W912P520B0001_Solicitation.pdf
PDF 2 MB Posted
- Attached to
- Lake Cumberland (Wolf Creek) O&M
- Solicitation number
- W912P520B0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Offers_W912P520B0001.pdf | ||
| W912P520B0001 Solicitaion Amendment 0002 (f).pdf | ||
| Exhibits C-2.1 thru C-2.15.pdf | ||
| Exhibit C-3.1 thru C-3.4.pdf | ||
| Exhibit C-3.4 in Excel.XLSX | XLSX spreadsheet | |
| Site Visit Signed Sign In Sheet.pdf | ||
| Bid Schedule in Excel.xlsx | XLSX spreadsheet | |
| Solicitation Amendment 0001 (f).pdf | ||
| Exhibit B, Definitions.docx | DOCX document | |
| Exihibit D AHA CELRL Form 1259 Blank.pdf | ||
| Exhibit E DD1155.pdf | ||
| Exhibit C.xlsx | XLSX spreadsheet | |
| Exhibit F Delivery Order Cost Estimate.pdf | ||
| Exhibit 3.4 Location of Work.pdf | ||
| Exhibit A QASP.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 11:00 AM local time 23 Dec 2019
A X B X C
D
EX
X G F 131 - 138
139 - 151 X H 152
Fannie.M.Robertson@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 152
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912P5 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
See Item 7 conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
FANNIE ROBERTSON 615-736-7986
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
3 - 25
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
26 - 78 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
80 - 81
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 82 - 83 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
84 - 97
PART II - CONTRACT CLAUSES
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, RM A405
NASHVILLE TN 37203 615-736-7917
615-736-7124FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
98 - 130
6. REQUISITION/PURCHASE NO.
W38XDD91547920
5. DATE ISSUED
21 Nov 2019
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912P520B0001
Section Supplies or Services and Price
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Base: Lake Cumberland WOL O&M CONTRACT
FFP
The contractor shall furnish all necessary management, supervision, inspection, personnel, materials, tools, parts, fuel, equipment, vehicles, and transportation to perform Operations and Maintenance Services at Lake Cumberland Wolf Creek project in accordance with the Performance Work Statement.
Period of Performance: Contract Award - 1 February 2020 - 31 January 2021 FOB: Destination
PURCHASE REQUEST NUMBER: W38XDD91547920
NET AMT
Section B - Supplies or Services and Prices
1001 1 Job OPTION Opt 1. Lake Cumberland WOL O&M Req
FFP
The contractor shall furnish all necessary management, supervision, inspection, personnel, materials, tools, parts, fuel, equipment, vehicles, and transportation to perform Operations and Maintenance Services at Lake Cumberland Wolf Creek project in accordance with the Performance Work Statement.
Period of Performance: 1 February 2021 - 31 January 2022
2001 1 Job OPTION Opt 2. Lake Cumberland WOL O&M Req
FFP
The contractor shall furnish all necessary management, supervision, inspection, personnel, materials, tools, parts, fuel, equipment, vehicles, and transportation to perform Operations and Maintenance Services at Lake Cumberland Wolf Creek project in accordance with the Performance Work Statement.
Period of Performance: 1 February 2022 - 31 January 2023
3001 1 Job OPTION Opt 3. Lake Cumberland WOL O&M Req
FFP
The contractor shall furnish all necessary management, supervision, inspection, personnel, materials, tools, parts, fuel, equipment, vehicles, and transportation to perform Operations and Maintenance Services at Lake Cumberland Wolf Creek project in accordance with the Performance Work Statement.
Period of Performance: 1 February 2023 - 31 January 2024
4001 1 Job OPTION Opt 4 Lake Cumberland WOL O&M Req
FFP
The contractor shall furnish all necessary management, supervision, inspection, personnel, materials, tools, parts, fuel, equipment, vehicles, and transportation to perform Operations and Maintenance Services at Lake Cumberland Wolf Creek project in accordance with the Performance Work Statement.
Period of Performance: 1 February 2024 - 31 January 2025
BID SCHEDULE
Section B - Schedule of Prices Lake Cumberland (Wolf Creek) - Operation and Maintenance Services
This is a Requirements Type Contract to furnish all necessary management, personnel, materials, supplies, tools, parts, equipment, and vehicles required to perform operations and maintenances services at
Lake Cumberland (Wolf Creek)(Wolf Creek)with options to extend the term of the contract as described in the contract specifications.
BASE YEAR
Item Number
Title/Descripton Quantit y (Max)
Unit Unit Price Total Cost
Section C-2: Grass Mowing and Maintenance of Landscaped Areas NOTE: Item #0001-0021: Mowing and Trimming of Recreation Areas 0001 Resource Manager's Office area and entrance roadway 16 EA $ - $ - 0002 Facility Management Compound and surrounding area 16 EA $ - 0003 Waitsboro Day Use Area 16 EA $ - 0004 Waitsboro Campground 16 EA $ - 0005 Fishing Creek Recreation Area 16 EA $ - 0006 Cumberland Point Recreation Area 16 EA $ - 0007 Wolf Creek Shop Area 16 EA $ - 0008 Halcomb's Landing 16 EA $ - 0009 Kendall Day Use Area 16 EA $ - 0010 Kendall Campground 16 EA $ - 0011 Kendall Forest Campground 16 EA $ - 0012 East and West Bank Parking 16 EA $ - 0013 Wolf Creek Dam Overlook 16 EA $ - 0014 76 Falls Day Use Area 16 EA $ - 0015 Fall Creek Recreation Area 16 EA $ - 0016 Mill Springs Park 16 EA $ - 0017 Lakeview Access 12 EA $ - 0018 Whispering Pines Trail 6 EA $ - 0019 Black Walnut Nature Trail 6 EA $ - 0020 Fishing Creek Utility Right-of-Way 2 Ea $ - 0021 Fishing Creek Nature Trail 6 EA $ - 0022 Remove tree up to 6" DBH 20 EA $ - 0023 Remove tree up to 6"-12" DBH 25 EA $ - 0024 Remove tree up to 12"-18" DBH 25 EA $ - 0025 Remove tree up to 18"-24" DBH 25 EA $ - 0026 Remove tree up to 24"-30" DBH 20 EA $ - 0027 Remove tree up to 30"-36" DBH 5 EA $ - Section C-2 Subtotal $ -
Section C-3: Cleaning Services of Recreational Facilities and Areas Quantit y (Max) Unit Unit Price Total Cost
0028 Restroom 3,100 EA $ - 0029 Showerhouse with Restroom 3,186 EA $ - 0030 Picnic Shelter 1,500 EA $ - 0031 Picnic Sites 14,000 EA $ - 0032 Campsites 29,000 EA $ - 0033 Litter Removal - Recreational Areas 2,296 EA $ - 0034 Litter Removal - Access Areas 1,000 EA $ - 0035 Trash Cans 14,000 EA $ - 0036 Dumpsters 600 EA $ - 0037 Sanitary Dump Stations 1,265 EA $ - 0038 Fish Cleaning Station 12 MO $ - 0039 Whispering Pines Trail 6 EA $ - 0040 Trash Bags - Furnish to Park Attendants 50 BX $ - 0041 Playgrounds 2,400 EA $ - 0042 Bulletin Boards 160 EA $ - 0043 Basketball Court 208 EA $ - 0044 Wolf Creek Dam Shop Area 12 MO $ -
0045 Cemetery Parking and Water Tank Hill Road 3 EA $ - 0046 Splash Pad 100 EA $ - 0047 Pre-Season Cleaning - Fishing Creek 1 EA $ - 0048 Pre-Season Cleaning - Cumberland Point 1 EA $ - 0049 Pre-Season Cleaning - Waitsboro 1 EA $ - 0050 Pre-Season Cleaning - Fall Creek 1 EA $ - 0051 Pre-Season Cleaning - Mill Springs Mill Park 1 EA $ - 0052 Pre-Season Cleaning - 76 Falls 1 EA $ - 0053 Pre-Season Cleaning - Kendall and Kendall Forest 1 EA $ - 0054 Service Courtesy Floats and Launching Ramps 96 EA $ - NOTE: Leaf removal not to begin until after the first week of December
0055 Leaf Removal - Kendall and Kendall Forest Recreation Area 1 EA $ - 0056 Leaf Removal - Fishing Creek Recreation Area 1 EA $ - 0057 Leaf Removal - Cumberland Point Recreation Area 1 EA $ - 0058 Leaf Removal - Waitsboro Recreation Area 1 EA $ - 0059 Leaf Removal - Fall Creek Recreation Area 1 EA $ - 0060 Leaf Removal - Resource and Facility Mgt. Office Area 1 EA $ - 0061 Leaf Removal - Mill Springs Mill Park 1 EA $ - Section C - 3 Subtotal $ -
Section C-4, Janitorial Services Quantit y (Max) Unit Unit Price Total Cost
0062 General Cleaning - Resource Managers Office 12 EA $ - 0063 General Cleaning - Contract Admin Building and Service
Are
12 EA $ -
0064 Dumpster - Facility Management Compound 12 MO $ - Section C-4 Subtotal $ -
Section C-5, Facility Repair, Maintenance and Other Non-Routine Work NOTE: Item #'s 0065 - 0086: Bid shall be based on Service Contract Labor Standards Quantit y (Max) Unit Unit Price Total Cost
0065 Emergency Work Surcharge 16 HR $ - 0066 Laborer 400 HR $ - 0067 General Maintenance Worker 400 HR $ - 0068 Carpenter 56 HR $ - 0069 Painter 56 HR $ - 0070 Electrician 40 HR $ - 0071 Plumber 40 HR $ - 0072 Truck Driver 40 HR $ - 0073 Welder, Stick/Wire Electrical with operator 36 HR $ - 0074 Welder/Cutter W/Oxygen Acetylene equipment with operator
36 HR $ -
0075 Equipment Operator (for govt furnished equipment) 100 HR $ - 0076 Backhoe (Case 580 or equivalent) withOperator 20 HR $ - 0077 Dump Truck (2-5 Ton) with Driver 20 HR $ - 0078 Stake Truck (2-3 Ton) with Driver 20 HR $ - 0079 Dozer (D-6 or equivalent) with Operator 24 HR $ - 0080 Trailer, Equipment Flatbed, 16-20' 30 HR $ - 0081 Skid Steer Loader (743 Bobcat or equivalent) with Operator 120 HR $ - 0082 Air Compressor (125 CFM minimum) 8 HR $ - 0083 Jackhammer/pavement breaker/rock bit 8 HR $ -
0084 Workboat, 16 F. aluminum, 20 HP min. with Operator 20 HR $ - 0085 Pickup, Full Size, 1/2-3/4 on with Driver 36 HR $ - 0086 Tractor (Ford 3000 or equivalent) with Operator 12 HR $ - The following equipment shall be available and compatable with the above listed tractor, and included in the hourly price of the tractor.
Rotary Mower, Heavy Duty 5 ft. Minimum Fertilizer/Seed Spreader Power Broom Min. 6' Section C-5 Service Subtotal $ -
NOTE: Item #'s 0087 - 0114: Bid shall be based on Construction Wage Rate Requirements Quantit y (Max) Unit Unit Price Total Cost
0087 Laborer 1,500 HR $ - 0088 General Maintenance Worker 1,000 HR $ - 0089 Carpenter 200 HR $ - 0090 Painter 100 HR $ - 0091 Electrician 80 HR $ - 0092 Plumber 80 HR $ - 0093 Truck Driver 40 HR $ - 0094 Welder, Stick/Wire Electrical with operator 12 HR $ - 0095 Welder/Cutter with Oxygen Acetylene equipment with operator
12 HR $ -
0096 Equipment Operator (for govt furnished equipment) 20 HR $ - 0097 Backhoe (Case 580 or equivalent) with operator 80 HR $ - 0098 Dump Truck (2-5 Ton) with Driver 40 HR $ - 0099 Stake Truck (2-3 Ton) with Driver 80 HR $ - 0100 Dozer (D-6 or equivalent) with Operator 24 HR $ - 0101 Trailer, Equipment Flatbed, 16-20' 40 HR $ - 0102 Skid Steer Loader (743 Bobcat or equivalent) with Operator 300 HR $ - 0103 Air Compressor (125 CFM minimum) 20 HR $ - 0104 Jackhammer/pavement breaker/rock bit 20 HR $ - 0105 Pickup, Full Size, 1/2-3/4 on with Driver 100 HR $ - 0106 Tractor (Ford 3000 or equivalent) with Operator 24 HR $ - 0107 Chainsaw with Operator 8 HR $ - 0108 Compactor with Operator 16 HR $ - 0109 Concrete Finisher with Operator 40 HR $ - 0110 Concrete Saw with Operator 16 HR $ - 0111 Generator 15 HR $ - 0112 Personnel Lift with Operator 24 HR $ - 0113 Pressure washer with Operator 40 HR $ - 0114 4 ton asphalt/stone roller with Operator 40 HR $ - Section C-5 Construction Subtotal $ - Section C-5 Subtotal $ -
Section C-6: Facility Sewage Systems and Pest Control Quantit y (Max) Unit Unit Price Total Cost
0115 Septic Tanks 70 EA $ - 0116 Comperhensive pest control 12 MO $ - Section C-6 Subtotal $ -
Section C-7: Herbicide Application Quantit y (Max)
Unit Unit Price Total Cost
0117 Herbicide application square yard to include equipment, transportation and operator
180,000 SY $ -
Section C-7 Subtotal $ -
Section C-8: Red Bird Debris Management System Quantit y (Max) Unit Unit Price Total Cost
0118 Long Reach Excavator (60 foot reach) (Case CX250 or equivalent) with operator
100 HR $ -
0119 Rubber tired full size articulated loader (Case CX521 or equivalent) with operator
100 HR $ -
0120 Long Reach Excavator (approximtely 30 foot reach) (Case CX250 or equivalent) with bucket thumb, with operator
80 HR $ -
0121 Jon Boat (minimum two-person)(25 hp) with operator 48 HR $ - 0122 General Maintenance Worker 40 HR $ - 0123 Laborer 160 HR $ - 0124 Stake truck with driver 40 HR $ - 0125 Pickup Truck with driver 60 HR $ - 0126 Equipment Mobilization (excavators, blower, Loader) 5 EA $ - 0127 Equipment Demobilization (excavators, blower, Loader) 5 EA $ - 0128 Hauling and Disposal of debris to Landfill/check station 50 Tn $ - Section C-8 Subtotal $ -
Section C-9: Marking and Painting Boundary Line Quantit y (Max) Unit Unit Price Total Cost
0129 Mark and Paint Boundary Line 100 MI $ - 0130 Pickup, Full Size, 1/2-3/4 on with Driver 160 HR $ - Section C-9 Subtotal $ -
Section C-10: Debris Removal Operations at Lake Cumberland 0131 Laborer 80 HR $ - 0132 General Maintenance Worker 3,500 HR $ - 0133 Dump Truck (2-5 Ton) with Driver 40 HR $ - 0134 Equipment Trailer, Flatbed, 16-20' 40 HR $ - 0135 Equipment Operator (for govt furnished equipment) 160 HR $ - 0136 Pickup, Full Size, 1/2-3/4 on W/Driver 80 HR $ - 0137 Skid Steer Loader (743 Bobcat or equivalent) with Operator 320 HR $ - Section C-10 Subtotal $ -
Section C-11: Pavement Striping and Sealing, and Placard Placement Quantit y (Max) Unit Unit Price Total Cost
0138 Joint Compound Sealant equipment with operator 3,000 LF $ - 0139 Pavement Sealing equipment with operator 30,000 SY $ - 0140 Laborer 120 HR $ - Section C-11 Subtotal $ -
Total Base Year $
OPTION YR 1
Item Number Title/Descripton
NOTE: Item #1001-1021: Mowing and Trimming of Recreation Areas Quantit y (Max) Unit Unit
Price Total Cost
1001 Resource Manager's Office area and entrance roadway 16 EA $ 1002 Facility Management Compound and surrounding area 16 EA $ 1003 Waitsboro Day Use Area 16 EA $ 1004 Waitsboro Campground 16 EA $ 1005 Fishing Creek Recreation Area 16 EA $ 1006 Cumberland Point Recreation Area 16 EA $ 1007 Wolf Creek Shop Area 16 EA $ 1008 Halcomb's Landing 16 EA $ 1009 Kendall Day Use Area 16 EA $ 1010 Kendall Campground 16 EA $ 1011 Kendall Forest Campground 16 EA $ 1012 East and West Bank Parking 16 EA $ 1013 Wolf Creek Dam Overlook 16 EA $ 1014 76 Falls Day Use Area 16 EA $ 1015 Fall Creek Recreation Area 16 EA $ 1016 Mill Springs Park 16 EA $ 1017 Lakeview Access 12 EA $ 1018 Whispering Pines Trail 6 EA $ 1019 Black Walnut Nature Trail 6 EA $ 1020 Fishing Creek Utility Right-of-Way 2 Ea $ 1021 Fishing Creek Nature Trail 6 EA $ 1022 Remove tree up to 6" DBH 20 EA $ 1023 Remove tree up to 6"-12" DBH 25 EA $ 1024 Remove tree up to 12"-18" DBH 25 EA $ 1025 Remove tree up to 18"-24" DBH 25 EA $ 1026 Remove tree up to 24"-30" DBH 20 EA $ 1027 Remove tree up to 30"-36" DBH 5 EA $ Section C-2 Subtotal $
Section C-3: Cleaning Services of Recreational Facilities and Areas Quantit y (Max) Unit Unit
Price Total Cost
1028 Restroom 3100 EA $ 1029 Showerhouse with Restroom 3186 EA $ 1030 Picnic Shelter 1500 EA $ 1031 Picnic Sites 14000 EA $ 1032 Campsites 29000 EA $ 1033 Litter Removal - Recreational Areas 2296 EA $ 1034 Litter Removal - Access Areas 1000 EA $ 1035 Trash Cans 14000 EA $ 1036 Dumpsters 600 EA $ 1037 Sanitary Dump Stations 1265 EA $
1038 Fish Cleaning Station 12 MO $ 1039 Whispering Pines Trail 6 EA $ 1040 Trash Bags - Furnish to Park Attendants 50 BX $ 1041 Playgrounds 2400 EA $ 1042 Bulletin Boards 160 EA $ 1043 Basketball Court 208 EA $ 1044 Wolf Creek Dam Shop Area 12 MO $ 1045 Cemetery Parking and Water Tank Hill Road 3 EA $ 1046 Splash Pad 100 EA $ 1047 Pre-Season Cleaning - Fishing Creek 1 EA $ 1048 Pre-Season Cleaning - Cumberland Point 1 EA $ 1049 Pre-Season Cleaning - Waitsboro 1 EA $ 1050 Pre-Season Cleaning - Fall Creek 1 EA $ 1051 Pre-Season Cleaning - Mill Springs Mill Park 1 EA $ 1052 Pre-Season Cleaning - 76 Falls 1 EA $ 1053 Pre-Season Cleaning - Kendall and Kendall Forest 1 EA $ 1054 Service Courtesy Floats and Launching Ramps 96 EA $ NOTE: Leaf removal not to begin until after the first week of December 1055 Leaf Removal - Kendall and Kendall Forest Recreation Area 1 EA $ 1056 Leaf Removal - Fishing Creek Recreation Area 1 EA $ 1057 Leaf Removal - Cumberland Point Recreation Area 1 EA $ 1058 Leaf Removal - Waitsboro Recreation Area 1 EA $ 1059 Leaf Removal - Fall Creek Recreation Area 1 EA $ 1060 Leaf Removal - Resource and Facility Mgt. Office Area 1 EA $ 1061 Leaf Removal - Mill Springs Mill Park 1 EA $ Section C - 3 Subtotal $
Section C-4, Janitorial Services Quantit y (Max) Unit Unit
Price Total Cost
1062 General Cleaning - Resource Managers Office 12 EA $ 1063 General Cleaning - Contract Admin Building and Service Are 12 EA $ 1064 Dumpster - Facility Management Compound 12 MO $ Section C-4 Subtotal $
Section C-5, Facility Repair, Maintenance and Other Non-Routine Work NOTE: Item #'s 1065 - 1086: Bid shall be based on Service Contract Labor Standards Quantit y (Max) Unit Unit
Price Total Cost
1065 Emergency Work Surcharge 16 HR $ 1066 Laborer 400 HR $ 1067 General Maintenance Worker 400 HR $ 1068 Carpenter 56 HR $ 1069 Painter 56 HR $ 1070 Electrician 40 HR $ 1071 Plumber 40 HR $ 1072 Truck Driver 40 HR $ 1073 Welder, Stick/Wire Electrical with operator 36 HR $ 1074 Welder/Cutter W/Oxygen Acetylene equipment with operator 36 HR $ 1075 Equipment Operator (for govt furnished equipment) 100 HR $ 1076 Backhoe (Case 580 or equivalent) withOperator 20 HR $ 1077 Dump Truck (2-5 Ton) with Driver 20 HR $ 1078 Stake Truck (2-3 Ton) with Driver 20 HR $ 1079 Dozer (D-6 or equivalent) with Operator 24 HR $
1080 Trailer, Equipment Flatbed, 16-20' 30 HR $ 1081 Skid Steer Loader (743 Bobcat or equivalent) with Operator 120 HR $ 1082 Air Compressor (125 CFM minimum) 8 HR $ 1083 Jackhammer/pavement breaker/rock bit 8 HR $ 1084 Workboat, 16 F. aluminum, 20 HP min. with Operator 20 HR $ 1085 Pickup, Full Size, 1/2-3/4 on with Driver 36 HR $ 1086 Tractor (Ford 3000 or equivalent) with Operator 12 HR $ The following equipment shall be available and compatable with the above listed tractor, and included in the hourly price of the tractor.
Rotary Mower, Heavy Duty 5 ft. Minimum Fertilizer/Seed Spreader Power Broom Min. 6' Section C-5 Service Subtotal $
NOTE: Item #'s 1087 - 1114: Bid shall be based on Construction Wage Rate Requirements Quantit y (Max) Unit Unit
Price Total Cost
1087 Laborer 1500 HR $ 1088 General Maintenance Worker 1000 HR $ 1089 Carpenter 200 HR $ 1090 Painter 100 HR $ 1091 Electrician 80 HR $ 1092 Plumber 80 HR $ 1093 Truck Driver 40 HR $ 1094 Welder, Stick/Wire Electrical with operator 12 HR $ 1095 Welder/Cutter with Oxygen Acetylene equipment with operator 12 HR $ 1096 Equipment Operator (for govt furnished equipment) 20 HR $ 1097 Backhoe (Case 580 or equivalent) with operator 80 HR $ 1098 Dump Truck (2-5 Ton) with Driver 40 HR $ 1099 Stake Truck (2-3 Ton) with Driver 80 HR $ 1100 Dozer (D-6 or equivalent) with Operator 24 HR $ 1101 Trailer, Equipment Flatbed, 16-20' 40 HR $ 1102 Skid Steer Loader (743 Bobcat or equivalent) with Operator 300 HR $ 1103 Air Compressor (125 CFM minimum) 20 HR $ 1104 Jackhammer/pavement breaker/rock bit 20 HR $ 1105 Pickup, Full Size, 1/2-3/4 on with Driver 100 HR $ 1106 Tractor (Ford 3000 or equivalent) with Operator 24 HR $ 1107 Chainsaw with Operator 8 HR $ 1108 Compactor with Operator 16 HR $ 1109 Concrete Finisher with Operator 40 HR $ 1110 Concrete Saw with Operator 16 HR $ 1111 Generator 15 HR $ 1112 Personnel Lift with Operator 24 HR $ 1113 Pressure washer with Operator 40 HR $ 1114 4 ton asphalt/stone roller with Operator 40 HR $ Section C-5 Construction Subtotal $ Section C-5 Subtotal $
Section C-6: Facility Sewage Systems and Pest Control Quantit y (Max) Unit Unit
Price Total Cost
1115 Septic Tanks 70 EA $ 1116 Comperhensive pest control 12 MO $
Section C-6 Subtotal $
Section C-7: Herbicide Application Quantit y (Max) Unit Unit
Price Total Cost
1117 Herbicide application square yard to include equipment, transportation and operator
180000 SY $
Section C-7 Subtotal $
Section C-8: Red Bird Debris Management System Quantit y (Max) Unit Unit
Price Total Cost
1118 Long Reach Excavator (60 foot reach) (Case CX250 or equivalent) with operator
100 HR $
1119 Rubber tired full size articulated loader (Case CX521 or equivalent) with operator
100 HR $
1120 Long Reach Excavator (approximtely 30 foot reach) (Case CX250 or equivalent) with bucket thumb, with operator
80 HR $
1121 Jon Boat (minimum two-person)(25 hp) with operator 48 HR $ 1122 General Maintenance Worker 40 HR $ 1123 Laborer 160 HR $ 1124 Stake truck with driver 40 HR $ 1125 Pickup Truck with driver 60 HR $ 1126 Equipment Mobilization (excavators, blower, Loader) 5 EA $ 1127 Equipment Demobilization (excavators, blower, Loader) 5 EA $ 1128 Hauling and Disposal of debris to Landfill/check station 50 Tn $ Section C-8 Subtotal $
Section C-9: Marking and Painting Boundary Line Quantit y (Max) Unit Unit
Price Total Cost
1129 Mark and Paint Boundary Line 100 MI $ 1130 Pickup, Full Size, 1/2-3/4 on with Driver 160 HR $ Section C-9 Subtotal $
Section C-10: Debris Removal Operations at Lake Cumberland Quantit y (Max) Unit Unit
Price Total Cost
1131 Laborer 80 HR $ 1132 General Maintenance Worker 3500 HR $ 1133 Dump Truck (2-5 Ton) with Driver 40 HR $ 1134 Equipment Trailer, Flatbed, 16-20' 40 HR $ 1135 Equipment Operator (for govt furnished equipment) 160 HR $ 1136 Pickup, Full Size, 1/2-3/4 on W/Driver 80 HR $ 1137 Skid Steer Loader (743 Bobcat or equivalent) with Operator 320 HR $ Section C-10 Subtotal $
Section C-11: Pavement Striping and Sealing, and Placard Placement Quantit y (Max) Unit Unit
Price Total Cost
1138 Joint Compound Sealant equipment with operator 3000 LF $ 1139 Pavement Sealing equipment with operator 30000 SY $ 1140 Laborer 120 HR $ Section C-11 Subtotal $
Total Option Year 1 $
OPTION YR 2
Title/Descripton
NOTE: Item #2001-2021: Mowing and Trimming of Recreation Areas Quantity
(Max) Unit Unit
Price Total Cost
2001 Resource Manager's Office area and entrance roadway 16 EA $ 2002 Facility Management Compound and surrounding area 16 EA $ 2003 Waitsboro Day Use Area 16 EA $ 2004 Waitsboro Campground 16 EA $ 2005 Fishing Creek Recreation Area 16 EA $ 2006 Cumberland Point Recreation Area 16 EA $ 2007 Wolf Creek Shop Area 16 EA $ 2008 Halcomb's Landing 16 EA $ 2009 Kendall Day Use Area 16 EA $ 2010 Kendall Campground 16 EA $ 2011 Kendall Forest Campground 16 EA $ 2012 East and West Bank Parking 16 EA $ 2013 Wolf Creek Dam Overlook 16 EA $ 2014 76 Falls Day Use Area 16 EA $ 2015 Fall Creek Recreation Area 16 EA $ 2016 Mill Springs Park 16 EA $ 2017 Lakeview Access 12 EA $ 2018 Whispering Pines Trail 6 EA $ 2019 Black Walnut Nature Trail 6 EA $ 2020 Fishing Creek Utility Right-of-Way 2 Ea $ 2021 Fishing Creek Nature Trail 6 EA $ 2022 Remove tree up to 6" DBH 20 EA $ 2023 Remove tree up to 6"-12" DBH 25 EA $ 2024 Remove tree up to 12"-18" DBH 25 EA $ 2025 Remove tree up to 18"-24" DBH 25 EA $ 2026 Remove tree up to 24"-30" DBH 20 EA $ 2027 Remove tree up to 30"-36" DBH 5 EA $ Section C-2 Subtotal $
Section C-3: Cleaning Services of Recreational Facilities and Areas Quantity
(Max) Unit Unit
Price Total Cost
2028 Restroom 3100 EA $ 2029 Showerhouse with Restroom 3186 EA $ 2030 Picnic Shelter 1500 EA $ 2031 Picnic Sites 14000 EA $ 2032 Campsites 29000 EA $ 2033 Litter Removal - Recreational Areas 2296 EA $ 2034 Litter Removal - Access Areas 1000 EA $ 2035 Trash Cans 14000 EA $ 2036 Dumpsters 600 EA $ 2037 Sanitary Dump Stations 1265 EA $ 2038 Fish Cleaning Station 12 MO $
2039 Whispering Pines Trail 6 EA $ 2040 Trash Bags - Furnish to Park Attendants 50 BX $ 2041 Playgrounds 2400 EA $ 2042 Bulletin Boards 160 EA $ 2043 Basketball Court 208 EA $ 2044 Wolf Creek Dam Shop Area 12 MO $ 2045 Cemetery Parking and Water Tank Hill Road 3 EA $ 2046 Splash Pad 100 EA $ 2047 Pre-Season Cleaning - Fishing Creek 1 EA $ 2048 Pre-Season Cleaning - Cumberland Point 1 EA $ 2049 Pre-Season Cleaning - Waitsboro 1 EA $ 2050 Pre-Season Cleaning - Fall Creek 1 EA $ 2051 Pre-Season Cleaning - Mill Springs Mill Park 1 EA $ 2052 Pre-Season Cleaning - 76 Falls 1 EA $ 2053 Pre-Season Cleaning - Kendall and Kendall Forest 1 EA $ 2054 Service Courtesy Floats and Launching Ramps 96 EA $ NOTE: Leaf removal not to begin until after the first week of December
2055 Leaf Removal - Kendall and Kendall Forest Recreation Area 1 EA $ 2056 Leaf Removal - Fishing Creek Recreation Area 1 EA $ 2057 Leaf Removal - Cumberland Point Recreation Area 1 EA $ 2058 Leaf Removal - Waitsboro Recreation Area 1 EA $ 2059 Leaf Removal - Fall Creek Recreation Area 1 EA $ 2060 Leaf Removal - Resource and Facility Mgt. Office Area 1 EA $ 2061 Leaf Removal - Mill Springs Mill Park 1 EA $ Section C - 3 Subtotal $
Section C-4, Janitorial Services Quantity
(Max) Unit Unit
Price Total Cost
2062 General Cleaning - Resource Managers Office 12 EA $ 2063 General Cleaning - Contract Admin Building and Service Are 12 EA $ 2064 Dumpster - Facility Management Compound 12 MO $ Section C-4 Subtotal $
Section C-5, Facility Repair, Maintenance and Other Non-Routine Work NOTE: Item #'s 2065 - 2086: Bid shall be based on Service Contract Labor Standards Quantity
(Max) Unit Unit
Price Total Cost
2065 Emergency Work Surcharge 16 HR $ 2066 Laborer 400 HR $ 2067 General Maintenance Worker 400 HR $ 2068 Carpenter 56 HR $ 2069 Painter 56 HR $ 2070 Electrician 40 HR $ 2071 Plumber 40 HR $ 2072 Truck Driver 40 HR $ 2073 Welder, Stick/Wire Electrical with operator 36 HR $ 2074 Welder/Cutter W/Oxygen Acetylene equipment with operator 36 HR $ 2075 Equipment Operator (for govt furnished equipment) 100 HR $ 2076 Backhoe (Case 580 or equivalent) withOperator 20 HR $ 2077 Dump Truck (2-5 Ton) with Driver 20 HR $ 2078 Stake Truck (2-3 Ton) with Driver 20 HR $ 2079 Dozer (D-6 or equivalent) with Operator 24 HR $
2080 Trailer, Equipment Flatbed, 16-20' 30 HR $ 2081 Skid Steer Loader (743 Bobcat or equivalent) with Operator 120 HR $ 2082 Air Compressor (125 CFM minimum) 8 HR $ 2083 Jackhammer/pavement breaker/rock bit 8 HR $ 2084 Workboat, 16 F. aluminum, 20 HP min. with Operator 20 HR $ 2085 Pickup, Full Size, 1/2-3/4 on with Driver 36 HR $ 2086 Tractor (Ford 3000 or equivalent) with Operator 12 HR $ The following equipment shall be available and compatable with the above listed tractor, and included in the hourly price of the tractor.
Rotary Mower, Heavy Duty 5 ft. Minimum Fertilizer/Seed Spreader Power Broom Min. 6' Section C-5 Service Subtotal $
NOTE: Item #'s 2087 - 2114: Bid shall be based on Construction Wage Rate Requirements Quantity
(Max) Unit Unit
Price Total Cost
2087 Laborer 1500 HR $ 2088 General Maintenance Worker 1000 HR $ 2089 Carpenter 200 HR $ 2090 Painter 100 HR $ 2091 Electrician 80 HR $ 2092 Plumber 80 HR $ 2093 Truck Driver 40 HR $ 2094 Welder, Stick/Wire Electrical with operator 12 HR $ 2095 Welder/Cutter with Oxygen Acetylene equipment with operator 12 HR $ 2096 Equipment Operator (for govt furnished equipment) 20 HR $ 2097 Backhoe (Case 580 or equivalent) with operator 80 HR $ 2098 Dump Truck (2-5 Ton) with Driver 40 HR $ 2099 Stake Truck (2-3 Ton) with Driver 80 HR $ 2100 Dozer (D-6 or equivalent) with Operator 24 HR $ 2101 Trailer, Equipment Flatbed, 16-20' 40 HR $ 2102 Skid Steer Loader (743 Bobcat or equivalent) with Operator 300 HR $ 2103 Air Compressor (125 CFM minimum) 20 HR $ 2104 Jackhammer/pavement breaker/rock bit 20 HR $ 2105 Pickup, Full Size, 1/2-3/4 on with Driver 100 HR $ 2106 Tractor (Ford 3000 or equivalent) with Operator 24 HR $ 2107 Chainsaw with Operator 8 HR $ 2108 Compactor with Operator 16 HR $ 2109 Concrete Finisher with Operator 40 HR $ 2110 Concrete Saw with Operator 16 HR $ 2111 Generator 15 HR $ 2112 Personnel Lift with Operator 24 HR $ 2113 Pressure washer with Operator 40 HR $ 2114 4 ton asphalt/stone roller with Operator 40 HR $ Section C-5 Construction Subtotal $ Section C-5 Subtotal $
Section C-6: Facility Sewage Systems and Pest Control Quantity
(Max) Unit Unit
Price Total Cost
2115 Septic Tanks 70 EA $ 2116 Comperhensive pest control 12 MO $
Section C-7: Herbicide Application Quantity
(Max) Unit Unit
Price Total Cost
2117 Herbicide application square yard to include equipment, transportation and operator
180000 SY $
Section C-7 Subtotal $
Section C-8: Red Bird Debris Management System Quantity
(Max) Unit Unit
Price Total Cost
2118 Long Reach Excavator (60 foot reach) (Case CX250 or equivalent) with operator
100 HR $
2119 Rubber tired full size articulated loader (Case CX521 or equivalent) with operator
100 HR $
2120 Long Reach Excavator (approximtely 30 foot reach) (Case CX250 or equivalent) with bucket thumb, with operator
80 HR $
2121 Jon Boat (minimum two-person)(25 hp) with operator 48 HR $ 2122 General Maintenance Worker 40 HR $ 2123 Laborer 160 HR $ 2124 Stake truck with driver 40 HR $ 2125 Pickup Truck with driver 60 HR $ 2126 Equipment Mobilization (excavators, blower, Loader) 5 EA $ 2127 Equipment Demobilization (excavators, blower, Loader) 5 EA $ 2128 Hauling and Disposal of debris to Landfill/check station 50 Tn $ Section C-8 Subtotal $
Section C-9: Marking and Painting Boundary Line Quantity
(Max) Unit Unit
Price Total Cost
2129 Mark and Paint Boundary Line 100 MI $ 2130 Pickup, Full Size, 1/2-3/4 on with Driver 160 HR $ Section C-9 Subtotal $
Section C-10: Debris Removal Operations at Lake Cumberland Quantity
(Max) Unit Unit
Price Total Cost
2131 Laborer 80 HR $ 2132 General Maintenance Worker 3500 HR $ 2133 Dump Truck (2-5 Ton) with Driver 40 HR $ 2134 Equipment Trailer, Flatbed, 16-20' 40 HR $ 2135 Equipment Operator (for govt furnished equipment) 160 HR $ 2136 Pickup, Full Size, 1/2-3/4 on W/Driver 80 HR $ 2137 Skid Steer Loader (743 Bobcat or equivalent) with Operator 320 HR $ Section C-10 Subtotal $
Section C-11: Pavement Striping and Sealing, and Placard Placement Quantity
(Max) Unit Unit
Price Total Cost
2138 Joint Compound Sealant equipment with operator 3000 LF $ 2139 Pavement Sealing equipment with operator 30000 SY $ 2140 Laborer 120 HR $
Total Option Year 2 $
OPTION YR 3
NOTE: Item #3001-3021: Mowing and Trimming of Recreation Areas Quantity
(Max) Unit Unit
Price Total Cost
3001 Resource Manager's Office area and entrance roadway 16 EA $ 3002 Facility Management Compound and surrounding area 16 EA $ 3003 Waitsboro Day Use Area 16 EA $ 3004 Waitsboro Campground 16 EA $ 3005 Fishing Creek Recreation Area 16 EA $ 3006 Cumberland Point Recreation Area 16 EA $ 3007 Wolf Creek Shop Area 16 EA $ 3008 Halcomb's Landing 16 EA $ 3009 Kendall Day Use Area 16 EA $ 3010 Kendall Campground 16 EA $ 3011 Kendall Forest Campground 16 EA $ 3012 East and West Bank Parking 16 EA $ 3013 Wolf Creek Dam Overlook 16 EA $ 3014 76 Falls Day Use Area 16 EA $ 3015 Fall Creek Recreation Area 16 EA $ 3016 Mill Springs Park 16 EA $ 3017 Lakeview Access 12 EA $ 3018 Whispering Pines Trail 6 EA $ 3019 Black Walnut Nature Trail 6 EA $ 3020 Fishing Creek Utility Right-of-Way 2 Ea $ 3021 Fishing Creek Nature Trail 6 EA $ 3022 Remove tree up to 6" DBH 20 EA $ 3023 Remove tree up to 6"-12" DBH 25 EA $ 3024 Remove tree up to 12"-18" DBH 25 EA $ 3025 Remove tree up to 18"-24" DBH 25 EA $ 3026 Remove tree up to 24"-30" DBH 20 EA $ 3027 Remove tree up to 30"-36" DBH 5 EA $ Section C-2 Subtotal $
Section C-3: Cleaning Services of Recreational Facilities and Areas Quantity
(Max) Unit Unit
Price Total Cost
3028 Restroom 3100 EA $ 3029 Showerhouse with Restroom 3186 EA $ 3030 Picnic Shelter 1500 EA $ 3031 Picnic Sites 14000 EA $ 3032 Campsites 29000 EA $ 3033 Litter Removal - Recreational Areas 2296 EA $ 3034 Litter Removal - Access Areas 1000 EA $ 3035 Trash Cans 14000 EA $ 3036 Dumpsters 600 EA $ 3037 Sanitary Dump Stations 1265 EA $ 3038 Fish Cleaning Station 12 MO $
3039 Whispering Pines Trail 6 EA $ 3040 Trash Bags - Furnish to Park Attendants 50 BX $ 3041 Playgrounds 2400 EA $ 3042 Bulletin Boards 160 EA $ 3043 Basketball Court 208 EA $ 3044 Wolf Creek Dam Shop Area 12 MO $ 3045 Cemetery Parking and Water Tank Hill Road 3 EA $ 3046 Splash Pad 100 EA $ 3047 Pre-Season Cleaning - Fishing Creek 1 EA $ 3048 Pre-Season Cleaning - Cumberland Point 1 EA $ 3049 Pre-Season Cleaning - Waitsboro 1 EA $ 3050 Pre-Season Cleaning - Fall Creek 1 EA $ 3051 Pre-Season Cleaning - Mill Springs Mill Park 1 EA $ 3052 Pre-Season Cleaning - 76 Falls 1 EA $ 3053 Pre-Season Cleaning - Kendall and Kendall Forest 1 EA $ 3054 Service Courtesy Floats and Launching Ramps 96 EA $ NOTE: Leaf removal not to begin until after the first week of December
3055 Leaf Removal - Kendall and Kendall Forest Recreation Area 1 EA $ 3056 Leaf Removal - Fishing Creek Recreation Area 1 EA $ 3057 Leaf Removal - Cumberland Point Recreation Area 1 EA $ 3058 Leaf Removal - Waitsboro Recreation Area 1 EA $ 3059 Leaf Removal - Fall Creek Recreation Area 1 EA $ 3060 Leaf Removal - Resource and Facility Mgt. Office Area 1 EA $ 3061 Leaf Removal - Mill Springs Mill Park 1 EA $ Section C - 3 Subtotal $
Section C-4, Janitorial Services Quantity
(Max) Unit Unit
Price Total Cost
3062 General Cleaning - Resource Managers Office 12 EA $ 3063 General Cleaning - Contract Admin Building and Service Are 12 EA $ 3064 Dumpster - Facility Management Compound 12 MO $ Section C-4 Subtotal $
Section C-5, Facility Repair, Maintenance and Other Non-Routine Work NOTE: Item #'s 3065 - 3086: Bid shall be based on Service Contract Labor Standards Quantity
(Max) Unit Unit
Price Total Cost
3065 Emergency Work Surcharge 16 HR $ 3066 Laborer 400 HR $ 3067 General Maintenance Worker 400 HR $ 3068 Carpenter 56 HR $ 3069 Painter 56 HR $ 3070 Electrician 40 HR $ 3071 Plumber 40 HR $ 3072 Truck Driver 40 HR $ 3073 Welder, Stick/Wire Electrical with operator 36 HR $ 3074 Welder/Cutter W/Oxygen Acetylene equipment with operator 36 HR $ 3075 Equipment Operator (for govt furnished equipment) 100 HR $ 3076 Backhoe (Case 580 or equivalent) withOperator 20 HR $ 3077 Dump Truck (2-5 Ton) with Driver 20 HR $ 3078 Stake Truck (2-3 Ton) with Driver 20 HR $ 3079 Dozer (D-6 or equivalent) with Operator 24 HR $
3080 Trailer, Equipment Flatbed, 16-20' 30 HR $ 3081 Skid Steer Loader (743 Bobcat or equivalent) with Operator 120 HR $ 3082 Air Compressor (125 CFM minimum) 8 HR $ 3083 Jackhammer/pavement breaker/rock bit 8 HR $ 3084 Workboat, 16 F. aluminum, 20 HP min. with Operator 20 HR $ 3085 Pickup, Full Size, 1/2-3/4 on with Driver 36 HR $ 3086 Tractor (Ford 3000 or equivalent) with Operator 12 HR $ The following equipment shall be available and compatable with the above listed tractor, and included in the hourly price of the tractor.
Rotary Mower, Heavy Duty 5 ft. Minimum Fertilizer/Seed Spreader Power Broom Min. 6' Section C-5 Service Subtotal $
NOTE: Item #'s 3087 - 3114: Bid shall be based on Construction Wage Rate Requirements Quantity
(Max) Unit Unit
Price Total Cost
3087 Laborer 1500 HR $ 3088 General Maintenance Worker 1000 HR $ 3089 Carpenter 200 HR $ 3090 Painter 100 HR $ 3091 Electrician 80 HR $ 3092 Plumber 80 HR $ 3093 Truck Driver 40 HR $ 3094 Welder, Stick/Wire Electrical with operator 12 HR $ 3095 Welder/Cutter with Oxygen Acetylene equipment with operator 12 HR $ 3096 Equipment Operator (for govt furnished equipment) 20 HR $ 3097 Backhoe (Case 580 or equivalent) with operator 80 HR $ 3098 Dump Truck (2-5 Ton) with Driver 40 HR $ 3099 Stake Truck (2-3 Ton) with Driver 80 HR $ 3100 Dozer (D-6 or equivalent) with Operator 24 HR $ 3101 Trailer, Equipment Flatbed, 16-20' 40 HR $ 3102 Skid Steer Loader (743 Bobcat or equivalent) with Operator 300 HR $ 3103 Air Compressor (125 CFM minimum) 20 HR $ 3104 Jackhammer/pavement breaker/rock bit 20 HR $ 3105 Pickup, Full Size, 1/2-3/4 on with Driver 100 HR $ 3106 Tractor (Ford 3000 or equivalent) with Operator 24 HR $ 3107 Chainsaw with Operator 8 HR $ 3108 Compactor with Operator 16 HR $ 3109 Concrete Finisher with Operator 40 HR $ 3110 Concrete Saw with Operator 16 HR $ 3111 Generator 15 HR $ 3112 Personnel Lift with Operator 24 HR $ 3113 Pressure washer with Operator 40 HR $ 3114 4 ton asphalt/stone roller with Operator 40 HR $ Section C-5 Construction Subtotal $ Section C-5 Subtotal $
Section C-6: Facility Sewage Systems and Pest Control Quantity
(Max) Unit Unit
Price Total Cost
3115 Septic Tanks 70 EA $ 3116 Comperhensive pest control 12 MO $
(Max) Unit Unit
Price Total Cost
3117 Herbicide application square yard to include equipment, transportation and operator
180000 SY $
Section C-7 Subtotal $
Section C-8: Red Bird Debris Management System Quantity
(Max) Unit Unit
Price Total Cost
3118 Long Reach Excavator (60 foot reach) (Case CX250 or equivalent) with operator
100 HR $
3119 Rubber tired full size articulated loader (Case CX521 or equivalent) with operator
100 HR $
3120 Long Reach Excavator (approximtely 30 foot reach) (Case CX250 or equivalent) with bucket thumb, with operator
80 HR $
3121 Jon Boat (minimum two-person)(25 hp) with operator 48 HR $ 3122 General Maintenance Worker 40 HR $ 3123 Laborer 160 HR $ 3124 Stake truck with driver 40 HR $ 3125 Pickup Truck with driver 60 HR $ 3126 Equipment Mobilization (excavators, blower, Loader) 5 EA $ 3127 Equipment Demobilization (excavators, blower, Loader) 5 EA $ 3128 Hauling and Disposal of debris to Landfill/check station 50 Tn $ Section C-8 Subtotal $
Section C-9: Marking and Painting Boundary Line Quantity
(Max) Unit Unit
Price Total Cost
3129 Mark and Paint Boundary Line 100 MI $ 3130 Pickup, Full Size, 1/2-3/4 on with Driver 160 HR $ Section C-9 Subtotal $
Section C-10: Debris Removal Operations at Lake Cumberland Quantity
(Max) Unit Unit
Price Total Cost
3131 Laborer 80 HR $ 3132 General Maintenance Worker 3500 HR $ 3133 Dump Truck (2-5 Ton) with Driver 40 HR $ 3134 Equipment Trailer, Flatbed, 16-20' 40 HR $ 3135 Equipment Operator (for govt furnished equipment) 160 HR $ 3136 Pickup, Full Size, 1/2-3/4 on W/Driver 80 HR $ 3137 Skid Steer Loader (743 Bobcat or equivalent) with Operator 320 HR $ Section C-10 Subtotal $
Section C-11: Pavement Striping and Sealing, and Placard Placement Quantity
(Max) Unit Unit
Price Total Cost
3138 Joint Compound Sealant equipment with operator 3000 LF $ 3139 Pavement Sealing equipment with operator 30000 SY $ 3140 Laborer 120 HR $
Total Option Year 3 $
OPTION YR 4
NOTE: Item #4001-4021: Mowing and Trimming of Recreation Areas Quantity
(Max) Unit Unit Price Total Cost
4001 Resource Manager's Office area and entrance roadway 16 EA $ 4002 Facility Management Compound and surrounding area 16 EA $ 4003 Waitsboro Day Use Area 16 EA $ 4004 Waitsboro Campground 16 EA $ 4005 Fishing Creek Recreation Area 16 EA $ 4006 Cumberland Point Recreation Area 16 EA $ 4007 Wolf Creek Shop Area 16 EA $ 4008 Halcomb's Landing 16 EA $ 4009 Kendall Day Use Area 16 EA $ 4010 Kendall Campground 16 EA $ 4011 Kendall Forest Campground 16 EA $ 4012 East and West Bank Parking 16 EA $ 4013 Wolf Creek Dam Overlook 16 EA $ 4014 76 Falls Day Use Area 16 EA $ 4015 Fall Creek Recreation Area 16 EA $ 4016 Mill Springs Park 16 EA $ 4017 Lakeview Access 12 EA $ 4018 Whispering Pines Trail 6 EA $ 4019 Black Walnut Nature Trail 6 EA $ 4020 Fishing Creek Utility Right-of-Way 2 Ea $ 4021 Fishing Creek Nature Trail 6 EA $ 4022 Remove tree up to 6" DBH 20 EA $ 4023 Remove tree up to 6"-12" DBH 25 EA $ 4024 Remove tree up to 12"-18" DBH 25 EA $ 4025 Remove tree up to 18"-24" DBH 25 EA $ 4026 Remove tree up to 24"-30" DBH 20 EA $ 4027 Remove tree up to 30"-36" DBH 5 EA $ Section C-2 Subtotal $
Section C-3: Cleaning Services of Recreational Facilities and Areas Quantity
(Max) Unit Unit Price Total Cost
4028 Restroom 3100 EA $ 4029 Showerhouse with Restroom 3186 EA $ 4030 Picnic Shelter 1500 EA $ 4031 Picnic Sites 14000 EA $ 4032 Campsites 29000 EA $ 4033 Litter Removal - Recreational Areas 2296 EA $ 4034 Litter Removal - Access Areas 1000 EA $ 4035 Trash Cans 14000 EA $ 4036 Dumpsters 600 EA $ 4037 Sanitary Dump Stations 1265 EA $ 4038 Fish Cleaning Station 12 MO $ 4039 Whispering Pines Trail 6 EA $
4040 Trash Bags - Furnish to Park Attendants 50 BX $ 4041 Playgrounds 2400 EA $ 4042 Bulletin Boards 160 EA $ 4043 Basketball Court 208 EA $ 4044 Wolf Creek Dam Shop Area 12 MO $ 4045 Cemetery Parking and Water Tank Hill Road 3 EA $ 4046 Splash Pad 100 EA $ 4047 Pre-Season Cleaning - Fishing Creek 1 EA $ 4048 Pre-Season Cleaning - Cumberland Point 1 EA $ 4049 Pre-Season Cleaning - Waitsboro 1 EA $ 4050 Pre-Season Cleaning - Fall Creek 1 EA $ 4051 Pre-Season Cleaning - Mill Springs Mill Park 1 EA $ 4052 Pre-Season Cleaning - 76 Falls 1 EA $ 4053 Pre-Season Cleaning - Kendall and Kendall Forest 1 EA $ 4054 Service Courtesy Floats and Launching Ramps 96 EA $ NOTE: Leaf removal not to begin until after the first week of December
4055 Leaf Removal - Kendall and Kendall Forest Recreation Area 1 EA $ 4056 Leaf Removal - Fishing Creek Recreation Area 1 EA $ 4057 Leaf Removal - Cumberland Point Recreation Area 1 EA $ 4058 Leaf Removal - Waitsboro Recreation Area 1 EA $ 4059 Leaf Removal - Fall Creek Recreation Area 1 EA $ 4060 Leaf Removal - Resource and Facility Mgt. Office Area 1 EA $ 4061 Leaf Removal - Mill Springs Mill Park 1 EA $ Section C - 3 Subtotal $
Section C-4, Janitorial Services Quantity
(Max) Unit Unit Price Total Cost
4062 General Cleaning - Resource Managers Office 12 EA $ 4063 General Cleaning - Contract Admin Building and Service Are 12 EA $ 4064 Dumpster - Facility Management Compound 12 MO $ Section C-4 Subtotal $
Section C-5, Facility Repair, Maintenance and Other Non-Routine Work Note: Item #'s 4065 -4086: Bid Shall be based on Service Contract Labor Standards
Quantity (Max)
Unit Unit Price Total Cost
4065 Emergency Work Surcharge 16 HR $ 4066 Laborer 400 HR $ 4067 General Maintenance Worker 400 HR $ 4068 Carpenter 56 HR $ 4069 Painter 56 HR $ 4070 Electrician 40 HR $ 4071 Plumber 40 HR $ 4072 Truck Driver 40 HR $ 4073 Welder, Stick/Wire Electrical with operator 36 HR $ 4074 Welder/Cutter W/Oxygen Acetylene equipment with operator 36 HR $ 4075 Equipment Operator (for govt furnished equipment) 100 HR $ 4076 Backhoe (Case 580 or equivalent) withOperator 20 HR $ 4077 Dump Truck (2-5 Ton) with Driver 20 HR $ 4078 Stake Truck (2-3 Ton) with Driver 20 HR $ 4079 Dozer (D-6 or equivalent) with Operator 24 HR $ 4080 Trailer, Equipment Flatbed, 16-20' 30 HR $ 4081 Skid Steer Loader (743 Bobcat or equivalent) with Operator 120 HR $
4082 Air Compressor (125 CFM minimum) 8 HR $ 4083 Jackhammer/pavement breaker/rock bit 8 HR $ 4084 Workboat, 16 F. aluminum, 20 HP min. with Operator 20 HR $ 4085 Pickup, Full Size, 1/2-3/4 on with Driver 36 HR $ 4086 Tractor (Ford 3000 or equivalent) with Operator 12 HR $ The following equipment shall be available and compatable with the above listed tractor, and included in the hourly price of the tractor.
Rotary Mower, Heavy Duty 5 ft. Minimum Fertilizer/Seed Spreader Power Broom Min. 6' Section C-5 Service Subtotal $
NOTE: Item #'s 4087 - 4114: Bid shall be based on Construction Wage Rate Requirements
Quantity (Max)
Unit Unit Price Total Cost
4087 Laborer 1500 HR $ 4088 General Maintenance Worker 1000 HR $ 4089 Carpenter 200 HR $ 4090 Painter 100 HR $ 4091 Electrician 80 HR $ 4092 Plumber 80 HR $ 4093 Truck Driver 40 HR $ 4094 Welder, Stick/Wire Electrical with operator 12 HR $ 4095 Welder/Cutter with Oxygen Acetylene equipment with operator
12 HR $
4096 Equipment Operator (for govt furnished equipment) 20 HR $ 4097 Backhoe (Case 580 or equivalent) with operator 80 HR $ 4098 Dump Truck (2-5 Ton) with Driver 40 HR $ 4099 Stake Truck (2-3 Ton) with Driver 80 HR $ 4100 Dozer (D-6 or equivalent) with Operator 24 HR $ 4101 Trailer, Equipment Flatbed, 16-20' 40 HR $ 4102 Skid Steer Loader (743 Bobcat or equivalent) with Operator 300 HR $ 4103 Air Compressor (125 CFM minimum) 20 HR $ 4104 Jackhammer/pavement breaker/rock bit 20 HR $ 4105 Pickup, Full Size, 1/2-3/4 on with Driver 100 HR $ 4106 Tractor (Ford 3000 or equivalent) with Operator 24 HR $ 4107 Chainsaw with Operator 8 HR $ 4108 Compactor with Operator 16 HR $ 4109 Concrete Finisher with Operator 40 HR $ 4110 Concrete Saw with Operator 16 HR $ 4111 Generator 15 HR $ 4112 Personnel Lift with Operator 24 HR $ 4113 Pressure washer with Operator 40 HR $ 4114 4 ton asphalt/stone roller with Operator 40 HR $ Section C-5 Construction Subtotal $ Section C-5 Subtotal $
Section C-6: Facility Sewage Systems and Pest Control Quantity
(Max) Unit Unit Price Total Cost
4115 Septic Tanks 70 EA $ 4116 Comperhensive pest control 12 MO $
(Max) Unit Unit Price Total Cost
4117 Herbicide application square yard to include equipment, transportation and operator
180000 SY $
Section C-7 Subtotal $
Section C-8: Red Bird Debris Management System Quantity
(Max) Unit Unit Price Total Cost
4118 Long Reach Excavator (60 foot reach) (Case CX250 or equivalent) with operator
100 HR $
4119 Rubber tired full size articulated loader (Case CX521 or equivalent) with operator
100 HR $
4120 Long Reach Excavator (approximtely 30 foot reach) (Case CX250 or equivalent) with bucket thumb, with operator
80 HR $
4121 Jon Boat (minimum two-person)(25 hp) with operator 48 HR $ 4122 General Maintenance Worker 40 HR $ 4123 Laborer 160 HR $ 4124 Stake truck with driver 40 HR $ 4125 Pickup Truck with driver 60 HR $ 4126 Equipment Mobilization (excavators, blower, Loader) 5 EA $ 4127 Equipment Demobilization (excavators, blower, Loader) 5 EA $ 4128 Hauling and Disposal of debris to Landfill/check station 50 Tn $ Section C-8 Subtotal $
Section C-9: Marking and Painting Boundary Line Quantity
(Max) Unit Unit Price Total Cost
4129 Mark and Paint Boundary Line 100 MI $ 4130 Pickup, Full Size, 1/2-3/4 on with Driver 160 HR $ Section C-9 Subtotal $
Section C-10: Debris Removal Operations at Lake Cumberland Quantity
(Max) Unit Unit Price Total Cost
4131 Laborer 80 HR $ 4132 General Maintenance Worker 3500 HR $ 4133 Dump Truck (2-5 Ton) with Driver 40 HR $ 4134 Equipment Trailer, Flatbed, 16-20' 40 HR $ 4135 Equipment Operator (for govt furnished equipment) 160 HR $ 4136 Pickup, Full Size, 1/2-3/4 on W/Driver 80 HR $ 4137 Skid Steer Loader (743 Bobcat or equivalent) with Operator 320 HR $ Section C-10 Subtotal $
Section C-11: Pavement Striping and Sealing, and Placard Placement Quantity
(Max) Unit Unit Price Total Cost
4138 Joint Compound Sealant equipment with operator 3000 LF $ 4139 Pavement Sealing equipment with operator 30000 SY $ 4140 Laborer 120 HR $
Total Option Year 4 $
Section C - Descriptions and Specifications
PREFORMANCE WORK STATEMENT
SPECIFICATIONS SECTION C-1
General
C-1.1 PROJECT INFORMATION. The Nashville District U.S. Army Corps of Engineers (USACE) anticipates a requirement for a firm fixed-price requirements contract with a base and four (4) option years for operation and maintenance services at Lake Cumberland (Wolf Creek).
Lake Cumberland (Wolf Creek) is located on the Cumberland River, 60 miles south of Lexington, Kentucky. The areas of work are located in Pulaski, Wayne, Clinton, Russell, Whitley and McCreary Counties of Kentucky. Principal cities in the area are Somerset, Monticello, Albany, Jamestown and Russell Springs.
C-1.2 SCOPE OF WORK. The Contractor shall furnish all necessary management, supervision, inspection, personnel, materials, supplies, parts, tools, tool related hardware, equipment, transportation, vehicles, and fuel except as otherwise provided herein, required to perform mowing, cleaning, janitorial, and other maintenance services at the Lake Cumberland (Wolf Creek) project recreation areas, as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, Tables, etc., contained herein or incorporated by reference. Incorporation by reference shall include any and all mandatory provisions required by the Federal Acquisition Regulation (FAR) whether it is referenced or not referenced, current at time of award.
Quantities and/or the work to be performed is described herein and listed on separate sheets as Exhibits. These quantities are approximate and are provided as information only to assist in the preparation of bids. The quantities shown are the not-to-exceed (NTE) quantities; actual quantities may be less than shown but shall not exceed them. They are not guaranteed.
Variation in these estimated quantities shall not be justification for modification of the contract. The services required in this contract are in addition to the routine operation and maintenance performed by Government personnel, however, the Government reserves the right to perform any or all of the services described herein with its own personnel or volunteers.
Increased or decreased visitation shall not justify a price increase. The Contractor’s work and responsibility shall include, but shall not…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .