EXHIBIT_E_PROTOTYPICAL_PROJEC1.docx

DOCX document 15 KB Posted

Attached to
IDIQ MULTIPLE AWARD TASK ORDER CONTRACT FOR THE MISSOURI NATIONAL GUARD, Statewide
Solicitation number
W912NS-14-R-0001
Issued by

About this file

Exhibit E

View the file

Other files

File Type Posted
A-11_MATOC_00800__Nov_13_(2).docx DOCX document
amendment2.matoc.docx DOCX document
AMEND.MATOC14.0002.doc DOC document
MATOC14x2.doc DOC document
AMEND.MATOC14.doc DOC document
MATOC_Preproposal_Conference.pdf PDF
Attendance_roster_from_the_MATOC_Pre.docx DOCX document
Proj_B55_HalfSizeDwgs.pdf PDF
Proj_B55_Specs.pdf PDF
EXHIBIT_B.docx DOCX document
EXHIBIT_D.docx DOCX document
EXHIBIT_E_PROTOTYPICAL_PROJECT.docx DOCX document
EXHIBIT_C_PACKAGE_INFORMATION_AND_FORMS.docx DOCX document
EXHIBIT_A_____PERFORMANCE_RELEVANCY_QUESTIONNAIRE.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MISSOURI IDIQ MATOC RFP W912NS-14-R-0001

EXHIBIT E PROTOTYPICAL PROJECT

NOTICE OF PROPOSED PROJECT, SOLICITATION

Date: November 12, 2013

PROJECT TITLE AND NO. Building 55 Renovation, PN 060432

PROJECT DESCRIPTION: Provide all work in accordance with SOW and Drawings to complete renovations to Building 55.

All work shall be in strict accordance with the ( XX ) Plans/drawings and Specifications dated 6/12/12 and the Basic Contract General requirements See Section 00800.

Note General Requirements are found in solicitation and resulting contract indicated as Division 1 in Section 00800

MAGNITUDE OF PROJECT:; ( )$500,000 - $1,000,000;.

PERFORMANCE PERIOD 260 Days, after receipt of Notice to Proceed

SITE VISIT: A site visit will not be conducted in conjunction with the MATOC pre-proposal meeting. Contractors shall consider for location(s) Fort Leonard Wood, MO

PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.

PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx

WAGE DETERMINATION: Currently, General Decision Number MO130019 DATED 09/20/2013 Modification No. 07 dated 09/20/2013 for PULASKI County is applicable for pricing of this prototyplical task order. Rates can be found at http://www.wdol.gov/wdol/scafiles/davisbacon/mo.html

PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.

The Following Provisions/Clauses if marked [X] are applicable to this task order

[ X ] Contract Clause 52.246-21 Warranty of Construction, is applicable to this task order.

[ X ] PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY. (September 2002) This special contract clause IS NOT APPLICABLE TO THIS TASK ORDER.

[ ] FAR 52.217-5 Evaluation of Options- do not price the Option for this RFP.

EXHIBIT E MATOC PROPOSAL FORM

Include this form completed with your proposal

PROJECT NO. 060432 FTB Building 55 Renovations

PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to complete JFTB Building 55 Renovations in accordance with the Plans/drawings dated 06 APR 12 and Specifications dated 12APR12 and the basic contract general requirements. This project is for a Firm Fixed Task Order.

Offerors are caution to propose a realistic and reasonable price to include all costs associated with accomplishing this project as if it were to be awarded so as to demonstrate your ability to provide reasonable and realistic pricing on future offerings. Do not price the OPTION.

Location being proposed:

Item Number Description Quantity Unit Amount

0001 Building 55 Renovations 1 JOB $_______

0002 OPTION Manufactured Aluminum Sun Shades 1 JOB $___n/a____

(DO NOT PRICE OPTION)