EXHIBITDJFHQFtBuchanan.doc
DOC document 46 KB Posted
- Solicitation number
- W912LR-13-R-0007
About this file
Exhibit D
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912LR-13-R-0007_PRE-PROPOSAL_SIGN_IN_SHEET.docx | DOCX document | |
| PRARNG_Fort_Buchanan_JFHQ_Geotechnical_Report.pdf | ||
| 0007-012_PRARNG_Ft_Buchanan_JFHQ_attachment_13-June-13.pdf | ||
| A-14_PREPROP_SLIDES_JFHQ_Ft_Buchanan_0007.pptx | PPTX presentation | |
| 0007-012200_PRARNG_Ft_Buchanan_JFHQ_100__REV1_13-May-2013.pdf | ||
| W912LR-13-R-0007-0002.pdf | ||
| QA0007Buchanan20June13.doc | DOC document | |
| QA0007Buchanan10June13.doc | DOC document | |
| W912LR-13-R-0007-0001.pdf | ||
| EXHIBITFForwardPricing0007.docx | DOCX document | |
| ExhibitHTEPCalculation0007.docx | DOCX document | |
| ExhibitITEPSamplePR0007.docx | DOCX document | |
| 0007-012200_PRARNG_Ft_Buchanan_JFHQ_100__REV1_13-May-2013.pdf | ||
| ExhibitCJFHQFtBuchanan.doc | DOC document | |
| EXHIBITBJFHQFtBuchanan.doc | DOC document | |
| ExhibitJJFHQFtBuchanan.doc | DOC document | |
| W912LR-13-R-0007.pdf | ||
| ExhibitEJFHQFtBuchanan.doc | DOC document |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT D
OPTION EXECUTION PERIOD
SOLICITATION W912LR-13-R-0007
PLEASE REVIEW THE FOLLOWING AND INCLUDE COMPLETED FORM WITH VOLUME 1
To the maximum extent possible, the Government intends on awarding options at time of the Contract Award. In the event all options are not awarded at the time of contract award, the Government may award an option, provided it does not impact the performance period of the contract. Providing and/or receipt of this information will not be used for evaluation purposes and in no way guarantees that the Government will exercise the Option(s).
COMPLETE THE FOLLOWING WITH THE NUMBER OF DAYS AFTER NOTICE TO PROCEED (NTP) THE LISTED OPTION MAY BE EXERCISED AT THE PRICE PROPOSED AND NOT AFFECT THE CONTRACT PERFORMANCE PERIOD. USE 10 October AS THE ESTIMATED DATE.
BASIC AWARD CONTRACT COMPLETION PERIOD OF 660 DAYS AFTER NTP
CLIN 0002 OPTION 1 ________________ DAYS AFTER NTP
(2-inch thick surface/wearing course of all new JFHQ bituminous pavement)
CLIN 0003 OPTION 2 ________________ DAYS AFTER NTP
(Additional landscaping not included in base)
CLIN 0004 OPTION 3 ________________ DAYS AFTER NTP
(Unit Storage Area (including Arms Vault)
CLIN 0005 OPTION 4 ________________ DAYS AFTER NTP
(Manual operable window blinds)
CLINN 0006 OPTION 5 ________________ DAYS AFTER NTP
(Canopy at east entrance to central courtyard)
CLINN 0007 OPTION 6 ________________ DAYS AFTER NTP
(Gated entrance assembly at east entrance to central courtyard)
CLINN 0008 OPTION 7 ________________ DAYS AFTER NTP
(150KVA UPS)
CLINN 0009 OPTION 8 ________________ DAYS AFTER NTP
(Emergency generator set, associated fuel storage tank)
CLINN 0010 OPTION 9 ________________ DAYS AFTER NTP
(Outdoor water feature and fountain)
CLINN 0011 OPTION 10 ________________ DAYS AFTER NTP
(Surface mounted spandrel window connections)
CLINN 0012 OPTION 11 ________________ DAYS AFTER NTP
(Surface spandrel window assemblies)
CLINN 0013 OPTION 12 ________________ DAYS AFTER NTP
(Service Elevator)
CLINN 0014 OPTION 13 ________________ DAYS AFTER NTP
(Furniture, Fixtures, and Equipment (FF&E)
CLINN 0015 OPTION 14 ________________ DAYS AFTER NTP
(Soil Sampling/Testing)
CLINN 0016 OPTION 15 ________________ DAYS AFTER NTP
(Lead Based Paint Mitigation)