W912P5-16-B-0005_Bid_Schedule.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Lock Excavation, Chickamauga Lock Federal contract opportunity
Solicitation number
W912P5-16-B-0005
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

Excel version of the Bid Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Lock Excavation, Chickamauga Lock, newest first.
File Type Posted
Bid_Abstract_(OF_1419).pdf PDF
W912P5-16-B-0005-0003.pdf PDF
W912P5-16-B-0005_Plans_Am2sheets.pdf PDF
W912P5-16-B-0005_AppA-11.pdf PDF
CHH_Tail_Water.xlsx XLSX spreadsheet
W912P5-16-B-0005-0002.pdf PDF
W912P5-16-B-0005_AppA-13.pdf PDF
W912P5-16-B-0005_AppA-16.pdf PDF
W912P5-16-B-0005_AppA-05.pdf PDF
W912P5-16-B-0005_AppA-09.pdf PDF
W912P5-16-B-0005_AppA-10.pdf PDF
W912P5-16-B-0005_AppA-14.pdf PDF
W912P5-16-B-0005_AppA-02.pdf PDF
W912P5-16-B-0005_AppA-06.pdf PDF
W912P5-16-B-0005_TSpecs_Am2pages.pdf PDF
W912P5-16-B-0005_AppA-15.pdf PDF
W912P5-16-B-0005_AppA-12.pdf PDF
W912P5-16-B-0005_AppA-07.pdf PDF
W912P5-16-B-0005_AppA-08.pdf PDF
W912P5-16-B-0005_AppA-04.pdf PDF
W912P5-16-B-0005_AppA-01.pdf PDF
W912P5-16-B-0005_AppA-03.pdf PDF
Chick_Lock_-_Lock_Excavation_PreBid_Slides.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
W912P5-16-B-0005-0001.pdf PDF
W912P5-16-B-0005.pdf PDF
W912P5-16-B-0005_Plans.pdf PDF
Foreign_National_Security_Form.pdf PDF
Site_Visit_Map.jpg JPG image
Pre-Bid_Site_Visit_Form.pdf PDF
W912P5-16-B-0005_TSpecs.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

Solicitation No. W912P5-16-B-0005, Amendment 0002
Lock Excavation
Chickamauga Lock Replacement
Hamilton County, Tennessee

BID SCHEDULE

ITEM NO.DESCRIPTIONSPECIFICATION SECTIONEST. QTY.UNITUNIT
PRICEESTIMATED

AMOUNT

BASE
0001Mobilization and Demobilization01 22 001Job
0002Initial Unwatering and Design of Dewatering System01 57 241Job
0003Diversion and Care of Water - Base01 57 2412.5MO
0004Instrumentation Program O&M - Base13 50 0012.5MO
0005USACE Office Cleaning Services - Base01 50 0012.5MO
0006USACE Office Carpet Cleaning Services - Base01 50 002EA
0007Core Drilling, Vertical Holes02 32 003,628.0LF
0008Secant Wall; Primary Piles In-Place31 66 17364LF
0009Secant Wall; Secondary Piles In-Place31 66 17545LF
0010Secant Wall; Cap Beam31 66 171Job
0011Furnish and Install Inclined Anchors31 68 145,057.0LF
0012Performance Tests31 68 1413EA
0013Proof Tests31 68 1431EA
0014Watertightness Testing31 68 1488EA
0015Grouting Holes & Redrilling31 68 145,057.0LF
0016Anchor Support Blocks31 68 14273LF
0017Probe Hole31 68 14465LF
STAGE 1 ROCK EXCAVATION
0018Cofferdam Stability Berm31 00 002,441.0CY
0019Lock Overburden Removal31 23 053,600.0CY
0020Flood Facility Concrete Splash Pad31 23 051Job
0021Shotcrete Placement (4")03 37 13534.0SY
0022Rock Excavation31 23 0523,186.0CY
0023Pre-Splitting31 23 0627,544.0LF
0024Line Drilling (6" Spacing)31 23 06225.0SY
0025Rock Bolts31 68 13996.0LF
DISPOSAL AREA DEVELOPMENT
0026Grubbing Only31 11 005.3ACR
0027Clearing and Grubbing31 11 005.2ACR
0028Drainage Ditch Construction31 00 001,500.0LF
0029Manage, and Place Disposal Area Fill31 00 0023,186.0CY
0030Geotextile Installations31 05 224,991.0SY
0031Manhole Extensions33 40 002EA
0032Strip, Manage, and Place On-Site Vegetative Soil32 92 195,768.0CY
0033Furnish, Manage, and Place Off-Site Vegetative Soil32 92 194,846.0CY
0034Seeding32 92 1910.5ACR
0035Control Monuments01 32 236EA
0036Toe Drain Discharge Pipe Replacement33 40 001Job
BASE TOTAL ESTIMATED AMOUNT$
OPTION 1 - STAGE 2 ROCK EXCAVATION
0037Diversion and Care of Water - Option 101 57 242MO
0038Instrumentation Program O&M - Option 113 50 002MO
0039USACE Office Cleaning Services - Option 101 50 002MO
0040USACE Office Carpet Cleaning Services - Option 101 50 001EA
0041Shotcrete Placement (4") - Option 103 37 13815.0SY
0042Rock Excavation - Option 131 23 0511,837.0CY
0043Pre-Splitting - Option 131 23 0612,121.0LF
0044Line Drilling (6" Spacing) - Option 131 23 06560.0SY
0045Rock Bolts - Option 131 68 131,782.0LF
0046Manage, and Place Disposal Area Fill - Option 131 00 0011,837.0CY
OPTION 1 TOTAL ESTIMATED AMOUNT$
OPTION 2 - STAGE 3 ROCK EXCAVATION
0047Diversion and Care of Water - Option 201 57 245MO
0048Instrumentation Program O&M - Option 213 50 005MO
0049USACE Office Cleaning Services - Option 201 50 005MO
0050USACE Office Carpet Cleaning Services - Option 201 50 001EA
0051Shotcrete Placement (4") - Option 203 37 131,124.0SY
0052Rock Excavation - Option 231 23 0534,752.0CY
0053Pre-Splitting - Option 231 23 0623,749.0LF
0054Line Drilling (6" Spacing) - Option 231 23 06954.0SY
0055Rock Bolts - Option 231 68 131,727.0LF
0056Manage, and Place Disposal Area Fill - Option 231 00 0034,752.0CY
OPTION 2 TOTAL ESTIMATED AMOUNT$
OPTION 3 - LOCK FLOOR TREATMENT
0057Diversion and Care of Water - Option 301 57 240.5MO
0058Instrumentation Program O&M - Option 313 50 000.5MO
0059USACE Office Cleaning Services - Option 301 50 000.5MO
0060USACE Office Carpet Cleaning Services - Option 301 50 001EA
0061Lock Floor Excavation & Concrete - Option 331 23 053,360.0CY
0062Manage, and Place Disposal Area Fill - Option 331 00 003,360.0CY
OPTION 3 TOTAL ESTIMATED AMOUNT$
OPTION 4 - STAGE 4 ROCK EXCAVATION
0063Diversion and Care of Water - Option 401 57 241MO
0064Instrumentation Program O&M - Option 413 50 001MO
0065USACE Office Cleaning Services - Option 401 50 001MO
0066USACE Office Carpet Cleaning Services - Option 401 50 001EA
0067Shotcrete Placement (4") - Option 403 37 13309.0SY
0068Rock Excavation - Option 431 23 054,896.0CY
0069Pre-Splitting - Option 431 23 065,490.0LF
0070Line Drilling (6" Spacing) - Option 431 23 06614.0SY
0071Rock Bolts - Option 431 68 131,287.0LF
0072Manage, and Place Disposal Area Fill - Option 431 00 004,896.0CY
OPTION 4 TOTAL ESTIMATED AMOUNT$
OPTION 5 - STAGE 5 ROCK EXCAVATION
0073Diversion and Care of Water - Option 501 57 240.5MO
0074Instrumentation Program O&M - Option 513 50 000.5MO
0075USACE Office Cleaning Services - Option 501 50 000.5MO
0076USACE Office Carpet Cleaning Services - Option 501 50 001EA
0077Shotcrete Placement (4") - Option 503 37 1348.0SY
0078Rock Excavation - Option 531 23 053,646.0CY
0079Pre-Splitting - Option 531 23 067,395.0LF
0080Line Drilling (6" Spacing) - Option 531 23 0675.0SY
0081Rock Bolts - Option 531 68 13325.0LF
0082Manage, and Place Disposal Area Fill - Option 531 00 003,646.0CY
OPTION 5 TOTAL ESTIMATED AMOUNT$
OPTION 6 - STAGE 6 ROCK EXCAVATION
0083Diversion and Care of Water - Option 601 57 240.5MO
0084Instrumentation Program O&M - Option 613 50 000.5MO
0085USACE Office Cleaning Services - Option 601 50 000.5MO
0086USACE Office Carpet Cleaning Services - Option 601 50 001EA
0087Shotcrete Placement (4") - Option 603 37 13153.0SY
0088Rock Excavation - Option 631 23 054,172.0CY
0089Pre-Splitting - Option 631 23 068,138.0LF
0090Line Drilling (6" Spacing) - Option 631 23 0631.0SY
0091Rock Bolts - Option 631 68 131,029.0LF
0092Manage, and Place Disposal Area Fill - Option 631 00 004,172.0CY
OPTION 6 TOTAL ESTIMATED AMOUNT$
OPTION 7 - STAGE 7 ROCK EXCAVATION
0093Diversion and Care of Water - Option 701 57 241MO
0094Instrumentation Program O&M - Option 713 50 001MO
0095USACE Office Cleaning Services - Option 701 50 001MO
0096USACE Office Carpet Cleaning Services - Option 701 50 001EA
0097Shotcrete Placement (4") - Option 703 37 13577.0SY
0098Rock Excavation - Option 731 23 051,545.0CY
0099Mechanical Excavation - L13 - Option 731 23 054,870.0CY
0100Pre-Splitting - Option 731 23 061,944.0LF
0101Line Drilling (6" Spacing) - Option 731 23 06736.0SY
0102Rock Bolts - Option 731 68 13462.0LF
0103Manage, and Place Disposal Area Fill - Option 731 00 006,415.0CY
OPTION 7 TOTAL ESTIMATED AMOUNT$
OPTION 8 - STAGE 8 ROCK EXCAVATION
0104Diversion and Care of Water - Option 801 57 241MO
0105Instrumentation Program O&M - Option 813 50 001MO
0106USACE Office Cleaning Services - Option 801 50 001MO
0107USACE Office Carpet Cleaning Services - Option 801 50 001EA
0108Shotcrete Placement (4") - Option 803 37 13610.0SY
0109Rock Excavation - Option 831 23 056,785.0CY
0110Pre-Splitting - Option 831 23 0610,544.0LF
0111Line Drilling (6" Spacing) - Option 831 23 06287.0SY
0112Rock Bolts - Option 831 68 132,420.0LF
0113Manage, and Place Disposal Area Fill - Option 831 00 006,785.0CY
OPTION 8 TOTAL ESTIMATED AMOUNT$