Amendment 0001: Update Site Visit Location The location for the site visit is: The Honorable Charles Raleigh Mayor of the City of Cumberland 402 West Main Street Cumberland, KY 40823 (606)589-2108 Office
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XDD71028423 114708
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project: Shepherd's Street Bridge
1. The purpose of this amendment is to revise the site visit meeting location and update the issued by address (SF1442 BLOCK 6).
2. Please disregard the modified Wage Determination listed in this summary of changes for this amendment. The current w age rate for KY187 dated 05 January 2018 remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jan-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-17-B-0003
X 9B. DATED (SEE ITEM 11)
18-Jan-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2018
CODE
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37203
W912P5 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912P5-17-B-0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The Issued By organization has changed from
US ARMY CORPS OF ENGINEERS-NASHVILLE
CELRN-EC-C,
110 NINTH AVE. SOUTH
NASHVILLE TN 37203
to
US ARMY CORPS OF ENGINEERS-CELRN-RC-N
DIRECTORATE OF CONTRACTING
110 9TH AVENUE SOUTH, ROOM A680
NASHVILLE TN 37203
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been modified:
BIDDING SCHEDULE/INSTRUCTIONS
Section 00100 -Instructions to Bidders
1. DESCRIPTION OF WORK: This is a Total Small Business Set-Aside, sealed bid, firm-fixed price construction contract to demolish and replace the Shepherd Street Bridge in Cumberland, KY, 40823, in accordance with the attached plans and specifications.
2. PLACE OF DELIVERY: Harlan County, Cumberland, KY 40823.
3. DATE OF DELIVERY: 250 Days from Notice to Proceed.
4. SITE VISIT: Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the delivery site and the general and local conditions that can affect the delivery and material handling of the materials or the cost thereof. Failure to do so will not relieve the bidder from responsibility for estimating properly the difficulty or cost of successfully accomplishing delivery. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the solicitation, the specifications or related documents.
The Government has scheduled a Site Visit for this requirement. An organized site visit has been scheduled for:
25 January 2018, 2:00 PM local time (Eastern Time Zone)
Participants will meet at the Mayor’s Office, 402 West Main Street, Cumberland, KY 40823, for the organized Site Visit.
PRE-BID SITE VISIT REGISTRATION REQUIRED FOR ALL POTENTIAL BIDDERS:
Register via email for the site visit within 48 hours of the start time to Eugenia.J.Corder@usace.army.mil.
Please include the following information in your email: (1) number of participants from your firm attending the site visit, (2) a primary point of contact from your firm to include their title, telephone number, and email address. The subject of your email message shall be addressed as follows:
Registration Request for Pre-Bid Site Visit, Solicitation W912P5-17-B-0003.
5. QUESTIONS: Questions resulting from the site visit must be submitted to Eugenia Corder via email at Eugenia.J.Corder@usace.army.mil by close of business, 30 January 2018.
6. SPECIFICATIONS AND DRAWINGS: The complete Specifications and Drawings are provided as separate files and are available to download on Federal Business Opportunities (FBO) website, www.fbo.gov.
Questions concerning IFB documents should be submitted in writing to Eugenia Corder via email at Eugenia.J.Corder@usace.army.mil
7. BIDDER’S QUALIFICATIONS: To establish responsibility, the apparent low bidder will be required by the Government to submit information used by the Contracting Officer to determine responsibility.
Bidders may elect to submit the necessary information with their bid package and are encouraged to do so in the interest of time and efficiency; but are neither penalized for not doing so, nor rated on any information provided. If responsibility information is provided with the bid package, it must be sealed in a separate envelope marked “Responsibility Information”, and it will not be opened or reviewed prior to establishment of the apparent low bidder. If not included in the bid package, the required information must be provided to the Contracting Officer within four (4) calendar days.
The banking reference shall include the financial institution’s legal name, complete physical address, a point-of-contact (POC) at the financial institution, the POC’s telephone number, fax number, and email address.
The past performance references shall include firm’s name, the contract number, the contract period of performance and/or contract completion date, the contract’s aggregate value, a brief description of the project, a POC, the POC’s telephone number, fax number, and email address.
8. PUBLIC OPENING OF BIDS: Bids will be publicly opened on the date and time set for bid opening in Block 13A of the SF 1442. The location of the bid opening is the Estes Kefauver Federal Building, USACE Contracting Division, Bid Opening Conference Room A-681 (6th floor), 110 9th Avenue South, Nashville, Tennessee, 37203. The content will be made public for the information of bidders and others interested, who may be present.
9. AMENDMENTS PRIOR TO DATE SET FOR CLOSING OF INVITATION FOR BID: The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for submission of bid. Such revisions and amendments, if any will be announced by an amendment or amendments to this Invitation for Bid (IFB). If the revisions and amendments are of a nature which requires material changes in quantities or prices proposed or both, the date set for receipt of bids may be postponed by such number of days as in the opinion of the issuing officer will enable bidder to revise their bid. In such cases, the amendment will include an announcement of the new date for receipt of bid.
10. NOTICE TO BIDDER– USE OF CLASS I OZONE-DEPLETING SUBSTANCES:
(a) In accordance with Section 326 of P.L. 102-484, the Government is prohibited from awarding any contract which includes a specification or standard that requires the use of a Class I ozone-depleting substance (ODS) identified in Section 601(a) of the Clean Air Act, (42 U.S.C 767a(a)), or that can be met only through the use of such a substance unless such use has been approved, on an individual basis, by a senior acquisitions official who determines that there is no suitable substitute available.
(b) To comply with this statute, the Government has conducted a best effort screening of the specifications and standards associated with this acquisition to determine whether they contain any ODS requirements. To the extent that ODS requirements were revealed by this review, they are identified below with the disposition determined in each case.
ODS Identified Specification/Standard Disposition: “None”
(c) If the bidder possesses any special knowledge about any other ODSs required directly or indirectly at any level of contract performance, the U.S. Army would appreciate if such information were surfaced to the Contracting Officer for appropriate action. To preclude delay to the procurement, the bidder should provide any information as soon as possible after release of this IFB and prior to the submission of bids to the extent practicable. It should be understood that there is no obligation on the bidder to comply with the request and that no compensation can be provided for doing so.
11. SYSTEM FOR AWARD MANAGEMENT (SAM) REGISTRATION: Contractors must be registered in the System for Award Management (SAM) database (www.sam.gov) to receive an award.
Contractors shall have representations and certifications completed in SAM OR provide completed representation and certification applicable provisions as listed in 52.204-8 of this solicitation.
For SAM Customer Service contact:
Federal Service Desk URL: https://www.fsd.gov/fsd-gov/home.do Hours: 8am - 8pm Eastern Time US Calls: (866) 606-8220 International Calls: (334) 206-7828
12. POC FOR COMMUNICATIONS: Any communications regarding this procurement must be made in writing to the Contracting Division, Attn: Eugenia Corder via email at Eugenia.J.Corder@usace.army.mil or by facsimile at (615) 736-7124. Inquiries must identify the solicitation number, the requestor’s company name, address, email address, telephone and facsimile numbers to include area code.
Phone calls or requests to arrange meetings at the Nashville District during the solicitation period to discuss project requirements or company’s capabilities will not be allowed.
13. BIDDER’S ADDRESS: Prospective bidders should indicate in the offer, the address to which correspondence should be mailed, if such address is different from that shown for the bidder.
14. BID DOCUMENTS: The following documents and information must be submitted with the IFB in original and one (1) copy:
(a) SF 1442, Solicitation, Offer and Award for CLIN 0001
(b) Representations and Certifications, unless bidder has SAM representations and certifications
(c) Solicitation amendments acknowledged, if applicable
(d) Tax Payer ID Number
(e) Cage Code
(f) DUNS Number
(g) Bid Bond
NOTE: The following is required from the successful low bidder prior to actual award of the contract: (1) Copy of Teaming or Partnering agreement or Joint Venture agreement (if applicable) if chosen as the successful contractor (prior to award); (2) A minimum of one (1) banking reference for their firm and a minimum of three (3) past performance references for similar contracted work.
15. This is a Total Small Business set aside. In accordance with FAR Provisions 52.236-1, Performance of Work by the Contractor, by submission of an offer and execution of a contract, the Offeror/Contractor agrees that the Contractor shall perform on the site, and with its own organization, work equivalent to at least 15% percent of the total amount of work to be performed under the contract if for general construction; and work equivalent to at least 25% if construction by special trade contractors.
16. WHERE TO SUBMIT THE IFB: Bidders shall submit sealed IFB packages to the USACE address listed below. Receipt of delivery is highly recommended. The Government will accept sealed IFB packages prior to the due date. It is highly recommended that IFB packages be received at the address listed below at least one day prior to due date to avoid a possible late bid situation. The Government will accept hand delivered packages until the time of bid closing. The Government must be in receipt of your IFB by the public bid opening time set forth in Block 13A of the SF 1442.
If being sent via courier or U.S. Postal Service:
U.S. Army Corps of Engineers Nashville Contracting Branch, CELRN-RC-N ATTN: Eugenia J. Corder 110 9th Ave. South, Room A405 (Mailroom) Nashville, TN 37203 Nashville, TN 37203-3817
17. BASIS FOR AWARD: Award will be made to the responsible bidder whose bid, conforming to the invitation, is the most advantageous to the Government based on price.
52.252-3 ALTERATIONS IN SOLICITATION (APR 1984)
Portions of this solicitation are altered as follows:
AMENDMENT 0001
1. The purpose of this amendment is to revise the site visit meeting location and update the issued by address
(SF1442 BLOCK 6).
2. Please disregard the modified Wage Determination listed in this summary of changes for this amendment. The current wage rate for KY187 dated 05 January 2018 remains unchanged.
(End of clause)
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DETERMINATION
General Decision Number: KY180187 01/05/2018 KY187
Superseded General Decision Number: KY20170187
State: Kentucky
Construction Type: Highway
Counties: Adair, Barren, Bell, Breathitt, Casey, Clay, Clinton, Cumberland, Estill, Floyd, Garrard, Green, Harlan, Hart, Jackson, Johnson, Knott, Knox, Laurel, Lawrence, Lee, Leslie, Letcher, Lincoln, Magoffin, Martin, McCreary, Menifee, Metcalfe, Monroe, Morgan, Owsley, Perry, Pike, Powell, Pulaski, Rockcastle, Russell, Taylor, Wayne, Whitley and Wolfe Counties in Kentucky.
HIGHWAY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018
SUKY2015-047 10/20/2015
Rates Fringes
BOILERMAKER......................$ 24.65 12.94
BRICKLAYER
Bricklayer..................$ 22.90 8.50 Stone Mason.................$ 21.50 8.50
CARPENTER
Carpenter...................$ 24.90 14.50 Piledriver..................$ 24.55 14.50
CEMENT MASON.....................$ 21.25 8.50
ELECTRICIAN
Electrician.................$ 29.36 10.55 Equipment Operator..........$ 26.90 10.31 Groundsman..................$ 17.79 8.51 Lineman.....................$ 30.09 10.94 When workmen are required to work from bosum chairs, trusses, stacks, tanks, scaffolds, catwalks, radio and T.V. towers, structural steel (open, unprotected, unfloored raw steel), and bridges or similar hazardous locations where workmen are subject to fall, except where using JLG's and bucket trucks up to 75 feet: Add 25% to workman's base rate for 50 to 75 feet, and add 50% to workman's base rate for over 75 feet.
IRONWORKER.......................$ 27.56 20.57
LABORER
Group 1.....................$ 21.80 12.36 Group 2.....................$ 22.05 12.36 Group 3.....................$ 22.10 12.36 Group 4.....................$ 22.70 12.36 GROUP 1: Aging and Curing of Concrete (Any Mode or Method), Asbestos Abatement Worker, Asphalt Plant Laborers, Asphalt Laborers, Batch Truck Dumpers, Carpenter Tenders, Cement Mason Tenders, Cleaning of Machines, Concrete Laborers, Demolition Laborers, Dredging Laborers, Drill Tender, Environmental Laborer - Nuclear, Radiation, Toxic and Hazardous Waste - Level D, Flagmen, Grade Checkers, All Hand Digging and Hand Back Filling, Highway Marker Placers, Landscaping Laborers, Mesh Handlers and Placers, Puddler, Railroad Laborers, Rip-rap and Grouters, Right of Way Laborers, Sign, Guard Rail and Fence Installers (All Types), Signalmen, Sound Barrier Installer, Storm and Sanitary Sewer Laborers, Swampers, Truck Spotters and Dumpers, Wrecking of Concrete Forms, General Cleanup
GROUP 2: Batter Board Men (Sanitary and Storm Sewer), Brickmason Tenders, Mortar Mixer Operator, Scaffold Builders, Burner and Welder, Bushammers, Chain Saw Operator, Concrete Saw Operators, Deckhand Scow Man, Dry Cement Handlers, Environmental Laborers - Nuclear, Radiation, Toxic and Hazardous Waste - Level C, Forklift Operators for Masonry, Form Setters, Green Concrete Cutting, Hand Operated Grouter and Grinder Machine Operator, Jack Hammers, Lead Paint Abatement, Pavement Breakers, Paving Joint Machine, Pipe Layers - Laser Operators (Non-metallic), Plastic Pipe Fusion, Power Driven Georgia Buggy and Wheel Barrow, Power Post Hole Diggers, Precast Manhole Setters, Walk-behind Tampers, Walk-behind Trenchers, Sand Blasters, Concrete Chippers, Surface Grinders, Vibrator Operators, Wagon Drillers
GROUP 3: Air Track Driller (All Types), Asphalt Luteman and
Rakers, Gunnite Nozzleman, Gunnite Operators and Mixers, Grout Pump Operator, Powderman and Blaster, Side Rail Setters, Rail Paved Ditches, Screw Operators, Tunnel Laborers (Free Air), Water Blasters
GROUP 4: Caisson Workers (Free Air), Cement Finishers, Environmental Laborer - Nuclear, Radiation, Toxic and Hazardous Waste - Level A and B, miners and Drillers (Free Air), Tunnel Blasters, and Tunnel Mockers (Free Air), Directional and Horizontal Boring, Air Track Drillers (All Types), Powder Man and Blasters, Troxler and Concrete Tester if Laborer is Utilized
PAINTER
All Excluding Bridges.......$ 19.92 9.57 Bridges.....................$ 23.92 10.07
PLUMBER..........................$ 22.52 7.80
POWER EQUIPMENT OPERATOR:
Group 1.....................$ 29.95 14.40 Group 2.....................$ 29.95 14.40 Group 3.....................$ 27.26 14.40 Group 4.....................$ 26.96 14.40 GROUP 1: Auto Patrol, Batcher Plant, Bituminous Paver, Cable- Way, Clamshell, Concrete Mixer (21 cu ft or over), Concrete Pump, Crane, Crusher Plant, Derrick, Derrick Boat, Ditching and Trenching Machine, Dragline, Dredge Engineer, Elevator (regardless of ownership when used for hoisting any building material), Elevating Grader and all types of Loaders, Hoe-type Machine, Hoisting Engine, Locomotive, LeTourneau or Carry-all Scoop, Bulldozer, Mechanic, Orangepeel Bucket, Piledriver, Power Blade, Roller (Bituminous), Roller (Earth), Roller (Rock), Scarifier, Shovel, Tractor Shovel, Truck Crane, Well Point, Winch Truck, Push Dozer, Grout Pump, High Lift, Fork Lift (regardless of lift height), all types of Boom Cats, Multiple Operator, Core Drill, Tow or Push Boat, A-Frame Winch Truck, Concrete Paver, Grade-All, Hoist, Hyster, Material Pump, Pumpcrete, Ross Carrier, Sheepfoot, Sideboom, Throttle- Valve Man, Rotary Drill, Power Generator, Mucking Machine, Rock Spreader attached to Equipment, Scoopmobile, KeCal Loader, Tower Cranes,(French, German and other types), Hydrocrane, Tugger, Backfiller Gurries, Self-propelled Compactor, Self-Contained Hydraulic Percussion Drill
GROUP 2: All Air Compressors (200 cu ft/min or greater), Bituminous Mixer, Concrete Mixer (21 cu. ft. or over), Welding Machine, Form Grader, Tractor (50 hp and over), Bull Float, Finish Machine, Outboard Motor Boat, Brakeman, Mechanic Tender, Whirly Oiler, Tract-air, Road Widening Trencher, Articulating Trucks
GROUP 3: Greaser on Grease Facilities servicing Heavy Equipment
GROUP 4: Bituminous Distributor, Cement Gun, Conveyor, Mud
Jack, Paving Joint Machine, Pump, Tamping Machine, Tractor (under 50 hp), Vibrator, Oiler, Air Compressor (under 200 cu ft per minute), Concrete Saw, Burlap and Curing Machine, Hydro Seeder, Power Form Handling Equipment, Deckhand Oiler, Hydraulic Post Driver
SHEET METAL WORKER...............$ 20.40 7.80
TRUCK DRIVER
Driver (3 Tons and Over), Driver (Truck Mounted Rotary Drill)...............$ 23.74 14.50 Driver (3 Tons and Under), Tire Changer and Truck Mechanic Tender.............$ 23.53 14.50 Driver (Semi-Trailer or Pole Trailer), Driver (Dump Truck, Tandem Axle), Driver of Distributor.......$ 23.40 14.50 Driver on Mixer Trucks (All Types).................$ 23.45 14.50 Driver on Pavement Breakers.$ 23.55 14.50 Driver, Euclid and Other Heavy Earth Moving Equipment and Low Boy.......$ 24.31 14.50 Driver, Winch Truck and A- Frame when used in Transporting Materials......$ 23.30 14.50 Greaser on Greasing Facilities..................$ 24.40 14.50 Truck Mechanic..............$ 23.50 14.50 Truck Tender and Warehouseman................$ 23.20 14.50
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)