. The purpose of the pipe type structure is so that the wires are easily identifiable and organized for follow on work.

10. Details 1/S02 & 2/S05 show electrode arrangements on the concrete sleepers but do not show the cables or cable connection assemblies. This is a concern at E10 and E28 where electrodes are stacked. The outer electrodes on the bottom row could be set with the cables/connection rotated 90‐degrees so the cables/connections are on the side. This may require the slot in the sleeper to be slightly wider. However, the middle electrodes on the bottom row would need to be places upside down but here is no pathway for the cable. A possible solution could be a secondary slot in the sleeper to accommodate the cable on the bottom. Please advise.

Response: Sheet S05 does not exist. The assumption is the question refers to sheet E05. The sleepers are not slotted. The top row of cables is connected to the top surface of the upper electrodes and the bottom row of cables is connected to the bottom surface of the lower electrodes. The electrodes are not to be notched.

11. Detail 3/S02 – what is the subgrade at the access vault? Is the access vault to be “tied” into the bedrock?

Response: The concrete stops at the bottom of the slab on grade. Dowel the concrete to the bedrock.

12. Detail 5/S02 – The concrete raceway is shown NIC‐Future on E01 but is not labeled as such on this sheet.

Please clarify.

Response: The concrete raceway is not included in this contract.

h6ct9rgb Typewritten Text

END OF AMENDMENT

h6ct9rgb

File details come from the government source that posted it. Updated .