EXHIBIT_E_PROTOTYPICAL_PROJECT.docx
DOCX document 15 KB Posted
- Solicitation number
- W912NS-14-R-0001
About this file
Exhibit E Prototypical specs
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A-11_MATOC_00800__Nov_13_(2).docx | DOCX document | |
| amendment2.matoc.docx | DOCX document | |
| AMEND.MATOC14.0002.doc | DOC document | |
| MATOC14x2.doc | DOC document | |
| AMEND.MATOC14.doc | DOC document | |
| MATOC_Preproposal_Conference.pdf | ||
| Attendance_roster_from_the_MATOC_Pre.docx | DOCX document | |
| Proj_B55_HalfSizeDwgs.pdf | ||
| Proj_B55_Specs.pdf | ||
| EXHIBIT_B.docx | DOCX document | |
| EXHIBIT_D.docx | DOCX document | |
| EXHIBIT_E_PROTOTYPICAL_PROJEC1.docx | DOCX document | |
| EXHIBIT_C_PACKAGE_INFORMATION_AND_FORMS.docx | DOCX document | |
| EXHIBIT_A_____PERFORMANCE_RELEVANCY_QUESTIONNAIRE.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT E PROTOTYPICAL PROJECT
NOTICE OF PROPOSED PROJECT, SOLICITATION
Date: 5 December 2013
PROJECT TITLE AND NO.: Ammo Breakdown Building
PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to complete Ammo Breakdown Building in accordance with the Plans/drawings dated 15 May 2007 and Specifications dated 3 October 2007 and the basic contract general requirements. This project is for a Firm Fixed Task Order. All work shall be in strict accordance with the Plans/drawings and Specifications and the Basic Contract General requirements See Section 00800.
Note General Requirements are found in solicitation and resulting contract indicated as Division 1 in Section 00800.
MAGNITUDE OF PROJECT: $0 - $50,000
PERFORMANCE PERIOD: 60 CALENDAR Days, after receipt of Notice to Proceed
SITE VISIT: A site visit will not be conducted in conjunction with the MATOC pre-proposal meeting. Contractors shall consider for location(s) Fort Leonard Wood, MO
PERFORMANCE & PAYMENT BONDS: In accordance with FAR 28.102-1 and Contract Clause 52.228-15, Contractors are reminded that any amount awarded over $30,000 shall require Payment Bonds, and awards exceeding $150,000 shall require both Payment and Performance Bonds. All bonds are due no later than 10 days after award.
PROJECT SAFETY: In accordance with FAR 52.236-13, Accident Prevention, construction contractors are required to use the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. To view this manual click here http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx
WAGE DETERMINATION: Currently, General Decision Number AR130132 Modification No. 5 dated 05/28/2013 for Pulaski County is applicable for pricing of this prototyplical task order. Rates can be found at http://wdol.gov/wdol/scafiles/davisbacon/ar.html
PROPOSAL DUE DATE: All offers are due with proposal for MATOC basic contract. Failure to provide a price will make offer noncompliant, eliminated from the competition and offeror ineligible for a basic contract award. Basis for award is in the RFP.
The Following Provisions/Clauses if marked [X] are applicable to this task order
[ X ] Contract Clause 52.246-21 Warranty of Construction, is applicable to this task order.
[ X ] PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY. (September 2002) This special contract clause IS NOT APPLICABLE TO THIS TASK ORDER.
[ X ] FAR 52.217-5 Evaluation of Options applies to this solicitation
EXHIBIT E MATOC PROPOSAL FORM
Include this form completed with your proposal
PROJECT NO. Ammo Breakdown Building
PROJECT DESCRIPTION: Project provides for the furnishing of all plant, labor, material, equipment, appliances and supervision necessary to complete Ammo Breakdown Building in accordance with the Plans/drawings dated 15 May 2007 and Specifications dated 3 October 2007 and the basic contract general requirements. All work shall be in strict accordance with the Plans/drawings and Specifications and the Basic Contract General requirements This project is for a Firm Fixed Task Order.
Offerors are caution to propose a realistic and reasonable price to include all costs associated with accomplishing this project as if it were to be awarded so as to demonstrate your ability to provide reasonable and realistic pricing on future offerings.
Location being proposed: Fort Leonard Wood, MO
PLACE AN “X” IN THE BLOCK (OF ALL THAT APPLY) IF YOUR FIRM WILL ACTIVELY PURSUE PROJECT(s) AT THESE LOCATIONS
( ) Lambert IAP, Jefferson Barracks ANG, Kingshighway Reserve Center – St. Louis area ( ) Rosecrans MAP – St. Joseph area ( ) Camp Clark Training Site – Nevada, MO ( ) Camp Crowder Training Site – Neosho, MO ( ) Fort Leonard Wood, MO ( ) Whiteman AFB, Knob Knoster, MO
Item Number Description Quantity Unit Amount
0001 AMMO BREAKDOWN BUILDING 1 JOB $_______
SIGNATURE: COMPANY NAME
Name and title of person authorized to sign
File details come from the government source that posted it. Updated .