Q A 20 June 2013 -0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912LR-13-R-0007_PRE-PROPOSAL_SIGN_IN_SHEET.docx | DOCX document | |
| PRARNG_Fort_Buchanan_JFHQ_Geotechnical_Report.pdf | ||
| 0007-012_PRARNG_Ft_Buchanan_JFHQ_attachment_13-June-13.pdf | ||
| A-14_PREPROP_SLIDES_JFHQ_Ft_Buchanan_0007.pptx | PPTX presentation | |
| 0007-012200_PRARNG_Ft_Buchanan_JFHQ_100__REV1_13-May-2013.pdf | ||
| W912LR-13-R-0007-0002.pdf | ||
| QA0007Buchanan10June13.doc | DOC document | |
| W912LR-13-R-0007-0001.pdf | ||
| EXHIBITFForwardPricing0007.docx | DOCX document | |
| ExhibitHTEPCalculation0007.docx | DOCX document | |
| ExhibitITEPSamplePR0007.docx | DOCX document | |
| 0007-012200_PRARNG_Ft_Buchanan_JFHQ_100__REV1_13-May-2013.pdf | ||
| ExhibitCJFHQFtBuchanan.doc | DOC document | |
| EXHIBITDJFHQFtBuchanan.doc | DOC document | |
| EXHIBITBJFHQFtBuchanan.doc | DOC document | |
| ExhibitJJFHQFtBuchanan.doc | DOC document | |
| W912LR-13-R-0007.pdf | ||
| ExhibitEJFHQFtBuchanan.doc | DOC document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUESTIONS AND ANSWERS RELATED TO:
SOLICITATION W912LR-13-R-0007
JFHQ FORT BUCHANAN
Make Sure You Have the Latest Version of this Web Page “Refresh” or “Reload” Dated 20 June 2013 R0007-Q001. How do I access the files/documents for the Project?
A. See, Sections 4.4, 4.5 & 4.7 of the FBO Vendor Guide available for download in PDF format via the Federal Business Opportunities / FBO Home Page. See also, Section 00100 of the Solicitation. Additionally, to view and/or download Export Controlled Materials, a company must be certified (via an approved DD Form 2345) by the Joint Certification Program (JCP) administered by the DLA Logistic Information Service (DLIS). This certification establishes that a company is a U.S. or Canadian contractor eligible to receive unclassified technical data that is under the control of the U.S. Department of Defense (DoD) or the Canadian Department of National Defense (DND). Questions about this program or DD Form 2345 should be addressed to U.S./Canada Joint Certification Office, DLA Logistics Information Services (DLIS), Federal Center, 74 Washington Avenue North, Battle Creek, MI 49017-3084. The Joint Certification Office may be contacted by telephone at: 1-(800) 352-3572; or email: jcp-admin@dla.mil.
R0007-Q002. I am trying to access the [export controlled] packages and have a number as assigned on DD Form 2345 but cannot get the packages to open. Our DD 2345 Number is ####### expiration ##/##/2015.
A. The U.S./Canada Joint Certification Program (JCP) office reported to this office that once a company is certified with the JCP office (normally 7 to 12 business days), the company should contact FBO to have them add their JCP number to their FBO account. The FBO help desk (Federal Service Desk) reported to this office that companies need to make sure that they are registered and login as a Vendor to FBO. When the Vendor click's to open an export controlled package/document, they should be asked for their MPIN. After entering the MPIN, the export controlled package/document should be viewable/downloadable by Vendors that have gone through the JCP process. If a Vendor still has problems, the Vendor should check to make sure that their CCR registration and MPIN are valid and up-to-date. If problems still persist, the Vendor may call the FBO help desk at 866-606-8220, selection option 2 for FBO issues, and ask for troubleshooting assistance.
R0007-Q003. Please confirm the date and time for the pre-proposal conference.
A. The pre-proposal conference is scheduled for Monday, May 20, 2013 at 1430 hours/2:30 PM. Please be advised it could take in excess of 1 hour to get through the security checkpoints. Please plan accordingly and arrive early to ensure you are able to be in the Community Club, Ballroom in time for the meeting. In addition, you must have already registered to attend by submitting Exhibit J in order to ensure you are cleared to enter the base.
R0007-Q004. Have there been any amendments to the solicitation thus far?
A. Yes, W912LR-13-0007-0001 has been issued. This is Amentment #1 to the solicitation. The conformed copy has been uploaded to FBO. Please refer to this version of the complete solicitation and not the original. Most changes to solicitation language are highlighted in yellow.
R0007-Q005. Does a contractor doing business for the Federal Government in Florida need to have a Florida License?
A. You must have all the necessary permits to do work/construction in Puerto Rico.
R-0007-Q006. We missed the Pre-Proposal Conference. Can we quote even if we did not attend?
A. Yes, the Pre-Proposal Confernce was not mandatory and therefore not required to provide a proposal. However, it is noted that no contractor will receive a private/separate walk thru of the project site by request.
R-0007-Q007. We are interested in participating in bid of the above referenced project. Our participation would be in a joint venture/teaming agreement with an SBA contractor, can you please let me know if there are specific procedures to get approval in order to bid this project?
A. Reference Solicitation, Section 00110, paragraph 3.4.1.7. A Joint Venture must have a separate registration for that business that is verified by the SBA prior to receiving an award. You must contact your SBA representative directly, as they will make the determination that the Joint Venture is a Small Business and therefore eligible to submit a proposal for this Small Business Set-Aside.
R-0007-Q008. Would you re-issue solicitation as open to large businesses? Would you re-issue solicitation as a Service Disabled Veteran Owned Small Business (SDVOSB) set-aside?
A. The Government has conducted market research with this project and other ongoing projects and determined there are a number of Small Businesses capable and interested in doing this project. It has been determined in the best interest of the Government to leave solicitation as-is. Method of determining this set-aside meets all policy and procedures of the organization and set-aside will not be changed.
R-0007-Q009. We are having trouble completing registration with JCP to access the plans and specification which are posted on FBO as secure documents. Please delay proposal due date.
A. If you are still having issues getting access, follow directions below.
ALL REQUESTS FOR DISKS MUST BE RECEIVED PRIOR TO NOON (EST) 21 JUNE 2013. NO DISKS WILL BE SHIPPED AFTER 21 JUN 2013 DUE TO TIME LIMITATIONS OF DELIVERY PRIOR TO PROPOSAL DUE DATE.
INSTRUCTIONS TO GET PROJECT DISKS
1. As an alternate means of ensuring you have the plans and specifications in ample time to submit a proposal on the referenced project. We will provide disks with plans and specifications at your request if the following is met. These disks will be sent FedEx to you at your expense.
2. Please provide proof that you have made an earnest attempt to complete the registration process. Details were provided in the synopsis, the solicitation, pre-proposal slides and the Q&A documents. Proof should include the following:
A. Copy of documentation proving submission of the DD 2345. This is copy of email stating the JCP has received your documents for processing.
B. This is a sample of a help desk response email showing the Company submitted a “help desk” ticket requesting assistance and current status.
----Original Message-----
From: DLA Customer Support [mailto:dlacontactcenter@dla.mil]
Sent: date and time
To: your name or email
Subject: DLA Service Ticket Response
ABC Construction CORP
STREET ADDRESS OF REGISTRATION
CITY PR 00721
USA
Service Ticket Information:
Ticket No./ Date: ########## / MM/DD/2013
Account ID: ########## (your id #)
Created By: HPXXXXX
DODAAC:
Contact Person
Name: Your POC
Telephone: 787-###-####
Service Ticket Detail:
Description: JCP CERTIFICATION STATUS INQUIRY
Quantity of Action: 1
Created On: MM/DD/2013
Your inquiry has been escalated to SVC JCP / for further research.
Please expect an email update or resolution soon.
Problem/Interim/Resolution:
Problem : Customer would like to check status on her JCP Certification.
CAGE # #XX## (your cage)
DUNS # ##-###-#### (your Duns)
Customer states they mailed in the certification around a week ago.
We are DLA. We stand committed to providing logistics solutions to our valued customers.
This email is for informational purposes only. Please do not reply to the agent. Doing so could delay your response. If you require further assistance, please call 1(877)352-2255,
3. In addition to the above documentation, you will be required to send a completed FedEx shipping form which includes your account number and all the necessary information required to complete the FedEx International Air Waybill as in sample shown here.
REQUEST FORM FOR PROJECT DISKS
(SUBMIT THIS PAGE OF DOCUMENT WITH PROOF OF REGISTATION ATTEMPT)
COMPLETE THE FOLLOWING INFORMAITON AND RETURN THIS SHEET WITH YOUR PROOF OF REGISTRATION TO: Donna.M.Phillips32.civ@mail.mil
MARK PROJECT NAME AND NUMBER YOU WISH TO RECIEVE:
____W912LR-13-R-0007-JFHQ, FORT BUCHANAN
____W912LR-13-R-0008-CAMP SANTIAGO READINESS CENTER
____W912LR-13-R-0009-REFILL STATION, CEIBA PR
YOUR EMAIL ADDRESS:_______________________________________
(tracking number will be emailed to this email for you to check status)
(1) (I will input my ship from information, zip is 39232-8861)
(2)
RECIPIENT’S NAME:____________________________________
RECIPIENT’S PHONE:____________________
COMPANY NAME:__________________
RECIPIENT’S ADDRESS:______________________________
(Must be complete address)
(4) Express Package Service
(SELECT ONE-THIS WILL DETERMINE COST OF SHIPPING AND SPEED YOU WILL RECEIVE PACKAGE)
___ FEDEX INTERNATIONAL PRIORITY
___ FEDEX INTERNATIONAL FIRST
___ FEDEX INTERNATIONAL ECONOMY
(5) TYPE OF PACKAGING: FEDEX BOX
(6) SPECIAL HANDLING
____ HOLD AT FEDEX LOCATION
____SATURDAY DELIVERY
(7)PAYMENT
BILL TRANSPORTATION, DUTIES, & TAX CHARGES TO: (SELECT ONE AND COMPLETE INFORMATION)
____RECIPIENT : FEDEX ACCOUNT NO._________________________________________ ____CREDIT CARD: CREDIT CARD NO._______________________ EXP. DATE__________
(8) YOUR INTERNAL BILLING REFERENCE: (IF ANY) ____________________________________
R0007-Q010. On amendment number 1 (W912LR-13-R-0007-0001) we received exhibits D, E, F, H, I, and J. Is Exhibit G part of the project documents?
A. There is no Exhibit G.
R0007-Q011. Please provide me a copy of the pre-proposal attendees.
A. The pre-proposal sign in sheet along with the pre-proposal slides are posted on FBO.gov. no additional copies will be emailed directly.
R0007-Q012. Please see clarifications to Architectural Drawing (A-111) regarding vault clarifications
A. Details of updated drawings can be found in the attachment titled:
0007-012 PRARNG Ft Buchanan JFHQ_attachment_13-June-13
R0007-Q013. Please provide additional information about the requirements for Option No. 1 (2” Surface). Does it means that ALL new surface asphalt course will be 1 ½” thick at the Base Bid (new drop off, new roadway pavement and new course over existing asphalt surface), to be substituted by 2” thick at the same three areas with Option No.1 ?
A. OLI No. 1 only includes the top 2” surface course of the areas with a complete asphalt pavement section. All areas to receive new full pavement section shall be for Heavy Traffic. Areas identified as to be resurfaced, shall include a top 1-1/2” surface course and it shall be part of the base bid.
R0007-Q014. Technical specifications includes Section 108230 (Security Mesh), but we only see wire mesh partitions and ceiling at the drawings. Please clarify.
A. Refer to secure walls, partition type 08, 08A, 15 and 15A.
R0007-Q015. The Geotechnical Report is being mentioned at Section 00010 (Uncontrolled Fill). Are we going to receive a copy of such Report?
A. Attached is the Geotechnical Investigation Report that was completed in November 2011 for the PRARNG Joint Force Headquarters Project in Fort Buchanan Puerto Rico and shall be considered Supplemental Information Only for the Bidder’s Use. The Contract Plans and Specifications have taken into consideration the discussions and recommendations in the report and govern as construction requirements.
R0007-Q016. The interior courtyard is indicated as OLI in the drawings but it is not listed as so in Section 00010
A. The courtyard concrete slab is indicated as OLI No. 2 on Civil drawings. OLI No. 2, which includes all Landscaping features shall include the courtyard slab, benches, trees, site lighting, and all required cost associated to obtain a completely functional courtyard area as indicated in contract documents. All backfill, final grading, grass, storm sewer, sanitary sewer, water, underground electric power conduits, manholes, handholes, etc., and any other utilities required to run in the area shall be part of the base bid.
R0007-Q017. Please clarify if the CATV RG-6 Coaxial cable, RG-11 Trunk cable, splitters, amplifiers equipment and cable terminations are part of the scope of work.
A. Yes, CATV RG-6 Coaxial cable, RG-11 Trunk cable, splitters, amplifiers equipment and cable terminations are part of this scope of work. Refer to Telecommunications Plan Drawings, CATV one-line T-603 and Specifications, 271300, 271500 and 274133 for additional information.
R0007-Q018. ON DRAWING S-111, ALL SLAB ON GRADE IS MARKED AS KEY NOTE 1, WHICH DEFINES THE SLAB THICKNESS AS 4”. ON THE SAME DRAWING, IN AREAS MARKED AS KEY NOTES 7 AND 13 THE SLAB IS REDUCED BY 2”. THE SLAB THICKNESS IN THESE AREAS WILL BE 2”. PLEASE CLARIFY IF THIS CONSIDERATION IS CORRECT OR IF WE SHOULD CONSIDER THE SLAB ON GRADE AS KEY NOTE 2 WHICH DEFINES A 6” THICK SLAB.
A. The slab on grade is typically 4” thick throughout the building, per key note 1. At areas indicated with key note 7 and 13 (with 2” depression), maintain the 4 inch slab thickness with typical slab step.
R0007-Q019. Please delay proposal due date due to JCP delays in processing certification.
A. The due date remains unchanged, reference R0007-Q009, alternate means were previously provided to receive project plans and specifications.
R0007-Q020. In Section 31 20 00-Earth Moving, Item 3.14 Geofoam Fill, pages 13 thru 14, from the Specifications gives information regarding the installation of geofoam blocks, but it is not clear when or where it will be installed. Please provide the geotechnical report.
A. Please disregard the use of Geofoam Fill as it is not required in this project.
R0007-Q021. In Section 28 31 14-Fire Alarm And Mass Notification System, page 10, item 2.1 Fire-Alarm And Mass Notification Control Unit from the Specifications states that:
“Transmission to Remote Alarm Receiving Station: Automatically transmit alarm, supervisory, and trouble signals to a remote alarm station and the Gatehouse”.
Where is the Gatehouse that you are referring to? Is it the main entrance of Buchanan?
A. Alarm, trouble and supervisory signals are not required to be transmitted to the Gatehouse. These signals shall be transmitted to a UL listed Central Station Receiving station only.
R0007-Q022. The following are questions and issues concerning the glazing:
a. Is it required a Low-E coating on all three of the glass components on an insulated, laminated glass units?
b. Is it required to have a Low-E coating on all three glasses substrates? Low-E surface is identified as surface #2.
c. The specifications identify the products as VNE1-63 and as VE-85 #2 which are two different products. Which one will be used?
d. The glass components in an isolated laminated unit have six surfaces and the Low-E layer it only can be applied exclusively at each one of the different internal surfaces which are surface #2, #3, # 4 & # 5. Therefore you cannot have three glasses and identify the surface of each one of these three glasses as the surface #2. Please clarify; the information is indispensable to us to quote.
e. Please indicate if the glass that is specified is insulated thermal to withstand 145 mph winds or impact resistant thermal or blast resistant thermal?
A.
a. No
b. Low-E on surface #2
c. VE-85 #2
d. Second layer to be Double Glazed Insulating Unit
e. All glazing, windows, storefront and entrance systems must comply with UFC 4-010-01 R0007-Q023. Regarding the aluminum system, the specifications mention manufacturers but not a specific system and there exist several options. Please provide more details.
A. Contractor to provide product equal to requirements of UFC 4-010-01R0007-Q024. Also we need to know if the aluminum finish is clear anodized as is, bronze anodized as is or painted clear anodized, bronze anodized or another color. Warranties are different according to the finishes.
A. Clear anodized
R0007-Q025. Is a Bid Bond required?
A. See Solicitation, SF1442, block 13B.
R0007-Q026. Who will pay for the Builder’s Risk Insurance?
A. See Solicitation, Section 00010 Notes, #2 and Section 00800 1, specific insurance requirements. The contractor is responsible for all costs to provide requirements.
R0007-Q027. Please confirm if the Municipal Taxes and Patente will be paid by the Owner.
A. All taxes are to be paid by the contractor, not the Government.
R0007-Q028. Who will pay for the CIAPR stamps?
A. CIAPR stamps, if required, shall be paid by the contractor, not the Government.
R0007-Q029. Please confirm if the government agencies’ impact fees, connection fees, or any other fees will be paid by the Owner.
A. As required by spec section 011000-1.3-I, the contractor is responsible for all permits, agencies impact fees, connection fees, or any other fees required for the projec R0007-Q030. Please confirm if all required permits will be obtained by the Owner.
A. Reference FAR 52.236-7. Also, see response for question R0007-Q029 which is applicable to this question as well.
R0007-Q031. Please inform the status (and provide copies, if already available) of all permits and agency approvals: AAA, AEE, DRN, JCA, Fire Department, Demolition, etc.
A. Reference FAR 52.236-7. Also, see response for question R0007-Q029 which is applicable to this question as well.
R0007-Q032. Please confirm if the security, temporary utilities (water, electricity, portable toilets, etc.), and temporary facilities will be provided and paid by the Owner.
A. Reference Solictation, Section 00800, Paragraph 8.
R0007-Q033. Is the Contractor responsible for providing a full-time Quality Control Manager?
A. References to Quality Control and Quality Control Manager are found throughout the contract solicitation ensure you have read the documents carefully to fully understand the requirements. Some, but not all of the information is mentioned in Section 00800, Paragraph 27. Also note in Section 00110 and 00120 there are requirements to provide details of your key personnel to be evaluated which includes your Quality Control Person.
R0007-Q034. Is a licensed engineer required for the project? If so, shall he/she be at the project full time?
A. Licensed engineer is required to produce certain shop drawings per the specifications.
R0007-Q035. Is there an escalator clause for this project (for any increases in material costs; e.g., steel, copper, etc)?
A. No.This will be awarded as a Firm Fixed Price Contract.
R0007-Q036. What will be the order of precedence should discrepancies between plans, specs, and/or other bid documents arise?
A. Reference Solicitation, Section 00800, Paragraph 2.
R0007-Q037. Please provide the Plan CES
A. Erosion and Sediment Control Plan drawings are part of the Construction Documents. See dwgs C-181 and C-551. It is the Contractor’s responsibility to obtain all permits required, including a General Consolidated permit and to include any maintenance required to all BMP’s. See notes 12 and 13 as indicated in dwg C-003 which are also applicable to Erosion and Sediment Control Plan.
R0007-Q038. Is there a fugitive dust and erosion control plan?
A. See response to question R0007-Q037 which is also applicable to this question.
R0007-Q039. Who’s responsible for fugitive dust emissions and erosion control? Should we estimate a full time water truck or will there be water available all throughout the project?
A. See response to question R0007-Q037 which is also applicable to this question. Water is limited in Fort Buchanan and shall be coordinated with DPW. The contractor shall include all necessary expenses required to comply with all federal and local regulations, including the use of a water truck and any other measurement required.
R0007-Q040. Should we include an amount per month for maintenance of the erosion control?
Clearing and grubbing
A. As indicated in note 3 found in the Erosion and Sediment Control Plan notes in dwg C-551, the contractor shall include all the maintenance required to the Erosion and Sediment Control BMPs during the life of the construction project.
R0007-Q041. Do we need to dispose of the removed topsoil layer during the earthwork activities? Shall we dispose it outside the project?
A. The contractor shall evaluate if some amount of the top soil may be used on site. Any excess material shall be tested for contamination as per contract provisions and shall be disposed outside the project in an authorized land fill as considered in the General Consolidated permit. No excess material can remain on site.
R0007-Q042. Amendment No 1 is still locked , we are not able to download the document that we need to revise to comply. On June 14, 2013 we received a CD that contains the following: Plans, Specifications, Commissioning Plan, FF&E.
We were able to download from fbo.gov website the following files: Solicitation 1, Solicitation 2, Amendment 2, Q&A. Please provide Amendment No. 1. How are we going to open and have access on future amendments if they appear locked.
A. The following was verified without by going to FBO.gov without logging in as the Government or a contractor. Therefore this info is available to see to everyone. It is noted the only items shown as “locked” are Amendment 1 and plans & specs.
The following documents are what is found under both of those items:
PRARNG_JFHQ PHASE 1_Electrical_BID FINAL (100%) SUBMISSION_08.24.12 PRARNG_JFHQ Phase I_GENERALl_ BID FINAL (100%) SUBMISSION _08.24.12
PRARNG_JFHQ Phase I_Telecom-Security_BID FINAL (100%) SUBMISSION _08.24.12 PRARNG Fort Buchanan JFHQ Bid Final [100%] Specs Vol 01_082412 PRARNG Fort Buchanan JFHQ Bid Final [100%] Comm Plan_082412 PRARNG_JFHQ Phase I_FF&E_BID FINAL (100%) SUBMISSION_08.20.2012
PRARNG_JFHQ Phase I_Landscape_BID FINAL (100%) SUBMISSION _08.24.12
PRARNG_JFHQ Phase I_Mechanical_ BID FINAL (100%) SUBMISSION _08.24.12
PRARNG_JFHQ Phase I_Plumbing_ BID FINAL (100%) SUBMISSION _08.24.12
PRARNG_JFHQ Phase I_SIGNAGE_BID FINAL (100%) SUBMISSION _08.24.12
PRARNG_JFHQ Phase I_Structural_BID FINAL (100%) SUBMISSION _08.24.12
PRARNG Fort Buchanan JFHQ Bid Final [100%] Specs Vol 02_082412
SOW Soil Sampling Buchanan_JFHQ
PRARNG_JFHQ Phase I_FireProt_ BID FINAL (100%) SUBMISSION _08.24.12
All of these Documents were provided to you on a disk if you requested it. Therefore you have everything you need to propose.
Solicitation 1 is document W912LR-13-R-0007.PDF This is not a locked document and it is available without logging in.
Solicitation 2 is document W912LR-13-R-0007-0001.PDF. This is not a locked document and is the first Amended solicitation issued as a conformed copy rather than a SF30. Reference the question above, R0007-Q004.
Q&A documents are available and not locked. They were posted on 17 May and 10 Jun and will continue to be posted as necessary.
You have been provided access to all document needed to submit a proposal and all future updates will be posted to FBO.gov to allow access to all interested contractors.
R0007-Q043. We are requesting a change of date for this proposal since we just received a copy of the specs and drawings. This was because of a backlog of JCP. We would like to have the same opportunity that other contractors had from the beginning to analyze the drawings and prepare a responsible proposal.
A. Reference question R0007-Q019. An alternate method of getting project documents was provided to everyone at the same time and all FedEx shipments went out immediately after requests were received. In addition, the need to register was posted in original synopsis (30 Apr 2013), the solicitation (13 May 2013) and the Pre-Proposal conference information therefore giving everyone the same opportunity to be prepared to access documents.
R0007-Q044. Is it possible to get the list of bidders for this project?
A. An “Interested Vendors List” is public information on FBO.gov web site. You have access to that information and the Contract Award will be posted on FBO after an award has been issued to the selected contractor. No additional lists are available.
R0007-Q045. ON DRAWING S-114, DETAIL C4 SHOWS AND IDENTIFIES BOTH FOOTINGS FOR THE CANOPY TO BE INCLUDED AS OLI NO. 5. HOWEVER, WE ARE NOT PROVIDED WITH THE THICKNESS OF SAID FOOTING. PLEASE PROVIDE DETAIL OR CLARIFY WHAT SHOULD BE CONSIDERED. IN ADDITION, PLEASE INCLUDE DETAIL AS TO HOW SAID CANOPY WILL BE SUPPORTED BY THE STRUCTURE TO BE INCLUDED IN THE BASE BID.
A. The (2) F7.0 footings noted on Sheet S-114 are 7’-0” x 7’-0” x 1’-8” thick with (8) #6 rebar each way, top and bottom.
The ends of the W21 x 101 steel canopy beams located between mechanical rooms shall attach to the 8” CIP concrete walls per detail B3/S-602 (double angle shear connections).
R0007-Q046. WE WOULD LIKE TO KNOW IF THE PLANS AND SPECIFICATIONS SENT ON THE CD INCLUDE THE LATEST PLANS AND SPECIFICATIONS INCLUDED IN AMENDMENT.
A. The documents sent on disk are only those original documents (as listed in response to R0007-Q042 above). Any additional or amended specifications or drawings have been posted to FBO.gov as unsecure and therefore are available to everyone.
R0007-Q047. In Section 09 69 00-Access Flooring from the Specifications gives information regarding the installation of Access-flooring panels, Understructure and Floor panel coverings, but this system is not shown in the drawings. Please let us know location and quantity for such access-flooring system.
A. Room 1066 - IT support (TER) - refer to detail A3/A503.
R0007-Q047. ON DRAWING I-111, 76 CHAIRS MARKED CH-2 ARE SHOWN. HOWEVER, THERE ARE 78 CHAIRS MARKED CH-2 IN THE FURNITURE, FIXTURES, AND EQUIPMENT MANUAL. PLEASE ADVISE AS TO WHICH SHOULD BE CONSIDERED.
A. 78 Chairs marked CH2 should be considered.
R0007-Q048. clarification is needed to Note 22 on Floor plan A-111 for the Gate Assembly. Please advise the Bidders of this additional clarification to Note 22, which shall now read as follows:
A. “22. OLI NO. 6, GATED ENTRANCE ASSEMBLY. BASIS OF DESIGN - AMERISTAR® AEGIS II® CLASSIC 2-RAIL INDUSTRIAL ORNAMENTAL STEEL FENCE SYSTEM. (OR EQUAL) 8'-0" HIGH WITH 1” SQUARE X 14 GA PICKETS AND 3” SQUARE X 12 GA POST. DOUBLE GATE, EACH LEAF 8'-0" WIDE BY 8'-0" HIGH PROVIDING A 16'-0" CLEAR OPENING. ALL MATERIAL TO BE GALVANIZED PRIOR TO FORMING IN ACCORDANCE WITH THE REQUIREMENTS OF ASTM A653/A653M. FINISH TO BE POWDERED COAT; COLOR – BLACK."