FAQs.docx

DOCX document 53 KB Posted

Attached to
Uninterruptible Power Supply (UPS) systems and maintenance
Solicitation number
W912NR26QA026
Issued by

About this file

This file is a Frequently Asked Questions (FAQ) document providing clarifications on a Louisiana Army National Guard solicitation for Uninterruptible Power Supply (UPS) systems maintenance and installation. The Q&A document addresses procedural, technical, and logistical questions submitted by potential bidders regarding solicitation W912NR26QA026, with responses organized into four groups (A through D) covering deadline confirmations, authorization requirements, site-specific details, and maintenance specifications.

Key clarifications include: the quote submission deadline is September 25, 2026, at 8:00 a.m. CDT; small business primes may satisfy Eaton and Liebert authorization requirements through fully disclosed subcontractors; the performance period begins October 1, 2026; and quotation submissions should be sent via email with the Oral Quotation Worksheet preferred but not mandatory. The government confirmed that 24/7 emergency response with four-hour onsite service and two preventive maintenance inspections annually per UPS system are required for all covered units. Site-specific logistics were clarified for Jackson Barracks, including that no loading dock is available, the UPS room is on the 2nd floor with no freight elevator (standard elevator with 4,000 lb weight limit), and unloading/staging is the bidder's responsibility. The FAQ also provides detailed battery specifications and test data for three UPS units at Camp Beauregard, Camp Minden, and Jackson Barracks, ranging from 40 kVA to 60 kVA systems. The maintenance scope includes full-service coverage with parts, labor, travel, and expenses for one year, excluding battery and capacitor replacements; refurbishment of battery cell connections includes cleaning, corrosion removal, retorquing, hardware replacement, and intercell connector work per industry standards.

View the file

Other files

File Type Posted
PWS.docx DOCX document
Leibert Sole Source-Name Brand Only Determination Under SAT FAR Part 13 Procedures.pdf PDF
Eaton Sole Source-Name Brand Only Determination Under SAT FAR Part 13 Procedures.pdf PDF
PWS.docx DOCX document
SAM Solicitation - W912NR26QA026.pdf PDF
RFQ.docx DOCX document
PWS.docx DOCX document
RFQ.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Group A:

1. May a small-business prime satisfy the required Eaton and Liebert authorized third-party status, OEM-parts access, certified technician, and four-hour onsite response requirements through a fully disclosed subcontractor/teaming partner? If so, will the Eaton/Liebert authorization letters and certifications issue to that partner satisfy the solicitation requirement?

1. Please confirm the controlling quote deadline. The SAM.gov header reflects September 25, 2026, at 7:00 AM Central, while the solicitation narrative states September 25, 2026, at 8:00 AM.

1. Please confirm the current base and option period dates. Published PWS appears to contain performance dates beginning October 1, 2025.

1. Is there a separate deadline for questions?

1. Is any site visit or pre-bid meeting mandatory?

1. For the 20 kVA, 480V input/480V output UPS installation at Jackson Barracks, is a Louisiana electrical contractor license or any bid/performance bond required at the prime level, or may the electrical installation be performed by a properly licensed subcontractor?

1. Please confirm the required quotation submission method/address and whether the completed Oral Quotation Worksheet, pricing, manufacturer authorization/certification documentation, OEM-parts-access documentation, and past-performance/technical information constitute the complete required package.

Answers Group A:

1. Yes

1. September 25, 2026, at 8:00 AM

1. Performance dates beginning October 1, 2026

1. 22 September 2026

1. No visit or meeting needed, pre-bid.

1. a properly licensed subcontractor would be acceptable

1. All offers and responses will be accepted via email.

Questions Group B:

1. The solicitation narrative states September 25, 2026, at 8:00 a.m. for closing, while the SAM.gov response timestamp appears to resolve to 7:00 a.m. Central. Which exact deadline/time zone controls?

1. The RFQ requires certified authorization letters from both EATON and Liebert/Vertiv. May an eligible small-business prime satisfy that requirement through a clearly disclosed subcontractor/teaming partner that holds the required OEM authorizations and performs the specialized UPS service work, with the prime retaining responsibility for overall contract performance?

1. Please confirm the current UPS inventory and locations/CLINs covered by the PWS, including the units at Jackson Barracks and any units at Camp Beauregard/Camp Minden or other sites.

1. Please confirm whether the emergency-response requirement is 24/7 with a four-hour onsite response, and whether two preventive-maintenance inspections per system per year are required for all covered units.

1. The apparent base/option period dates in the publicly indexed PWS appear inconsistent with the September 2026 solicitation date. Please confirm the intended base period and option periods.

1. Are there any mandatory site surveys/pre-bid visits, Louisiana electrical licensing requirements, insurance minimums, or bid/performance/payment bond requirements beyond those contained in the posted RFQ/PWS?

1. Please confirm the controlling quote submission method and whether the Oral Quotation Worksheet must be included with the complete quote package.

Answers Group B:

1. Solicitation has been updated to correct the dates.

1. Solicitation has been updated to address this concern.

1. 5.1 of the PWS answers this question

1. As per the PWS, yes, the emergency-response requirement is 24/7 with a four-hour onsite response, and Yes, two preventive-maintenance inspections per system per year are required for all covered units

1. I do not understand this question, as I cannot see the solicitation itself. Mr. Banton, is there a difference between the base and option years listed in the PWS and those listed on the solicitation?

1. No.

1. Quotation Worksheet is not mandatory but preferred.

Questions Group C:

1. Is a full-service maintenance agreement required for the UPS systems, including parts, labor, travel, and expenses, or would a preventive maintenance agreement with a guaranteed 4-hour emergency response time be considered acceptable?

1. Regarding consumable components, please confirm that batteries and capacitors are excluded from coverage under the maintenance agreement, as stated in the requirement.

1. Is there a loading dock available at the installation location? If yes, please provide the hours of operation.

1. If a loading dock is not available, will personnel be available to receive the UPS equipment and stage it inside the facility prior to the scheduled installation?

1. Is a pallet jack available on-site for unloading and movement of the equipment?

1. Approximately how far is the UPS room from the delivery/drop-off point or staging area?

1. What floor is the UPS room located on? If applicable, is a freight elevator available for equipment movement?

1. Are there any known access limitations or obstacles between the delivery point and the UPS room (e.g., narrow doorways, stairs, protected flooring, tight corridors, or other restrictions) that should be considered during installation planning?

Additionally, please confirm whether the recommended Schneider/APC Galaxy VS 20kVA system (GVSUPS20KB4GS or equivalent) with the required battery configuration is the preferred solution, or if equivalent systems meeting the stated performance requirements will be accepted.

Answers Group C:

1. Section 5.0.1 of the PWS, “The contractor shall: “ “One year of full warranty service coverage (parts, labor, expenses and travel)”

1. Confirmed, as per the PWS, “Section 5.0.3.3 Battery replacement and capacitors need not be covered under contract”

1. No, there is no loading dock at the Jackson Barracks location.

1. Personnel will be available on site as per the PWS section “5.0.3.1 Performed during normal business hours (Tuesday – Friday 0700 – 1730)”. They can accept the shipment. Any unloading, moving, or “staging” of the equipment should be handled between the bidder and the shipping company.

1. No, a pallet jack is not available for use, this should be handled between the bidder and the shipping company.

1. A delivery truck can pull up to the backside of the building to make the delivery, but the pallet will have to be deconstructed and brought up to the 2nd floor.

1. UPS is located on the 2nd floor. There is no freight elevator, only a standard elevator.

1. known access limitations or obstacles between the delivery point and the UPS room: The elevator is small, but should fit a single pallet and has a weight limit of 4,000 lbs. There are also 2 sets of stairs available.

Confirmation: The provided example system is listed with the rider “or equivalent” as to allow subject matter experts freedom to meet the requirements, the stated minimum performance requirements are acceptable

Questions Group D:

1) Question:

Clarification on “Refurbish cell connections as needed” In Section 5.2, the PWS states that corrective maintenance consists of “refurbish cell connections as deemed necessary by the detailed inspection report.”

Could you please specify what actions the Government expects under “refurbishment”?

For example, should this include cleaning/corrosion removal, re‑torquing, hardware replacement (nuts/bolts/washers), intercell connector replacement, cable/lug replacement, or any other tasks?

Answer:

“refurbish cell connections” includes cleaning/corrosion removal, re‑torquing, hardware replacement (nuts/bolts/washers), intercell connector replacement, cable/lug replacement, and any other tasks typically associated with industry standards for UPS maintenance.

2) Question:

Battery quantities and specifications To properly quote the battery PM requirements, we need more information about each battery system associated with the UPS units in Section 5.1.

Could you please provide all available battery details, including:

1. Battery make and model

1. Quantity of jars, trays, strings, or cabinets per unit

1. Any available nameplate data or installation dates The PWS tables list descriptions such as “Sealed Battery” but do not specify quantities, which prevents accurate PM pricing.

Answer:

Site
Louisiana NatGd Camp Beauregard
Ticket #
16172
Battery Type
12HX505-FR
POC
bryan scott guillory
UPS Model
Vertiv eXM
Date Code
8/1/2025
Address
Bldg 420 Room 203 F Street
KVA
60
KW
60
Jars
24

Camp Beauregard

Serial #
M16LUB0002
Cells a Jar
6
City
Pineville
ST
LA
Zip
0
CTO #
N/A
Cells a String
144
TEL
318-290-5350
X
FAX
N/A
Order #
N/A
Nominal Volts
326.16

String 1 of 2

String 2 of 2

#
Volts
Siemens
% Cap
% Ave
Eval
#
Volts
Siemens
% Cap
% Ave
Eval
1
13.56
2104
91%
101%
Good
1
13.60
2326
101%
112%
Good
2
13.57
2190
95%
105%
Good
2
13.58
2345
102%
112%
Good
3
13.53
2209
96%
106%
Good
3
13.58
2357
102%
113%
Good
4
13.51
2147
93%
103%
Good
4
13.56
2314
101%
111%
Good
5
13.57
2128
93%
102%
Good
5
13.54
2333
101%
112%
Good
6
13.55
2240
97%
107%
Good
6
13.53
2252
98%
108%
Good
7
13.49
2172
94%
104%
Good
7
13.53
2271
99%
109%
Good
8
13.51
2073
90%
99%
Good
8
13.53
2258
98%
108%
Good
9
13.54
2147
93%
103%
Good
9
13.51
2333
101%
112%
Good
10
13.56
2147
93%
103%
Good
10
13.42
2277
99%
109%
Good
11
13.54
2098
91%
101%
Good
11
13.49
2252
98%
108%
Good
12
13.55
2116
92%
101%
Good
12
13.48
2258
98%
108%
Good
13
13.49
2289
100%
110%
Good
13
13.47
2320
101%
111%
Good
14
13.49
2159
94%
103%
Good
14
13.48
2209
96%
106%
Good
15
13.46
2110
92%
101%
Good
15
13.45
2240
97%
107%
Good
16
13.48
2085
91%
100%
Good
16
13.45
2258
98%
108%
Good
17
13.49
2091
91%
100%
Good
17
13.48
2252
98%
108%
Good
18
13.50
1999
87%
96%
Good
18
13.47
2252
98%
108%
Good
19
13.48
2079
90%
100%
Good
19
13.45
2271
99%
109%
Good
20
13.45
2036
89%
98%
Good
20
13.43
2283
99%
109%
Good
21
13.44
2209
96%
106%
Good
21
13.47
2190
95%
105%
Good
22
13.41
2054
89%
98%
Good
22
13.45
2246
98%
108%
Good
23
13.46
2085
91%
100%
Good
23
13.43
2227
97%
107%
Good
24
13.49
2005
87%
96%
Good
24
13.31
2345
102%
112%
Good
Site
Louisiana NatGd Camp Minden
Ticket #
16181
Battery Type
12HX505-FR
POC
Jakob Vanantwerpen
UPS Model
Vertiv eXM
Date Code
9/1/2024
Address
100 Louisiana Blvd
KVA
40
KW
40
Jars
24

Camp Minden

Serial #
M18KZB0007
Cells a Jar
6
City
Minden
ST
LA
Zip
71055
CTO #
N/A
Cells a String
144
TEL
318-299-4224
X
FAX
N/A
Order #
N/A
Nominal Volts
326.16

String 1 of 1

N/A

#
Volts
Siemens
% Cap
% Ave
Eval
#
Volts
Siemens
% Cap
% Ave
Eval
1
13.53
2209
96%
103%
Good
1
-
-
-
-
-
2
13.60
2122
92%
99%
Good
2
-
-
-
-
-
3
13.37
2110
92%
99%
Good
3
-
-
-
-
-
4
13.51
1955
85%
92%
Good
4
-
-
-
-
-
5
13.52
2240
97%
105%
Good
5
-
-
-
-
-
6
13.48
2252
98%
105%
Good
6
-
-
-
-
-
7
13.53
2030
88%
95%
Good
7
-
-
-
-
-
8
13.48
2172
94%
102%
Good
8
-
-
-
-
-
9
13.51
2128
93%
100%
Good
9
-
-
-
-
-
10
13.54
1955
85%
92%
Good
10
-
-
-
-
-
11
13.54
1875
82%
88%
Good
11
-
-
-
-
-
12
13.48
2221
97%
104%
Good
12
-
-
-
-
-
13
13.53
2172
94%
102%
Good
13
-
-
-
-
-
14
13.54
1974
86%
92%
Good
14
-
-
-
-
-
15
13.50
2172
94%
102%
Good
15
-
-
-
-
-
16
13.51
2060
90%
96%
Good
16
-
-
-
-
-
17
13.46
2357
102%
110%
Good
17
-
-
-
-
-
18
13.44
2209
96%
103%
Good
18
-
-
-
-
-
19
13.43
2178
95%
102%
Good
19
-
-
-
-
-
20
13.37
2252
98%
105%
Good
20
-
-
-
-
-
21
13.50
2246
98%
105%
Good
21
-
-
-
-
-
22
13.49
2172
94%
102%
Good
22
-
-
-
-
-
23
13.50
2067
90%
97%
Good
23
-
-
-
-
-
24
13.49
2122
92%
99%
Good
24
-
-
-
-
-
Site
Louisiana NatGd Jackson Barracks
Ticket #
16179
Battery Type
HRL12200Wfr
POC
Donovan Lemieux
UPS Model
Eaton 9390-40
Date Code
4/3/2023
Address
6400 St Claude Ave
KVA
40
KW
40
Jars
40

Jackson Barracks

Serial #
EE504CBB04
Cells a Jar
6
City
New Orleans
ST
LA
Zip
0
CTO #
N/A
Cells a String
240
TEL
504-278-8231
X
FAX
N/A
Order #
N/A
Nominal Volts
543.6

String 1 of 1

N/A

#
Volts
Siemens
% Cap
% Ave
Eval
#
Volts
Siemens
% Cap
% Ave
Eval
1
12.04
601
94%
73%
Bad
1
-
-
-
-
-
2
-
-
-
-
-
2
-
-
-
-
-
3
-
-
-
-
-
3
-
-
-
-
-
4
-
-
-
-
-
4
-
-
-
-
-
5
12.01
576
91%
70%
Bad
5
-
-
-
-
-
6
-
-
-
-
-
6
-
-
-
-
-
7
-
-
-
-
-
7
-
-
-
-
-
8
-
-
-
-
-
8
-
-
-
-
-
9
12.02
570
91%
69%
Bad
9
-
-
-
-
-
10
-
-
-
-
-
10
-
-
-
-
-
11
-
-
-
-
-
11
-
-
-
-
-
12
-
-
-
-
-
12
-
-
-
-
-
13
12.01
576
91%
70%
Bad
13
-
-
-
-
-
14
-
-
-
-
-
14
-
-
-
-
-
15
-
-
-
-
-
15
-
-
-
-
-
16
-
-
-
-
-
16
-
-
-
-
-
17
12.02
601
93%
73%
Bad
17
-
-
-
-
-
18
-
-
-
-
-
18
-
-
-
-
-
19
-
-
-
-
-
19
-
-
-
-
-
20
-
-
-
-
-
20
-
-
-
-
-
21
12.85
774
92%
94%
Good
21
-
-
-
-
-
22
-
-
-
-
-
22
-
-
-
-
-
23
-
-
-
-
-
23
-
-
-
-
-
24
-
-
-
-
-
24
-
-
-
-
-
25
12.07
533
92%
65%
Bad
25
-
-
-
-
-

3) Question:

Confirmation of Preventive Maintenance frequencies Our interpretation of the PWS is that the Government requires:

1. Two (2) PM inspections annually per UPS unit, including battery maintenance

1. The additional detailed internal battery PM applies only to the 45 kVA unit(s) Can you please confirm that this interpretation is correct?

Answer:

This interpretation is correct.

4) Question:

Confirmation of “Qty” column meaning in Section 5.1 also request confirmation that the “Qty” column in the PWS equipment tables refers to the number of physical units at each site, rather than the number of PM visits.

Answer:

In section 5.1 the “Qty” column in the PWS equipment tables refers to the number of PM visits.

File details come from the government source that posted it. Updated .