Downstream Lock Excavation Construction Contract Federal contract opportunity
Solicitation number
W912P518B0005
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

Amendment 0003 W912P518B0005

View the file

Other files for this federal contract opportunity

Other files attached to Downstream Lock Excavation Construction Contract, newest first.
File Type Posted
BID_OPENING_W912P518B0005_ABSTRACT_OF_OFFERS.pdf PDF
Bid_Opening_Attendance_Sign_In_Sheet.pdf PDF
W912P518B0005_TPlans-Am4Sheets.pdf PDF
W912P518B0005_TSpecs-Am4Pages.pdf PDF
W912P518B0005_0004.pdf PDF
W912P518B0005_TPlans-Am3Sheets.pdf PDF
W912P518B0005_TSpecs-Am3Pages.pdf PDF
Amendment_0002_W912P518B0005.pdf PDF
Amendment_0002_Answer_26_KY_Lock_2017_Annual_Maintenance_Report.pdf PDF
Amendment_0002_Answer_25_ABS_Submersible_Backup_Pump.pdf PDF
Amendment_0002_Answer_25_AS-LEFT_DEWATERING_ASB.pdf PDF
Amendment_0002_Answer_26_KY_Lock_2017_Annual_Maintenance_Report.pdf PDF
Amendment_0002_Answer_25_ABS_Submersible_Backup_Pump.pdf PDF
Amendment_0002_Answer_25_AS-LEFT_DEWATERING_ASB.pdf PDF
Amendment_0002_W912P518B0005.pdf PDF
Amendment_0001_W912P518B0005.pdf PDF
KYL_Lock_Excavation_July2018_PreBid_v2.pdf PDF
Site_Visit_Attend_Sign-In_Sheet.pdf PDF
W912P518B0005_TPlans_2_of_2.pdf PDF
W912P518B0005_Solicitation.pdf PDF
W912P518B0005_TPlans_1_of_2.pdf PDF
Site_Visit_Form.pdf PDF
Foreign_National_Registration_Form.pdf PDF
W912P518B0005_TSpecs.pdf PDF
Site_Visit_Form.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W38XDD80750959

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1. Provide Q&A Set 2.

2.Extend the bid due date.

3. Provide revised bid schedule.

4. Revise specification sections and draw ing numbers as described in the "AM3 Technical Changes" section below .

5.Add FAR clause 52.228-5.

6. Provide revised section 00 73 00 Supplementary Conditions.

7. Update clause 52.252-3

1. CONTRACT ID CODE PAGE OF PAGES

J 1 33

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912P518B0005

X 9B. DATED (SEE ITEM 11)

13-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Aug-2018

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, RM A405

NASHVILLE TN 37203

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912P518B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

Q&A SET 2

IFB No. W912P518B0005 Amendment No. 0003

Downstream Lock Excavation Kentucky Lock

Grand Rivers, Kentucky Questions and Answers

Set 2

26. Question: Do you foresee any gaps in options where contractor will have to completely move in/out of site? If so, what is the duration of the gap?

Answer: No. The period of performance for the base contract and options have been designed along with the expiration dates to exercise the options such that no gaps will be possible.

27. Question: Government supplied stop log inbeds. Are there provisions for fabrication tolerance issues stemming from fabrication errors? Is there as builts for the fabricated dimensions and stud locations?

Answer: See revised Technical Drawing 68N200-10.

28. Question: What is the actual completion date of the downstream cofferdam work?

Answer: See revised Specification Section 01 00 00 Paragraph 1.3 for the revised date for access to the Downstream Cofferdam work area.

29. Question: Can the strand anchors be installed simultaneously inside of the corrugated as shown in the presentation from the 2010 contract?

Answer: The requirements for installation of the strand anchors are shown in the Plans and in Specification Section 31 68 13 Lock and Cofferdam Stability Anchors.

30. Question: Section 1.11 of the solicitation states that cutoff time for questions is july 30 at 9:00 am. This does not give the contractors enough time and we request that the deadline be changed to August 10 COB.

Answer: Q&A was extended to no later than 11:59 p.m., 2 August 2018, Central Time in Amendment 0001.

31. Question: We request an extension of Q&A submission by two weeks.

Answer: Reference the Government’s response to Question #30.

32. Question: Can the question period be extended?

33. Question: Will grouting data from the upstream monolith contract be made available?

Answer: Yes, see attachment "Upstream Monolith Grout Curtain Plots".

34. Question: Could you place CAD drawings for the KY Lock excavation project on your web site?

Answer: All CADD drawing files, with the exception of the Maintenance Building, will be made available through AMRDEC SAFE. Bidders who would like access to the files are to submit their request to Jessica Baker at jessica.l.baker@usace.army.mil by August 21, 2018. The request must identify the solicitation number and a specific e-mail address.

The requestor will receive a link to access the AMRDEC SAFE at the e-mail address provided within 1-2 business days after receipt of request.

Data contained on these electronic CADD files shall not be used for any purpose other than as a convenience in the preparation of bids for the referenced project and are not to be copied or reused for any other purpose or project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government.

The Contractor shall make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files.

The Contractor shall, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.

These electronic CADD drawing files are a part of the process of developing the contract plans and are not construction documents. Differences may exist between the CADD files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic CADD files, nor does it make representation to the compatibility of these files with the Contractors hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished CADD files, the signed and sealed construction documents shall govern. The Contractor is responsible for determining if any conflict exists. Use of these CADD files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project.

The attached files may be considered sensitive information and should be transmitted only to those with specific use in support of the referenced project. The Contractor and all subsequent users agree to limit file distribution accordingly, and to provide a copy of this disclaimer to any subsequent users.

35. Question: Options 5aa and 5ab have a duration of 24 days which is considered to be insufficient for this scope. We’d request this period be extended to a minimum of 45 days.

Answer: See revised Specification Section 01 00 00 Paragraph 1.3 for additional lock closure provisions.

36. Question: Sheet 61N241-14A, Note 7 is missing.

Answer: See revised Technical Drawing 61N241-14A.

37. Question: Section 31 68 13 3.1.7 states “The bone zone portion of the anchor holes which fail the water tightness test shall be grouted with cement grout…” Later in the same section it is stated “The hole shall be tremied to the top of the hole…” Please clarify.

Answer: See revised Technical Specification 31 68 13, Paragraph 3.1.7.

38. Question: Section 31 68 13, 1.3.3 specifies “Corrosion Protection - Class I, per PTI DC35.1. However, epoxy-coated strand tendons are not permitted.” Drawing 61N241- 14A, Post Tensioned Strand Anchor Detail has a note that reads “If corrugated sheath is used, fill inside and outside of corrugated sheath with cement grout.” Please clarify.

39. Question: Please clarify if all anchors receive caps or just detressable anchors?

Answer: See revised Technical Drawing 61N241-14A and Technical Specification 31 68 13, Paragraph 2.2.3.

40. Question: Section 31 68 13, 3.1.3 specifies a maximum 3-ft over drill whereas Drawing 61N241-14A, Post Tensioned Strand Anchor Detail specifies a maximum of 5-ft. Please clarify.

41. Question: Sheet 61N241-31, stressing table provides an installation elevation of 342 for AN22-1. Section A depicts an elevation of 320. Please clarify. In addition, AN22-2 is missing from the stressing table.

Answer: See revised Technical Drawing 61N241-31.

42. Question: Regarding the load cells, drawing 61N851-20, note 1 requires 1 load cell per monolith on an inclined anchor. Drawing 61N241-14A, note 9 requires a load cell on each anchor to be performance tested. Can the contractor assume overlapping the required load cell and performance test to reduce the overall quantity of load cells.

Answer: Yes. See revised Technical Drawing 61N241-14A.

43. Question: The bid tab has Clearing and Grubbing units as Acres with no Quantities. Can the quantities be provided for these items?

Answer: See revised bid schedule.

44. Question: Is it safe to assume the existing panel and generator will be big enough to feed the downstream dewatering system?

Answer: No. Reference the Government’s response to Question #s 11 and 12 in

Amendment 0002.

45. Question: For the design of the support system, what is the weight of the RT Crane and the max load it will handle?

Answer: The weight of the crane can be found in Technical Specification 41 22 01, Paragraph 1.3.1.

46. Question: Spec Section 31 00 00 paragraph 1.4.6.1 Does the blasted rock hauled to stockpile need to be sized down to 18" minus to be wasted?

Answer: No, there is no size restriction for blasted rock being taken to Disposal Area D.

47. Question: Spec Section 31 00 00 paragraph 1.4.6.1 Should blasted rock be used as stockpile material? If so, should the blast rock be sized to 18" minus?

Answer: The contractor may use blasted rock for site work, as needed to create ramps, haul roads, etc. It is up to the contractor to design the material gradation of the rock required for these purposes.

48. Question: Spec Section 31 00 00 paragraph 1.4.7 Should blast rock be stockpiled to be used as rip rap for the project of future projects?

Answer: Blasted rock will be disposed of in Disposal Area D. Rock and overburden materials placed in the disposal area are to be segregated for potential future use as backfill materials. There is no specific quantity of blasted rock to be stockpiled.

Paragraph 1.4.7 will be removed from specification 31 00 00.

49. Question: Spec Section 31 00 00 paragraph 1.4.8 Structural Backfill- What quantity is required for stockpile? What is the location of the stockpile?

Answer: There is no requirement to stockpile structural backfill. Paragraph 1.4.8 will be removed from specification 31 00 00.

50. Question: Spec Section 31 00 00 paragraph 1.5.1.2 Rock Excavation: Can we submit a plan for rock excavation which utilizes exploratory drilling and test pitting?

Answer: The contractor that receives the award may submit alternate methods of excavation, which must be approved by the Contracting Officer's Representative.

51. Question: Is the overburden required to be removed for rock quantity qualification prior to blasting of rock?

Answer: Yes, overburden must be removed to facilitate a survey of top of rock for quantity calculations and to allow the blaster to properly design each shot, based on geologic conditions. See Section 01 22 00 for specific requirements for overburden and rock excavation measurement.

52. Question: Request the extension of question and answer period till 2 weeks before the Bid Date?

53. Question: Can the shop drawings for the Utility Relocate contract be provided to understand what will be in place during this contract?

Answer: Shop Drawings are not currently available. They will be available upon request after award.

54. Question: Can we get the TOP OF ROCK elevations in CAD for takeoff?

Answer: Note that top of rock contours are estimated from borings. See notes 3 and 5 on drawing sheet 61N651-20. Reference the Government’s response to Question #34 for instructions on obtaining CADD drawing files.

55. Question: Are their proposed grades for the Disposal Area Primary D or any other disposal area? Are their clearance issues with the disposal areas and overhead lines?

Answer: See sheet 61N247-74 notes 5 and 7.

56. Question: Loading limits of the existing lock?

Answer: See revised Technical Specification 01 00 00, Paragraph 1.6.3

57. Question: Loading limits of the existing bridge structures?

Answer: See revised technical specification section 02 41 00.02, paragraph 1.5.1 for bridge loading during construction.

58. Question: Can we drill and shoot the rock below 330 prior to tensioning the anchor system?

Answer: See drawings 61N241-18 thru 61N241-34 for anchor stressing schedule. See Specification Section 31 23 05, paragraph 3.1 for restrictions on excavation near anchors.

59. Question: Does the counterweight need to be per the detail in the plans or can the contractor implement their own design as long as it meets the weight and stability requirements?

Answer: The Contractor may submit a different design for the counterweight. See revised Technical Specification 02 41 00.02, Paragraph 1.5.1.

60. Question: Does the existing condition grading file accurately depict the current conditions at the Phase I monolith construction?

Answer: The topographical surface provided near the upstream monoliths represents the most recent survey data and is believed to be reasonably accurate relative to the current field conditions. Site topography is subject to change due to ongoing operations of the current contractor.

61. Question: Since Phase 1 and 2 overburden excavations will be a done at a different time than phase 3 overburden excavation there will be a need to lay back the material. See attached drawing for a visual representation:

a. Will be the required slope be 1.5:1?

b. Since it will be approximately a 93 ft slope will it be required to have any benches? If so how many?

c. Will the toe of the slope be starting at station 8+00 or is the top of the slope at 8+00? If the top of the slope is at 8+00 it will significantly hinder the amount of work done in Phase 1 and 2 overburden excavations as well as the corresponding rock excavation. We would prefer the toe to start at station 8+00 and lay back into phase 3

d. If allowed to have the toe start at station 8+00 and the lay back slope into the Phase 3 overburden excavation will we need to take any preventive measures in regards to the tailwaters?

Answer: Refer to specification section 31 00 00 and drawing 61N651-19.

62. Question: Is the excavation limits line on Page 61N651-19, excavation plan, the proposed end of the finish grading?

Answer: See sheet 61N651-19 note 3.

63. Question: Please extend the bid date 1 month for our team to adequately establish the price for the project.

Answer: The bid due date has been extended to September 6, 2018 at 1:00 PM local time.

64. Question: After reviewing the ‘Stoplog Recess Plan’ in the Downstream Lock Excavation solicitation documents (W912P518B0005) I was taken back by the short period allowed for the bulkhead slot installation.

Our firm has constructed approximately 60 main chamber bulkhead slots on the Upper Mississippi River and I know for a fact that this work can’t be safely completed in such an abbreviated period. Please reconsider the performance period for this feature of work. I would recommend extending that period to at least 60 calendar days.

Answer: Reference the Government’s response to Question #35.

65. Question: Please clarify the types and level of insurance coverages required under the contract.

Answer: See revised section 00 73 00 SCHEDULE OF INSURANCE.

66. Question: What are the load restrictions with respect to length, wheel load, total load, length, and height that can be transported on the highway over Kentucky Dam as well as the height between the lock and Kentucky Dam?

Answer: Reference the Government’s response to Question #57 for bridge load restrictions.

67. Question: What are the load restrictions with respect to length, wheel load, total load, length, and height that can be transported on the highway over between the lock and the disposal site by the US 62/641 bridge over the abandoned P & L Railway?

Answer: Reference the Government’s response to Question #57 for bridge load restrictions.

68. Question: Reference Section 02 41 00.02 “Bridge Demolition”; Paragraph 3.4.1 “Regulation of Removed Materials” states: “ … The maximum particle size of material to be placed in government designated disposal areas shall be three feet (36 inches) in the longest dimension.” The bridge deck may be removed in pieces that have dimensions exceeding 36”. Can these pieces be disposed of in the government designated disposal areas if they are buried or covered with soil?

Answer: Bid as specified. However, the Contractor may submit a request for information to vary the size of debris allowed by the Technical Specifications post award. The Government considers all Contractor requests for information and makes determinations based on contract requirements and benefit to the Government.

69. Question: Does the Support Floor Beam that is shown on Drawing 80N760-5 have to be installed before any of the concrete deck can be removed from US 61 Highway Bridge?

Answer: Yes. See "Construction and Demolition Sequence" notes on Drawing 80N760-3.

70. Question: Drawing 80N760-8, Note 1 states: “REMOVE SLAB CURB & SIDEWALK WITHIN STAGE LIMITS. ….” and includes the wording “LIMITS OF REMOVAL 85’-0” DEMOLTION STAGE 1” . Drawings 80N760-9 and 80N760-10 show additional “Stages” of demolition. Does this mean the concrete deck, including curbs and sidewalks, cannot be removed completely from the West Abutment to the East Abutment before removing the structural steel members?

Answer: See Note "Demolition Methods" on technical drawing 80N760-1A for notes on alternative demolition sequence.

71. Question: Drawing 80N760-13 provides a basic cross section through the railroad bridge.

However, there are no details that show structural member anchorages that connect concrete ballast to structural members, reinforcing steel layout, or structural members that may cast into the concrete ballast. Can the contractor assume the concrete ballast does include any of these features? If they are present, what are their dimensions and their frequency? Are any drawings available that can provide more detail regarding how the concrete ballast is or isn’t connected to the structural steel members?

Answer: As-Built drawings of the former railroad bridge and former powerhouse access bridge have been added to the reference drawings.

72. Question: Are any drawings available that provide structural details of the P & L Railway Bridge?

Answer: Reference the Government’s response to Question #71.

73. Question: Was some sort of stay in place form left between the 4-1/4” I-beams that are mentioned throughout the drawings for demolition of the US 61 Highway bridge and the former access road bridge?

Answer: Yes. See Reference Drawing 80H436 R1 for more details.

74. Question: Drawing number 61N241-18 shows a total of QTY. 7 anchors to be installed in EL-16. Drawing number 61N241-24 indicates QTY. 5 anchors to be installed in EL-16.

Please clarify the quantity of anchors to be installed in EL-16.

Answer: See revised Technical Drawing 61N241-18.

75. Question: The Contractor has attempted to obtain drawings for the four existing bridges that will be demolished in SOLICITATION NO. W912P518B0005. The drawings are listed on Stantec Drawing 80N760-1A. We contacted several government agencies and were not successful in obtaining any of the drawings. Please provide the referenced drawings for the four existing bridges that get demolished in SOLICITATION NO.

W912P518B0005.

76. Question: Has a hazardous material survey been performed for the existing maintenance building scheduled for demolition? If so, please provide. If not, will the contractor have to provide prior to demolition?

Answer: See Paragraph 1.2.1 of Section 02 41 00 in Appendix A of the Specifications.

No asbestos or lead paint are anticipated to be in this existing structure.

77. Question: There is an existing riprap swale within the US lock excavation on the NE side.

Does this swale generate/affect any dewatering scope? Can a volume be provided?

Answer: This riprap is for slope stabilization not related to drainage and does not contribute to the dewatering volume any more so than the rest of the excavation.

78. Question: Are there any elevation limits to any of the disposal areas?

Answer: No, but the requirements of note 7 on drawing 61N247-74 must be met.

79. Question: CLIN 3201-00 of the Base Bid Schedule refers to a “Temporary Maintenance Building”. Please clarify if this is intended to be the CLIN for the New Maintenance Building, what is the significance of the word “Temporary”

Answer: See the revised Bid Schedule and section 01 22 00 for revised CLIN 3201-00 name of "Maintenance Building".

80. Question: Drawing 61N241-18 appears to have redundant anchor numbering in Monolith EL16. There is a vertical anchor on the lock side numbered AN16-3 and a vertical anchor on the land side also numbered AN16-3. In cross-referencing Drawing 61N241-24, it appears that the land side vertical anchor labeled AN16-3 is not required. Furthermore, Drawing 61N241-18 shows 4 anchors on the land side and the details on Drawing 61N241-24 only show two anchors on the land side. Please clarify.

81. Question: Drawing 61N241-18 appears to have anchors in Monolith 18A mislabeled as AN17-8 and AN17-9. Please clarify.

82. Question: Specification 01 00 00 Page 16 Paragraph 1.21.2.1 Option 1 states there are vertical anchors in Monoliths EL-22 thru EL-25. We only find four vertical anchors in Monolith EL-25. No vertical anchors are called for in Monoliths EL-22 thru EL-24. Please clarify.

Answer: See revised Paragraph 1.21.2.1 of Section 01 00 00 for clarification.

83. Question: Specification 01 00 00 Page 17 Paragraph 1.21.2.3 Option 3 states there are inclined anchors in Monoliths EL-24 and EL-25. There is no reference to the inclined anchors in Monoliths EL-22 and EL-23. Please clarify.

Answer: See revised Paragraph 1.21.2.3 of Section 01 00 00 for clarification.

84. Question: Can work be done on the demolition of the existing structures over the existing lock during non-outage periods (with barge traffic below the work area) if adequate debris capture is provided?

Answer: Yes, if it can be demonstrated to be safe after review and approval of the contractor's demolition plan by the Contracting Officer and the U.S. Coast Guard.

85. Question: May USACE provide an inventory of the permanent materials they will be providing? i.e. Stop logs

Answer: Yes. See revised Technical Drawing 68N200-10.

86. Question: The work in Option 5, the bulkhead slots for the stoplogs, seems to run parallel to the demo of the bridges above. We believe this will be a safety concern and are asking for an extension on the 24 day shutdown of the existing lock.

87. Question: Also after speaking with others that have prior experience retrofitting bulkhead slots, we believe it will be another driver for needing an extension. We kindly request to allocate 60 days for the lock shutdown.

88. Question: Specification Section 32 23 06 There are potentially conflicting wording in the blasting specs regarding the use of blast mats – can the requirement for the use of blasting mats be clarified?

a.3.2.6 “The Contracting Officer's Representative may require blasting mats for shots downstream of 8+00.”

b. 3.2.11 “Protective blasting mats shall be kept onsite and used on shots when flyrock is a concern.

c.3.3.1 “The Contractor shall cover all production shots with blasting mats.”

d.3.7.5 “Blast mats are required for all blasts upstream of station 8+00 to prevent flyrock.”

Answer: Blasting mats are required upstream of station 8+00 to protect the operating lock and new upstream monoliths from potential flyrock. Blasting mats are not required downstream of station 8+00, unless, in the opinion of the COR, they are necessary to prevent flyrock. The referenced paragraphs have been amended to clarify when the use of blasting mats is required, see section 31 23 06.

89. Question: Please provide clarification on any temporary matting that will need to be put down during the process of excavation, i.e.. Between Option 6 and 9.

Answer: Erosion control matting is required on permanent soil slopes, as described in the notes of the excavation section drawings 61N651-21 to 61N651-27. Matting is not required for temporary slopes except where required under specification 01 57 19 Temporary Environmental Controls.

90. Question: Specfication Section 31 60 00 paragraph 3.1.1 Is there any need for shotcrete on the job? It is show in specifications but not included in the bid item list. If it is required please refer to where.

Answer: After award, the contractor will be required to submit, for approval, a slope protection plan that may include shotcrete, or other method proposed by the contractor on an as needed basis, as described in specification 31 23 05 Lock Excavation, paragraph

3.6. Section 31 60 00 has been amended to remove the reference to shotcrete.

91. Question: In Disposal Area D are there any height restrictions for grading or any restrictions for how far away from the water it needs to be?

Answer: See Technical Drawings 61N247-74 and 61N247-75.

92. Question: May you provide the design requirements for the debris shield to be installed underneath the demolition of the bridges? Loadings?

Answer: No. See revised Technical Drawing 80N760-1A.

93. Question: Diaphragms and stringers of the existing bridges to be removed extent to the same elevation (Low chord) obstructing the access under the bridge. A demo shield placed

1 foot below the low chord will not provide access to work under the bridge. The bottom of the debris shield should be located at least 4.5 feet underneath the carrier beams so that someone is able to move from section to section under the bridge?

Answer: See Demolition General Notes on revised Technical Drawing 80N760-1A.

94. Question: How the erection of the containment system or any access under the bridge is expected? Will this need to happen during the lock shutdown period?

Answer: Reference the Government’s response to Question #93.

95. Question: May you provide the railroad as-built plans.

96. Question: How the personnel performing Lead abatement will access underneath the bridge if the containment system is only 1 foot below the girders?

97. Question: If a containment system is not necessary. Any other access method, i.e.

manlifts, will as well encroach into the channel.

98. Question: Please extend the question and answer period till 2 weeks before the Bid Date.

To allow sufficient time for our specialized subcontractors and vendors to review the documents.

99. Question: Please extend the bid date 1 month for our team to adequately establish the price for the project.

100. Question: Base Bid Schedule CLIN 3130-00 Clearing and Grubbing has no Estimated Quantity. Please provide a quantity.

101. Question: Option 6 Bid Schedule CLIN 3130-06 Clearing and Grubbing has no Estimated Quantity. Please provide a quantity.

102. Question: Option 9 Bid Schedule CLIN 3130-09 Clearing and Grubbing has no Estimated Quantity. Please provide a quantity.

103. Question: RE: Drawing 61N852-17: Please confirm that the instrumentation needs to be replaced as indicated by clouds on the drawing. The drawing also states the contactor will take over the instrumentation in January 2017 – please clarify.

Answer: Yes, clouded instrumentation must be replaced. See Revised Drawing 61N852- 17, the reference to January 2017 was made in error and has been corrected.

104. Question: RE: Section 13 50 00, Subsection 1.1.1.b. New Components on Existing Lock and Upstream Cofferdam: This subsection lists additional instruments as “new”. Please confirm if the instrumentation on the Upstream Cofferdam is existing or needs to be installed.

Answer: Clouded instrumentation on Drawing 61N852-17 must be replaced.

105. Question: RE: Section 13 50 00, Subsection 3.4.2 Inclinometer Monitoring: This subsection states manually read inclinometers are to be read once a day during the unwatering test period. Please provide the number of manually read inclinometers in the project. (We only observed in-place inclinometers on the drawings.)

Answer: There are currently no plans for manually read inclinometers. If used, they would adhere to the reading schedule in the subject paragraph.

106. Question: RE: Section 13 50 00, Subsection 3.13 Maintenance, Reliability, & Replacement. Should the anticipated rates of failures shown be applied to both existing and instruments installed as part of this project?

Answer: Yes, assume it applies to both existing and new.

107. Question: Can the contractor elect to utilize on one disposal area?

Answer: Yes, but clean overburden material must be stockpiled such that it can be easily accessed for use as backfill in the future.

108. Question: Can the blasting consultant not work for any blasting material supplier for manufacture or just the one for the project?

Answer: The Blasting Consultant may not work for the supplier of the blasting materials used on this project. The intent is for the Consultant to be an independent expert. See section 31 23 06, para. 3.4.1.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 28-Aug-2018 01:00 PM to 06-Sep-2018 01:00 PM.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been added by full text:

AM3 BID SCHEDULE

Kentucky Lock Downstream Lock Excavation, W912P5-18-B-0005 Amendment 0003 Base Bid Schedule

Maintenance Building Relocation, Bridge Demolition, Phase 1 Instrumentation, Phase 1 Post-Tensioned Anchors, Position Crane, Phase 1 Overburden Excavation, & Landwall Grating

BID ITEM DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-00 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0102-00 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $ 0103-00 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0105-00 Diversion and Care of Water (U/S Monoliths) 01 57 24 17 Month $ $

02 Div 02; Existing Conditions 0201-00 Demolish Maintenance Building 02 41 00.02 1 Job $ $ 0202-00 Partial Demolition of Existing Lock Bridges 02 41 00.03 1 Job $ $ 0204-00 Demolish Highway over railroad Bridge 02 41 00.03 1 Job $ $ 0207-00 Refurbish Crane 1 Job $ $ 0208-00 Personnel Hoist 1 Job $ $

05 Div 05; Metals 0501-00 Fabrication and Installation of Landwall Grating 05 50 15 1 Job $ $

13 Div 13; Special Construction 1301-00 Installation of US Cofferdam and Lock Wall

Instrumentation 13 50 00 1 Job $ $

1303-00 O&M Phase 1 Instrumentation Program 13 50 00 17 Month $ $ 31 Div 31; Earthwork

ANCHORS

3101-00 Drill 13" Anchor Hole (Vertical, in concrete) 31 68 13 394 LF $ $ 3102-00 Drill 13" Anchor Hole (Vertical, in rock) 31 68 13 260 LF $ $ 3105-00 Drill 15" Anchor Hole (Vertical, in concrete) 31 68 13 1395 LF $ $ 3106-00 Drill 15" Anchor Hole (Vertical, in rock) 31 68 13 1136 LF $ $ 3109-00 Borehole Camera Log (Anchors) 31 68 13 7 EA $ $ 3110-00 Watertightness Testing 31 68 13 28 EA $ $ 3111-00 Pregrouting Holes 31 68 13 479 CF $ $ 3112-00 Redrilling Pregrouted Holes 31 68 13 405 LF $ $ 3113-00 Watertightness Testing of Full Anchor Length

Encapsulation

31 68 13 18 EA $ $

3114-00 Anchors, 30-Strand 31 68 13 652 LF $ $ 3117-00 Anchors, 50-Strand 31 68 13 2136 LF $ $ 3118-00 Anchors, 61-Strand 31 68 13 395 LF $ $ 3119-00 Anchor Installation, 30-Strand (Vertical) 31 68 13 4 EA $ $ 3123-00 Anchor Installation, 50-Strand (Vertical) 31 68 13 12 EA $ $

3125-00 Anchor Installation, 61-Strand (Vertical) 31 68 13 2 EA $ $ 3127-00 Performance Tests 31 68 13 2 EA $ $ 3128-00 Proof Tests 31 68 13 16 EA $ $

EXCAVATION

3130-00 Clearing and Grubbing 31 11 00 11 Acre $ $ 3131-00 Overburden Excavation 31 00 00 132,000 CY $ $ 3132-00 Rock Excavation 31 23 05 5,000 CY $ $

32 Div 32; Exterior Improvements 3201-00 Maintenance Building 1 Job $ $ 3202-00 Seeding 32 92 19 1 Job $ $ 3203-00 Erosion Control 17 Month $ $

BASE

ESTIMATED

AMOUNT

Kentucky Lock Downstream Lock Excavation, W912P5-18-B-0005

Option 1 Bid Schedule Phase 2 Post-Tensioned Anchors

BID

ITEM

DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-01 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0102-01 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $ 0103-01 Maintenance and Protection of Traffic 01 50 00 1 Job $ $

31 Div 31; Earthwork

ANCHORS

3105-01 Drill 15" Anchor Hole (Vertical, in concrete) 31 68 13 295 LF $ $ 3106-01 Drill 15" Anchor Hole (Vertical, in rock) 31 68 13 186 LF $ $ 3109-01 Borehole Camera Log (Anchors) 31 68 13 1 EA $ $ 3110-01 Watertightness Testing 31 68 13 6 EA $ $ 3111-01 Pregrouting Holes 31 68 13 104 CF $ $ 3112-01 Redrilling Pregrouted Holes 31 68 13 84 LF $ $ 3113-01 Watertightness Testing of Full Anchor Length

Encapsulation

31 68 13 4 EA $ $

3117-01 Anchors, 50-Strand 31 68 13 480 LF $ $ 3123-01 Anchor Installation, 50-Strand (Vertical) 31 68 13 4 EA $ $ 3127-01 Performance Tests 31 68 13 1 EA $ $ 3128-01 Proof Tests 31 68 13 3 EA $ $

OPTION 1

Option 2 Bid Schedule Phase 3 Post-Tensioned Anchors

DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

01 Div 01; General Requirements

0101-02 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0102-02 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $ 0103-02 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0105-02 Diversion and Care of Water (U/S Monoliths) 01 57 24 5.5 Month $ $

13 Div 13; Special Construction 1303-02 O&M Phase 1 Instrumentation Program 13 50 00 5.5 Month $ $

31 Div 31; Earthwork

ANCHORS

3103-02 Drill 13" Anchor Hole (Inclined, in concrete) 31 68 13 451 LF $ $ 3104-02 Drill 13" Anchor Hole (Inclined, in rock) 31 68 13 630 LF $ $ 3105-02 Drill 15" Anchor Hole (Vertical, in concrete) 32 68 13 95 LF $ $ 3106-02 Drill 15" Anchor Hole (Vertical, in rock) 33 68 13 123 LF $ $ 3107-02 Drill 15" Anchor Hole (Inclined, in concrete) 31 68 13 851 LF $ $ 3108-02 Drill 15" Anchor Hole (Inclined, in rock) 31 68 13 1575 LF $ $ 3109-02 Borehole Camera Log (Anchors) 31 68 13 2 EA $ $ 3110-02 Watertightness Testing 31 68 13 47 EA $ $ 3111-02 Pregrouting Holes 31 68 13 727 CF $ $ 3112-02 Redrilling Pregrouted Holes 31 68 13 636 LF $ $ 3113-02 Watertightness Testing of Full Anchor Length

Encapsulation

31 68 13 31 EA $ $

3114-02 Anchors, 30-Strand 31 68 13 1080 LF $ $ 3117-02 Anchors, 50-Strand 31 68 13 1702 LF $ $ 3118-02 Anchors, 61-Strand 31 68 13 942 LF $ $ 3120-02 Anchor Installation, 30-Strand (Inclined) 31 68 13 10 EA $ $ 3123-02 Anchor Installation, 50-Strand (Vertical) 30 68 13 2 EA $ $ 3124-02 Anchor Installation, 50-Strand (Inclined) 31 68 13 12 EA $ $ 3126-02 Anchor Installation, 61-Strand (Inclined) 31 68 13 7 EA $ $ 3127-02 Performance Tests 31 68 13 2 EA $ $ 3128-02 Proof Tests 31 68 13 29 EA $ $

32 Div 32; Exterior Improvements 3203-02 Erosion Control 5.5 Month $ $

OPTION 2

Option 3 Bid Schedule Phase 4 Post-Tensioned Anchors

DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-03 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0102-03 Premiums for Performance and Payment Bonds 01 22 00 1 Job $ $ 0103-03 Maintenance and Protection of Traffic 01 50 00 1 Job $ $

31 Div 31; Earthwork

ANCHORS

3103-03 Drill 13" Anchor Hole (Inclinded, in concrete) 31 68 13 174 LF $ $ 3104-03 Drill 13" Anchor Hole (Inclined in rock) 31 68 13 298 LF $ $ 3105-03 Drill 15" Anchor Hole (Vertical, in concrete) 31 68 13 103 LF $ $ 3106-03 Drill 15" Anchor Hole (Vertical, in rock) 31 68 13 93 LF $ $

3107-03 Drill 15" Anchor Hole (Inclined, in concrete) 31 68 13 212 LF $ $ 3108-03 Drill 15" Anchor Hole (Inclined, in rock) 31 68 13 96 LF $ $ 3109-03 Borehole Camera Log (Anchors) 31 68 13 3 EA $ $ 3110-03 Watertightness Testing 31 68 13 16 EA $ $ 3111-03 Pregrouting Holes 31 68 13 239 CF $ $ 3112-03 Redrilling Pregrouted Holes 31 68 13 220 LF $ $ 3113-03 Watertightness Testing of Full Anchor Length

Encapsulation

31 68 13 10 EA $ $

3114-03 Anchors, 30-Strand 31 68 13 189 LF $ $ 3115-03 Anchors, 37-Strand 31 68 13 282 LF $ $ 3116-03 Anchors, 45-Strand 30 68 13 308 LF $ $ 3117-03 Anchors, 50-Strand 31 68 13 196 LF $ $ 3120-03 Anchor Installation, 30-Strand (Inclined) 31 68 13 2 EA $ $ 3121-03 Anchor Installation, 37-Strand 31 68 13 3 EA $ $ 3122-03 Anchor Installation, 45-Strand 32 68 13 3 EA $ $ 3123-03 Anchor Installation, 50-Strand (Vertical) 31 68 13 2 EA $ $ 3127-03 Performance Tests 31 68 13 1 EA $ $ 3128-03 Proof Tests 31 68 13 9 EA $ $

OPTION 3

Option 4 Bid Schedule Specialized Grouting

BID ITEM DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-04 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0102-04 Premiums for Performance and Payment

Bonds 01 22 00 1 Job $ $

0103-04 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 02 Div 02; Existing Conditions

0209 Core Drilling 02 32 00 0209A-04 First 1,500 Linear Feet 02 32 00 1500 LF $ $ 0209B-04 Over 1,500 Linear Feet 02 32 00 358 LF $ $

31 Div 31; Earthwork

GROUTING

3140 Drill Grout Holes in Rock 31 32 23 3140A-04 First 5,747 Linear Feet 31 32 23 5,747 LF $ $ 3140B-04 Over 5.747 Linear Feet 31 32 23 992 LF $ $

3141 Drill Grout Holes in Overburden/Cell Fill 31 32 23 3141A-04 First 3,042 Linear Feet 31 32 23 3,042 LF $ $ 3141B-04 Over 3,042 Linear Feet 31 32 23 800 LF $ $

3142 Drill Grout Holes in Concrete 31 32 23 3142A-04 First 3,574 Linear Feet 31 32 23 3,574 LF $ $ 3142B-04 Over 3,574 Linear Feet 31 32 23 466 LF $ $ 3144-04 Falling Head Permeability Testing

(Hydraulic)

31 32 23 760 EA $ $

3145 Portland Cement in Grout 31 32 23

3145A-04 First 17,026 Cubic Feet 32 32 23 17,026 CF $ $ 3145B-04 Over 17,026 Cubic Feet 33 32 23 3,277 CF $ $ 3146-04 Grouting Connections 31 32 23 912 EA $ $

3147 Placing Grout 31 32 23 3147A-04 First 41,232 Cubic Feet 32 32 23 41,232 CF $ $ 3147B-04 Over 41,232 Cubic Feet 33 32 23 7,935 CF $ $ 3148-04 Government Requested Standby -

Grouting

31 32 23 40 HR $ $

3149-04 Televiewer Survey 31 32 23 2724 LF $ $ 3151-04 Re-Drill Grout Holes in Rock 31 32 23 1720 LF $ $

OPTION 4

Option 5aa Bid Schedule Cutting Downstream Bulkhead Slots

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-05aa Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0102-05aa Premiums for Performance and Payment

Bonds 01 22 00 1 Job $ $

02 Div 02; Existing Conditions 0205-05aa Downstream Stoplog Slots (Vertical Cuts) 1 Job $ $

OPTION

5AA

ESTIMATED

Option 5ab Bid Schedule Completing Downstream Bulkhead Slots

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-05ab Mobilization and Demobilization -

General 01 22 00 1 Job $ $

0102-05ab Premiums for Performance and Payment Bonds

01 22 00 1 Job $ $

02 Div 02; Existing Conditions 0206-05ab Downstream Stoplog Slots (Installation) 1 Job $ $

OPTION 5ab

Option 6 Bid Schedule

Phase 2 Overburden Excavation

DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-06 Mobilization and Demobilization -

General 01 22 00 1 Job $ $

0102-06 Premiums for Performance and Payment Bonds

01 22 00 1 Job $ $

0103-06 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0105-06 Diversion and Care of Water (U/S

Monoliths) 01 57 24 4 Month $ $

13 Div 13; Special Construction 1303-06 O&M Phase 1 Instrumentation Program 13 50 00 4 Month $ $

31 Div 31; Earthwork

EXCAVATION

3130-06 Clearing and Grubbing 31 11 00 2 Acre $ $ 3131-06 Overburden Excavation 31 00 00 248,000 CY $ $ 3132-06 Rock Excavation 31 23 05 1,000 CY $ $

3203-06 Erosion Control 4 Month $ $

OPTION 6

Option 7 Bid Schedule Phase 1 Rock Excavation

DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-07 Mobilization and Demobilization -

General 01 22 00 1 Job $ $

0102-07 Premiums for Performance and Payment Bonds

01 22 00 1 Job $ $

0103-07 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 31 Div 31; Earthwork

EXCAVATION

3132-07 Rock Excavation 31 23 05 85,000 CY $ $ 3133-07 Foundation Preparation 31 60 00 5281 SY $ $ 3134-07 Pre Splitting 31 23 06 2,725 SY $ $

OPTION 7

Option 8 Bid Schedule

D/S Cofferdam Grouting, Cofferdam Instrumentation, Dewatering, & Phase 5 Post-Tensioned Anchors

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-08 Mobilization and Demobilization - General 01 22 00 1 Job $ $ 0102-08 Premiums for Performance and Payment

Bonds 01 22 00 1 Job $ $

0103-08 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0104-08 Installation of Dewatering System and Initial

Dewatering 01 57 24 1 Job $ $

02 Div 02; Existing Conditions 0209 Core Drilling 02 32 00

0209A-08 First 2,000 Linear Feet 02 32 00 2,000 LF $ $ 0209B-08 Over 2,000 Linear Feet 02 32 00 460 LF $ $

13 Div 13; Special Construction 1302-08 Installation of Downstream Cofferdam

Instrumentation 13 50 00 1 Job $ $

31 Div 31; Earthwork

ANCHORS

3101-08 Drill 13" Anchor Hole (Vertical, in concrete) 31 68 13 2,460 LF $ $ 3102-08 Drill 13" Anchor Hole (Vertical, in rock) 31 68 13 2,604 LF $ $ 3109-08 Borehole Camera Log (Anchors) 31 68 13 10 EA $ $ 3110-08 Watertightness Testing 31 68 13 60 EA $ $ 3111-08 Pregrouting Holes 31 68 13 554 CF $ $ 3112-08 Redrilling Pregrouted Holes 31 68 13 600 LF $ $ 3113-08 Watertightness Testing of Full Anchor

Length Encapsulation

31 68 13 40 EA $ $

3114-08 Anchors, 30-Strand 31 68 13 5,065 LF $ $ 3119-08 Anchor Installation, 30-Strand (Vertical) 31 68 13 40 EA $ $ 3127-08 Performance Tests 31 68 13 2 EA $ $ 3128-08 Proof Tests 31 68 13 38 EA $ $

GROUTING

3140 Drill Grout Holes in Rock 31 32 23

3140A-08 First 11,683 Linear Feet 31 32 23 11,683 LF $ $ 3140B-08 Over 11,683 Linear Feet 31 32 23 3,074 LF $ $

3141 Drill Grout Holes in Overburden/Cell Fill 31 32 23 3141A-08 First 7,920 Linear Feet 31 32 23 7,920 LF $ $ 3141B-08 Over 7,920 Linear Feet 31 32 23 1,720 LF $ $

3142 Drill Grout Holes in Concrete 31 32 23 3142A-08 First 7,990 Linear Feet 31 32 23 7,990 LF $ $ 3142B-08 Over 7,990 Linear Feet 31 32 23 1,740 LF $ $ 3143-08 Pressure Washing (Hydraulic) 31 32 23 110 HR $ $ 3144-08 Pressure Testing (Hydraulic) 31 32 23 1,476 EA $ $

3145 Portland Cement in Grout 31 32 23 3145A-08 First 9,836 Cubic Feet 32 32 23 9,836 CF $ $ 3145B-08 Over 9,836 Cubic Feet 33 32 23 1,524 CF $ $ 3146-08 Grouting Connections 31 32 23 1,624 EA $ $

3147 Placing Grout 31 32 23 3147A-08 First 23,819 Cubic Feet 32 32 23 23,819 CF $ $

3147B-08 Over 23,819 Cubic Feet 33 32 23 3,689 CF $ $ 3148-08 Government Requested Standby - Grouting 31 32 23 30 HR $ $ 3149-08 Televiewer Survey 31 32 23 1,845 LF $ $ 3151-08 Re-Drill Grout Holes in Rock 31 32 23 1,720 LF $ $

OPTION 8

Option 9 Bid Schedule Phase 3 Overburden Excavation & Phase 2 Rock Excavation

DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-09 Mobilization and Demobilization -

General 01 22 00 1 Job $ $

0102-09 Premiums for Performance and Payment Bonds

01 22 00 1 Job $ $

0103-09 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0105-09 Diversion and Care of Water (U/S

Monoliths) 01 57 24 3 Month $ $

0106-09 Diversion and Care of Water (D/S Cofferdam)

01 57 24 3 Month $ $

03 Div 03; Concrete 0301-09 Splash Pad 03 30 00 1 Job $ $

13 Div 13; Special Construction 1303-09 O&M Phase 1 Instrumentation Program 13 50 00 3 Month $ $ 1304-09 O&M Phase 2 Instrumentation Program 13 50 00 3 Month $ $

31 Div 31; Earthwork

EXCAVATION

3130-09 Clearing and Grubbing 31 11 00 2 Acre $ $ 3131-09 Overburden Excavation 31 00 00 200,000 CY $ $ 3132-09 Rock Excavation 31 23 05 96,200 CY $ $ 3133-09 Foundation Preparation 31 60 00 8835 SY $ $ 3134-09 Pre Splitting 31 23 06 3,180 SY $ $

3203-09 Erosion Control 3 Month $ $

OPTION 9

Option 10 Bid Schedule Phase 3 Rock Excavation

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-10 Mobilization and Demobilization -

General 01 22 00 1 Job $ $

0102-10 Premiums for Performance and Payment Bonds

01 22 00 1 Job $ $

0103-10 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0105-10 Diversion and Care of Water (U/S

Monoliths) 01 57 24 1 Month $ $

0106-10 Diversion and Care of Water (D/S Cofferdam)

01 57 24 1 Month $ $

13 Div 13; Special Construction 1303-10 O&M Phase 1 Instrumentation Program 13 50 00 1 Month $ $ 1304-10 O&M Phase 2 Instrumentation Program 13 50 00 1 Month $ $

31 Div 31; Earthwork

EXCAVATION

3132-10 Rock Excavation 31 23 05 21,600 CY $ $ 3133-10 Foundation Preparation 31 60 00 6936 SY $ $ 3134-10 Pre Splitting 31 23 06 595 SY $ $ 3135-10 Line Drilling 31 23 06 240 SY $ $

3203-10 Erosion Control 1 Month $ $

OPTION 10

Option 10 Bid Schedule Phase 3 Rock Excavation

DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements 0101-10 Mobilization and Demobilization -

General 01 22 00 1 Job $ $

0102-10 Premiums for Performance and Payment Bonds

01 22 00 1 Job $ $

0103-10 Maintenance and Protection of Traffic 01 50 00 1 Job $ $ 0105-10 Diversion and Care of Water (U/S

Monoliths) 01 57 24 1 Month $ $

0106-10 Diversion and Care of Water (D/S Cofferdam)

01 57 24 1 Month $ $

13 Div 13; Special Construction 1303-10 O&M Phase 1 Instrumentation Program 13 50 00 1 Month $ $ 1304-10 O&M Phase 2 Instrumentation Program 13 50 00 1 Month $ $

31 Div 31; Earthwork

EXCAVATION

3132-10 Rock Excavation 31 23 05 21,600 CY $ $ 3133-10 Foundation Preparation 31 60 00 6936 SY $ $ 3134-10 Pre Splitting 31 23 06 595 SY $ $ 3135-10 Line Drilling 31 23 06 240 SY $ $

3203-10 Erosion Control 1 Month $ $

Option 11 Bid Schedule 8" Water Line Relocation & Completion of Existing Lock Bridges Demolition

DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

ESTIMATED

AMOUNT

01 Div 01; General Requirements

0101-11 Mobilization and Demobilization - General

01 22 00 1 Job $ $

0102-11 Premiums for Performance and Payment Bonds

01 22 00 1 Job $ $

0103-11 Maintenance and Protection of Traffic

01 50 00 1 Job $ $

02 Div 02; Existing Conditions 0203-00 Complete Demolition of Existing

Lock Bridges 02 41 00.03 1 Job $ $

33 Div 33; Utilities 3301-11 Grand Rivers Water Line Relocation 33 11 00 1 Job $ $

OPTION 11

Bid Schedule Summary

DESCRIPTION SPECIFICATION

NUMBER

EST.

QTY.

UNIT UNIT

PRICE

BASE

OPTION 1

OPTION 2

OPTION 3

OPTION4

AMOUNT

OPTION 5aa

ESTIMATED

OPTION 5ab

OPTION 6

OPTION 7

OPTION 8

OPTION 9

OPTION 11

TOTAL

AMOUNT

(BASE+ALL

OPTIONS)

AM3 TECHNICAL CHANGES

Solicitation No. W912P518B0005 Amendment No. 0003

I. CHANGES TO TECHNICAL SPECIFICATIONS

A. Section 01 00 00 GENERAL REQUIREMENTS. Remove Section 01 00 00 in its entirety (19 pages), and replace with revised Section 01 00 00 (20 pages).

B. Section 01 22 00 PRICE AND PAYMENT PROCEDURES. Remove Section 01 22 00 in its entirety (86 pages), and replace with revised Section 01 22 00 (87 pages).

C. Section 02 41 00.02 BRIDGE DEMOLITION. Remove Section 02 41 00.02 in its entirety (6 pages), and replace with revised Section 02 41 00.02 (6 pages).

D. Section 02 83 20 LEAD BASE PAINT (LBP) ABATEMENT, REMOVAL, AND DISPOSAL. Remove Section 02 83 20 in its entirety (23 pages), and replace with revised Section 02 83 20 (23 pages).

E. Section 31 00 00 EARTH EXCAVATION AND FILL PLACEMENT. Remove

Section 31 00 00 in its entirety (26 pages), and replace with revised Section 31 00 00 (25 pages).

F. Section 31 23 06 BLASTING. Remove Section 31 23 06 in its entirety (37 pages), and replace with revised Section 31 23 06 (37 pages).

G. Section 31 60 00 FOUNDATION PREPARATION. Remove Section 31 60 00 in its entirety (7 pages), and replace with revised Section 31 60 00 (6 pages).

H. Section 31 68 13 LOCK AND COFFERDAM STABILITY ANCHORS. Remove

Section 31 68 13 in its entirety (35 pages), and replace with revised Section 31 68 13 (35 pages).

I. Appendix A – MAINTENANCE BUILDING SPECIFICATIONS, Section 09 90 00

PAINTS AND COATINGS. Remove Section 09 90 00 in its entirety (25 pages), and replace with revised Section 09 90 00 (21 pages.)

J. Appendix A – MAINTENANCE BUILDING SPECIFICATIONS, Section 27 10 00

BUILDING TELECOMMUNICATIONS CABLING SYSTEM. Remove Section 27 10 00 in its entirety (14 pages), and replace with revised Section 27 10 00 (15 pages.)

K. Appendix A – MAINTENANCE BUILDING SPECIFICATIONS, Section 33 40 00

STORM DRAINAGE UTILITIES. Add new Section 33 40 00 (10 pages) to the set of technical specifications.

L. Appendix C -…

This is the start of the file's text. The full file is on GovTribe.