W912P5-14-R-0008-0001.pdf

PDF 1 MB Posted

Attached to
Construction MATOC Federal contract opportunity
Solicitation number
W912P5-14-R-0008
Issued by
Department of the Army Corps of Engineers Engineering District Nashville

About this file

Amendment W912P5-14-R-0008-0001

View the file

Other files for this federal contract opportunity

Other files attached to Construction MATOC, newest first.
File Type Posted
14R0008_MATOC_TSpecsA0003_2014-08-26.pdf PDF
14R0008_Prototype_PlansA0003_2014-08-26.pdf PDF
14R0008_Prototype_TSpecsA0003_2014-08-26.pdf PDF
W912P5-14-R-0008-0003.pdf PDF
14R0008_Prototype_TSpecs.pdf PDF
W912P5-14-R-0008-0002.pdf PDF
Middlesboro_Floodplain_Permit.pdf PDF
SiteVisitRoster.pdf PDF
14R0008_MATOC_TSpecs.pdf PDF
DBA_KY140081_07-04-2014.pdf PDF
MATOC_proto_MIDCR_Plans_2014-05-01.pdf PDF
MATOC_proto_MIDCR_TSpecs_2014-04-15.pdf PDF
W912P5-14-R-0008.pdf PDF
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING DIVISION (JWP)

JAMES.W.PURCELL@USACE.ARMY.MIL

(615) 736-7674

(615) 736-7124

NASHVILLE TN 37202-1070

W38XDD41289301

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to add the MATOC Division I Technical Specif ications and publish the Site Visit Roster. Closing date remains 18 Aug 2014.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-Jul-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912P5-14-R-0008

X 9B. DATED (SEE ITEM 11)

18-Jul-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-Jul-2014

CODE

US ARMY CORPS OF ENGINEERS-CELRN-RC-N

DIRECTORATE OF CONTRACTING

110 9TH AVENUE SOUTH, ROOM A680

NASHVILLE TN 37202-1070

W912P5 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912P5

FACILITY CODECODE

EMAIL:TEL:

H3EXCJWP

Typewritten Text

-----SEE SUMMARY OF CHANGES-----

W912P5-14-R-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) For the prototype project, the work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

Site Location Plan and Vicinity Map pdf Q1E-64/77 Existing Conditions Plan pdf Q1E-64/78 Concrete Block Revetment Plan pdf Q1E-64/79 Details pdf Q1E-64/80 Cross Sections pdf Q1E-64-81

(f) For the overall MATOC, the work shall conform to the specifications in the following document:

Title File Drawing No.

MATOC Division I Technical Specifications pdf N/A

W912P5-14-R-0008

(g) For subsequent projects, the specifications and drawings will be attached to the RFP letters relating to the individual task orders.

(End of clause)

(End of Summary of Changes)

File details come from the government source that posted it. Updated .