PWS.docx

DOCX document 63 KB Posted

Attached to
Uninterruptible Power Supply (UPS) systems and maintenance
Solicitation number
W912NR26QA026
Issued by

About this file

Summary: Performance Work Statement for EATON and Liebert UPS Systems Services

This Performance Work Statement (PWS) outlines the Louisiana National Guard's requirements for comprehensive maintenance, troubleshooting, and repair services for existing Liebert and EATON Uninterruptible Power Supply (UPS) systems across three military installations, plus the installation of a new 20KVA 480V UPS system with at least 10-minute battery capacity at Jackson Barracks. The contract has a base period of 12 months (October 1, 2026 through September 30, 2026) with four optional renewal years through 2030. The contractor must provide all personnel, equipment, tools, materials, supervision, and quality control except for Government-furnished property and workspace. Services will be performed at Jackson Barracks (New Orleans), Camp Beauregard (Pineville), and Camp Minden (Minden), Louisiana.

The core service requirements include: one year of full warranty service coverage (parts, labor, expenses, and travel); guaranteed 4-hour on-site emergency response available 24/7; two preventive maintenance (PM) inspections per UPS annually during normal business hours (Tuesday-Friday, 0700-1730); and emergency troubleshooting and repair services available seven days a week. The PWS specifies detailed PM procedures including temperature checks, visual inspections, voltage/current measurements, battery maintenance, and comprehensive reporting. The contractor must be an authorized third-party vendor certified by both EATON and Liebert, possess demonstrated experience with specified UPS models, maintain direct access to OEM parts (not cannibalized or used components), and employ qualified, certified personnel. The Government will provide workspace, desk facilities, telephones, computers, and utilities. All contractor employees must complete required security training (AT Level 1, iWATCH, OPSEC) within 30 days of contract award and comply with installation access and security requirements. Performance will be evaluated against a Quality Assurance Surveillance Plan with 95% acceptable quality levels across emergency support, maintenance activities, and inspection reporting requirements.

View the file

Other files

File Type Posted
FAQs.docx DOCX document
PWS.docx DOCX document
Leibert Sole Source-Name Brand Only Determination Under SAT FAR Part 13 Procedures.pdf PDF
Eaton Sole Source-Name Brand Only Determination Under SAT FAR Part 13 Procedures.pdf PDF
SAM Solicitation - W912NR26QA026.pdf PDF
RFQ.docx DOCX document
RFQ.docx DOCX document
PWS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

EATON and Liebert UPS Systems Services

1.0 General: DPI is an entity within the Louisiana National Guard that requires extended services on their Uninterruptible Power Supply systems, and the replacement of one UPS system and batteries. This PWS covers DPI’s requirements for extended services for Liebert and EATON UPS systems.

1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform Liebert and EATON UPS system maintenance, troubleshooting, and repair services, as defined in this PWS. In addition the contractor shall install a 20KVA 480V INPUT 480V OUTPUT system with at least 10 MINUTE BATTERY capacity and the required batteries at the Jackson Barracks location, as specified in section 5.0.3.4.

1.2 Background: Provide the Louisiana National Guard with maintenance, troubleshooting, and repair services for existing Liebert and / or EATON UPS systems in the existing infrastructure. In addition the contractor shall install a 20KVA 480V INPUT 480V OUTPUT system with at least 10 MINUTE BATTERY capacity and the required batteries at the Jackson Barracks location, as specified in section 5.0.3.4.

1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 12 months, 01 October 2026 to 31 September 2026, plus 4 Option Years (2027, 2028, 2029, 2030).

1.4 General Information:

1.4.1 Place and Performance of Services: The contractor shall provide maintenance services between the hours of 0700-1730 on Tuesday – Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. The contractor shall provide troubleshooting and repair services 7 days a week, 24 hours a day. Performance shall be at Jackson Barracks, New Orleans, Louisiana, Camp Beauregard, Pineville, Louisiana and Camp Minden, Minden, Louisiana (see section 5.1 for further location details). The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential. Teleworking is only authorized for initial troubleshooting.

1.4.1.1 Telework:

The Government will permit the contractor to telework only in support of this requirement for initial troubleshooting. In furtherance of Continuity of Operations Planning (COOP), a telework program may be enacted to ensure that the Government's mission-critical operations stay operational during times of national emergency or incidents of national significance. Telework shall be at no additional cost to the Government.

1.4.1.2 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays. Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.

1.4.1.3 The contractor’s employees shall become familiar with and obey the regulations of the installation; including fire, traffic, safety and security regulations while on the installation. Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall carry proper identification with them at all times and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation, which may affect performance. The Government reserves the right to direct the removal of an employee from Government property or revoke access to Government systems for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.

1.4.2 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform maintenance services, but might be required to perform troubleshooting and repair services on these days:

1.4.2.1 New Year’s Day: January 1st

1.4.2.2 Martin Luther King, Jr.’s Birthday

1.4.2.3 President’s Day

1.4.2.4 Memorial Day

1.4.2.5 Independence Day: July 4th

1.4.2.6 Labor Day

1.4.2.7 Columbus Day

1.4.2.8 Veteran’s Day: November 11th

1.4.2.9 Thanksgiving Day

1.4.2.10 Christmas Day: December 25th

1.4.4 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).

1.4.5 Installation Access and Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy (see PWS 6.0). Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4.5.1 Reserved

1.4.5.2 For contractors that do not require a CAC, but require access to a DoD facility or installation: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05), and applicable installation, facility and area commander installation/facility access, and local security policies and procedures (provided by a Government representative).

1.4.5.3 Awareness Training (AT) Level 1: All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level 1 training within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training by each employee or subcontractor personnel. AT Level 1 awareness training is available at the following website: https://jko.jten.mil/courses/atl1/launch.html.

1.4.5.4 iWATCH Training: The contractor and all associated subcontractors with an area of performance within an Army-controlled installation, facilities or area shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Antiterrorism Officer (ATO)). This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR, within 15 calendar days after completion of training.

1.4.5.5 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations. Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.

1.4.5.11 OPSEC Training: In accordance with AR 530-1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm.

1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.

1.4.7 Special Qualifications: The contractor shall ensure all employees possess any required experience for operating and maintaining EATON and Liebert UPS systems used in the performance of this contract. Proposals should include documentation of prior work experience on the items listed in section 5.1, or like items. Vendors need to stock EATON and Liebert parts and/or have a relationship with the prime vendors that allows you to secure any necessary EATON and Liebert parts rapidly. Proposals should include documentation that you have access to OEM parts and will not provide cannibalized or used parts. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)

1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, COR and other Government personnel, as appropriate, may meet periodically with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.

1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO. The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.

1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e-mail) and dealings with Government or non-Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.

1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero-tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.

1.4.12 Contractor Travel: Reserved

1.4.13 Data Rights: Reserved

1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.0 Definitions and Acronyms:

2.1 Definitions:

2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.

2.1.2 Defective Service: A service output that does not meet the standard of performance associated with the PWS.

2.1.3 Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.

2.1.4 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.5 Physical Security: Actions that prevent the loss or damage of Government property.

2.1.6 Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.7 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.8 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.

2.1.9 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.2 Acronyms:

AEIArmy Enterprise Infostructure
ARArmy Regulation
AT/OPSECAntiterrorism/Operational Security
BIBackground Investigation
CMContract Manager
CORContracting Officer Representative
DADepartment of the Army
DD254Department of Defense Contract Security Classification Specification
DFARSDefense Federal Acquisition Regulation Supplement
DoDDepartment of Defense
FARFederal Acquisition Regulation
GFP/M/E/SGovernment Furnished Property/Material/Equipment/Services
HQDAHeadquarters, Department of the Army
HSPDHomeland Security Presidential Directive
IAInformation Assurance
ISInformation System(s)
KOContracting Officer
NGBNational Guard Bureau
OCIOrganizational Conflict of Interest
OEMOriginal Equipment Manufacturer
PIIPersonally Identifiable Information
PIPOPhase In/Phase Out
POCPoint of Contact
PRSPerformance Requirements Summary
PWSPerformance Work Statement
QAQuality Assurance
QASPQuality Assurance Surveillance Plan
QCQuality Control
QCPQuality Control Program
SCRService Contract Reporting
SSNSocial Security Number
TETechnical Exhibit
UPSUninterrupted Power Supply
USD(I)Under Secretary of Defense for Intelligence

3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract:

3.1 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers and other items necessary to maintain an office environment.

3.2 Materials: Reserved

3.3 Equipment: Reserved

3.4 Services: Reserved

3.5 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.

5.0 Requirements: The contractor shall: Proposals should include documentation from the manufacturer that you are qualified and certified to work on the items listed below. Vendors need to stock parts and/or have a relationship with the prime vendors that allows you to secure any necessary parts rapidly. Proposals should include documentation that you have access to OEM parts and will not provide cannibalized or used parts. Vendor must provide a certified letter from EATON and one from Liebert stating that their business is an authorized Third-Party vendor. Vendors must describe parts attainment process. What are the sources (EATON, Liebert, or cannibalized/older units)? Priority will be given to Authorized third party vendors who get parts directly from EATON and Liebert. Options may be exercised on some CLINs and not on others if that UPS is replaced or removed from inventory.

5.0.1 One year of full warranty service coverage (parts, labor, expenses and travel)

5.0.2 Guaranteed 4-hour on-site emergency response, 7 days/week, 24 hours/day

5.0.3 two (2) PM Inspections per UPS per year

5.0.3.1 Performed during normal business hours (Tuesday – Friday 0700 – 1730)

5.0.3.2 Includes full UPS Electronics & Battery maintenance

5.0.3.3 Battery replacement and capacitors need not be covered under contract

5.0.3.4 Install a 20KVA 480V INPUT 480V OUTPUT system with at least 10 MINUTES BATTERY capacity and the required batteries at the Jackson Barracks location. UPS System recommendation is Schnieder/APC – Galaxy VS 20kW 408V/480V GDS UPS 20kVA Part number: UPS - GVSUPS20KB4GS or similar. Battery recommendation is two (2) Part numbers: Batteries - GVSBTH4 or similar in order to achive at lease ten (10) minute battery runtime.

5.0.3.5 See section 5.1 for annual PM quantity per service tag.

5.1 Environmental Areas: Make, Model, kVA, and serial #of Liebert UPS systems:

Site #: – JACKSON BARRACKS 6400 ST. CLAUDE AVENUE BLDG 3010, NEW ORLEANS, LA 70117

Tag #
Model #
Description
Annual PM
Qty.
EE504CBB04
EATON 9390 9390-40 SEALED BATTERY
2
2

Site #: 99383 – CAMP BEAUREGARD, 408 F STREET, PINEVILLE, LA 71360

Tag #
Model #
Description
Annual PM
Qty.

1346755

NPOWER 30-50
37SA050C0C6BD92
2

1346756

SEALED BATTERY
37BP050XPX1BNL
2

1346757

MBC/SLIM LN CAB
37MB0500CC61N
1

Site #: 144317 – CAMP BEAUREGARD, 408 F STREET, PINEVILLE, LA 71360

Tag #
Model #
Description
Annual PM
Qty.

1608615

APM 45 WINTBATTNR
C40CCSAFA3132
1

Site #: 122181 – CAMP MINDEN, 100 LOUISIANA BLVD, MINDEN LA 71055

Tag #
Model #
Description
Annual PM
Qty.

1487665

EXM 208V 30
37SA040C0C6EA10
2

1487666

SEALED BATTERY
37BP040XMX1BAL
2

1487667

EXM208V MBC
37MB0400CC61Q
1

Site #: 136275 – CAMP BEAUREGARD, 420 F STREET 2nd FL, PINEVILLE, LA 71360

Tag #
Model #
Description
Annual PM
Qty.

1815455

EXM 208V 60
47SA060GAC00S49
2

1815457

SEALED BATTERY
47BPGWX92S10S01
2

1815458

SEALED BATTERY
47BPGWX92S20S02
2

1815456

EXM10-200PERIPH
47MBG37AC1R0S05
1

1838745

EXM 208V 60
47SA060GAC00S91
2

1838742

SEALED BATTERY
47BPGWX92L10S91
2

1838743

SEALED BATTERY
47BPGWX92L20S91
2

1838744

EXM10-200PERIPH
47MBG37AC0R0S91
1

5.2 PERFORMANCE REQUIREMENTS: UPS Full Preventive Maintenance Service

1. Perform a temperature check on all breakers, connections and associated controls. Repair and/or report all high temperature areas.

2. Perform a complete visual inspection of the equipment, including sub-assemblies, wiring harnesses, contacts, cables and major components.

3. Check air filters for cleanliness. (if applicable)

4. Check rectifier and inverter snubber boards for discoloration.

5. Record all voltage and current meter readings on the module control cabinet or the system control cabinet.

6. Check the inverter and rectifier snubbers for burned or broken wires.

7. Check all nuts, bolts, screws, and connectors for tightness and heat discoloration.

8. Check fuses on the DC capacitor deck for continuity (if applicable).

9. With customer approval, perform operational test of the system including unit transfer and battery discharge.

10. Calibrate and record all electronics to system specifications.

11. Check or perform Engineering Field Change Notices (FCN) as necessary.

12. Measure and record all low-voltage power supply levels.

13. Record phase-to-phase input voltage and currents.

14. Review system performance with customer to address any questions and to schedule any repairs.

15. Check power capacitors for swelling or leaking oil (if applicable).

16. Check for DC capacitor vent caps that have extruded more than 1/8" (if applicable).

17. Measure and record harmonic trap filter currents (if applicable)

Internal Battery Full Preventive Maintenance Service (applicable to 45kVA units only)

1. Inspect the appearance and cleanliness of the battery and the battery room.

2. Clean normal cell top dirt accumulation (to be done only with battery off line).

3. Measure and record the total battery float voltage and charging current.

4. Measure and record overall AC ripple current.

5. Measure and record overall AC ripple voltage.

6. Visually inspect the jars and covers for cracks and leakage.

7. Visually inspect for evidence of corrosion.

8. Measure and record ambient temperature.

9. Verify the condition of the ventilation equipment, if applicable.

10. Verify the integrity of the battery rack/cabinet.

11. Measure and record 100% of the cell temperatures.

12. Measure and record the float voltage of all cells.1Measure and record all internal impedance readings.

13. Provide a detailed written report noting any deficiencies and corrective action needed, taken and/or planned.

14. Re-tighten all battery connections to the battery manufacturer's specifications, offline only.

Corrective Maintenance Performed as Required

1. Refurbish cell connections as deemed necessary by the detailed inspection report.

5.3 Inspection Reports: After each inspection:

1. Submit by email to the COR, a report which includes the actions taken, battery and system health status, faults found (if any), recommended actions (if any), for each location.

6.0 Applicable Publications: Publications applicable to this PWS are listed below:

Publication (Chapter/Page)

Date of Publication
Mandatory or Advisory
Website

Federal Acquisition Regulation https://www.acquisition.gov/?q=browsefar

Defense Federal Acquisition Regulation Supplement http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html or https://www.acquisition.gov/dfars

Joint Travel Regulation (JTR) https://www.defensetravel.dod.mil/site/travelreg.cfm

DoDM 1000.13-M-V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b) 01/23/2014 (Change 1: 07/28/2020) http://www.esd.whs.mil/Directives/issuances/dodm

Federal Information Processing Standards (FIPS) Publication 201-2 Personal Identity Verification (PIV) of Federal Employees and Contractors (paragraph 9) August 2013 http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201-2.pdf

DoDM 5200.2 Procedures for the DoD Personnel Security Program (PSP)
04/03/2017

https://www.esd.whs.mil/Directives/issuances/dodm/

DoDI 5200.46 DoD Investigative and Adjudicative Guidance for Issuing the Common Access Card (CAC) 09/09/14 (Change 1: 05/04/2018) https://www.esd.whs.mil/Directives/issuances/dodi/

Homeland Security Presidential Directive (HSPD)-12 Policy for a Common Identification Standard for Federal Employees and Contractors 08/27/2004 https://www.dhs.gov/homeland-security-presidential-directive-12

DoDI 5400.11 Department of Defense Privacy and Civil Liberties Programs 01/29/2019 https://www.esd.whs.mil/Directives/issuances/dodi/

DoD 5400.11-R Department of Defense Privacy Program 05/14/2007 https://www.esd.whs.mil/Directives/issuances/dodm/

DoDD 8140.01 Cyberspace Workforce Management

10/05/2020 https://www.esd.whs.mil/Directives/issuances/dodd/

DoD 8570.01-M Information Assurance Workforce Improvement Program 12/19/2005 (Change 4: 11/10/2015) https://www.esd.whs.mil/Directives/issuances/dodm/

DoD 5220.22-M National Industrial Security Program Operating Manual (NISPOM) 02/28/2006 (Change 2: 05/18/2016) https://www.esd.whs.mil/Directives/issuances/dodm/

Army Directive 2014-05 Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors 03/07/2014 https://armypubs.army.mil/ProductMaps/PubForm/ArmyDir.aspx

AR 25-2

Information Assurance 04/04/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

AR 530-1

Operations Security 09/26/2014 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

AR 525-13

Antiterrorism 12/09/2019 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

AR 381-12

Threat Awareness and Reporting Program (TARP) (Section II, ¶ 2-4.b) 06/01/2016 http://armypubs.army.mil/ProductMaps/PubForm/AR.aspx

6.1 Applicable Forms: Forms applicable to the PWS are listed below:

Form
Date
Website

DD 1172-2

Application for Identification Card/DEERS Enrollment

Mar 2017
http://www.dtic.mil/whs/directives/forms/index.htm

I-9 Employment Eligibility Verification 10/21/2019 https://www.uscis.gov/sites/default/files/files/form/i-9.pdf

DD 441

Department of Defense Security Agreement Feb 2020 http://www.dtic.mil/whs/directives/forms/dd/ddforms0001-0499.htm

DD 250

Material Inspection and Receiving Report

Aug 2000
https://www.esd.whs.mil/Directives/forms/dd0001_0499/

TECHNICAL EXHIBIT 1

Performance Requirements Summary (PRS) This PRS includes performance objectives the Government will use to determine contractor performance and will compare contractor performance to the Acceptable Quality Level (AQL).

Performance Objective
Performance Standard
Acceptable Quality Levels (AQL)
Surveillance Method / By Whom

(5.0.2) Emergency Support

Provide technical support when need to cover 24 hours a day 7 days a week.
95%

As needed by the COR

(5.0.2) Emergency Support

Provide Provided 4 hour response repair labor
95%

As needed by the COR

(5.0.3.4) Install
Replace current UPS and batteries
95%
As needed by the COR
(5.0.3.5) Maintenance
Annual PM quantity per service tag
95%

As needed by the COR

(5.3) Inspection Reports

After each inspection
95%

As needed by the COR

TECHNICAL EXHIBIT 2

Deliverables Schedule

PWS Reference / Deliverable Title
Frequency
Number of Copies
Medium/Format
Submit To
5.0 OEM Parts
Provide with proposal
1
Electronic Submission
KO
5.0 qualified and certified labor
Provide with proposal
1
Electronic Submission
KO
5.3 Inspection Reports
Provide after each visit
1
Electronic Submission
COR
1.4.5.3 AT Level 1 Awareness Training Certificates
Provide within 15 calendar days after employee completes training.
1
Electronic Submission
COR

1.4.5.4 iWATCH Training Certificates

Provide within 15 calendar days after employee completes training.
1
Electronic Submission
COR

1.4.5.11 OPSEC

Training Certificates

Provide within 15 calendar days after employee completes training.
1
Electronic Submission
COR

Ver. October 2022

File details come from the government source that posted it. Updated .