Attachment 1_PWS (Performance Work Statement) for LRN EM-DTOS BLDG Roof Repair Project.pdf

PDF 781 KB Posted

Attached to
EM-DTOS Bldg Roof Replacement Project
Solicitation number
W912P526QA005
Issued by

About this file

This Performance Work Statement (PWS) details a roof replacement project for the LRN EM-DTOS Building located at 1188 Cinder Road in Old Hickory, Tennessee. The project involves removing 350 square feet of damaged roofing on the southern corner of the building, replacing paneling and insulation, conducting a comprehensive building inspection, replacing the gutter and downspout system, replacing two roof ventilation fans, increasing insulation value to R-15, and installing new roofing materials. The contractor must complete all requirements within 180 days of receiving the Notice to Proceed, with all physical repairs to be finished before 27FEB2026.

The project requires compliance with federal safety standards, preparation of a site-specific Activity Hazard Analysis, and submission of various safety and occupational health plans. The contractor will provide a minimum 2-year full repair/replacement warranty covering materials, parts, labor, and equipment. Work hours are Monday through Friday from 0700-4:00pm, with any weekend work requiring advance coordination and written approval from the Contracting Officer Representative (COR), Emory Perkins Jr. from the US Army Corps of Engineers Nashville District Office.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .