Exhibit F Delivery Order Cost Estimate.pdf
PDF 84 KB Posted
- Attached to
- Lake Cumberland (Wolf Creek) O&M
- Solicitation number
- W912P520B0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract of Offers_W912P520B0001.pdf | ||
| W912P520B0001 Solicitaion Amendment 0002 (f).pdf | ||
| Exhibits C-2.1 thru C-2.15.pdf | ||
| Exhibit C-3.1 thru C-3.4.pdf | ||
| Exhibit C-3.4 in Excel.XLSX | XLSX spreadsheet | |
| Site Visit Signed Sign In Sheet.pdf | ||
| Bid Schedule in Excel.xlsx | XLSX spreadsheet | |
| Solicitation Amendment 0001 (f).pdf | ||
| Exhibit B, Definitions.docx | DOCX document | |
| Exihibit D AHA CELRL Form 1259 Blank.pdf | ||
| Exhibit E DD1155.pdf | ||
| Exhibit C.xlsx | XLSX spreadsheet | |
| W912P520B0001_Solicitation.pdf | ||
| Exhibit 3.4 Location of Work.pdf | ||
| Exhibit A QASP.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. COST ESTIMATE: SUBMITTED BY c. CONT. SECT. NUMBER:
CELRN FORM 564, JUN 2015 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2
VERSION 1.3
1. CONTRACT NUMBER 2. DUE OUT COST ESTIMATE NUMBER 3. DATE (YYYYMMDD)
U.S. ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT
DELIVERY ORDER COST ESTIMATE
For use of this form, see AR 715-30; the proponent agency is CELRN-OP-R.
a. GOVERNMENT OR
4. WORK DESCRIPTION: THE CONTRACTOR SHALL PROVIDE ALL SUPERVISION, LABOR, TOOLS, EQUIPMENT, SUPPLIES, VEHICLES AND TRANSPORTATION TO (attach additional plans, specifications, or drawings).
b. CONTRACTOR d.
ITEM
NUMBER
e.
SERVICES
f.
QUANTITY
g.
UNIT
h.
PRICE EACH
i.
AMOUNT
(f. x h.)
j. TOTAL HOURS
k. COLUMN TOTAL (i.) $
6. GOVERNMENT FURNISHED ITEMS (GFI) REQUIRED:
a.
ITEM
c.
b.
DESCRIPTION
d.
a.
ITEM
DESCRIPTION
SECTION I - CONTRACT COST DATA
CELRN FORM 564, JUN 2015 Page 2 of 2
SECTION II - RECORD OF DISCUSSIONS
1. CONTRACT NUMBER 2. DUE OUT COST ESTIMATE NUMBER 3. DATE (YYYYMMDD) 4. TIME (0001-2400 hours)
5. GOVERNMENT REPRESENTATIVES 6. CONTRACTOR REPRESENTATIVES
7. REMARKS (attach additional sheets if necessary).
8. ADJUSTED COST ESTIMATE
a.
ITEM
SERVICES
e.
PRICE EACH
f.
AMOUNT
(c. x e.)
g. TOTAL HOURS
h. COLUMN TOTAL (f.) $
b. DATE (YYYYMMDD)9a. CONTRACTOR'S REPRESENTATIVE (Last, First MI) c. CONTRACTOR REPRESENTATIVE'S SIGNATURE
b. DATE (YYYYMMDD)10a. GOVERNMENT'S REPRESENTATIVE (Last, First MI) c. GOVERNMENT REPRESENTATIVE'S SIGNATURE
b. DATE (YYYYMMDD)11a. APPROVED BY COR (Last, First MI) c. COR'S SIGNATURE
7. REMARKS
b. DATE (YYYYMMDD)8a. PREPARED BY NAME (Last, First MI) AND TITLE c. PREPARED BY SIGNATURE
b. DATE (YYYYMMDD)9a. APPROVED BY NAME (Last, First MI) AND TITLE c. APPROVED BY SIGNATURE
5. COST ESTIMATE: SUBMITTED BY c. CONT. SECT. NUMBER:
CELRN FORM 564, JUN 2015 PREVIOUS EDITIONS ARE OBSOLETE. Page 1 of 2
VERSION 1.3
U.S. ARMY CORPS OF ENGINEERS, NASHVILLE DISTRICT
DELIVERY ORDER COST ESTIMATE
For use of this form, see AR 715-30; the proponent agency is CELRN-OP-R.
d.
ITEM NUMBER
e.
SERVICES
f.
QUANTITY
g.
UNIT
h.
PRICE EACH
i.
AMOUNT
(f. x h.)
k. COLUMN TOTAL (i.) $
6. GOVERNMENT FURNISHED ITEMS (GFI) REQUIRED:
a.
ITEM NUMBER
c.
UNIT
b.
DESCRIPTION
d.
QUANTITY
a.
ITEM NUMBER
c.
UNIT
b.
DESCRIPTION
d.
QUANTITY
SECTION I - CONTRACT COST DATA
CELRN FORM 564, JUN 2015 Page 2 of 2
SECTION II - RECORD OF DISCUSSIONS
8. ADJUSTED COST ESTIMATE
a.
ITEM NUMBER
b.
SERVICES
c.
QUANTITY
d.
UNIT
e.
PRICE EACH
f.
AMOUNT
(c. x e.)
h. COLUMN TOTAL (f.) $ 1.3 Forms Design Team CEIT-OPI-PF CELRN Form 564 Delivery Order Cost Estimate JUN 2015 Mark Cooper CELRN Form 564 Delivery Order Cost Estimate JUN 2015 mark.a.cooper@usace.army.mil 20150601 20150601
| PrintForm: |
| Button1: |
| CONTRACT: |
| DUE: |
| DATE: |
| CheckBox1: 0 |
| CheckBox1: 0 |
| CAPTIONS: |
| TEXT: |
| NUM1: |
| NUM2: |
| NUM3: |
| NUM4: |
| NUM30: |
| TIME: |
| NUMBER: |
| C1: |
| C2: |
| CSIGNATURE: |
| D1: |
| D2: |
| DSIGNATURE: |
| E1: |
| E2: |
| ESIGNATURE: |
| A1: |
| A2: |
| ASIGNATURE: |
| B1: |
| B2: |
| BSIGNATURE: |
File details come from the government source that posted it. Updated .