0007-012200_PRARNG_Ft_Buchanan_JFHQ_100__REV1_13-May-2013.pdf

PDF 21 KB Posted

Attached to
Construction of Joint Force Headquarters (JFHQ) Fort Buchanan, Puerto Rico
Solicitation number
W912LR-13-R-0007
Issued by

About this file

0007-012200 PRARNG Ft Buchanan JFHQ 100 _REV_13-May-2013.pdf

View the file

Other files

File Type Posted
W912LR-13-R-0007_PRE-PROPOSAL_SIGN_IN_SHEET.docx DOCX document
PRARNG_Fort_Buchanan_JFHQ_Geotechnical_Report.pdf PDF
0007-012_PRARNG_Ft_Buchanan_JFHQ_attachment_13-June-13.pdf PDF
A-14_PREPROP_SLIDES_JFHQ_Ft_Buchanan_0007.pptx PPTX presentation
W912LR-13-R-0007-0002.pdf PDF
QA0007Buchanan20June13.doc DOC document
QA0007Buchanan10June13.doc DOC document
W912LR-13-R-0007-0001.pdf PDF
EXHIBITFForwardPricing0007.docx DOCX document
ExhibitHTEPCalculation0007.docx DOCX document
ExhibitITEPSamplePR0007.docx DOCX document
0007-012200_PRARNG_Ft_Buchanan_JFHQ_100__REV1_13-May-2013.pdf PDF
ExhibitCJFHQFtBuchanan.doc DOC document
EXHIBITDJFHQFtBuchanan.doc DOC document
EXHIBITBJFHQFtBuchanan.doc DOC document
ExhibitJJFHQFtBuchanan.doc DOC document
W912LR-13-R-0007.pdf PDF
ExhibitEJFHQFtBuchanan.doc DOC document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PUERTO RICO ARMY NATIONAL GUARD 24-AUGUST-2012

JOINT FORCE HEADQUARTERS (JFHQ) REV1: 13-MAY-2013

FORT BUCHANAN, PUERTO RICO

BID FINAL [100%] SUBMISSION

UNIT PRICES 01 22 00 - 1

SECTION 01 22 00 - UNIT PRICES

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for unit prices.

B. Related Sections include the following:

1. Section 01 40 00 "Quality Requirements" for general testing and inspecting requirements.

2. Section 31 20 00 “Earth Moving” for definitions of “Bedrock” and “All Other Rock,” and

Testing Agency requirements for “Bedrock” and “All Other Rock” definition-testing for required execution of the Project.

1.2 DEFINITIONS

A. Unit price is a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if estimated quantities of Work required by the Contract Documents are increased or decreased. FAR Clause 52.211-18, “Variation in Estimated Quantity”, applies.

1.3 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation and removal, insurance, applicable taxes, overhead, and profit.

B. Measurement and Payment: Refer to individual Specification Sections for work that requires establishment of unit prices. Methods of measurement and payment for unit prices are specified in those Sections.

C. Government reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Government's expense, by an independent surveyor.

D. List of Unit Price Items: A list of unit price items is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price item.

PART 2 - PRODUCTS (Not Used)

PUERTO RICO ARMY NATIONAL GUARD 24-AUGUST-2012

JOINT FORCE HEADQUARTERS (JFHQ) REV1: 13-MAY-2013

FORT BUCHANAN, PUERTO RICO

BID FINAL [100%] SUBMISSION

UNIT PRICES 01 22 00 - 2

PART 3 - EXECUTION

3.1 UNIT PRICE ITEMS

A. Unit Price No. 1. “Uncontrolled Fill” Excavation:

1. Description: “Uncontrolled Fill” Excavation and Removal according to Section 31 20 00 “Earth Moving.” This item remains an optional item and unit price remains effective throughout entire period of performance of the contract. Item will only be exercised if removal of dirt exceeds the conditions described below.

2. Unit of Measurement: Cubic Yard.

3. The Contractor shall include the cost in their Base Bid lump sum price for the work, all required earthwork to construct all of the facilities and infrastructure indicated in the Contract Documents. This Base Bid amount also includes an estimated 'overexcavation' amount of 850 cubic yards (at the time of bid) of 'uncontrolled fill' (as defined in the contract documents/specifications) that is anticipated to exist within the construction limits-refer to the Geotechnical Report as Supplemental Information. Note that the geotechnical report is for the Contractor's reference only as Supplemental Information only to the Contract documents. All earthwork shall be accomplished in accordance with the contract documents (plans and specifications) which have taken into account the data in the geotechnical report. It is the Contractor's responsibility however to verify all existing conditions. Also note that 'over-excavation' is excavation beyond the lines and grades required by the contract documents for proper construction of the facilities and infrastructure as specified in the contract documents. The Contractor shall not proceed with any 'over-excavation' without written permission from the Contracting Officer. If such written permission is granted by the Contracting Officer, then the Contractor shall also not proceed with any 'overexcavation' work without the onsite presence of the Government's construction inspection representative and the Contractor's Independent Soil Inspection and Testing Agent in any areas where the Contractor deems it necessary to perform 'over-excavation'. The Contractor shall provide Daily Reports to include weight tickets with quantities of approved over-excavation material amounts to the Contracting Officer within 5-working days following over-excavation work. For the purpose of this Unit Price, the over-excavation quantity shall be based on actual field measurements and without considering any expansion or contraction factors. It is anticipated that the 'uncontrolled fill' material will be able to be utilized onsite, however, only in landscaped areas for such items as berms, etc. In no case shall 'uncontrolled fill' material be utilized as backfill or fill for areas under pavements, sidewalks, buildings, in or under utility trenches, under roadways or under building slabs, foundations, or other structures. If the total amount of 'over-excavation' required turns out to be more than 115% of the estimated 850 CY (more than 978 CY), then the Contractor shall be paid at the Unit Price for removal and proper disposal of such extra material. If the total amount of 'over-excavation' required turns out to be less than 85% of 850 CY (less than 723 CY), then the Contractor will be required to provide a credit back to the Owner at the Unit Price provided for such 'over-excavation'.

END OF SECTION 01 22 00