PDF 18 MB Posted
- Attached to
- Downstream Lock Excavation Construction Contract Federal contract opportunity
- Solicitation number
- W912P518B0005
About this file
Amendment 0002 Answer 26 Attachment
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
Atlanta Boston
Chicago New York
San Francisco www.geocomp.com
1390 Busch Parkway Buffalo Grove, IL 60089 Tel 224 676 1371 Fax 224 676 1375
1/18/2018
Mr. Brandon Stidham Johnson Bros Corporation KY Dam Lock Addition 192 Taylor Park Rd Grand Rivers, KY 42045
Mr. Stidham, Under cover of this letter, we are providing the following:
• 2017 System Maintenance and Troubleshooting Report
• Summary of System Component Replacement since June, 2010
• Listing of On-site Instrumentation Materials
• 2017 Cumulative data plots for:
o Tilt Meters o Joint Meters o VW Piezometers o In-place Inclinometers (60 day increments)
It should be noted this is a 2017 Annual Maintenance Report and is not intended to discuss data in detail.
This is accomplished in the monthly reports.
Sincerely, Erik Hanson Instrumentation Technician, Geocomp Consulting, Inc.
Thomas L. Weinmann Vice President, Practice Area Leader – Structural Monitoring Geocomp Consulting, Inc.
KY Lock Downstream Cofferdam Project 2017 Annual Maintenance Report
Kentucky Lock Addition – Instrumentation System Maintenance and Troubleshooting, 2017
January 3, 2017—Replaced A SCU on TM-4 Trans in Logger 102 January 17, 2017—Replaced A SCU on TM-4 Trans in Logger 102 January 17, 2017—Replaced the external battery in Logger 102 January 17, 2017—Replaced the Sunsaver in Logger 102 January 17, 2017—Replaced the SCU’s on IPI6-4 X/Y in logger 200 January 17, 2017—Replaced the 16-ch A/D Mux Board and the SCU’s in logger 202 January 18, 2017—Replaced the Ribbon cable in logger 202 January 18, 2017—Replaced the external battery in Logger 202 January 18, 2017—Replaced the external battery in Logger 103 January 18, 2017—Replaced the external battery in Logger 104 January 18, 2017—Replaced the external battery in Logger 105 January 18, 2017—Replaced the external battery in Logger 108 January 18, 2017—Replaced the external battery in Logger 109 January 18, 2017—Replaced the external battery in Logger 111 January 19, 2017— Replaced the SCU’s on IPI6-4 X/Y in logger 200 March 8, 2017—Replaced the 16-ch A/D Mux Board and the SCU’s in logger 202 March 14, 2017—Replaced the SCU’s on IPI7-2 X/Y in logger 202 April 6, 2017—Replaced the 16-ch A/D Mux Board and the SCU’s in logger 202 April 13, 2017—Replaced the external battery in Logger 202 June 5, 2017—Replaced the external battery in Logger 202 June 10, 2017— Replaced the Sunsaver and internal battery in Logger 202 June 14, 2017—Replaced the internal battery in Logger 110 June 15, 2017—Replaced the SCU’s on IPI7-2 X/Y in logger 202 July 25, 2017—Replaced logger 202 A/D board with a Campbell Scientific CR800 AM 16/32B and a LS300 modem. The new Campbell logger is now called logger 204.
August 12, 2017—Replaced the internal and external batteries in Logger 101,106 and 201 August 12, 2017—Replaced the internal battery in Logger 109 August 14, 2017—Replaced the vibrating wire board on logger 103.
August 29, 2017—Replaced the internal battery on logger 202.
October 18, 2017—Replaced the external marine battery on logger 202 & 204.
October 19, 2017—After troubleshooting IPI 7-1Y it has been determined that the sensor is damaged, the core has decided to turn off the alarms on the sensor.
November 13, 2017—Replaced the external marine battery on logger 202 & 204.
December 13, 2017—After troubleshooting IPI 2-2 and 4-4 it has been determined that the sensors are damaged, the core has decided to turn off the alarms on the sensors.
December 14, 2017—Replaced Logger 200
Tiltmeter:
All readings appear to be within expected range with the exception of the following sensors that were decommissioned.
• TM-04 in August of 2017.
RBMD:
RBMD’s 9/10, 10/11, 11/12, 12/13, and 13/14 are up to date and within expected range.
RBMD’s 1, 2, 3, 3/4, 4, 4/5, 5/6, 6/7, 7/8, and 8/9 were decommissioned in March of 2017.
Alignment Pin:
All readings appear to be within expected range.
Joint Meters:
All readings appear to be within expected range.
VWPZ:
Piezometers 11, 12, 13, 14, 15, 22, 23, and 24 were offline November 5th to December 15th of 2017 due to troubleshooting and VW board replacement of logger 200.
In-Place Inclinometers:
All readings appear to be within expected range with the exception of the following exception:
• IPI 2-2 and IPI 4-4 were decommissioned in December of 2017.
• Due to invalid data up to 4/11/2017 and a 60 day graphing interval the graph for IPI 7a-X starts on
5/5/2017. Invalid data until 1/18/2017 causes the graph for IPI 7a-Y to start at 3/6/2017. The outlying data points for IPI 7a-X and 7a-Y on 7/4/2017 are caused by invalid data during that time.
System Component Replacement since June, 2010
Data Logger L101 external battery and regulator June, 2010 internal battery November 1, 2012 external battery December 27, 2012 internal battery July 1, 2013 external battery July 2, 2013 external battery March 7, 2014 external battery August 4, 2014 internal and external battery November 19, 2014
External Battery December 22, 2015 external battery July 2, 2016 internal battery July 6, 2016 internal and external battery August 12, 2017
Data Logger L102 internal and external battery June, 2012 internal battery December 18, 2012 internal battery November 19, 2013 external battery March 7, 2014 external battery June 10, 2014 internal and external battery November 19, 2014
Regulator December 9, 2014
External Battery December 22, 2015
1 SCU (TM-4 Trans) January 3, 2017
1 SCU (TM-4 Trans) January 17, 2017
External Battery January 18, 2017
Sun Saver January 18, 2017
Data Logger L103
TM05 Transverse Feb, 2011 internal battery June, 2012 external battery January 11, 2013 external battery March 7, 2014 internal and external battery November 19, 2014
External Battery December 22, 2015
Vibrating Wire Board August 14, 2017
Data Logger L104 external battery and regulator July, 2010
TM06 Longitudinal Feb, 2011 internal battery November 1, 2012 external battery January 11, 2013
1 SCU chip (TM-06) August 16, 2013
16-ch A/D MUX board August 22, 2013 external battery March 20, 2014 internal and external battery November 19, 2014
Data Logger L105
TM07 Longitudinal Feb, 2011 internal battery November 1, 2012 external battery January 11, 2013 internal battery July 1, 2013 external battery July 2, 2013 internal battery November 14, 2013 external battery December 23, 2013 internal and external battery April 8, 2014 internal and external battery November 19, 2014
External battery May 15, 2015
External Battery December 22, 2015
Internal battery November 15, 2016
Internal battery November 21, 2016
External battery November 21, 2016
Data Logger L106
TM08 Transverse December, 2011 external battery December 27, 2012 internal and external battery July 3, 2013 external battery March 20, 2014 internal and external battery November 20, 2014
External Battery December 22, 2015
Internal Battery October 12, 2016
Data Logger L107
TM09 Longitudinal September, 2011 internal battery June, 2012 internal battery August, 2012 internal battery November 1, 2012 internal battery July 1, 2013 external battery July 2, 2013 external battery March 20, 2014 external battery October 8, 2014 internal and external battery November 20, 2014
1 SCU chip (TM-9 Trans – CH2) August 31, 2015
1 SCU chip (TM-9 Trans – CH2) September 8, 2015
16-ch A/D MUX board September 9, 2015
A/D Mux Board September 10, 2015
2 SCU chips (TM-9 Trans & Long) September 11, 2015
2 SCU chips (TM-9 Trans & Long) September 17, 2015
Internal & External Batteries September 17, 2015
Tiltmeter replaced TM -09 Trans (AGI Tiltmeter) September 25, 2015
Internal Battery October 12, 2016
Data Logger L108 internal battery December, 2011 external battery December 27, 2012 internal and external battery July 2, 2013 external battery March 20, 2014
External battery November 8, 2014
Internal battery November 12, 2014
Internal battery June 5, 2015
Data Logger L109 internal battery June, 2012 external battery December 27, 2012 internal and external battery July 2, 2013 external battery March 7, 2014 external battery August 4, 2014 internal and external battery November 20, 2014
External Battery December 22, 2015 internal August 12, 2017
Data Logger L110 internal battery June, 2012 external battery December 27, 2012 internal and external battery July 2, 2013 external battery March 20, 2014 external battery October 3, 2014 internal and external battery November 20, 2014 external battery April 30, 2015
Vibrating Wire board July 7, 2015 internal and external battery June 1, 2016
Internal Battery October 12, 2016
Internal Battery October 13, 2016
Internal Battery October 18, 2016
1 SCU Chip (TM-12 Trans) January 19, 2017
Internal Battery June 14, 2017
Data Logger L111 internal battery June, 2012 external battery December 27, 2012 internal and external battery July 2, 2013 external battery December 23, 2013 external battery June 16, 2014 internal and external battery November 20, 2014 internal battery June 1, 2015
External batteries June 5, 2015
External batteries August 12, 2016
Data Logger L113
Control Room Computer September 17, 2010
Atlas to iSite changeover December 14, 2012 @4:45pm
Data Logger L200 external battery and regulator November, 2010
20-watt solar panel November, 2010
CCP 14 August, 2011
VWSG MUX board August 23, 2012
16 SCU chips (all of IPI 3x/y & 6x/y) October 4, 2012 internal battery October, 2012 external battery January 16, 2013
50-watt solar panel January 24, 2013
2 SCU chips (IPI 3-3x & 3-3y) January 24, 2013
2 SCU chips (IPI 6-1x & 6-1y) February 20, 2013
2 SCU chips (IPI 6-2y & 6-4y) March 6, 2013
1 SCU chip (IPI 3-4x) March 6, 2013
1 SCU chip (IPI 3-4x) April 19, 2013
1 SCU chip (IPI 3-1x) April 29, 2013
VWSG MUX board August 27, 2013
16-ch A/D MUX board September 3, 2013
4 SCU chips (IPI 6-3x/y & 6-4x/y) September 11, 2013
16-ch A/D MUX board April 24, 2014
16 SCU chips (to go with A/D board) April 24, 2014 internal battery and external marine July 14, 2012
16-ch A/D MUX board July 24, 2014
16 SCU chips (all of IPI 3x/y & 6ax/y) July 24, 2014
16-ch A/D MUX board August 20, 2014
16 SCU chips (all of IPI 3x/y & 6x/y) August 20, 2014
16-ch A/D MUX board (With Boards pulled from this logger 8-20-14)
August 22, 2014
16 SCU chips (all of IPI 3x/y & 6x/y) (With SCU’s pulled from this logger 8-20-14)
August 22, 2014
2 SCU chips (IPI 3-2x & 3-2y) September 17, 2013
16-ch A/D MUX board September 25, 2014
16 SCU chips September 25, 2014
16-ch A/D MUX board (With Boards pulled from this logger 9-25-14)
September 26, 2014
16 SCU chips (With SCU’s pulled from this logger 9-25-14)
September 26, 2014
Replaced the A/D board in logger 200 with the upgraded one.
October 9, 2014
Internal battery October 22, 2014
External marine battery October 28, 2014
2 SCU chips (IPI 3-1X & 3-1Y) April 10, 2015
2 SCU chips (IPI 6-3x & 6-3Y) June 1, 2015
Sunsaver July 10, 2015
2 SCU chips (IPI 6-1x & 6-1y) July 27, 2015
Replaced external marine battery August 3, 2015
2 SCU chips (IPI 6-2x & 6-2Y) October 20, 2015
2 SCU chips (IPI 6-2x & 6-2Y) December 29, 2015
2 SCU chips (IPI 3-3x & 3-3Y) January 19, 2016
External battery August 12, 2016
2 SCU chips (IPI 6-4x & 6-4Y) January 17, 2017
2 SCU chips (IPI 6-4x & 6-4Y) January 19, 2017
Replaced the logger December 14, 2017
Data Logger L201
INCL 2-1 August, 2010
INCL 2-2 August, 2010
16-ch A/D MUX board August 28, 2010
16-ch A/D MUX board September 17, 2010
16-ch A/D MUX board September 21, 2010 solar panel November, 2010 external battery and regulator November, 2010
16-ch A/D MUX board November 2, 2010 external marine battery June, 2011 solar controller September, 2011 iSite Data Logger, VWSG MUX board, radio September 6, 2011 iSite Data Logger, radio May 31, 2012 internal battery and external marine July, 2012
CCP 20 July, 2012
VWSG MUX board August 23, 2012
14 SCU chips (all of IPI 1x/y & 2x/y) October 4, 2012
50-watt solar panel January 24, 2013 internal and external battery November 21, 2014
Data Logger L202
1 SCU chip (IPI 5y) August 13, 2010
1 SCU chip (IPI 5y) August 28, 2010
16-ch A/D MUX board September 16, 2010
1 SCU chip (IPI 5y) September 24, 2010
16-ch A/D MUX board September 16, 2011
Regulator May, 2012
8 SCU chips for IPI 4 & IPI 5 May 29, 2012 internal battery June, 2012 internal battery August, 2012 iSite Data Logger August 23, 2012
VWSG MUX board August 23, 2012
16-ch A/D MUX board August 23, 2012
16 SCU chips (all of IPI 4x/y & 7ax/y) October 4, 2012
INCL 4-1 October, 2012
INCL 4-2 October, 2012
INCL 4-3 October, 2012
INCL 4-4 October, 2012
INCL 7a-1 October, 2012
INCL 7a-2 October, 2012
INCL 7a-3 October, 2012
INCL 7a-4 October, 2012
2 SCU chips (IPI 4-3x, 4-3y) November 27, 2012 external battery December 10, 2012 internal battery December 21, 2012 iSite Data Logger January 15, 2013
50-watt solar panel January 24, 2013
2 SCU chips (IPI 4-4x & 4-4y) January 24, 2013
2 SCU chips (IPI 4-2x & 4-2y) February 25, 2013
Added logger grounding to sheet piling March 12, 2013
1 SCU chip (IPI 4-4X) April 22, 2013
2 SCU chips (IPI 7a-3X & 7a-3Y) May 31, 2013
2 SCU chips (IPI 7a-3X & 7a-3Y) June 7, 2013
1 SCU chip (IPI 4-1X) June20, 2013
16-ch A/D MUX board June30, 2014
16-ch A/D MUX board July 24, 2014
16 SCU chips (all of IPI 4x/y & 7ax/y) July 24, 2014
A/D Internal ribbon cable July 29, 2014
16-ch A/D MUX board August 21, 2014
16 SCU chips (all of IPI 4x/y & 7ax/y) August 21, 2014
16-ch A/D MUX board (With Boards pulled from this logger 8-21-14)
August 22, 2014
16 SCU chips (all of IPI 4x/y & 7ax/y) (With SCU’s pulled from this logger 8-21-14)
August 22, 2014
2 SCU chips (IPI 4-1X & 4-1Y) April 14, 2015
2 SCU chips (IPI 4-1X & 4-1Y) April 27, 2015 internal battery September 10, 2015 internal battery November 30, 2015
External battery/ External battery box January 4, 2016 2 SCU chips (IPI 7-3X & 7-3Y) January 19, 2016 2 SCU chips (IPI 7-2X & 7-2Y) September 12, 2016 2 SCU chips (IPI 7-2X & 7-2Y) November 21, 2016 2 SCU chips (IPI 7-2X & 7-2Y) December 1, 2016
16-ch A/D MUX board January 17, 2017
Ribbon cable January 18, 2017 external battery January 18, 2017
16-ch A/D MUX board March 8, 2017 16 SCU chips (IPI 4-1,4-2,4-3,4-4,7-1,7-2,7-3,7-4 X and Y)
March 8, 2017
2 SCU chips (IPI 7-2X & 7-3Y) March 14, 2017 A/D Board and 16 SCU chips (IPI 4-1,4-2,4-3,4- 4,7-1,7-2,7-3,7-4 X and Y)
April 6, 2017 external battery April 13, 2017 external battery June 5, 2017 solar controller & Internal battery June 10, 2017
2 SCU chips (IPI 7-2X & 7-2Y) June 15, 2017
Replaced A/D board with CSI 800 Logger and IP phone July 25, 2017
Internal battery August 29, 2017
External marine battery October 18, 2017
External marine battery November 13, 2017
Data Logger L203 solar panel November, 2010 external battery and regulator November, 2010 external marine battery June, 2011 solar controller September, 2011 internal battery June, 2012
6 SCU chips for INCU1- 1, 2, 3 (X,Y) June 20, 2012 internal and external battery July, 2012
3 SCU chips (IPI 2-2x, 2-3y, 2-4y) November 27, 2012
16-ch A/D MUX board November 28, 2012
3 SCU chips (IPI 2-2y, 2-3x, 1-1y) November 29, 2012 external battery December 27, 2012
50-watt solar panel January 24, 2013
8 SCU chips for INCU2- 1, 2, 3,4 (X,Y) June 30, 2015 internal and external battery June 11, 2016 internal and external battery July 2, 2016
2 SCU chips (IPI 2-2x, 2-3y) July 15, 2016
2 SCU chips (IPI 2-2x, 2-3y) July 18, 2016 external battery July 20, 2016 solar controller & external battery August 11, 2011
2 SCU chips (IPI 2-2x, 2-3y) September 8, 2016
Data Logger L204
Commissioned the CSI 800 logger July 25, 2017
External marine battery October 18, 2017
External marine battery November 13, 2017
Inventory of On-site Instrumentation Materials as of most current date updated 1/05/2018
(LKF)
• (2) 8-port iSite Data Loggers
• (2) 2-port iSite Data Loggers
• (2) A/D Multiplexers
• (0) VWSG Multiplexers
• (1) Solar panels with mounting hardware
• (1) SunSaver voltage regulator
• (5) Internal Data Logger rechargeable battery packs
• (2) Internal Data Logger battery pack chargers
• (3) External dry cell Data Logger battery packs (for Lock Wall loggers)
• (0) External “marine” deep cycle batteries (for Coffer Dam loggers)
• (0) External battery charger
• (1) Tilt Meter
• (2) IPI sensor
• (1) Piezometer
• (1) Vibrating Wire readout box
• (1) RBMD Micrometer
• (1) Digital Voltmeter
• (1) Battery load tester
• (1) Tool Box including soldering iron, heat gun and misc. hand tools
• (1) Geokon tilt sensor reader
• (8) New SCU chips (Cofferdam)
KENTUCKY LOCK AND DAM
2017 AP (New 3D) Annual Report
Prisms added to AP on 4/24/12
Prepared by
Geocomp Corporation
Thursday, January 18, 2018 iSiteCentral - 1/18/2018 8:57:26 AM
2017 JointMeter Annual Report
Temperature is JM temperature iSiteCentral - 1/18/2018 8:57:58 AM
2017 RBMD Annual Report
RBMD Locations on Lock Wall iSiteCentral - 1/18/2018 8:59:24 AM
2017 TiltMeter Annual Report
Temperature is TM temperature iSiteCentral - 1/18/2018 9:00:04 AM
2017 VWPZ (CCP) Annual Report
Temperature is PZ temperature iSiteCentral - 1/18/2018 9:01:25 AM
Elevation and Plan View of Piezometer Locations on Cofferdam iSiteCentral - 1/18/2018 1:39:11 PM
2017 IPI Profile Annual Report
Event Report for IPI-1X
Event Report for IPI-1Y
Event Report for IPI-2X
Event Report for IPI-2Y
Event Report for IPI-3X
Event Report for IPI-3Y
Event Report for IPI-4X
Event Report for IPI-4Y
Event Report for IPI-6X
Event Report for IPI-6Y
Event Report for IPI-7aX
Event Report for IPI-7aY
| Binder1.pdf |
| 1. KY Lock 2017 Annual Maintenance Report |
| 1_Alignment_Pin |
| 2_JointMeter |
| 3_RBMD_Locations_on_Lock_Wall |
| 4_TiltMeter |
| 5_VWPZ |
| 6_IPI_Profile |
| 2018-01-24T10:25:39-0600 | |
| ROBINSON.JOSEPH.N.1257727404 |
File details come from the government source that posted it.