Pre-performance conference slide presentation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-11_MATOC_00800__Nov_13_(2).docx | DOCX document | |
| amendment2.matoc.docx | DOCX document | |
| AMEND.MATOC14.0002.doc | DOC document | |
| MATOC14x2.doc | DOC document | |
| AMEND.MATOC14.doc | DOC document | |
| Attendance_roster_from_the_MATOC_Pre.docx | DOCX document | |
| Proj_B55_HalfSizeDwgs.pdf | ||
| Proj_B55_Specs.pdf | ||
| EXHIBIT_B.docx | DOCX document | |
| EXHIBIT_D.docx | DOCX document | |
| EXHIBIT_E_PROTOTYPICAL_PROJEC1.docx | DOCX document | |
| EXHIBIT_E_PROTOTYPICAL_PROJECT.docx | DOCX document | |
| EXHIBIT_C_PACKAGE_INFORMATION_AND_FORMS.docx | DOCX document | |
| EXHIBIT_A_____PERFORMANCE_RELEVANCY_QUESTIONNAIRE.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-PROPOSAL CONFERENCE
November 20, 2013
Competitive Multiple Award
Indefinite Delivery, Indefinite Quantity(IDIQ)
Contract
5 YEARS
BASE IS 2 YEAR PERIOD
PLUS
3 ONE YEAR OPTIONS
“SCOPE”
Covers a broad range of maintenance, repair, & construction services to include Design Build services
FEDERAL CONTRACTING OFFICERS
AT
ANY NATIONAL GUARD UNIT
IN MISSOURI MAY AWARD TASK ORDERS
DoD FEDERAL CONTRACTING OFFICERS IN STATE OF
MISSOURI WITH PRIOR APPROVAL FROM PCO
1. Statewide (all locations)
2. Lambert, Jefferson Barracks ANG, Kingshighway Reserve Center all in STL area
3. Rosecrans MAP, St. Joseph, MO
4. Fort Leonard Wood
5. Camp Clark Training Site, Nevada, MO
6. Camp Crowder Training Site, Neosho, MO
7. Wappappello Training Site, Poplar Bluff, MO
$20,000,000.00 per contractor over the life of the contract
• Once you reach a total of $20M no more offers will be made
$5,000,000.00 Per Task Order for the General Task Order Contract
(In Rare Cases Over $5M)
$200 MINIMUM ORDER which will be issued at time of basic contract award
A Minimum Of Nine (9) Small Business
Awards Anticipated
• Task orders may be set-aside for socio-economic groups such as HUBZone, Service
Disabled Veteran Owned Business, Woman
Owned Small Business, etc. provided two or more contractors in the socio-economic group are awarded a MATOC Basic
NOTE:
8(A) Contractors must have approved business plans on file and services by your District Office SBA
THE FOLLOWING IS A BRIEF OVERVIEW OF
THE PROPOSAL REQUIREMENTS
OFFERORS ARE CAUTIONED TO
CAREFULLY READ THE REQUIREMENTS
OF THE SOLICITATION AND COMPLY
ACCORDINGLY
Section 00110 of the RFP details required information and format
• 3 Volumes In 2 Binders are required
• BINDER 1
VOLUME 1 PRICE/COST, PRO FORMA DOCUMENTS
• BINDER 2
VOLUME 2 PAST PERFORMANCE REQUIREMENTS
VOLUME 3 TECHNICAL REQUIREMENTS
Cover Letter
SF 1442 - Signed
AREAS of CONSIDERATION- Section 00010
EXHIBIT E
• Price for Prototypical Project(s)
REPS & CERTIFICATIONS – Section 00600
Volume 2 - Past Performance Proposal
• Complete Exhibit A -Performance Relevancy
Form- 6 Part 1/ One Part 2
Have Subcontractors Complete- Exhibit B
• Subcontractor Consent and Information Form
List of Clients (name and number) you sent
Exhibit C questionnaires to and/or final
CCASS forms for the Exhibit A Part 1 projects
(Exhibit C Package) Send Questionnaires to References Introduction Letter, Exhibit C and Questionnaire
• References must return NLT the Closing Date to KO Not to You (12 DEC 2013)
• Email and Fax addresses available
• Do not include copies of what was sent in the proposal !
If you have a CCASS Final Evaluation for the project that may be included in lieu of sending form- place behind applicable Exhibit A
Offerors should carefully read section
00800- and DIVISION 01/00800 General
Requirements before preparing proposal
• Important basic contract requirements and conditions are contained in these sections
Volume 3 -TECHNICAL PROPOSAL
• Read the sub factor requirements in Exhibit D LIMIT to
10 double sided pages (20 single pages) exclusive of tabs, indexes, dividers, and attachments listed in this exhibit. Any additional attachments you provide will be included in the page count provided
• Complete Exhibit D Answer questions carefully and thoroughly Include required Attachments Consider evaluating your proposal IAW
Section 00120 before submitting
Represents type of smaller projects that may be awarded under this contract
Measures contractors’ estimating system
Detailed in Section 00120 of the RFP CAREFULLY review sections 00100, 00110
& 00120 and 00800 through Division 01 when preparing proposal
Comply with Section 00100 AND 00110 requirements
Inquire in writing if you have questions
Failure to furnish a complete proposal may result in elimination from consideration
Choose your dollar levels carefully
• Consider bonding
• Experience and staff
These contracts let you grow over time
• If you are not found technically capable for the high of the price range you chose at the sole discretion of the contracting officer you may be offered an award at a lower price category but this is NOT a guarantee
Past Performance and Technical when combined are
SIGNIFICANTLY MORE
IMPORTANT than price
Best Value is defined as an award based on the greatest overall benefit in response to the requirement.
Award is based on other factors in addition to price.
The Contractors whose proposals provide the best value to the
Government, price and other non-cost factions considered will be awarded contracts
Every Contractor who is awarded a MATOC contract will be given a FAIR
OPPORTUNITY to complete for the award of Task or
Projects unless and exemption applies
Urgent or emergency requirements
Services are unique or highly specialized interest of economy and efficiency
Satisfy the minimum guarantee
NOTE: THIS IS NOT A
REQUIREMENTS CONTRACT
KO May limit competition or exclude a contractor for the following reasons:
• Satisfy Agency Small Business Program Goals
Projects will be set-aside for 8(a) MATOC Contractors and/or HUB Zone and/or SDVB MATOC Contractors and/or Women Owned Small Business
• Failure to prosecute the work diligently on a current
Task Order Award
• Order outside your areas of consideration
• The Master specification, also referred to as the default specification
• Establishes an industrial and/or commercial standards for maintenance and repair of
Government Facilities
•If SOW does not address a specification for an element of work, the master/default specification applies
Normal response time is two (2) days for site visit and three (3) days to thirty (30) for proposal depending on complexity
Contractors must be able to respond within 120
Minutes in the event of an emergency to view a site and possibly give a price.
MATOC contractors are required to have insurance while under contract- not just when the task order is issued.
You will have access to base for contract related events
Must be in place if responding to emergencies
Most current Davis Bacon Wage rates will apply to each MATOC Request for Proposal
• Link to Web site will be provided- Note the most current wage determination at time of award of Task Order applies to the Task Order
Performance and Payment bonds are established by each Task Order
• PAYMENT BOND - T.O.>$30K
• PERFORMANCE BOND - T.O.>$150K
KO establishes site visit & notifies MATOC Contractors by email
• Provides MATOC Project synopsis, offering letter and basis for award & when available
SOW/Plans/Wage Rates etc.(RFQ/RFP) (Note in some instances this will be provided at the site visit)
• KO & Engineer conducts the site visit with MATOC
Contractors
• KO validates proposal due date with Contractors
Contractor submits questions to KO who will provide answers to all
If necessary, engineer makes changes via addendum and forwards to KO who issues Amendment
Contractor submits price or best value proposal by hand carried, email, or fax as applicable
KO does evaluation and makes award upon receipt of funds
KO emails award notice to awardees Notifies all others of award only
• Normal method of distribution will be via email or web posting
• When issued on CD/DVD one set of project plans & specifications will be provided to each
MATOC contractor at no cost.
• It is the MATOC contractors responsibility to notify their subcontractors and provide them copies.
• Electronic versions when available will be on the Web
1:00 p.m.
12 DEC 2013
DON’T FORGET TO HAVE REFERENCES SENT IN
BY THIS TIME & DATE
Award is contemplated to be made without discussions- Do Not anticipate a chance to make corrections or changes
Your first proposal will probably be your only proposal!!
Read the solicitation requirements carefully!!
Consider using Section 00120 to “rate” yourself before submitting the proposal-is it complete??
All Amendments Will On The FBO Web Site Check Site Regularly For Changes & Refresh
The Page After Closing No Information Will Be Available
Until Award
• Awards Will Be Posted To The Web
• Results should be announced in Approximately 90 Days
Questions Must Be Submitted In Writing Via
Email to kerrey.a.renkemeyer.civ@mail.mil
Submit Questions NLT COB on 9 DEC 2013
Submit Questions To KO Only Do Not Call
Other Government Personnel
Questions Received Late May Be Held And
Addressed After RFP Closing With Those Who
Submitted Offerors
Questions And Answers Will Be Posted To The
Web Site Only mailto:kerrey.a.renkemeyer.civ@mail.mil
All Questions, On A Non-Attribution Basis, And The Answers Will Be Posted To The FBO Web Site
If Necessary Addendums, Issued By An Amendment, Will Also Be Posted
Check Web Site Regularly And Don’t Forget To Refresh Web Page www.SAM.gov http://orca.bpn.gov/ http://www.gpo.gov/davisbacon/allstates.html https://www.fbo.gov