W912P5-16-B-0005_TSpecs.pdf

PDF 5 MB Posted

Attached to
Lock Excavation, Chickamauga Lock Federal contract opportunity
Solicitation number
W912P5-16-B-0005
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

Technical Specifications

View the file

Other files for this federal contract opportunity

Other files attached to Lock Excavation, Chickamauga Lock, newest first.
File Type Posted
Bid_Abstract_(OF_1419).pdf PDF
W912P5-16-B-0005-0003.pdf PDF
W912P5-16-B-0005_Bid_Schedule.xlsx XLSX spreadsheet
W912P5-16-B-0005_AppA-02.pdf PDF
W912P5-16-B-0005_AppA-06.pdf PDF
W912P5-16-B-0005_TSpecs_Am2pages.pdf PDF
W912P5-16-B-0005_AppA-13.pdf PDF
W912P5-16-B-0005_AppA-16.pdf PDF
W912P5-16-B-0005_AppA-05.pdf PDF
W912P5-16-B-0005_AppA-09.pdf PDF
W912P5-16-B-0005_AppA-10.pdf PDF
W912P5-16-B-0005_AppA-14.pdf PDF
W912P5-16-B-0005_AppA-15.pdf PDF
W912P5-16-B-0005_AppA-12.pdf PDF
W912P5-16-B-0005_AppA-07.pdf PDF
W912P5-16-B-0005_AppA-08.pdf PDF
W912P5-16-B-0005_AppA-04.pdf PDF
W912P5-16-B-0005_AppA-01.pdf PDF
W912P5-16-B-0005_AppA-03.pdf PDF
W912P5-16-B-0005_Plans_Am2sheets.pdf PDF
W912P5-16-B-0005_AppA-11.pdf PDF
CHH_Tail_Water.xlsx XLSX spreadsheet
W912P5-16-B-0005-0002.pdf PDF
Chick_Lock_-_Lock_Excavation_PreBid_Slides.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
W912P5-16-B-0005-0001.pdf PDF
Pre-Bid_Site_Visit_Form.pdf PDF
Site_Visit_Map.jpg JPG image
W912P5-16-B-0005.pdf PDF
W912P5-16-B-0005_Plans.pdf PDF
Foreign_National_Security_Form.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IFB No. W912P5-16-B-0005

US Army Corps Of Engineers Nashville District

LOCK EXCAVATION

Chickamauga Lock Replacement Tennessee River Hamilton County, Tennessee

TECHNICAL SPECIFICATIONS

June 2016

THIS PAGE INTENTIONALLY LEFT BLANK

FOR DUPLEX PRINTING

Lock Excavation Chickamauga Lock Replacement W912P5-16-B-0005 Hamilton County, Tennessee

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 GENERAL REQUIREMENTS

01 22 00 PRICE AND PAYMENT PROCEDURES

01 31 00 DATA MANAGEMENT

01 32 01 PROJECT SCHEDULE

01 32 23 SURVEY AND ALIGNMENT CONTROL

01 33 00 SUBMITTAL PROCEDURES

01 35 13 SPECIAL PROJECT PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 35 50 PROJECT SITE SECURITY AND AT/OPSEC PROCEDURES

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 01 QUALITY CONTROL

01 45 02 QUALITY CONTROL SYSTEM (QCS)

01 50 00 TEMPORARY AND PERMANENT CONSTRUCTION FACILITIES AND

CONTROLS

01 54 00 WORK IN NAVIGABLE WATERS

01 55 26 MAINTENANCE AND CONTROL OF TRAFFIC

01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS

01 57 24 DIVERSION AND CARE OF WATER

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 95 00 FORMS AND ATTACHMENTS

DIVISION 02 - EXISTING CONDITIONS

02 32 00 SUBSURFACE DRILLING, SAMPLING, AND TESTING

02 41 13 SITE DEVELOPMENT DEMOLITION WORK AND RESTORATIONS

02 42 00 DISPOSAL OF MATERIALS

DIVISION 03 - CONCRETE

03 11 14 CONCRETE: FORMWORK

03 20 02 STEEL BARS AND WELDED WIRE FABRIC FOR CONCRETE

REINFORCEMENT FOR CIVIL WORKS

03 30 00 CONCRETE: GENERAL REQUIREMENTS

03 30 01 CONCRETE: MATERIALS

03 30 02 CONCRETE: MIXTURE PROPORTIONING

03 30 03 CONCRETE: PRODUCTION

03 30 04 CONCRETE: PLACEMENT REQUIREMENTS

03 37 13 SHOTCRETE

03 70 00 CONCRETE: STRUCTURAL (SECANT PILE WALL CAPBEAM)

03 70 01 CONCRETE: MISCELLANEOUS

DIVISION 05 - METALS

05 50 14 STRUCTURAL METAL FABRICATIONS

05 50 15 CIVIL WORKS FABRICATIONS

DIVISION 13 - SPECIAL CONSTRUCTION

13 50 00 INSTRUMENTATION PROGRAM

DIVISION 31 - EARTHWORK

31 00 00 EARTH EXCAVATION AND FILL PLACEMENT

31 05 22 GEOTEXTILES USED AS FILTERS

PROJECT TABLE OF CONTENTS Page 1

31 11 00 CLEARING AND GRUBBING

31 23 05 LOCK EXCAVATION

31 23 06 BLASTING

31 60 00 FOUNDATION PREPARATION

31 66 17 SECANT PILE WALLS

31 68 13 ROCK BOLTS FOR SLOPE PROTECTION

31 68 14 ROCK STABILITY ANCHORS

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 19 SEEDING AND LANDSCAPE ESTABLISHMENT

DIVISION 33 - UTILITIES

33 30 00 SANITARY SEWERS

33 40 00 STORM DRAINAGE UTILITIES

33 70 02 EXTERIOR AND UNDERGROUND ELECTRICAL DISTRIBUTION SYSTEM

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 2

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 SCOPE

1.2 REFERENCES

1.3 COORDINATION WITH OTHERS

1.3.1 Coordination with Other Contractors Within the Same General Area

1.3.1.1 Coordination with TVA or Corps of Engineers' Dewatering &

Maintenance

1.3.2 Coordination with Land Owners and Utilities

1.3.2.1 General

1.3.2.2 Coordination with Norfolk Southern Railway Company

1.3.2.3 Electric Service Installation by Chattanooga Electric Power

Board

1.3.2.4 Coordination with City of Chattanooga, Traffic Engineering

1.3.2.5 Chattanooga Department of Parks and Recreation

1.3.2.6 Coordination with the Tennessee Valley Authority and Corps of Engineers

1.3.2.7 Coordination for Navigation with Tennessee Valley

Authority, The Corps of Engineers, and the United States Coast Guard

1.4 SITE ACCESS

1.4.1 Marine Access

1.4.2 Land Access

1.5 IMPACTS TO NAVIGATION TRAFFIC

1.5.1 Navigation Channel Restrictions and Information

1.5.2 Impacts to Recreational Craft

1.6 ARMORING OF EXPOSED STREAM BANK

1.7 PROJECT SITE SECURITY REQUIREMENTS

1.8 PROJECT SIGNS

1.9 ACCIDENT PREVENTION

1.10 SAFETY TRAINING FOR WORKERS

1.10.1 In Vicinity of Norfolk Southern Railway Right of Way

1.11 COMPLIANCE WITH U.S. COAST GUARD PERMITS

1.12 DAM SAFETY EMERGENCY ACTIONS

1.12.1 Dam Safety Training

1.12.2 Dam Safety Condition Notification

1.13 SUBMITTALS

1.14 EVALUATION OF CONTRACTOR PERFORMANCE

1.15 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

SECTION 01 00 00 Page 1

SECTION 01 00 00 Page 2

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 SCOPE

This section of the Specifications provides general information and requirements; work and access restrictions; and required coordination with others. The work covered by these Specifications consists of furnishing all equipment, labor, and materials required for the staging and construction of Chickamauga Lock Excavation features and associated facilities as shown on the drawings and as described herein

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

EP 310-1-6a (2006) Sign Standards Manual, VOL 1

1.3 COORDINATION WITH OTHERS

Construction of features in this contract will impact or be impacted by other organizations. The Contractor has primary responsibility to initiate the coordination and communication in a timely manner with the Contracting Officer to schedule activities of others and minimize or eliminate conflicts with others. The Contracting Officer will then determine the appropriate course of communicating with the others involved. In many cases, the Contracting Officer may determine that the Contractor should communicate directly with others while ensuring the Contracting Officer is timely informed of the decisions of the communications or actively involved in the communications.

1.3.1 Coordination with Other Contractors Within the Same General Area

In addition to the provisions of Contract Clause 52.236-8 titled "OTHER CONTRACTS", the following information is provided:

1.3.1.1 Coordination with TVA or Corps of Engineers' Dewatering & Maintenance

The contractor is advised that Tennessee Valley Authority (TVA) or Corps of Engineers' construction crews may be operating in and near the work limits of this contract while performing dewatering and maintenance repairs to the existing lock, typically in spring / summer months and typically only once every three years.

SECTION 01 00 00 Page 3

Most of the work will be performed from barges in the downstream approach of the existing lock and typically is completed within 30 days. Typically, the work will require that the Government position a crane and other support equipment in the downstream approach channel. Corps maintenance activities will have priority over the Contractor's forces during such periods, but such work should not impact work outside of the downstream approach to the existing lock. There are no scheduled dewatering and maintenance activities that would impact the Contractor's activities at this time.

The Corps will inform the contractor in advance of obstructions to lock contract activities. The Contractor shall coordinate all activities through the Resident Engineer. The primary point of contact for this activity is:

Mr. John Tribble, Navigation Branch Phone: (615) 736-7809

The secondary point of contact is:

Mr. Matt Emmons, Chickamauga Lockmaster Phone: (423) 875-6230

1.3.2 Coordination with Land Owners and Utilities

1.3.2.1 General

The primary lay down / staging areas for this contract shall be LAYDOWN AREA #1 landward of the existing lock and LAYDOWN AREA #2 adjacent to and North of Trailhead Drive. These areas are clearly identified on Drawing 61W510-02a-LE. These areas belongs to TVA, owner of the Chickamauga Lock and Dam. Any supplemental lands needed for contract staging shall be the responsibility of the contractor. Supplemental lands should be active commercial facilities that are currently used for construction operations.

Supplemental lands which are not in active commercial use shall require additional environmental assessments which could require up to 6 months for approval, depending on the environmental quality and previous disturbance of the site. The Contractor shall submit a Contractor Lay Down and Staging Area Plan showing development, utilization and restoration to the Contracting Officer for approval prior to initiation of work. All staging areas shall be returned to initial conditions to the extent possible, unless so directed by the Contracting Officer. The Contracting Officer reserves the right to disapprove the proposed site if it is determined to have an adverse environmental impact.

Where known, the locations of utilities are shown on the Contract Drawings. No utility relocations are anticipated for the work activities in this Contract. If during the course of this Contract, it is determined that utility relocations are necessary, they shall be performed by the respective owners, except as noted below. The Contractor is (a) responsible for field verification of exact locations with the utility owner; (b) responsible for coordination and cooperation with utility owners and scheduling access to required work areas; (c) should not assume that this list is all inclusive, and should anticipate that other utilities may be encountered. If this should occur, it is the Contractor's responsibility to notify the Contracting Officer and to coordinate the relocation of the utility appurtenance with the utility owner.

SECTION 01 00 00 Page 4

It is understood and agreed that the Contractor has considered in his bid all of the permanent and temporary utility appurtenances in their present or relocated positions and that no additional compensation will be allowed for delays, inconveniences, or damages sustained by him due to any interference from the said utility appurtenances or the operation of relocating them.

1.3.2.2 Coordination with Norfolk Southern Railway Company

The Contractor shall coordinate with the Norfolk Southern (NS) Railway Representative to develop work plans for activities regarding construction under the railroad bridge or near railroad bridge piers.

Coordination with Norfolk Southern Railroad is required for activities in close proximity to the railroad bridge crossing immediately downstream of Chickamauga Lock and Dam. The bridge is frequently used and railroad traffic shall not be interrupted. Construction activities which are within reach of the railroad facility require coordination with Norfolk Southern Railroad. Specifically, floating plants on the outside of the cofferdam which extend downstream of the railroad or around the railroad bridge piers must be thoroughly coordinated. The Railroad may require, at Contractor's expense, flagmen to be present to notify approaching trains if construction equipment could fall into the bridge or piers.

The point of contact for the railroad is:

Mr. A.K. Sylvester Bridge and Building Supervisor Norfolk Southern Railway Cell Phone: (865) 776-4782

The secondary point of contact is:

Mr. Phil Doss Norfolk Southern Railway

Cell Phone: (865) 599-0620

The emergency contact number for the Norfolk Southern Railway is:

Mr. Willie Benton Norfolk Southern Railway Engineer Structures Phone: (404) 529-2171 Cell Phone: (404) 310-5079

1.3.2.3 Electric Service Installation by Chattanooga Electric Power Board

The Contractor shall coordinate with the Contracting Officer, TVA, and the Chattanooga EPB at least 90 days in advance for any required relocations.

The point of contact for the Chattanooga Electric Power Board is:

Mr. David Henderson Chattanooga EPB Phone: (423) 648-3257

The point of contact for TVA is:

SECTION 01 00 00 Page 5

Mr. Dan Fisher Hiawassee Watershed Team, Chattanooga, TN

Phone: (423) 876-4177

1.3.2.4 Coordination with City of Chattanooga, Traffic Engineering

The contractor shall coordinate with the City of Chattanooga Traffic Department for any construction activities which impact local traffic or roadways. Permits for highway access or use by construction vehicles on the highway system shall also be coordinated with the City. The contractor is responsible for any damage caused to the roadway system from construction activities and must maintain the roadway in a satisfactory condition and make repairs during the course of the contract as required by the City.

The point of contact is:

Mr. Rick Davis City of Chattanooga Traffic Engineering Phone: (423) 757-5005 Cell Phone (423) 421-5118

1.3.2.5 Chattanooga Department of Parks and Recreation

The Contractor is advised that the area north of Lake Resort Drive is the boundary for the Hixson Greenway. The shelter and trailhead facilities have been closed for the duration of this contract and there is no public access from the south. Any maintenance of the site by Chattanooga Park personnel shall be coordinated with the Contracting Officer and the Contractor.

The point of contact for information regarding the Hixson Greenway is:

Mr. Dan Kral, Director Department of Parks and Recreation Phone: (423) 643-6085

1.3.2.6 Coordination with the Tennessee Valley Authority and Corps of Engineers

The Contractor is advised that the staging area near the existing lock and boat ramp is located on TVA property and contains TVA facilities. Some of these facilities, such as the toe drain and monitoring stations, are critical to the safe operation of the Chickamauga Lock and Dam.

Chickamauga Lock is a component of the Tennessee River navigation system and is operated by the Corps of Engineers. The contractor shall ensure that access is provided to TVA and Corps personnel throughout the project site at all times and that their activities are not hindered by the contractor's activities. Procedures shall be developed by the contractor to ensure this access is available when the contractor's or sub-contractor's work crews are off-duty. These provisions shall be developed in consultation with the TVA and Corps of Engineers' staff below and approved by the Contracting Officer.

The TVA point of contact for issues regarding power plant operations is:

Mr. Ralph Finch, TVA Production Manager

SECTION 01 00 00 Page 6

Chickamauga Dam Phone: (423) 697-4170

The COE point of contact for Chickamauga Lock is:

Mr. Matt Emmons Lockmaster - Chickamauga Lock Phone: (423) 875-6230

1.3.2.7 Coordination for Navigation with Tennessee Valley Authority, The Corps of Engineers, and the United States Coast Guard

The provisions of Section 01 35 13, SPECIAL PROJECT PROVISIONS and Section 01 54 00, WORK IN NAVIGABLE WATERS shall apply, in addition to the provisions stated herein and other applicable sections and provisions of the specifications.

1.4 SITE ACCESS

In addition to the site restrictions described in the above Sections and elsewhere in these Specifications and Contract Plans, the Contractor is advised that other access restrictions will apply to both land and water based activities in the project work area. These restrictions are defined in the following sections. In addition, the Contractor shall adhere to all load restrictions and speed limits on public roads when hauling material to and from the project site.

1.4.1 Marine Access

The Contract Plans show marine access by the contractor from the riverbank at the construction staging area. The existing boat ramp may require grading or other surface treatment by the Contractor prior to being available for use. The condition of existing boat ramp can be observed during the pre-bid site visit. Location of the docking facility other than where it is shown on the drawings; and any major improvements in the river to the boat ramp will require approval from the Tennessee Wildlife Resources Agency, the U.S. Fish and Wildlife Service, and the Tennessee Department of Environment and Conservation (TDEC) - Chattanooga Field Office, and may require relocation of mussels. The section of the Tennessee River from Chickamauga Dam downstream to Chattanooga is designated as a mussel sanctuary and as such is afforded special protection. Mussels at the lock construction site and for a 600 foot section along the shoreline at the staging area have been relocated for this contract. The use or construction of other marine access locations within the project area require the necessary environmental clearances and must be approved by the Contracting Officer. It is likely that permission to use an alternate marine access location will depend, at least partially, on an environmental assessment as described in Section 01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS of these Specifications.

1.4.2 Land Access

The road into the lock will be a dedicated access for lock personnel and for the construction contract staging. Trailhead Drive and the Hixson Greenway will be closed to the public. Activities which may impact access to the existing lock require the approval of the lock operator and the Contracting Officer. Use of any TVA lands outside the area dedicated for construction staging in the contract drawings require approval from TVA.

The point of contact is:

SECTION 01 00 00 Page 7

Benjamin J. Bean, Chattanooga Regional Watershed Office 4601 N. Access Road, Bldg. B Chattanooga, TN 37415-3825 Phone: (800) 882-5263

1.5 IMPACTS TO NAVIGATION TRAFFIC

The Contractor is advised that the development of his work plan and its execution shall not impede navigation through the project site, except as noted elsewhere in these Specifications. Specific criteria are provided in the following two sections.

1.5.1 Navigation Channel Restrictions and Information

The Contractor is advised that the project area is traversed by commercial cargo vessels on the Tennessee River. Tows traveling this reach of river are often jumbo barges configured 5L x 3W, resulting in tows of approximately 1200 feet in length and 105 feet in width. The average tow at Chickamauga Lock is 8 barges. Since each barge requires a lockage time of about one hour, the average tow requires about 8 hours to lock through the 360 ft x 60 ft lock.

The navigation channel within this Contract's work area is depicted in the drawings. The Contractor shall not engage in any activity restricting commercial or recreational vessel traffic within this channel without the knowledge and written approval of the Chickamauga Lock Lockmaster or unless specifically stated elsewhere in these Specifications. Marine vessels required to assist and relocate plant and equipment for construction shall have the horsepower to safely perform such operations under the flow conditions for which the work is being conducted.

If a helper boat is provided to assist navigation vessels as part of an approved Contractor Plan, then it shall have a minimum of 600 horsepower and shall be a twin screw vessel. All of its electronic, environmental, safety and fire-fighting equipment shall be in good working order and meet established marine industry and US Coast Guard standards. The government reserves the right to disqualify a vessel if the vessel's condition or seaworthiness is judged unacceptable or it is deemed unable to perform the task safely. In addition to the vessel's master, the vessel shall be crewed by a minimum of one deckhand while underway. The Contractor shall adhere to all requirements of the Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. The pilot and crew will not be allowed to be on duty for more than 12 hours in any 24 hour period.

No falsework will be allowed in this area that would impede or endanger vessels traversing the channel at water levels up to elevation 644 feet, unless a plan to protect the falsework and navigation traffic is developed and approved by the Contracting Officer and the U.S Coast Guard. It may be possible for the Contractor to develop plans to protect the falsework and navigation traffic at various water levels through the use of a helper boat dedicated to this effort and to this channel 24 hours a day. During low water elevations, the falsework may not require the protection or a helper boat or other protection means if it is not possible that vessels will impact the falsework. If a helper boat is provided to assist navigation vessels as part of an approved Contractor plan, then it shall have a minimum of 600 horsepower and shall be a twin screw vessel and meet the same requirements as those noted above.

SECTION 01 00 00 Page 8

While lockages are often 8 hours or more, the volume of traffic at Chickamauga Lock does not typically lead to significant delays between tows. As such, there will be windows where there is no commercial traffic in the lock. Therefore, it may be possible for the contractor to develop plans to operate within the navigation channel during these periods with advance coordination and approval from the Contracting Officer and the Lockmaster. The feasibility of this plan would depend on the type and size of equipment the contractor plans to have in the channel and many other factors that would have to be reviewed and approved by both the Contracting Officer and the U.S. Coast Guard.

The Lockmaster or lock operator on duty can be reached by phone at (423) 875-6230 or by Marine Band Radio VHF - FM 156.8 MHz (Ch.13) or 156.7 MHz (Ch.14). Channel 16 is the authorized reply and distress frequency, and locks are not permitted to use this frequency except in an emergency involving the risk to immediate loss of life or property. The Contractor is advised that under most circumstances, he will not be allowed to use or impede the use of the Federal mooring cells immediately downstream of the lock or the two cells on the right descending bank just upstream of the lock. Only when given written permission by the Contracting Officer or the Chickamauga Lock Lockmaster will the Contractor be allowed to use these mooring facilities.

1.5.2 Impacts to Recreational Craft

The Contractor is advised that the work area of this Contract is a popular area for recreational boating and fishing. During optimum water and weather conditions, it is not unusual to have 10 or more fishing boats present in the one-half mile reach of river below Chickamauga Dam. In addition, recreational lockage traffic is heavy each June during the week-long Chattanooga Riverbend Festival and during football season by boaters traveling to/from University of Tennessee football games. The Contractor's work plan and safety plan shall be developed with this knowledge and with the goal to minimize the impacts to these vessels. It is the desire of the Government not to close the river to these boats. It is the responsibility of the Contractor in the development of his work plan and safety plan to determine the need and mechanism for any closures of the tailwater area to these boats.

1.6 ARMORING OF EXPOSED STREAM BANK

It is anticipated that the Contractor's work plan may require the removal of existing riprap along the streambank at the construction staging area.

At no times shall areas of streambank within the limits of the existing riprap be exposed without a 30 inch thick layer of riprap for more than a period of two days unless specifically authorized by the Contracting Officer. If this riprap placement is not shown on the Contract Drawings and is being required to support the Contractor's work plan, then the cost of providing this riprap shall be considered incidental to the Cofferdam construction and will be the responsibility of the Contractor. The removal or placement of riprap below the top of any streambank on the project will require approval from the Contracting Officer and the issuance of a State Water Quality Certification.

1.7 PROJECT SITE SECURITY REQUIREMENTS

Project site security requirements are stated in Section 01 35 50 PROJECT

SITE SECURITY AND AT/OPSEC PROCEDURES.

SECTION 01 00 00 Page 9

1.8 PROJECT SIGNS

a. General. The Contractor shall furnish and erect within 30 days after issue of the Notice to Proceed at the location directed, a PROJECT IDENTIFICATION SIGN and a SAFETY PERFORMANCE SIGN. The signs shall be lettered on one side only and shall conform to EP 310-1-6a and to the details and colors shown on the sketches attached at the end of Section 01 95 00 FORMS AND ATTACHMENTS. The name of the project shall be as follows:

CHICKAMAUGA LOCK REPLACEMENT

LOCK EXCAVATION

b. Materials. The sign shall be constructed with a face sheet of 3/4 inch exterior grade plywood mounted on a substantial framework of treated 4-inch by 4-inch material. Screws shall be commercial quality and of sizes shown.

c. Painting. The signs and posts shall be given one prime coat and two finish coats of exterior oil paint before lettering. Letters and trim shall be applied to one side only using one coat of enamel of color, style, and size shown.

d. Erection and Maintenance. The signs shall be erected at the designated locations. Signs shall be plumb and backfill of post holes shall be well tamped to properly support the signs out the life of the contract. The signs shall be maintained in good condition until completion of the contract, shall remain the property of the Contractor, and shall be removed from the site upon final acceptance of the contract work.

1.9 ACCIDENT PREVENTION

Accident prevention requirements for this project are stated in Section

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS.

1.10 SAFETY TRAINING FOR WORKERS

1.10.1 In Vicinity of Norfolk Southern Railway Right of Way

The Contractor is responsible to provide training in compliance with regulations of the Federal Railroad Administration (FRA) for employees and subcontractors who will perform work on property controlled by the Norfolk Southern Railway and on property that has active railroad operations ongoing.

1.11 COMPLIANCE WITH U.S. COAST GUARD PERMITS

The U.S. Coast Guard has issued separate permits for the Norfolk Southern Railway Bridge. The Contractor shall adhere to all the restrictions and criteria specified in these permits.

1.12 DAM SAFETY EMERGENCY ACTIONS

1.12.1 Dam Safety Training

At least one representative from each of the Contractors and at least one representative from each of his subcontractors' work crews that are

SECTION 01 00 00 Page 10 involved in excavation work or drilling within 800 feet of the centerline of Chickamauga Dam shall be required to attend dam safety training. This training will be provided on-site by TVA personnel and shall consist of less than three hours of instructional video tape and site specific instructions. The training will be provided at no cost to the Contractor or subcontractors. This training is required prior to any of the described work effort above. Any excavation or pile driving in river outside the cofferdam will require a State Water Quality permit and review by the Corps Navigation Section.

1.12.2 Dam Safety Condition Notification

If a potential condition threatening dam safety is noticed by the Contractor or subcontractor employees, the Contractor should immediately notify the TVA's Production Manager for Chickamauga Dam at (423) 697-4170.

The senior operator will then dispatch a TVA employee to view and report on the condition. As soon as possible, the Contractor shall also notify the Contracting Officer's Representative at the site or the Resident Engineer.

If the situation is a potential or actual Dam Safety Emergency, the senior powerplant operator will issue guidance through the Contracting Officer's Representative or the Resident Engineer on actions the contractor must take to stabilize the dam safety situation or TVA will take actions in an attempt to stabilize the dam safety situation. In the event the Contracting Officer's Representative or Resident Engineer are not available, and the situation is considered critical, the senior powerplant operator may issue this guidance directly to the Contractor. Any part of the contract work delayed or otherwise impacted due to a dam safety concern as described herein will be addressed in accordance with the contract clause titled "Suspension of Work".

1.13 SUBMITTALS

Contracting Officer approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Contractor Lay Down and Staging Area Plan; G

The Contractor shall submit a lay down and staging area plan as described in paragraph 1.3.2.1.

1.14 EVALUATION OF CONTRACTOR PERFORMANCE

The Contractor's performance will be evaluated in accordance with FAR Part

42.15 in the areas of quality, schedule, cost control, management, utilization of small businesses, and regulatory compliance at minimum. The evaluation will include a written narrative and rating of either exceptional, very good, satisfactory, marginal, or unsatisfactory for each. The format for the evaluation is included in Appendix A - FORMS AND

ATTACHMENTS.

The Contractor's review of the evaluation shall be completed electronically at the CPARS website, http://www.cpars.gov. This website also includes guidance and the user's manual.

Upon contract award, the Contractor shall provide the Contracting Officer

SECTION 01 00 00 Page 11 with the name and e-mail address of the Contractor's Representative to be registered into the system. Following initial completion by the Government, the Contractor will have sixty (60) calendar days to review, comment, and return the evaluation.

1.15 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

Federal Veteran employment information at:

http://www.fedshirevets.gov/index.aspx

Department of Labor Veterans Employment Assistance:

http://www.dol.gov/vets/

Department of Veterans Affairs-VOW to Hire Heroes Act:

http://benefits.va.gov/vow/

Army Wounded Warrior Program:

http://wtc.army.mil/modules/employers/index.html

U.S. Chamber of Commerce Foundation-Hiring Our Heroes http://www.hiringourheroes.org/

Guide to Hiring Veterans - Reference Material:

http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council_-_ guide_to_hiring_veterans_0.pdf

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section --

SECTION 01 00 00 Page 12

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 PAYMENT ITEMS

1.2 BASE

1.2.1 CLIN 0001 Mobilization and Demobilization

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 CLIN 0002 Initial Unwatering and Design of Dewatering System

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.3 CLIN 0003 Diversion and Care of Water - Base

1.2.3.1 Payment

1.2.3.2 Measurement

1.2.3.3 Unit of Measure

1.2.4 CLIN 0004 Instrumentation Program O&M - Base

1.2.4.1 Payment

1.2.4.2 Measurement

1.2.4.3 Unit of Measure

1.2.5 CLIN 0005 USACE Office Cleaning Services - Base

1.2.5.1 Payment

1.2.5.2 Measurement

1.2.5.3 Unit of Measure

1.2.6 CLIN 0006 USACE Office Carpet Cleaning Services - Base

1.2.6.1 Payment

1.2.6.2 Measurement

1.2.6.3 Unit of Measure

1.2.7 CLIN 0007 Core Drilling, Vertical Holes

1.2.7.1 Payment

1.2.7.2 Measurement

1.2.7.3 Unit of Measure

1.2.8 CLIN 0008 Secant Wall; Primary Piles In-Place

1.2.8.1 Payment

1.2.8.2 Measurement

1.2.8.3 Unit of Measure

1.2.9 CLIN 0009 Secant Wall; Secondary Piles In-Place

1.2.9.1 Payment

1.2.9.2 Measurement

1.2.9.3 Unit of Measure

1.2.10 CLIN 0010 Secant Wall; Cap Beam

1.2.10.1 Payment

1.2.10.2 Unit of Measure

1.2.11 CLIN 0011 Furnish and Install Inclined Anchors

1.2.11.1 Payment

1.2.11.2 Measurement

1.2.11.3 Unit of Measure

1.2.12 CLIN 0012 Performance Tests

SECTION 01 22 00 Page 1

1.2.12.1 Payment

1.2.12.2 Measurement

1.2.12.3 Unit of Measure

1.2.13 CLIN 0013 Proof Tests

1.2.13.1 Payment

1.2.13.2 Measurement

1.2.13.3 Unit of Measure

1.2.14 CLIN 0014 Watertightness Testing

1.2.14.1 Payment

1.2.14.2 Measurement

1.2.14.3 Unit of Measure

1.2.15 CLIN 0015 Grouting Holes & Redrilling

1.2.15.1 Payment

1.2.15.2 Measurement

1.2.15.3 Unit of Measure

1.2.16 CLIN 0016 Anchor Support Blocks

1.2.16.1 Payment

1.2.16.2 Measurement

1.2.16.3 Unit of Measure

1.2.17 CLIN 0017 Pilot Hole

1.2.17.1 Payment

1.2.17.2 Measurement

1.2.17.3 Unit of Measure

1.2.18 CLIN 0018 Cofferdam Stability Berm

1.2.18.1 Payment

1.2.18.2 Measurement

1.2.18.3 Unit of Measure

1.2.19 CLIN 0019 Lock Overburden Removal

1.2.19.1 Payment

1.2.19.2 Measurement

1.2.19.3 Unit of Measure

1.2.20 CLIN 0020 Flood Facility Concrete Splash Pad

1.2.20.1 Payment

1.2.20.2 Unit of Measure

1.2.21 CLIN 0021 Shotcrete Placement (4")

1.2.21.1 Payment

1.2.21.2 Measurement

1.2.21.3 Unit of Measure

1.2.22 CLIN 0022 Rock Excavation

1.2.22.1 Payment

1.2.22.2 Measurement

1.2.22.3 Unit of Measure

1.2.23 CLIN 0023 Pre-Splitting

1.2.23.1 Payment

1.2.23.2 Measurement

1.2.23.3 Unit of Measure

1.2.24 CLIN 0024 Line Drilling (6" Spacing)

1.2.24.1 Payment

1.2.24.2 Measurement

1.2.24.3 Unit of Measure

1.2.25 CLIN 0025 Rock Bolts

1.2.25.1 Payment

1.2.25.2 Measurement

1.2.25.3 Unit of Measure

1.2.26 CLIN 0026 Grubbing Only

1.2.26.1 Payment

1.2.26.2 Measurement

1.2.26.3 Unit of Measure

1.2.27 CLIN 0027 Clearing and Grubbing

SECTION 01 22 00 Page 2

1.2.27.1 Payment

1.2.27.2 Measurement

1.2.27.3 Unit of Measure

1.2.28 CLIN 0028 Drainage Ditch Construction

1.2.28.1 Payment

1.2.28.2 Measurement

1.2.28.3 Unit of Measure

1.2.29 CLIN 0029 Manage, and Place Disposal Area Fill

1.2.29.1 Payment

1.2.29.2 Measurement

1.2.29.3 Unit of Measure

1.2.30 CLIN 0030 Geotextile Installations

1.2.30.1 Payment

1.2.30.2 Measurement

1.2.30.3 Unit of Measure

1.2.31 CLIN 0031 Manhole Extensions

1.2.31.1 Payment

1.2.31.2 Measurement

1.2.31.3 Unit of Measure

1.2.32 CLIN 0032 Strip, Manage, and Place On-Site Vegetative Soil

1.2.32.1 Payment

1.2.32.2 Measurement

1.2.32.3 Unit of Measure

1.2.33 CLIN 0033 Furnish, Manage, and Place Off-Site Vegetative Soil

1.2.33.1 Payment

1.2.33.2 Measurement

1.2.33.3 Unit of Measure

1.2.34 CLIN 0034 Seeding

1.2.34.1 Payment

1.2.34.2 Measurement

1.2.34.3 Unit of Measure

1.2.35 CLIN 0035 Control Monuments

1.2.35.1 Payment

1.2.35.2 Measurement

1.2.35.3 Unit of Measure

1.2.36 CLIN 0036 Toe Drain Discharge Alternate 1 (Replace)

1.2.36.1 Payment

1.2.36.2 Unit of Measure

1.2.37 CLIN 0037 Toe Drain Discharge Alternate 2 (New Alignment)

1.2.37.1 Payment

1.2.37.2 Unit of Measure

1.3 OPTION 1 - STAGE 2 ROCK EXCAVATION

1.3.1 CLIN 0038 Diversion and Care of Water - Option 1

1.3.1.1 Payment

1.3.1.2 Measurement

1.3.1.3 Unit of Measure

1.3.2 CLIN 0039 Instrumentation Program O&M - Option 1

1.3.2.1 Payment

1.3.2.2 Measurement

1.3.2.3 Unit of Measure

1.3.3 CLIN 0040 USACE Office Cleaning Services - Option 1

1.3.3.1 Payment

1.3.3.2 Measurement

1.3.3.3 Unit of Measure

1.3.4 CLIN 0041 USACE Office Carpet Cleaning Services - Option 1

1.3.4.1 Payment

1.3.4.2 Measurement

1.3.4.3 Unit of Measure

1.3.5 CLIN 0042 Shotcrete Placement (4") - Option 1

SECTION 01 22 00 Page 3

1.3.5.1 Payment

1.3.5.2 Measurement

1.3.5.3 Unit of Measure

1.3.6 CLIN 0043 Rock Excavation - Option 1

1.3.6.1 Payment

1.3.6.2 Measurement

1.3.6.3 Unit of Measure

1.3.7 CLIN 0044 Pre-Splitting - Option 1

1.3.7.1 Payment

1.3.7.2 Measurement

1.3.7.3 Unit of Measure

1.3.8 CLIN 0045 Line Drilling (6" Spacing) - Option 1

1.3.8.1 Payment

1.3.8.2 Measurement

1.3.8.3 Unit of Measure

1.3.9 CLIN 0046 Rock Bolts - Option 1

1.3.9.1 Payment

1.3.9.2 Measurement

1.3.9.3 Unit of Measure

1.3.10 CLIN 0047 Manage, and Place Disposal Area Fill - Option 1

1.3.10.1 Payment

1.3.10.2 Measurement

1.3.10.3 Unit of Measure

1.4 OPTION 2 - STAGE 3 ROCK EXCAVATION

1.4.1 CLIN 0048 Diversion and Care of Water - Option 2

1.4.1.1 Payment

1.4.1.2 Measurement

1.4.1.3 Unit of Measure

1.4.2 CLIN 0049 Instrumentation Program O&M - Option 2

1.4.2.1 Payment

1.4.2.2 Measurement

1.4.2.3 Unit of Measure

1.4.3 CLIN 0050 USACE Office Cleaning Services - Option 2

1.4.3.1 Payment

1.4.3.2 Measurement

1.4.3.3 Unit of Measure

1.4.4 CLIN 0051 USACE Office Carpet Cleaning Services - Option 2

1.4.4.1 Payment

1.4.4.2 Measurement

1.4.4.3 Unit of Measure

1.4.5 CLIN 0052 Shotcrete Placement (4") - Option 2

1.4.5.1 Payment

1.4.5.2 Measurement

1.4.5.3 Unit of Measure

1.4.6 CLIN 0053 Rock Excavation - Option 2

1.4.6.1 Payment

1.4.6.2 Measurement

1.4.6.3 Unit of Measure

1.4.7 CLIN 0054 Pre-Splitting - Option 2

1.4.7.1 Payment

1.4.7.2 Measurement

1.4.7.3 Unit of Measure

1.4.8 CLIN 0055 Line Drilling (6" Spacing) - Option 2

1.4.8.1 Payment

1.4.8.2 Measurement

1.4.8.3 Unit of Measure

1.4.9 CLIN 0056 Rock Bolts - Option 2

1.4.9.1 Payment

1.4.9.2 Measurement

SECTION 01 22 00 Page 4

1.4.9.3 Unit of Measure

1.4.10 CLIN 0057 Manage, and Place Disposal Area Fill - Option 2

1.4.10.1 Payment

1.4.10.2 Measurement

1.4.10.3 Unit of Measure

1.5 OPTION 3 - LOCK FLOOR TREATMENT

1.5.1 CLIN 0058 Diversion and Care of Water - Option 3

1.5.1.1 Payment

1.5.1.2 Measurement

1.5.1.3 Unit of Measure

1.5.2 CLIN 0059 Instrumentation Program O&M - Option 3

1.5.2.1 Payment

1.5.2.2 Measurement

1.5.2.3 Unit of Measure

1.5.3 CLIN 0060 USACE Office Cleaning Services - Option 3

1.5.3.1 Payment

1.5.3.2 Measurement

1.5.3.3 Unit of Measure

1.5.4 CLIN 0061 USACE Office Carpet Cleaning Services - Option 3

1.5.4.1 Payment

1.5.4.2 Measurement

1.5.4.3 Unit of Measure

1.5.5 CLIN 0062 Lock Floor Excavation & Concrete - Option 3

1.5.5.1 Payment

1.5.5.2 Measurement

1.5.5.3 Unit of Measure

1.5.6 CLIN 0063 Manage, and Place Disposal Area Fill - Option 3

1.5.6.1 Payment

1.5.6.2 Measurement

1.5.6.3 Unit of Measure

1.6 OPTION 4 - STAGE 4 ROCK EXCAVATION

1.6.1 CLIN 0064 Diversion and Care of Water - Option 4

1.6.1.1 Payment

1.6.1.2 Measurement

1.6.1.3 Unit of Measure

1.6.2 CLIN 0065 Instrumentation Program O&M - Option 4

1.6.2.1 Payment

1.6.2.2 Measurement

1.6.2.3 Unit of Measure

1.6.3 CLIN 0066 USACE Office Cleaning Services - Option 4

1.6.3.1 Payment

1.6.3.2 Measurement

1.6.3.3 Unit of Measure

1.6.4 CLIN 0067 USACE Office Carpet Cleaning Services - Option 4

1.6.4.1 Payment

1.6.4.2 Measurement

1.6.4.3 Unit of Measure

1.6.5 CLIN 0068 Shotcrete Placement (4") - Option 4

1.6.5.1 Payment

1.6.5.2 Measurement

1.6.5.3 Unit of Measure

1.6.6 CLIN 0069 Rock Excavation - Option 4

1.6.6.1 Payment

1.6.6.2 Measurement

1.6.6.3 Unit of Measure

1.6.7 CLIN 0070 Pre-Splitting - Option 4

1.6.7.1 Payment

1.6.7.2 Measurement

1.6.7.3 Unit of Measure

SECTION 01 22 00 Page 5

1.6.8 CLIN 0071 Line Drilling (6" Spacing) - Option 4

1.6.8.1 Payment

1.6.8.2 Measurement

1.6.8.3 Unit of Measure

1.6.9 CLIN 0072 Rock Bolts - Option 4

1.6.9.1 Payment

1.6.9.2 Measurement

1.6.9.3 Unit of Measure

1.6.10 CLIN 0073 Manage, and Place Disposal Area Fill - Option 4

1.6.10.1 Payment

1.6.10.2 Measurement

1.6.10.3 Unit of Measure

1.7 OPTION 5 - STAGE 5 ROCK EXCAVATION

1.7.1 CLIN 0074 Diversion and Care of Water - Option 5

1.7.1.1 Payment

1.7.1.2 Measurement

1.7.1.3 Unit of Measure

1.7.2 CLIN 0075 Instrumentation Program O&M - Option 5

1.7.2.1 Payment

1.7.2.2 Measurement

1.7.2.3 Unit of Measure

1.7.3 CLIN 0076 USACE Office Cleaning Services - Option 5

1.7.3.1 Payment

1.7.3.2 Measurement

1.7.3.3 Unit of Measure

1.7.4 CLIN 0077 USACE Office Carpet Cleaning Services - Option 5

1.7.4.1 Payment

1.7.4.2 Measurement

1.7.4.3 Unit of Measure

1.7.5 CLIN 0078 Shotcrete Placement (4") - Option 5

1.7.5.1 Payment

1.7.5.2 Measurement

1.7.5.3 Unit of Measure

1.7.6 CLIN 0079 Rock Excavation - Option 5

1.7.6.1 Payment

1.7.6.2 Measurement

1.7.6.3 Unit of Measure

1.7.7 CLIN 0080 Pre-Splitting - Option 5

1.7.7.1 Payment

1.7.7.2 Measurement

1.7.7.3 Unit of Measure

1.7.8 CLIN 0081 Line Drilling (6" Spacing) - Option 5

1.7.8.1 Payment

1.7.8.2 Measurement

1.7.8.3 Unit of Measure

1.7.9 CLIN 0082 Rock Bolts - Option 5

1.7.9.1 Payment

1.7.9.2 Measurement

1.7.9.3 Unit of Measure

1.7.10 CLIN 0083 Manage, and Place Disposal Area Fill - Option 5

1.7.10.1 Payment

1.7.10.2 Measurement

1.7.10.3 Unit of Measure

1.8 OPTION 6 - STAGE 6 ROCK EXCAVATION

1.8.1 CLIN 0084 Diversion and Care of Water - Option 6

1.8.1.1 Payment

1.8.1.2 Measurement

1.8.1.3 Unit of Measure

1.8.2 CLIN 0085 Instrumentation Program O&M - Option 6

SECTION 01 22 00 Page 6

1.8.2.1 Payment

1.8.2.2 Measurement

1.8.2.3 Unit of Measure

1.8.3 CLIN 0086 USACE Office Cleaning Services - Option 6

1.8.3.1 Payment

1.8.3.2 Measurement

1.8.3.3 Unit of Measure

1.8.4 CLIN 0087 USACE Office Carpet Cleaning Services - Option 6

1.8.4.1 Payment

1.8.4.2 Measurement

1.8.4.3 Unit of Measure

1.8.5 CLIN 0088 Shotcrete Placement (4") - Option 6

1.8.5.1 Payment

1.8.5.2 Measurement

1.8.5.3 Unit of Measure

1.8.6 CLIN 0089 Rock Excavation - Option 6

1.8.6.1 Payment

1.8.6.2 Measurement

1.8.6.3 Unit of Measure

1.8.7 CLIN 0090 Pre-Splitting - Option 6

1.8.7.1 Payment

1.8.7.2 Measurement

1.8.7.3 Unit of Measure

1.8.8 CLIN 0091 Line Drilling (6" Spacing) - Option 6

1.8.8.1 Payment

1.8.8.2 Measurement

1.8.8.3 Unit of Measure

1.8.9 CLIN 0092 Rock Bolts - Option 6

1.8.9.1 Payment

1.8.9.2 Measurement

1.8.9.3 Unit of Measure

1.8.10 CLIN 0093 Manage, and Place Disposal Area Fill - Option 6

1.8.10.1 Payment

1.8.10.2 Measurement

1.8.10.3 Unit of Measure

1.9 OPTION 7 - STAGE 7 ROCK EXCAVATION

1.9.1 CLIN 0094 Diversion and Care of Water - Option 7

1.9.1.1 Payment

1.9.1.2 Measurement

1.9.1.3 Unit of Measure

1.9.2 CLIN 0095 Instrumentation Program O&M - Option 7

1.9.2.1 Payment

1.9.2.2 Measurement

1.9.2.3 Unit of Measure

1.9.3 CLIN 0096 USACE Office Cleaning Services - Option 7

1.9.3.1 Payment

1.9.3.2 Measurement

1.9.3.3 Unit of Measure

1.9.4 CLIN 0097 USACE Office Carpet Cleaning Services - Option 7

1.9.4.1 Payment

1.9.4.2 Measurement

1.9.4.3 Unit of Measure

1.9.5 CLIN 0098 Shotcrete Placement (4") - Option 7

1.9.5.1 Payment

1.9.5.2 Measurement

1.9.5.3 Unit of Measure

1.9.6 CLIN 0099 Rock Excavation - Option 7

1.9.6.1 Payment

1.9.6.2 Measurement

SECTION 01 22 00 Page 7

1.9.6.3 Unit of Measure

1.9.7 CLIN 0100 Mechanical Excavation - L13 - Option 7

1.9.7.1 Payment

1.9.7.2 Measurement

1.9.7.3 Unit of Measure

1.9.8 CLIN 0101 Pre-Splitting - Option 7

1.9.8.1 Payment

1.9.8.2 Measurement

1.9.8.3 Unit of Measure

1.9.9 CLIN 0102 Line Drilling (6" Spacing) - Option 7

1.9.9.1 Payment

1.9.9.2 Measurement

1.9.9.3 Unit of Measure

1.9.10 CLIN 0103 Rock Bolts - Option 7

1.9.10.1 Payment

1.9.10.2 Measurement

1.9.10.3 Unit of Measure

1.9.11 CLIN 0104 Manage, and Place Disposal Area Fill - Option 7

1.9.11.1 Payment

1.9.11.2 Measurement

1.9.11.3 Unit of Measure

1.10 OPTION 8 - STAGE 8 ROCK EXCAVATION

1.10.1 CLIN 0105 Diversion and Care of Water - Option 8

1.10.1.1 Payment

1.10.1.2 Measurement

1.10.1.3 Unit of Measure

1.10.2 CLIN 0106 Instrumentation Program O&M - Option 8

1.10.2.1 Payment

1.10.2.2 Measurement

1.10.2.3 Unit of Measure

1.10.3 CLIN 0107 USACE Office Cleaning Services - Option 8

1.10.3.1 Payment

1.10.3.2 Measurement

1.10.3.3 Unit of Measure

1.10.4 CLIN 0108 USACE Office Carpet Cleaning Services - Option 8

1.10.4.1 Payment

1.10.4.2 Measurement

1.10.4.3 Unit of Measure

1.10.5 CLIN 0109 Shotcrete Placement (4") - Option 8

1.10.5.1 Payment

1.10.5.2 Measurement

1.10.5.3 Unit of Measure

1.10.6 CLIN 0110 Rock Excavation - Option 8

1.10.6.1 Payment

1.10.6.2 Measurement

1.10.6.3 Unit of Measure

1.10.7 CLIN 0111 Pre-Splitting - Option 8

1.10.7.1 Payment

1.10.7.2 Measurement

1.10.7.3 Unit of Measure

1.10.8 CLIN 0112 Line Drilling (6" Spacing) - Option 8

1.10.8.1 Payment

1.10.8.2 Measurement

1.10.8.3 Unit of Measure

1.10.9 CLIN 0113 Rock Bolts - Option 8

1.10.9.1 Payment

1.10.9.2 Measurement

1.10.9.3 Unit of Measure

1.10.10 CLIN 0114 Manage, and Place Disposal Area Fill - Option 8

SECTION 01 22 00 Page 8

1.10.10.1 Payment

1.10.10.2 Measurement

1.10.10.3 Unit of Measure

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 CONTRACT COST BREAKDOWN

-- End of Section Table of Contents --

SECTION 01 22 00 Page 9

SECTION 01 22 00

PRICE AND PAYMENT PROCEDURES

PART 1 GENERAL

1.1 PAYMENT ITEMS

Payment items for the work of this contract are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular payment item, shall be included in the listed payment item most closely associated with the work involved. The payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.

1.2 BASE

1.2.1 CLIN 0001 Mobilization and Demobilization

1.2.1.1 Payment

Payment will be made for costs associated with mobilization and demobilization for the base contract, as defined in Contract Clause

252.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION.

60 percent of the price for this payment item will be paid upon completion of the Contractor's mobilization at the work site.

The remaining 40 percent will be paid upon completion of demobilization.

1.2.1.2 Unit of Measure

Unit of measure: Job.

1.2.2 CLIN 0002 Initial Unwatering and Design of Dewatering System

1.2.2.1 Payment

Payment will be made for costs associated with initial unwatering and design of dewatering system as specified in Section 01 57 24 DIVERSION AND CARE OF WATER. Payment for initial unwatering will be made at the contract price per Job for "Initial Unwatering and Design of Dewatering System".

Payment for initial unwatering shall include all costs associated with dewatering the cofferdam area for the first time. Initial unwatering is defined as complete when 75% of the area within the cofferdam (excluding the spillway flip bucket)is either dry or has standing water less than 1/2 inch in depth. Costs shall include but not limited to equipment, fuel, electricity, personnel, and maintenance.

All costs associated with design and installation of the pumping system for

SECTION 01 22 00 Page 10 the Diversion and Care of Water CLINS are incidental to this bid item.

1.2.2.2 Unit of Measure

Unit of measure: Job.

1.2.3 CLIN 0003 Diversion and Care of Water - Base

1.2.3.1 Payment

Payment will be made for costs associated with diversion and care of Water as specified in Section 01 57 24 DIVERSION AND CARE OF WATER. Payment for diversion and care of water for the base contract, including the construction, maintenance, operation (including pumping), regulation of flow; diversion and care of water during construction; and all other work necessary to perform the construction work in areas free from water, will be made at the contract unit price per month for "Diversion and Care of Water - Base".

Costs shall include but not be limited to equipment, fuel, electricity, personnel, and maintenance.

1.2.3.2 Measurement

The monthly average flowrate will be the calculated as follows:

A daily measurement of the flow will be taken by flow meter by the Contractor and witnessed by the Government. The use of Manufacturer's charts and RPM shall not be used for official computations. A monthly average will be computed using flow meter data.

1.2.3.3 Unit of Measure

Unit of measure: Month.

1.2.4 CLIN 0004 Instrumentation Program O&M - Base

1.2.4.1 Payment

Payment will be made for costs associated with installation, operation, and maintenance of the instrumentation program as specified in Section 13 50 00

INSTRUMENTATION PROGRAM.

Monitoring and maintaining cofferdam instrumentation components (and related data acquisition components required to collect, store and relay data), reporting this data, and development and maintenance of the Emergency Action Plan will be measured and paid on a monthly basis under the pay item "Instrumentation Program O&M - Base".

1.2.4.2 Measurement

This payment item applies during the operation and maintenance period of the instrumentation program.

1.2.4.3 Unit of Measure

Unit of measure: Month.

SECTION 01 22 00 Page 11

1.2.5 CLIN 0005 USACE Office Cleaning Services - Base

1.2.5.1 Payment

Payment will be made for costs associated with providing cleaning services to the USACE office as specified in Section 01 50 00 TEMPORARY AND PERMANENT CONSTRUCTION FACILITIES AND CONTROLS. Payment will be made at the contract unit price per month for "USACE Office Cleaning Services - Base".

1.2.5.2 Measurement

Measurement for payment will be made by the quantity of months of satisfactorily performed cleaning services.

1.2.5.3 Unit of Measure

Unit of measure: Month.

1.2.6 CLIN 0006 USACE Office Carpet Cleaning Services - Base

1.2.6.1 Payment

Payment will be made for costs associated with providing carpet cleaning services to the USACE office as specified in Section 01 50 00 TEMPORARY AND PERMANENT CONSTRUCTION FACILITIES AND CONTROLS. Payment will be made at the contract unit price per each for "USACE Office Carpet Cleaning Services

- Base".

1.2.6.2 Measurement

Measurement for payment will be made for each time of satisfactorily performed cleaning service.

1.2.6.3 Unit of Measure

Unit of measure: Each (EA).

1.2.7 CLIN 0007 Core Drilling, Vertical Holes

1.2.7.1 Payment

Payment will be made for costs including equipment, labor, materials and incidentals associated with Core Drilling, Vertical Holes, as specified in Section 02 32 00 SUBSURFACE DRILLING, SAMPLING, AND TESTING. Payment for Core Drilling, Vertical Holes will be made at the contract unit price per linear feet (LF) for "Core Drilling, Vertical Holes".

1.2.7.2 Measurement

Core Drilling, Vertical Holes will be measured for payment to the nearest foot, based upon the linear feet of hole actually drilled in accordance with the specifications or as directed by the Contracting Officer.

Measurements less than 0.5 of a foot shall be rounded down, and measurements of 0.5 of a foot or greater shall be rounded up.

1.2.7.3 Unit of Measure

Unit of measure: Linear Feet (LF).

SECTION 01 22 00 Page 12

1.2.8 CLIN 0008 Secant Wall; Primary Piles In-Place

1.2.8.1 Payment

Payment will be made for costs associated with Secant Wall; Primary Piles In-Place as specified in Section 31 66 17 SECANT PILE WALLS. Payment for Secant Wall; Primary Piles In-Place will be made at the contract price per Linear Feet (LF) for "Secant Pile Wall; Primary Piles In-Place".

a. Primary piles of the secant pile wall shall be measured and paid for by the linear foot of piles actually installed, tested, and accepted.