Amendment 0004 W912P518B0005
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD80750959
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
1.Provide Q&A Set 3.
2.Provide revised Maintenance Building draw ings.
3.Revise specification sections and draw ings as described in the "AM4 Technical Changes"section below .
4.Revise the Conference Room number for the public opening of bids in INSTRUCTIONS TO BIDDERS paragraph 2.2.
5.Update clause 52.252-3
1. CONTRACT ID CODE PAGE OF PAGES
J 1 18
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P518B0005
X 9B. DATED (SEE ITEM 11)
13-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Aug-2018
CODE
CELRN-RC-N CONTRACTING BRANCH
A405, 110 9TH AVE S
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P518B0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
Q&A SET 3
IFB No. W912P518B0005 Amendment No. 0004
Downstream Lock Excavation Kentucky Lock
Grand Rivers, Kentucky Questions and Answers
Set 3
109. Question: Please provide the methodology for determining the watertightness test, redrilling, and pre-grouting quantities of the pay items. There appears to be significant discrepancies.
Answer: See revised Bid Schedule issued in Amendment 0003.
110. Question: Option 2 Bid Schedule Items 3114-02 through 3126-04 total 31-ea anchors while the testing items 3127-02 and 3128-02 total 33-ea. Please clarify.
Answer: See revised Bid Schedule issued in Amendment 0003.
111. Question: The Option 2 Bid Schedule for Phase 3 Post-Tensioned Anchors indicates a total quantity of 10 inclined 30-strand post-tensioned anchors and 14 inclined 50-strand post-tensioned anchors. Drawings 61N241-19 thru 61N241-34 indicate a total quantity of 12 inclined 30-strand post-tensioned anchors and 12 inclined 50-strand post-tensioned anchors. Please confirm the quantities of inclined 30-strand and inclined 50-strand post-tensioned anchors. If the quantities shown in the drawings are incorrect, please provide revised drawings.
Answer: See revised Bid Schedule and sheets 61N241-19 to 61N241-34 in Amendment 0003.
112. Question: Option 3 of the Bid Form does not include CLIN’s for inclined anchor drilling as indicated in Specification 01 00 00 Page 17 Paragraph 1.21.2.3. Please clarify.
Answer: See revised Specification 01 00 00, Paragraph 1.21.2.3 and revised Bid Schedule in Amendment 0003 for clarification.
113. Question: Was the previous overhang platform used for anchoring built to the same platform specifications that is part of this contract?
Answer: The contract has no separate requirement for a platform.
114. Question: Are all anchors required to be restressable?
Answer: See Note 9 on Sheet 61N241-14A as amended in Amendment 0003.
115. Question: Crane rehab- does olmsted crane rehab need to be completed by an independent 3rd party?
Answer: See revised Specification Section 41 22 01 Refurbishment of Government Crane and New Crawler Crane.
116. Question: Who determines the acceptability/quality of the select backfill material to be stockpiled?
Answer: See Specification Section 31 00 00, Paragraph 1.4.1 for select backfill requirements.
117. Question: Can the conduit and wire be disconnected from the power source in existing maintenance building and removed with the building? Or does each conduit need to be removed separately prior to the buildings demolition?
Answer: See the Plans and Specifications Section 02 41 00 Demolition for the requirements of the maintenance building demolition.
118. Question: Where will the heat trace for the 8” water line be fed from and will it require an additional control panel?
Answer: No, an additional control panel is not required. See the three attachments numbered 20., 21., and 22. included in Appendix B of Amendment 0004 for existing heat trace control panel and power availability for the 8" water line heat trace. See the un-amended drawing 614N249-41 for location.
119. Question: The weathered rock pinnacles in Johnson Bros contract which is exposed. Is that rock part of their excavation plan or is it part of this contract existing condition grading plan? Wil the rock be removed in Johnson Bros contract? If not, will the slope be put back to original condition prior to the start of this contract phase/option award?
Answer: The excavation that exposed the rock pinnacle was performed to facilitate Johnson Brothers’ means of cofferdam installation. No additional excavation within the immediate vicinity of the cofferdam will be performed by Johnson Brothers. The slope will not be returned to its original condition. Instead, updated contours are available on amended drawings 61N651-20 and 822N3066, which were included in Amendment 4.
120. Question: What is the minimum clearance for the power lines? What is the voltage of the existing power lines?
Answer: See EM 385-1-1 for guidance on required minimum distances. See Sheet 61N247-71. Voltages of power lines vary throughout the site.
121. Question: There is not enough information for us to do our excavation takeoff. We will either need a set of cad drawings or changes to the following;
a. Page 61N651-20, Foundations for Top of Rock, does not show the contours for the full extent of excavation. Shown on Page 61N651-19, Excavation Plan, it states excavation will begin at Station 2+56. Currently that station is not shown on the drawing. Please provide an updated sheet. See attached drawing for a visual representation.
b. Also, on Page 61N651-20, Foundations for Top of Rock, we would like confirmation that the contours shown are the most up to date. Specifically, on the upstream side of the drawing, just making sure the contours reflect the work done on the previous job in the constructing of the road. See attached drawing for a visual representation.
c. Page 822N3066, Boring Plan, shows the existing contours, we would like confirmation that the contours shown are the most up to date. Specifically, on the upstream side of the drawing, just making sure the contours reflect the work done on the previous job in the constructing of the road. See attached drawing for a visual representation.
d. Page 822N3066, Boring Plan, shows the existing contours, if you could please provide more clarification in the upstream side of the drawing. Specifically, in the part of the lock that has been constructed. The contour lines are so close together that it is difficult to interpret. If you could provide a blow-up drawing of this area it would be helpful. See attached drawing for a visual representation.
e. Page 822N3066, Boring Plan, if you can also provide clarification about contour lines that seem to just end, where the roadway is, two sets of contour lines are providing different elevation heights. See attached drawing for a visual representation.
Answer: Drawing 61N651-20 has been amended to show available approximate top of rock contours. Drawing 822N3066 has been amended to show the most current surface contours. The associated cross section drawings have also been amended to reflect the updated contours.
See the Government’s response to question #34 in Amendment 0003 for additional information concerning the CADD drawings made available by the Government.
122. Question: Removal of the concrete decks from the three lock bridges will be required before dismantling. This operation may require saw cutting and hydraulic hammers.
Water will be used in both of these types of operation.
*Saw cutting will require extensive water use and will most likely result in water run off that contains lots of sediment from cutting concrete. Can this water be allowed to flow off the bridge and possibly into the lock chamber water?
*Hydraulic hammers and other chipping operations may require water for controlling silica dust. Can this water be allowed to flow off the bridge and possibly into the lock chamber water?
Answer: For both sawing and the use of hydraulic hammers, the contractor should develop a plan for visually monitoring this discharge and, to the extent practicable, preventing discharges to Water of U.S. that cause objectionable turbidity or discoloration.
Where practicable, efforts should be made to allow the flow to pass through a Best Management Practice (some type of filter fabric) to minimize particulates from the operation to enter the river. This plan should be included in the Environmental Protection Plan. Reference Specification Section 01 57 19, Paragraphs 1.6 and 3.3.2.
123. Question: Can the railway bridge concrete ballast be removed starting at one end and progress to completion at the opposite end?
Answer: See revised Technical Drawing 80N760-1A and revised Technical Specification 02 41 00.02, Paragraph 1.5.1.
124. Question: Drawing 80N760-9, Typical Section - Stage II & III notes 42 each 3” and 4” diameter metal conduits. Can you advise on the schedule / wall thickness of these conduits? Can you advise if they contain wire or any other utility component? Please describe the utility components that are inside the conduits.
Answer: All available information has been provided in the Plans and Specifications.
125. Question: Could you please provide details of the existing maintenance building slab?
These are not evident in the bid documentation.
Answer: See revised sheet 16W220-10.
126. Question: Specification Section 01 00 00 Page 4 Paragraph 1.3 Required Sequence of Work and Drawing 61N247-72A reference a “TVA Drilling and Cutting Permit”. Is a copy of that permit application included in the contract documents? If so, could you direct us to it? If not, could one be provided?
Answer: A copy of the permit application has been added to Forms and Attachments in Appendix B of the Specifications.
127. Question: Does USACE has an inventory list of the items in the building to be relocated?
Answer: No. However seven pictures of the inside of the existing Maintenance Building have been added to Forms and Attachments in Appendix B of the Specifications to help describe and quantify items to be relocated that are not shown in the Plans.
128. Question: In the disposal areas is there specific erosion control requirements? How these would be paid?
Answer: Refer to Specification Section 01 57 19, Paragraph 3.2.2. Erosion control measures will be paid at the contract unit price per month for "erosion control" as defined in Specification Section 01 22 00.
129. Question: Specification Section 02 83 20 paragraph 1.1 and 1.17.5 May you clarify the need of full containment systems during lead abatement? Section 1.17.5 seems to mandate the use of a Negative Air Pressure System - Full Containment.
Answer: Section 02 83 20, Paragraph 1.17.5 Negative Air Pressure System have been removed. Abrasive blasting techniques are not used on lead paint on this contract.
130. Question: How the concrete removed from the existing bridges need to be treated in the case that it was poured against lead paint?
Answer: Removal and disposal of concrete with lead paint on it should be treated the same as steel with lead paint on it as per the requirements of Section 02 83 20 of the Specifications entitled “Lead Base Paint (LBP) Abatement, Removal, and Disposal.”
131. Question: Please clarify the location and boundaries of the five disposal areas, referred to as Areas A, B, C, D, and E. Also specify which of these areas, if not all, can be utilized during each phase of construction / Option?
Answer: Only Areas A, B, and D will be used in this contract. Limits are defined on sheet 61N247-72A.
132. Question: RE: Drawing 61N852-15, Section A-A references Drawing 61N852-10 which is missing from the plans. Please provide Drawing 61N852-10.
Answer: Section A-A is in reference to Drawing 61N852-14, see revised drawing in
Amendment 0004.
133. Question: Section 13 50 00, Subsection 3.12 Existing Lock & Dam Instrumentation, states the following (listed below). Please clarify if instrumentation on the existing lock structure (land wall) is not part of this project.
3.12 EXISITING LOCK & DAM INSTRUMENTATION The instrumentation program on the existing lock & dam at the project are not required to be monitored, maintained, or replaced as part of the work described herein.
Answer: The referenced paragraph was included in error and has been deleted from the specification. The Contractor will be responsible for existing instrumentation on the existing lock. See revised Specification Section 13 50 00 in Amendment 0004.
134. Question: Per Sheet 72A, the new maintenance building is not within the contactors work limits.
Answer: See Sheet 61N247-72A, as revised in Amendment 0003.
135. Question: Which holes will be Core Drilled in the grout curtain as paid for in Option 4 Item 0209A-04 and 0209B-04 Core Drilling? If it is unknown at this time and at the Owners discretion, what is the breakdown of cased hole and hole in rock or concrete as the grout curtain has many different cross sections?
Answer: Option 4 is for the Specialized Treatment Zone grouting. The holes that will be core drilled are the primary holes on the A-Line and all of the C-Line holes. The location of the C-Line holes will not be selected until after the A and B-Lines are completed. All of these holes will be advanced through the embankment and into the guidewall concrete before encountering rock. See Specification Section 31 32 23, Paragraph 1.1.
136. Question: What capacity does each disposal area have?
Answer: See sheet 61N247-72A, Note 11 as amended in Amendment 0004 for capacity of Disposal Area A. Disposal Area B and D have sufficient capacity to receive the respective materials associated with this contract.
137. Question: How much and from what location or phase does the clean overburden material to be stockpiled in disposal area A come from?
Answer: See sheet 61N247-72A as revised in Amendment 0004.
138. Question: Section 41 22 01 – 1.4 a. – Please provide the specified requirements (and/or catalog cuts) for the man basket/work platform and evacuation jib referenced in this section.
Answer: EM 385-1-1 requires the crane manufacturer to provide a statement of compliance that the equipment working with their crane is acceptable for use. The bidder is to pick a crane and then identify a man basket that the crane manufacturer says will work with the crane and that fits the dimensions of the required space.
139. Question: Please provide the electronic (microstation) files of the existing ground, finished grade, and cross sections.
Answer: See the Government’s response to question #34 in Amendment 000 concerning the CADD drawings made available by the Government.
140. Question: Please provide the overall site plan.
Answer: See sheets 61N247-71 to 61N247-73.
141. Question: Is it possible to receive the Instrumentation Operations and Maintenance Manuals for the existing instruments before the project is awarded?
Answer: If available, the Instrumentation Operations and Maintenance Manuals will be made available after contract award.
142. Question: What historical data will be provided for the geodatabase in the data management plan?
Answer: The Government will provide, historical boring locations and logs, surveys, and the footprint of the existing cofferdam post award. For specific requirements of the database, see Specification Section 01 31 00.
143. Question: What is the Olmsted crane serial number?
Answer: The serial number is 13700.
144. Question: In Section 01 00 00, why did the date change from 31 March 2020 to 15 May 2020 for access to the Downstream Cofferdam area in Amendment 0003?
Answer: The 31 March 2020 date was inadvertently left in the Specifications from an earlier version of the Government's Period of Performance schedule. The 15 May 2020 date reflects the Period of Performance periods that are included in the Solicitation.
145. Question: Is Note 11 on Technical Drawing 61N241-14A in Amendment 3 correct?
Answer: No, see revised Note 11 on Technical Drawing 61N241-14A in Amendment 0004.
146. Question: Specification Section 02 83 20 3.2.1 paragraph 3.2.1 Lead Abatement specification indicates to emphasize our efforts in the generator and turbine rehabilitation work. May you specify in which pay item we should include these costs?
Answer: Lead abatement only applies to Lock bridge demolition work. Section 02 83 20 has been revised. Payment for lead abatement will be included in the bid items for Demolition of Exiting Lock Bridges.
147. Question: Can the Government’s Bid Project Schedule be provided?
Answer: The Government's schedule will not be made available because development of an approved schedule is a contract requirement, which schedule should be based on the contractor's proposed means and methods to successfully complete the construction requirement within the contract period of performance.
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been added by full text:
AM4 TECHNICAL CHANGES
Solicitation No. W912P518B0005 Amendment No. 0004
I. CHANGES TO TECHNICAL SPECIFICATIONS
A. Section 01 00 00 GENERAL REQUIREMENTS. Remove Section 01 00 00 in its entirety (20 pages), and replace with revised Section 01 00 00 (20 pages).
B. Section 01 22 00 PRICE AND PAYMENT PROCEDURES. Remove Section 01 22 00 in its entirety (87 pages), and replace with revised Section 01 22 00 (87 pages).
C. Section 02 83 20 LEAD BASE PAINT (LBP) ABATEMENT, REMOVAL, AND DISPOSAL. Remove Section 02 83 20 in its entirety (23 pages), and replace with revised Section 02 83 20 (23 pages).
D. Section 13 50 00 INSTRUMENTATION SYSTEM. Remove Section 13 50 00 in its entirety (29 pages), and replace with revised Section 13 50 00 (28 pages).
E. Section 41 22 01 REFURBISHMENT OF GOVERNMENT CRANE AND NEW CRAWLER CRANE.
Remove Section 41 22 01 in its entirety (4 pages), and replace with revised Section 41 22 01 (5 pages).
F. Appendix A – MAINTENANCE BUILDING SPECIFICATIONS. Add the following new Sections to
Appendix A:
Section No. Description
PROJECT TABLE OF CONTENTS (2 pages)
07 05 23 PRESSURE TESTING AND AIR BARRIER SYSTEM FOR AIR TIGHTNESS
(21 pages)
07 19 00 WATER REPELLENTS (12 pages)
07 21 13 BOARD AND BLOCK INSULATION (8 pages)
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM (5 pages)
07 60 00 FLASHING AND SHEET METAL (19 pages)
07 92 00 JOINT SEALANTS (11 pages)
G. Appendix B FORMS AND ATTACHMENTS. Add the following new documents to Appendix B:
No. Description
Table of Contents (1 page)
18. TVA Drilling and Chipping Permit (1 page)
19 Interior of Existing Maintenance Building Photographs (8 pages)
20 Heat Trace Drawings (11 pages)
21. Heat Trace Panel Drawings (4 pages)
22. Heat Trace Panel and Cable Catalog Cuts (17 pages)
II. CHANGES TO CONTRACT DRAWINGS
A. The following CONTRACT DRAWINGS have been revised and replaced:
Drawing No. Description
OVERBURDEN EXCAVATION
61N651-20 FOUNDATIONS, APPROXIMATE TOP OF ROCK
61N651-21 EXCAVATION SECTIONS, SECTIONS AT 03+00B & 04+00B
61N651-22 EXCAVATION SECTIONS, SECTIONS AT 05+00B & 06+00B
61N651-23 EXCAVATION SECTIONS, SECTIONS AT 07+00B & 08+00B
61N651-24 EXCAVATION SECTIONS, SECTIONS AT 09+00B & 10+00B
61N651-25 EXCAVATION SECTIONS, SECTIONS AT 11+00B & 12+00B
61N651-26 EXCAVATION SECTIONS, SECTIONS AT 13+00B & 14+00B
61N651-27 EXCAVATION SECTIONS, SECTION AT 15+00B
ROCK EXCAVATION
822N3066 EXISTING BORINGS LOCATION, BORING PLAN
822N3067 GEOLOGIC PROFILE, SPECIALIZED TREATMENT ZONES (STZ)
822N3068 BORING SECTIONS, SECTIONS AT 05+00B & 06+00B
822N3069 BORING SECTIONS, SECTIONS AT 07+00B & 08+00B
822N3070 BORING SECTIONS, SECTIONS AT 09+00B & l0+00B 822N3071 BORING SECTIONS, SECTIONS AT ll+00B & 12+00B
822N3072 BORING SECTIONS, SECTIONS AT 13+00B & 14+00B
822N3073 BORING SECTIONS, SECTIONS AT 15+00B & 16+00B
EXISTING LANDWALL STABILIZATION MEASURES
61N241-14A EXISTING LOCK, ANCHOR DETAILS
MAINTENANCE BUILDING
10N400-03 LOCATION AND VICINITY MAPS
10N400-04 CONTRACTOR WORK LIMITS AND CONTROL POINT LOCATIONS
10N400-04A CONTROL POINT DESCRIPTIONS
10N400-05 TEST PIT LOCATION PLAN
10N400-05A SOIL AND ROCK CLASSIFICATION
10N400-05B TEST PIT LOGS, TP-1 AND TP-2 (1 OF 2)
10N400-05C TEST PIT LOGS, TP-3 AND TP-4 (2 OF 2)
10N400-06 EROSION CONTROL PLAN (1 OF 4)
10N400-07 EROSION CONTROL PLAN (2 OF 4)
10N400-08 EROSION CONTROL PLAN (3 OF 4)
10N400-09 EROSION CONTROL PLAN (4 OF 4)
10N400-10 EROSION CONTROL DETAILS
10N400-11 DEMOLITION PLAN (1 OF 3)
10N400-12 DEMOLITION PLAN (1 OF 3)
10N400-13 DEMOLITION PLAN (1 OF 3)
10N400-14 SITE PLAN (1 OF 3)
10N400-15 SITE PLAN (2 OF 3)
10N400-16 SITE PLAN (3 OF 3)
10N400-17 SITE DETAILS
10N400-17A SITE DETAILS
10N400-17B SITE DETAILS
10N400-18 GRADING PLAN (1 OF 4)
10N400-19 GRADING PLAN (2 OF 4)
10N400-20 GRADING PLAN (3 OF 4)
10N400-21 GRADING PLAN (4 OF 4)
10N400-22 TYPICAL SECTIONS
10N400-22A GRADING DETAILS
10N400-22B PROFILES
10N400-23 JOINT PLAN
10N400-23A PAVEMENT DETAILS
10N400-24 UTILITY PLAN (1 OF 4)
10N400-25 UTILITY PLAN (2 OF 4)
10N400-26 UTILITY PLAN (3 OF 4)
10N400-27 UTILITY PLAN (4 OF 4)
10N400-28 UTILITY CORRIDOR PLAN
10N400-29 UTILITY DETAILS
10N400-29A UTILITY DETAILS
10N400-29B UTILITY DETAILS
16W220-2 REFERENCE DRAWING
16W220-3 REFERENCE DRAWING
16W220-4 REFERENCE DRAWING
16W220-6 REFERENCE DRAWING
16W220-9 REFERENCE DRAWING
16W220-10 REFERENCE DRAWING
16W220-12 REFERENCE DRAWING
16W220-13 REFERENCE DRAWING
16W220-14 REFERENCE DRAWING
16W220-15 REFERENCE DRAWING
--- END OF AMENDMENT NO. 0004 TECHNICAL CHANGES---
The following have been modified:
INSTRUCTIONS TO BIDDERS
INSTRUCTIONS, CONDITIONS & NOTICES TO BIDDERS
1.0 GENERAL REQUIREMENTS
1.1 Intent: The intent of this solicitation is to award one (1) Firm Fixed-Price contract for the Downstream Lock Excavation Construction at Kentucky Lock in Grand Rivers, Kentucky.
1.2 Disclosure of Magnitude of Construction Project: The estimated magnitude of this requirement is between $25,000,000 and $100,000,000.
1.3 Basis of Selection of Award: Award shall be made to the lowest priced bidder who is determined to be responsive and responsible. See Federal Acquisition Regulation (FAR) clause 52.214-19, Contract Award— Sealed Bidding—Construction, for more information.
1.4 Options: The Government will evaluate offers pursuant to FAR 52.217-5.
1.5 Type of Contract: The Government intends to award one (1) Firm-Fixed price construction contract.
1.6 Evaluation of Subdivided Items: Option 4 Item Nos. 0209, 3140, 3141, 3142, 3145, 3147 and Option 8 Item Nos. 0209, 3140, 3141, 3142, 3145, 3147 are subdivided into two or more estimated quantities and are to be separately priced. The Government will evaluate each of these items on the basis of total price of its subitems. See section 00 73 00 – Supplementary Conditions VARIATIONS IN ESTIMATED
QUANTITIES- SUBDIVIDED ITEMS.
1.7 Who May Submit: The procurement is full and open competition.
1.8 North American Industry Classification System (NAICS) Code and Small Business Size Standard: The NAICS code for this project is 237990 with a size standard of $36.5M.
1.9 Specifications and Drawings: Specifications and Drawings will be provided as separate files and will be available in FBO due to the size and pages associated with each. See the complete drawings and specifications package located at the following website: www.fbo.gov.
The Specifications and Drawings are part of the contract and shall be considered in that respect (see Defense Federal Acquisition Regulation Supplement (DFARS) 252.236-7001, Contract Drawings and Specifications).
1.10 Pre-Bid Site Visit: An organized site visit has been scheduled to occur during the solicitation period. Bidders should inspect the job site prior to submitting a bid. Bidders should take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve bidders from the responsibility for properly estimating the difficulty or cost of successfully performing the work. The Government assumes no responsibility for any understanding or representations concerning conditions made by any of its officers, agents or employees, unless included in the solicitation, the specifications or related documents. Please refer to the FAR clause 52.236-27 Alt I, Site Visit (Construction) incorporated by full text in this solicitation, for information pertaining to the scheduled site visit.
REGISTRATION: Only registered persons will be permitted to attend the site visit. In addition to the below information, also provide your firm’s name, CAGE and/or Unique Entity Identifier (UEI) number (formerly known as DUNS), and name and position title of primary point-of-contact and their telephone number and email address. Please provide this information via email to Jessica.L.Baker@usace.army.mil.
Contractors and/or potential contractors wishing to attend a pre-bid meeting held at or in LRN restricted/controlled areas (such as a Power Plant or Navigation Lock) shall submit a Nashville District (LRN) Security Access Form to the Contract Specialist five (5) calendar days prior to the site visit or meeting. If submitting the document in less than five calendar days, the bidder may not receive approval for participation. The Contract Specialist will notify the Contractor if the request is approval or denied. Any pre-bid meeting which will cover anything other than public domain information shall be limited to U.S.
Citizens, except under unique circumstances.
U.S. CITIZENS: The bidder shall submit a Nashville District Corps of Engineers U.S. Citizen Pre-Bid and/or Site Visit Request Form to the LRN Point of Contact, Contract Specialist Jessica Baker, no later than five (5) calendar days prior to the site visit. If submitting the document in less than five (5) calendar days, the bidder may not receive approval for participation. The LRN POC will notify the individual(s) if the request is approved or denied. The Security Access Form and guidance is available as a pdf attachment on www.fbo.gov with this solicitation and is titled Pre-Bid Meeting and/or Site Visit Request Form.
FOREIGN NATIONALS (FNs): All non-U.S. Citizens, including permanent residents wishing to attend the site visit must be approved in advance. FNs wishing to attend a site visit shall submit a completed Nashville District Corps of Engineers Foreign National Pre-Bid Meeting Request Form and legible color copies of two (2) of the following documents: Passport (unexpired or expired), Certificate of U.S.
Citizenship (INS Form N-560 04 N-561), Certificate of Naturalization (INS Form N-550 or N-570), unexpired foreign Passport with I- 551 stamp or attached INS Form I-94 indicating unexpired employment authorization, an Alien Registration Receipt Card with photo (INS Form I-151 or I-551), unexpired Temporary Resident Card (INS Form I-688), unexpired Employment Authorization Card (INS Form I- 688A), unexpired Reentry Permit (INS Form I-327), unexpired Refugee Travel Document (INS Form I- 571), or unexpired Employment Authorization Documentation issued by the INS which contains a photograph (INS Form I-688B) to the LRN Point of Contact, Contract Specialist Jessica Baker. These documents must be as soon as possible but no later than five (5) calendar days prior to the site visit. FN requests require approval at the Headquarters U.S. Army Corps of Engineers (HQUSACE) level.
Exceptions will be considered on a case by case basis but will be limited. The form is available as a pdf attachment on www.fbo.gov with this solicitation and is titled Foreign National Pre-Bid Meeting Request Form.
POINT-OF-CONTACT: For questions and /or concerns regarding the site visit, please contact Contract Specialist Jessica Baker via email at the address referenced above.
Rock Core Sample Viewing:
Date: 9 August 2018 Time: No later than 9:30am Central Time.
Participants will meet at—
U.S.Army Corps of Engineers Kentucky Lock Resident Office 193 Taylor Park Road Grand Rivers, KY 42045
Special Instructions- All participants are required to have personal protective equipment, i.e. hard hat, safety glasses, reflective vests, and steel-toed shoes before entering the project site.
1.11 POC for Communication/Questions: Any communications regarding this procurement must be made in writing to the Nashville Contracting Branch, Attn: Jessica Baker via email at
Jessica.L.Baker@usace.army.mil. Inquiries must identify the solicitation number, the requestor’s company name, address, email address, telephone and facsimile numbers to include area code.
Phone calls or requests to arrange meetings at the Nashville District during the solicitation period to discuss project requirements or company’s capabilities are highly discouraged and will not be scheduled.
QUESTIONS: Questions regarding the solicitation must be submitted to Jessica Baker via email at Jessica.L.Baker@usace.army.mil no later than 11:59 am, 2 August 2018, Central Time.
1.12 Amendments Prior to Date Set for Closing of IFB. The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for submission of bid. Such revisions and amendments, if any will be announced by an amendment or amendments to this IFB. If the revisions and amendments are of a nature which requires material changes in quantities or prices proposed or both, the date set for receipt of bids may be postponed by such number of days as in the opinion of the issuing officer will enable bidder to revise their bid. In such cases, the amendment will include an announcement of the new date for receipt of bid.
1.13 NOTICE TO BIDDER: Use of Class I Ozone-Depleting Substances.
a. In accordance with Section 326 of P.L. 102-484, the Government is prohibited from awarding any contract which includes a specification or standard that requires the use of a Class I ozone-depleting substance (ODS) identified in Section 601(a) of the Clean Air Act, (42 U.S.C 767a(a)), or that can be met only through the use of such a substance unless such use has been approved, on an individual basis, by a senior acquisitions official who determines that there is no suitable substitute available.
b. To comply with this statute, the Government has conducted a best effort screening of the specifications and standards associated with this acquisition to determine whether they contain any ODS requirements.
This requirement has no relationship to ODSs.
c. If the bidder possesses any special knowledge about any other ODSs required directly or indirectly at any level of contract performance, the U.S. Army would appreciate if such information were surfaced to the Contracting Officer for appropriate action. To preclude delay to the procurement, the bidder should provide any information as soon as possible after release of this IFB and prior to the submission of bids to the extent practicable. It should be understood that there is no obligation on the bidder to comply with the request and that no compensation can be provided for doing so.
2.0 WHAT, HOW AND WHERE TO SUBMIT BID
2.1 The following documents must be submitted with your IFB in original and one (1) copy:
(1) SF 1442, Solicitation, Offer and Award
a. Should include:
i. Unique Entity Identifier (previously DUNS) number
ii. CAGE number
iii. Tax Payer ID number
(2) Solicitation amendments acknowledged, if applicable
(3) Bid Schedule
(4) Original Bid Bond with Power of Attorney
(5) Representations and Certifications, unless you are currently registered in SAM.
NOTE: To establish its responsibility the bidder may be requested by the Government to submit a statement regarding previous experience in performing comparable work, business and technical organization, financial resources, and plant available to be used in performing the work. The requested statement submitted will have the following: a minimum of one (1) up-to-date banking reference for their firm and a minimum of three (3) past performance references for similar work.
a. The bank reference shall include the financial institution’s legal name, complete physical address, a point-of-contact (POC) at the financial institution, the POC’s telephone number, fax number, and email address.
b. The past performance references shall include firm’s name, the contract number, the contract period of performance and/or contract completion date, the contract’s aggregate value, a brief description of the project, a POC, the POC’s telephone number, fax number, and email address.
2.2 PUBLIC OPENING OF BIDS: Bids will be publicly opened at the time set for opening in Block 13 of the SF1442 at the Estes Kefauver Federal Building, USACE Conference Room A620 110 9th Avenue South, Nashville, Tennessee, 37203. The content will be made public for the information of bidders and others interested, who may be present. Unbalanced bids may be rejected.
2.3 Bidders shall submit sealed IFB packages to the USACE address listed below. Receipt of delivery is highly recommended. The Government will accept sealed IFB packages prior to the due date. It is highly recommended that IFB packages be received at the address listed below at least one day prior to due date to avoid a possible late bid situation. The Government will accept hand delivered packages until the time of bid closing but will not accept bids submitted via email or fax. The Government must be in receipt of your IFB by the bid closing time set forth in Block 13 of the SF1442.
If being hand delivered:
Arrive at address shown below and call Jessica Baker at 615-736-5640 or Melissa Scogin at 615-736-7917 to gain access to 6th floor from elevator lobby.
U.S. Army Corps of Engineers Nashville District Contracting Branch, CELRN-RC-N ATTN: Jessica Baker
Solicitation W912P518B0005 110 9th Avenue South, Room A-680, Sixth Floor Nashville, Tennessee 37203
Physical address for mail delivery (USPS or carrier):
U.S. Army Corps of Engineers Nashville District Contracting Branch, CELRN-RC-N ATTN: Jessica Baker
Solicitation W912P518B0005 110 9th Avenue South, Room A405 Nashville, Tennessee 37203
Faxed or emailed bids will not be accepted.
3.0 INSURANCE/BONDS:
3.1 BID BONDS (SF 24). All bidders are required to submit bid bonds with their bid. In accordance with FAR 52.228-1, Bid Guarantee, the bid guarantee amount shall be at least 20 percent of the bid price but shall not exceed $3,000,000.00.
3.2 INSURANCE. Contractor shall carry Liability and Insurance. See FAR 52.228-5, Insurance – Work on a Government Installation.
3.3 The bidder whose bid is accepted will be required to comply with the following within the time established in the invitation for bid:
a. PERFORMANCE BONDS (SF 25-A). Pursuant to FAR 52.228-15, Performance and Payment
Bonds—Construction, the penal amount of the performance bond shall equal one hundred percent (100%) of the contract price. Bonds shall be received within ten (10) calendar days after receipt of contract award.
b. PAYMENT BONDS (SF 25). Pursuant to FAR 52.228-15, Performance and Payment Bonds—
Construction, the penal amount of the payment bond shall equal one hundred percent (100%) of the contract price. Bonds shall be received within ten (10) calendar days after receipt of award.
4.0 SYSTEM FOR AWARD MANAGEMENT (SAM) AND ANNUAL REPREENTATIONS AND
CERTIFICATIONS
4.1 To be considered for award all contractors must be successfully registered in the SAM database (www.sam.gov). See FAR Clause 52.204-7, System for Award Management, as applicable for requirement information.
For SAM Customer Service, contact:
Federal Service Desk URL: www.fsd.gov Hours: 8am - 8pm (Eastern Time) US Calls: 866-606-8220 International Calls: 334-206-7828
DSN: 866-606-8220
IMPORTANT NOTICE: Effective June 29, 2018 vendors creating or updating their registration can have their registration activated prior to the approval of the required notarized letter. However, the signed copy of the notarized letter must be sent to the GSA Federal Service Desk (FSD) within 30 days of activation or the vendor risks no longer being active in SAM.
Vendors can check whether an account is active by performing a query by their CAGE or Unique Entity Identifier (known as DUNS).
The new registration process may now take several weeks, so vendors are highly encouraged to begin registering as soon as possible to avoid any possible delays in future contract awards. Remember, there is no cost to use SAM.
To find out additional information about the changes of the SAM registration process, contractors should visit the Frequently Asked Questions (FAQ) link located at the top of the SAM homepage (www.sam.gov).
4.2 Contractors shall have representations and certifications completed in www.sam.gov OR provide FAR clause 52.204-8, Annual Representations and Certifications, with paragraph (c) completed. If completing the aforementioned clause, provide with submitted bid.
5.0 SUBCONTRACTING PLAN
In accordance with FAR 19.702 any large business must agree that small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns will have the maximum practicable opportunity to participate in contract performance consistent with its efficient performance. It is further the policy of the United States that its prime contractors establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts with small business, veteran-owned small business, service disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns.
The apparent low bid, if a large business, shall submit a subcontracting plan within 5 calendar days of request.
6.0 BIDDERS CHECKLIST
All information required by the terms of the Solicitation must be furnished. MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included in but not limited to those listed below.
This checklist is furnished only to assist you in submitting a proper bid. The Government shall not be responsible for items not described below. It is not required to be return with your bid.
[ ] Is your bid properly signed by an officer of your company?
[ ] If signing on behalf of your company, have you attached evidence of your authority to sign the bid?
[ ] Have you acknowledged all amendments? Have you submitted your bid on the latest amended bid schedule?
[ ] Is the name in which you submitted your bid the same as on the bid bond?
[ ] Have you entered a unit price for each bid item?
[ ] Have you checked your bid for possible errors? Arithmetically?
[ ] Are all erasures or corrections initialed by the person signing the bid?
[ ] The Government may reject a bid as nonresponsive if it is materially and mathematically unbalanced as to price for any bid item or combination of items. A bid is unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
[ ] Is the envelope containing your bid properly identified that it is a sealed bid and does it contain the correct solicitation number and bid opening time? See FAR Clause 52.214-5, Submission of Bids.
[ ] Will your bid arrive on time? See FAR Clause 52.214-7, Late Submissions, Modifications, and Withdrawals of Bids.
[ ] Have you furnished all information required by the invitation for bids solicitation and/or the specifications?
7.0 CONTRACTOR FEEDBACK
Help us in BUILDING STRONG. Please provide us with your feedback, comments and recommendations for improvement by visiting our Interactive Customer Evaluation (ICE) website at:
http://ice.disa.mil/index.cfm?fa=card&service_provider_id=110824&site_id=856&service_categ ory_id=14
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
AMENDMENT 0001
The purpose of this amendment is to:
1.Extend the due date to receive questions to no later than 11:59 p.m., 2 August 2018, Central Time.
2. Schedule a time and location for bidders to view rock core samples. See paragraph 1.10 of the Instructions to Bidders for details.
3. Update clause 52.252-3.
AMENDMENT 0002
The purpose of this amendment is to:
1. Post Q&A Set 1.
2. Update clause 52.252-3.
AMENDMENT 0003
The purpose of this amendment is to:
1. Provide Q&A Set 2.
2.Extend the bid due date.
3. Provide revised bid schedule.
4. Revise specification sections and drawing numbers as described in the "AM3 Technical Changes" section below.
5.Add FAR clause 52.228-5.
6. Provide revised section 00 73 00 Supplementary Conditions.
7. Update clause 52.252-3
AMENDMENT 0004
The purpose of this amendment is to:
1.Provide Q&A Set 3.
2.Provide revised Maintenance Building drawings.
3.Revise specification sections and drawings as described in the "AM4 Technical Changes"section below.
4.Revise the Conference Room number for the public opening of bids in INSTRUCTIONS TO BIDDERS paragraph 2.2.
5.Update clause 52.252-33
(End of Summary of Changes)