W912LQ23R00030001.pdf
PDF 394 KB Posted
- Solicitation number
- W912LQ-23-R-0003
About this file
This solicitation seeks aviation maintenance services for UH-60 Blackhawk helicopters. The contractor shall provide Phase 1 and 2 maintenance at the Virginia Army Aviation Support Facility Regional Aviation Phase Support Center in accordance with the Performance Work Statement. The base period of performance is August 1, 2023 through July 31, 2024 with four option years. The contractor will be required to service 12 Phase 1 or 2 inspections in the base year increasing to 20 in the last option year. The contractor must register in SAM and submit any questions by May 17th. Attachments include an information sheet, GFP list, and pricing sheet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 3_W912LQ23R0003.pdf | ||
| W912LQ23R00030002.pdf | ||
| Amendment 2_REVISED_Pricing Sheet(v.2).xlsx | XLSX spreadsheet | |
| Amendment 2_RAPSC Site Visit Agenda.docx | DOCX document | |
| Amendment 2_Sign-in Sheet_Jun 1 2023.pdf | ||
| Amendment 2_RAPSC Site Visit Minutes.docx | DOCX document | |
| W912LQ23R0003Attachment3.pdf | ||
| W912LQ-23-R-0003 RAPSC Services Solicitation.pdf | ||
| Pricing Sheet(v.2).xlsx | XLSX spreadsheet | |
| Information Sheet (Attachment 1).docx | DOCX document | |
| GFP and INCIDENTAL PROPERTY (Attachment 2).docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. The purpose of this amendment is to answ er questions received, add a line item for a phase-in period, add language to the Performance Workstatement regarding a phase in/out period, updated Technical Exhibit 3 and establish a date for an organized site visit.
1. Questions received and the Government's response are added to the solicitation as Attachment 3.
2. Contract Line Item Number (CLIN) 0003 is hereby added to the pricing schedule for a phase-in period.
3. Paragraph 1.4.15 is hereby added to the Performance Work Statement (PWS) regarding the Phase-in and Phase-Out period. A revised PWS is included in this amendment.
4. Technical Exhibit 3 is hereby revised and included in this amendment.
4. An organized site visiti is scheduled for 9:00 a.m. ET, on June 1, 2023.
B. The time and date for receipt of quotes is not changed.
C. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 26
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-May-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LQ23R0003
X 9B. DATED (SEE ITEM 11)
10-May-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-May-2023
CODE
USPFO VA PURCHASING & CONTRACTING
WSH15H DSCR
8000 JEFFERSON DAVIS HW
RICHMOND VA 23297-0000
W912LQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912LQ23R0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The pricing detail quantity has decreased by 1.00 from 12.00 to 11.00.
CLIN 0003 is added as follows:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0003 1 Months Base Period - Phase-In
FFP
The contractor shall provide a 30-day phase-in period in accordance with Performance Work Statement (PWS) paragraph 1.4.15.
FOB: Destination
PSC CD: J016
NET AMT
DELIVERIES AND PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-AUG-2023 TO
31-JUL-2024
N/A 2D BATTALION, 224TH AVIATION
REGIME
SEE AWARD INFORMATION
700 PORTUGEE ROAD
SANDSTON VA 23150-5050
W81EJP
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-SEP-2023 TO
31-JUL-2024
N/A 2D BATTALION, 224TH AVIATION
REGIME
SEE AWARD INFORMATION
700 PORTUGEE ROAD
SANDSTON VA 23150-5050
The following Delivery Schedule for CLIN 0003 has been added:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 01-AUG-2023 TO
31-AUG-2023
N/A 2D BATTALION, 224TH AVIATION
REGIME
SEE AWARD INFORMATION
700 PORTUGEE ROAD
SANDSTON VA 23150-5050
INSPECTION AND ACCEPTANCE
The following Acceptance/Inspection Schedule was added for CLIN 0003:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
The following have been modified:
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
FOR
UH‐60 Aviation Maintenance Services
1.0 General:
1.1 Scope: The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary, except as specified in Paragraph 3.0 as Government Furnished, to perform aviation maintenance services, as defined in this PWS.
1.2 Background: The Army Aviation Support Facility (AASF) of the Virginia Army National Guard is responsible for Aviation Unit Maintenance (AVUM), Aviation Intermediate Maintenance (AVIM) and Depot/Sustainment repair of all Army National Guard Helicopters in support of Federal and State operations. VAARNG AASF is in Sandston, VA.
1.2.1 Government's Right to Perform Work. The Government reserves the right to use Government employees, including military personnel, separate Contractor personnel, and Government Property to perform any facet of this contract as directed by the KO or COR. This will include teams to conduct scheduled services, un‐ scheduled services, special inspections, flight line support, aircraft mooring, aircraft fueling and defueling operations, training opportunities for Soldiers, strike assistance, assistance if the Contractor is failing to meet requirements or other reasons directed by the Government. Furthermore, any implementation of this section will be coordinated with the Contractor in advance if there are any tasks that the contractor cannot perform.
1.3 Period of Performance (PoP): The Period of Performance shall be 1 Base Year of 12 months and 4 option years of 12‐months.
1.4 General Information: This is a non‐personal services contract to provide aviation maintenance services. The Government shall not exercise any supervision or control over the contractor or sub‐contractor performing the services herein. The sub‐ contractor and contractor employees shall be accountable solely to the primary contractor who, in turn is responsible to the Government.
1.4.1 Quality Control (QC): The contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non‐ recurrence of defective services. The contractor’s QCP is the means by which it assures itself that its work complies with the requirements of the contract. As a minimum, the contractor shall develop QC procedures that address the areas identified in Technical Exhibit 1, Performance Requirements Summary (PRS). A final QCP shall be submitted to the Contracting Officer Representative (COR) NLT 10 days after contract award. After acceptance of the QCP, the contractor shall obtain the Contracting Officer’s (KO’s) acceptance in writing of any proposed changes to its QCP.
1.4.2 Quality Assurance (QA): The Government will evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and acceptable quality level(s) or defect rate(s).
1.4.3 Recognized Holidays: The following are recognized United States (US) holidays. The contractor shall not perform services on these days, including weekends:
1.4.3.1 New Year’s Day: January 1st
1.4.3.2 Martin Luther King, Jr.’s Birthday
1.4.3.3 President’s Day
1.4.3.4 Memorial Day
1.4.3.5 Juneteenth June 19th
1.4.3.6 Independence Day: July 4th
1.4.3.7 Labor Day
1.4.3.8 Columbus Day
1.4.3.9 Veteran’s Day: November 11th
1.4.3.10 Thanksgiving Day
1.4.3.11 Christmas Day: December 25th
1.4.4 Place and Performance of Services: Contractor work hours shall be from 7:30am‐4:00pm Monday‐Friday. Contractors will not work on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government‐directed facility/installation closings. Performance shall be at Virginia Army National Guard Army Aviation Support Facility (AASF), 700 Portugee Road, Sandston, VA 23150.
The contractor shall at all times maintain an adequate work force for the uninterrupted performance of all tasks defined within this PWS when the Government facility/installation is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the work force are essential.
1.4.4.1 Telework: Teleworking is not authorized.
1.4.4.2 Reserved.
1.4.4.3 Unscheduled gate closures by the Security Police may occur at any time causing all personnel entering or exiting a closed installation to experience a delay. This cannot be predicted or prevented. Contractors are not compensated for unexpected closures or delays.
Vehicles operated by contractor personnel are subject to search pursuant to applicable regulations. Any moving violation of any applicable motor vehicle regulation may result in the termination of the contractor employee’s installation driving privileges.
1.4.4.4 The contractor’s employees shall become familiar with and obey the regulations of the installation, including fire, traffic, safety and security regulations while on the installation.
Contractor employees should only enter restricted areas when required to do so and only upon prior approval. All contractor employees shall always carry proper identification with them and shall be subject to such checks as may be deemed necessary. The contractor shall ensure compliance with all regulations and orders of the installation which may affect performance.
The Government reserves the right to direct the removal of an employee for misconduct, security reasons, or any overt evidence of communicable disease. Removal of contractor employees for reasons stated above does not relieve the Contractor from responsibility for total performance of this contract.
1.4.5 Security Requirements. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the COR. The contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by Department of Defense (DoD), Headquarters Department of Army (HQDA) and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
1.4.5.1 For contractors requiring Common Access Card (CAC): The CAC is the DoD Federal Personal Identity Verification (PIV) credential. Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated Tier 1 or an equivalent or higher investigation in accordance with Army Directive 2014‐05. The contractor employee will be issued a CAC only if duties involve one of the following: (1) both physical access to a DoD facility and access, via logon, to DoD networks on‐site or remotely; (2) remote access, via logon, to a DoD network using DoD‐approved remote access procedures; or (3) physical access to multiple DoD facilities or multiple non DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an initial CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled Tier 1 investigation at the Office of Personnel Management.
Sponsorship and enrollment information about each applicant must be registered in the Defense Enrollment Eligibility Reporting System (DEERS) through either the Real‐Time Automated Personnel ID System (RAPIDS) using the DD Form 1172‐2 or the Trusted Associate Sponsorship System (TASS).
1.4.5.1.1 Homeland Security Presidential Directive (HSPD)‐12 Background Investigation Requirements: The contractor shall ensure that all contractor and subcontractor personnel whose duties require CAC card issuance obtain them and shall process all CAC card applications.
The contractor shall ensure that all employees requiring an initial background investigation complete a Personnel Security Investigation Portal (PSIP) form at Attachment to be determined (TBD), due to COR 15 days after contract award. The COR will review the form for completeness and accuracy and forward it to the National Guard Bureau (NGB) Personnel Security manager who will initiate the investigation process via the PSIP. Contractor personnel will then receive two e‐mail messages; the first will confirm that the investigative service provider has received the request, and the second will provide instructions for the completion of the appropriate form via the Electronic Questionnaires for Investigations Processing (e‐QIP) system. Upon completion of the e‐QIP questionnaire and submittal of all required documents, including fingerprint card to the security manager, the background investigation (BI) will be initiated. The contractor shall ensure immediate compliance with all instructions regarding background investigation processing, including those provided verbally, by e‐mail or via a Government system. The contractor is cautioned that the entire process from submittal of the
PSIP form to return of the FBI fingerprint check may routinely take from two to six weeks and shall factor this lead time into its hiring/placement process. The contractor shall make all reasonable efforts to ensure that contractor employees meet CAC eligibility standards upon assignment to the contract and shall be held responsible for delays, failure to meet performance requirements or decreases in efficiency in accordance with the applicable inspection clause.
1.4.5.1.2 Trusted Associate Sponsorship System (TASS): The contractor shall process CAC applications through the TASS, the procedures for which are described below. Although there is no requirement for the contractor to designate a “Corporate Facility Security Officer" (FSO) to serve as its single point of contact for the BI, the TASS application process and other CAC and security‐related matters, such designation facilitates these processes. If an FSO is not established, all contractor employees requiring a CAC will be required to process their own applications. The submission process for CAC applications is as follows:
1. The contractor's FSO or contractor employee shall submit requests for a CAC via email to the designated TASS Trusted Agent (TA). The TASS TA for this requirement will be identified at the time of award.
2. The Government will establish a TASS application account for each CAC Request and will provide each contractor employee a user ID and password, via email, to the contractor’s FSO or contractor employee. The FSO or contractor employee shall access the TASS account and complete the CAC application (entering/editing contractor information as applicable) at:
https://tass.dmdc.osd.mil/tass/ .The contractor’s FSO or contractor employee shall follow up to ensure that the TA is processing the request.
3. The Government will inform the contractor's applicant, via email, of one of the following:
a. Approval. * Upon approval, the information is transferred to the DEERS database and an email notification is sent to the contractor with instructions on obtaining their CAC. The contractor proceeds to a RAPIDS station (RAPIDS Site Locator: http://www.dmdc.osd.mil/rsl/).
b. Rejection. * The Government, in separate correspondence, will provide reason(s) for rejection.
c. Return. Additional information or correction to the application required by the contractor employee.
*The contractor shall maintain records of all approved and rejected applications.
1.4.5.1.3 At the RAPIDS station, the RAPIDS Verification Officer will verify the contractor employee by SSN and two forms of identification. Identity source documents must come from the list of acceptable documents included in Form I‐9, OMB No. 1615‐0047, "Employment
Eligibility Verification." Consistent with applicable law, at least one document from the Form I‐ 9 list shall be a valid (unexpired) State or Federal Government‐issued picture ID. The Identity documents will be inspected for authenticity and scanned and stored in the DEERS upon issuance of an ID. The photo ID requirement cannot be waived, consistent with applicable statutory requirements. The Verification Officer will capture primary and alternate fingerprints, picture, and updates to DEERS, and will then issue a CAC. Issued CACs will be valid for no longer than three years, or until the individual's contract end date (inclusive of any options), whichever is earlier.
1.4.5.1.4 The contractor shall manage requests for new or renewal CAC cards in sufficient time to ensure that all contractor employees have them when needed to perform work under this contract. The contractor shall provide at least 10 calendar days advance notice to the COR and TA, unless there are extenuating circumstances approved by the COR or KO.
1.4.5.1.5 The contractor shall return issued CACs to the DEERS office upon departure or dismissal of each contractor employee and shall obtain a receipt for each card and provide it to the TA/COR within 2 calendar days of receipt.
1.4.5.1.5.1 Failure to comply with these requirements may result in withholding of next or final payment.
1.4.5.1.6 The contractor shall obtain an Army Knowledge Online (AKO) email address for each applicant, including subcontractors, who may be deployed or require logical access to a government computer network. This can be done by going to: http://www.us.army.mil and registering as an "Army Guest," with the sponsor being the COR or a COR‐ designated individual if the COR is ineligible to Serve as an AKO Sponsor. Note: If employees of a contractor lose the privilege to access AKO, they lose the ability to renew their CAC. Therefore, it is critical that contractor employees maintain their AKO accounts.
1.4.5.1.7 Army Training Certification Tracking System (ATCTS) registration for contractor employees who require access to government information systems. All contractor employees with access to a Government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the information system and then annually thereafter.
1.4.5.2 Reserved
1.4.5.3 Communications Security/Information Technology (COMSEC/IT) Security. All communications with DoD organizations are subject to COMSEC review. All telephone communications networks are continually subject to intercept by unfriendly intelligence organizations. DoD has authorized the military departments to conduct COMSEC monitoring and recording of telephone calls originating from, or terminating at, DoD organizations.
Therefore, the contractor is advised that any time contractor personnel place or receive a call they are subject to COMSEC procedures. The contractor shall ensure wide and frequent dissemination of the above information to all employees dealing with DoD information. The contractor shall abide by all Government regulations concerning the authorized use of the Government's computer network, including the restriction against using the network to recruit Government personnel or advertise job openings.
1.4.5.4 Use of Government Information Systems (IS) and access to Government networks is a revocable privilege, not a right. Users are the foundation of the DoD strategy, and their actions affect the most vulnerable portion of the Army Enterprise Infostructure (AEI). Contractor employees shall have a favorable background investigation or hold a security clearance and access approvals commensurate with the level of information processed or available on the system. Contractor employees shall:
1.4.5.4.1 Comply with the command's Acceptable Use Policy (AUP) for Government owned IS and sign an AUP prior to or upon account activation.
1.4.5.4.2 Complete initial and/or annual Information Assurance (IA) training as defined in the IA Best Business Practices (BBP) training (https://atc.us.army.mil/iastar/docs/Training_BBP.pdf).
1.4.5.4.3 Mark and safeguard files, output products, and storage media per classification level and disseminate them only to individuals authorized to receive them with a valid need to know.
1.4.5.4.4 Protect IS and IS peripherals located in their respective areas in accordance with physical security and data protection requirements.
1.4.5.4.5 Practice safe network and Internet operating principles and take no actions that threaten the integrity of the system or network.
1.4.5.5 Reserved
1.4.5.6 AT Level 1 Awareness Training (AT): All contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete Level 1 AT within 30 calendar days after contract start date and within 30 calendar days of new employees commencing performance. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee to the COR within 15 calendar days after completion of training. Level 1 AT is available at http://jko.jten.mil/courses/atl1/launch.html .
1.4.5.7 Reserved
1.4.5.8 Reserved
1.4.5.9 iWatch Training: The contractor and all associated subcontractors with an area of performance within an Army‐controlled installation, facilities or area shall brief all employees on the local iWatch program. This local developed training shall be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR or the KO. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance. The contractor shall report completion for each contractor employee and subcontractor employee to the COR within 15 calendar days after completion of training.
1.4.5.10 OPSEC Training: In accordance with AR 530‐1, Operations Security, new contractor employees shall complete Level I OPSEC training within 30 calendar days of their reporting for duty and annually thereafter. The contractor shall submit certificates of completion for each contractor employee to the COR within 15 calendar days after completion of training. Level 1 OPSEC training is available at https://securityawareness.usalearning.gov/opsec/index.htm.
1.4.5.11 Reserved
1.4.5.12 Reserved
1.4.5.13 Threat Awareness and Reporting Program (TARP). Threat Awareness and Reporting Program (TARP). Per AR 381‐12, Threat Awareness and Reporting Program (TARP), contractor employees with security clearances must receive annual TARP training by a counterintelligence (CI) agent or other trainer as specified in Chapter 2 Threat Awareness and Education, Section II, paragraph 2‐4b. The contractor shall identify annual TARP training, personnel trained, and date of training within 15 days of training completion.
1.4.6 Physical Security. The contractor shall safeguard all Government property provided for contractor use. At the close of each work period, Government facilities, equipment and materials shall be secured.
1.4.6.1 Reserved
1.4.6.2 Keypad Combinations: The contractor shall establish and implement methods of ensuring that no keypad combinations are revealed to unauthorized persons. The contractor shall ensure that keypad combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
1.4.7 Special Qualifications: The contractor shall ensure all employees possess all required licenses for operating AASF equipment used in the performance of this contract. This does not include education or other qualifications for the position in which the contractor employee is performing, dress codes, or other information. (NOTE: The Government does not provide training to contractors. Contractors must ensure that any personnel performing under a contract are fully trained, licensed, certified, and otherwise qualified to provide services.)
1.4.8 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the KO in accordance with FAR 42.5. The KO, COR, and other Government personnel, as appropriate, shall meet quarterly with the contractor to review the contactor’s performance. At these meetings, the KO will apprise the contractor of how the Government views the contractor’s performance and the contractor shall apprise the Government of problems, if any, being experienced. The contractor shall resolve outstanding issues raised by the Government. Contractor attendance at these meetings shall be at no additional cost to the Government.
1.4.9 Contract Manager (CM): The contactor shall designate a CM who shall ensure performance under this contract. The name of this person, and an alternate who shall act for the contractor when the CM is absent, shall be designated in writing to the KO and COR NLT 15 calendar days after contract award. The CM or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The CM shall work through the COR, to resolve issues, receive technical instructions, and ensure adequate performance of services. The CM shall ensure that contractor employees do not perform any services outside the scope of the contract without an official modification issued by the KO.
The CM shall ensure contractor employees understand that services performed outside the scope of the contract are performed wholly at the expense of the contractor.
1.4.10 Identification of Contractor Employees: All contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government employees. The contractor shall ensure that all documents or reports produced by contractor personnel are suitably marked as contractor products or that contractor participation is appropriately disclosed. The contractor’s status as a “contractor” shall be predominantly displayed in all correspondence types (to include signature blocks on e‐mail) and dealings with Government or non‐Government entities. Contractor personnel shall wear identification badges distinguishing themselves as such. The badges shall have the company name, employee name and the word “contractor” displayed.
1.4.11. Combating Trafficking in Persons: The United States Government has adopted a zero‐ tolerance policy regarding trafficking in persons. Contractors and contractor employees shall not engage in severe forms of trafficking in persons during the period of performance of the contract; procure commercial sex acts during the period of performance of the contract; or use forced labor in the performance of the contract. The Contractor shall notify its employees of the United States Government’s zero tolerance policy, the actions that will be taken against employees for violations of this policy. The contractor shall take appropriate action, up to and including termination, against employees or subcontractors that violate the US Government policy as described at FAR 22.17.
1.4.12 Reserved
1.4.13 Data Rights the Government has unlimited rights to all documents/materials produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the KO. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.4.14 Organizational Conflicts of Interest (OCI): The contractor and subcontractor personnel performing services under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.) or perform evaluation services which may create a current or subsequent OCIs, as defined in FAR Subpart 9.5. The contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO. In the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may impose other remedies as he or she deems necessary, including prohibiting the contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.4.15 Phase In / Phase Out Periods: To minimize any decreases in productivity and to prevent possible negative impacts on additional services, the contractor shall have personnel on board, during the 30 day phase in/ phase out periods of the first month of the 12‐month base period.
During the phase in period, the contractor shall become familiar with performance requirements in order to commence full performance of services on the contract start date.
Phase‐out period shall only be needed when a new vendor takes over the contract through the proper channels and shall be a 30‐day phase‐out period with the current vendor and considered a phase‐in period for the new vendor.
2.0 Definitions and Acronyms:
2.1 Definitions:
2.1.1 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 Contracting Officer Representative (COR): An employee of the U.S. Government designated by the KO to monitor contractor performance. Such appointment will be in writing and will state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 Defective Service: A service output that does not meet the standard of performance associated with the PWS.
2.1.5 Deliverable: Anything that can be physically delivered and includes non‐manufactured things such as meeting minutes or reports.
2.1.6 Field‐level Maintenance: Maintenance performed, consisting of high frequency on or off the aircraft tasks required to retain or return aircraft to a fully mission capable (FMC) condition.
Categories of maintenance shall be as identified by the maintenance allocation chart (MAC) in applicable publications.
2.1.7 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.8 Modification: Any post‐production alteration of a permanent nature done to an end item, component, assembly or support equipment.
2.1.9 Physical Security: Actions that prevent the loss or damage of Government property.
2.1.10 Quality Assurance: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.11 Quality Assurance Surveillance Plan (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.12 Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
2.1.13 Safety‐Of‐Flight Discrepancies: One in which failure or malfunction would present a hazardous condition to the end item or personnel during pre‐flight, in‐flight, or post‐flight aircraft operations.
2.1.14 Serviceable: Capable of meeting the requirement and performing the function for which it was designed and meets all test requirements established by the Work Specification.
2.1.15 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.16 Sustainment‐level Maintenance: Maintenance performed on material requiring major overhaul or a complete rebuild of parts, assemblies, subassemblies, and end items, including the manufacture of parts, modification, testing and reclamation as required.
2.2 Acronyms:
AASF Army Aviation Support Facility AEI Army Enterprise Infostructure AMM Aircraft Maintenance Manual AR Army Regulation AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CECG Corrosion and Erosion Control Guide CFR Code of Federal Regulations CM Contract Manager CMRA Contractor Manpower Reporting Application COR Contracting Officer Representative DA Department of the Army DD254 Department of Defense Contract Security Classification Specification DFARS Defense Federal Acquisition Regulation Supplement DoD Department of Defense FAR Federal Acquisition Regulation FCF Functional Check Flight GFP/M/E/S Government Furnished Property/Material/Equipment/Services HQDA Headquarters, Department of the Army HSPD Homeland Security Presidential Directive KO Contracting Officer MOC Maintenance Operation Check MSM Master Servicing Manual MTF Maintenance Test Flight NGB National Guard Bureau OCI Organizational Conflict of Interest POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement
QA Quality Assurance QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program RFM Rotary Flight manual SRM Structural Repair Manual STC Supplemental Type Certificate TE Technical Exhibit USD(I) Under Secretary of Defense for Intelligence
3.0 Government Furnished Property, Material, Equipment and Services (GFP/M/E/S): The Government will provide the property, material, equipment, and/or services listed below solely for the purpose of performance under this contract. The contractor is responsible for maintenance and repair cost of the incidental property and conditions by which the contractor could be liable for any loss.
3.1 See “GFP & INCIDENTAL PROPERTY (Attachment 2)” for Government Furnished Property and Incidental Property for this requirement.
3.2 Property: The Government will furnish the necessary workspace for the contractor to perform services outlined in this PWS to include desk space, telephones, computers, and other items necessary to maintain an office environment.
3.3 Materials: The Government will furnish the necessary materials required to conduct aviation maintenance services.
3.4 Equipment: The Government will furnish the necessary aviation special tools, support, and test equipment to accomplish aviation maintenance services.
3.5 Services: Reserved
3.6 Utilities: All utilities in the facility will be available for the contactor’s use in the performance of this contract. The contractor shall instruct employees in utilities conservation practices. The contractor shall operate under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount.
4.0 Contractor Furnished Property, Materials, and Equipment (CFP/M/E):
4.1 General: Except for those items specifically stated to be Government‐Furnished in Paragraph 3.0, the contractor shall furnish everything required to perform these services as indicated in Paragraph 1.1. (See 4.1.1)
4.1.1 Contractor shall ensure that each mechanic has required hand tools equivalent to what is contained in the general mechanic tool kit (GMTK) for MOS 15T Part Number: CATSGMTK14/
NSN 5180‐01‐628‐2375)
& Electrical repairers tool kit (ELTK) MOS 15F Part Number CATSELTK14/ NSN 5180‐01‐626‐
5.0 Requirements: The contractor shall provide a qualified and professional staff to perform non‐personal services necessary to complete all tasks for Aviation Unit Maintenance (AVUM), Aviation Intermediate Maintenance (AVIM), and Depot Level Aviation Maintenance services (field and sustainment maintenance). Due to the classification and nature of equipment involved, all power on/Avionics checks will be completed by Army Aviation Support Facility (AASF) personnel.
5.1 Conduct Periodic Maintenance Inspection (PMI) 1 on UH‐60 in accordance with (IAW) U.S. Army Technical Manual 1‐1520‐237‐23&P or Technical Manual 1‐1520‐280‐23&P as each manual applies.
Pre‐phase maintenance inspection
Aircraft Disassembly
Component Removal
In‐Progress Inspection Support
1. Cockpit section
2. Cabin section
3. Transition section
4. Tail cone section
5. Tail rotor pylon section
6. Main rotor pylon section
Repair/Replace Components, Assemblies, and Sub‐assemblies
Structural Repairs Aircraft Reassembly
Post‐Phase Inspection Maintenance Operational Checks (MOC) not included in power on inspections REF:
WP0374 U.S. Army Technical Manual 1‐1520‐237‐23&P or Technical Manual 1‐1520‐ 280‐23&P
Post‐Phase/Intermediate Maintenance Test Flight (MTF) Support
Documentation
Indirect support such as those functions indirectly related to maintenance activities such as: Supply actions, Production Control, Quality Control, Timekeeping, and Aircraft Movement.
All applicable ‐18 inspections that fall within the window of the subsequent PMI Examples are but not limited to:
1. Preventative Maintenance Daily (PMD)
2. Preventative maintenance service (PMS) Inspection (40HR Inspection)
3. 120HR Inspection
4. 48‐month inspections (cabin tub, fuel cell O ring, fuel cell corrosion inspection, and flight control rod inspection).
5. Wash/lube CCI
5.2 Conduct Periodic Maintenance Inspection (PMI) 2 on UH‐60 IAW U.S. Army Technical Manual 1‐1520‐237‐23&P or Technical Manual 1‐1520‐280‐23&P as each manual applies.
Pre‐Periodic Inspection Aircraft Disassembly
Component Removal
In‐Progress Inspection Support
1. Cockpit section
2. Cabin section
3. Transition section
4. Tail cone section
5. Tail rotor pylon section
6. Main rotor pylon section
Repair/Replace Components, Assemblies, and Sub‐assemblies
Structural Repairs Aircraft Reassembly
Post‐Phase Inspection Maintenance Operational Checks (MOC) not included in power on inspections REF:
WP0374 U.S. Army Technical Manual 1‐1520‐237‐23&P or Technical Manual 1‐1520‐ 280‐23&P
Post‐Phase MTF Support
Documentation
Indirect support such as those functions indirectly related to maintenance activities such as: Supply actions, Production Control, Quality Control, Timekeeping, and Aircraft Movement.
All applicable ‐18 inspections that fall within the window of the subsequent PMI Examples are but not limited to:
1. Preventative Maintenance Daily (PMD)
2. Preventative maintenance service (PMS) Inspection (40HR Inspection)
3. 120HR Inspection
4. 48‐month inspections (cabin tub, fuel cell O ring, fuel cell corrosion inspection, and flight control rod inspection).
5. Wash/lube CCI
5.3 Apply outstanding Safety Messages and Air Worthiness Releases (AWR’s) on all UH 60 aircraft being serviced by the contractor as identified by the Technical Manual (TM), Maintenance Test Pilot (MTP), and Contracting Officer Representative (COR).
5.4 Correct Safety‐of‐Flight conditions revealed at the work site on all UH 60 aircraft being serviced by the contractor as identified in the Technical Manual (TM), Maintenance Test Pilot (MTP), and Contracting Officer Representative (COR).
5.5 Inspect, document (IAW DA PAM 738‐7510, preserve and properly package to prevent deterioration or damage during handling and shipment to overhaul and storage depots, all serviceable and unserviceable repairable aircraft components on UH 60 aircraft being serviced.
5.6 Maintain Forms and Records:
5.6.1 The contactor shall ensure that all work performed is documented IAW DA PAM 738- 751 utilizing the Aircraft Notebook (ACN) and other applicable Army technical documents.
5.7 Condemnation and Repair:
5.7.1 Contractor shall not condemn items without COR approval.
5.7.2 The contractor shall receive prior approval from the COR before repairing items where repair cost exceeds 65% of replacement.
5.8 Finishing:
5.8.1 After specified maintenance, reassemble all UH 60 aircraft being serviced.
5.8.2 Clean all aircraft of residue resulting from work accomplished and conduct Foreign Object of Destruction (FOD) inspection.
5.8.3 Paint all UH 60 aircraft in those areas disturbed by the contractor in performance of the required work to ensure adequate corrosion protection. (NOTE: The term “touch‐up” shall be interpreted to mean: The damaged area to be painted or repaired is to be cleaned of all surface contamination; the adjacent areas are to be tapered (feathered); area to be coated is to be scuffed; the proper primer and finish coats are to be applied IAW TB 746‐93‐2 so as to be compatible with original finish configuration and present a neat appearance.) Minor additional painting requirements may exist such as painting logos, tail numbers, etc.
5.9 Preservation: The Contractor shall perform preservation/de‐preservation of aircraft and related components on all UH 60 aircraft being serviced IAW specific aircraft technical manuals.
5.10 Handling: Contractor personnel shall ground handle all UH 60 aircraft being serviced.
Ground handling shall include moving, mooring, and parking. Ground handling, aircraft tie‐down and mooring shall be IAW applicable publications.
5.11 Required Technical Manuals (TM):
AR‐95‐1
Flight Regulations
3/17/2016 Mandatory http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 95‐20
Contractor’s Flight and Ground
Operations
08/21/2013 Mandatory http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 385‐10
Army Safety Program
2/24/2017 Mandatory http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 700‐138
Army Logistic Readiness and
Sustainability
4/23/2018 Mandatory http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 710‐2 Inventory Management Supply Policy Below the Wholesale
Level
3/28/2008 Mandatory http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
DA PAM 738‐751
Functional User’s Manual for the Army Maintenance Management System‐
Aviation (TAMMS‐A)
2/28/2014 Mandatory http://atiam.train.army.mil/
TB 1‐1500‐341‐01
Aircraft Components Requiring Maintenance Management and
Historical Data Reports.
12/30/2013 Mandatory http://atiam.train.army.mil/
TM 1‐1500‐204‐23‐(series) General Aircraft Maintenance Manual
07/31/1992 Mandatory http://atiam.train.army.mil/
TM 1‐1500‐328‐23
Aeronautical Equipment Maintenance Management Policies and Procedures
6/30/2014 Mandatory http://atiam.train.army.mil/
TM 1‐1500‐250‐23
Aviation Unit and Intermediate Maintenance Manual for General
Aircraft Maintenance for General Tie‐ Down and Mooring On All Series Army Models AH‐64, UH‐60, CH‐47, UH‐1, OH‐58 Helicopters
8/24/1990 Mandatory http://atiam.train.army.mil/
TM 1‐1520‐237‐23&P(series) Helicopters, UH‐60A, UH‐60L, EH‐
60A, UH‐60Q and HH‐60L
9/25/2009 Mandatory http://atiam.train.army.mil/
TM 1‐1520‐280‐23&P UH‐60M IETM 9/25/2009 Mandatory http://atiam.train.army.mil/
TM 55‐1500‐345‐23
Painting and Marking of Army Aircraft
6/25/2009 Mandatory http://atiam.train.army.mil/
TM 55‐1500‐333‐24 6/25/2009 Mandatory http://atiam.train.army.mil/
Cleaning Procedures for Army Aircraft
TM 55‐2620‐200‐24
Inspection, Maintenance Instructions, Storage and Disposal of Aircraft Tires and Inner Tubes
6/25/2009 Mandatory http://atiam.train.army.mil/
TM 1‐2840‐248‐23 (series) Aviation Unit and Intermediate
Maintenance Manual Engine, Aircraft Turboshaft, Models T700‐GE‐700, T700‐GE‐701, T700‐GE‐701C, T700‐GE‐
701D
8/31/2010 Mandatory http://atiam.train.army.mil/
TM 55‐2835‐208‐23 (series) Gas Turbine Engine (Auxiliary Power
Unit‐APU)
8/31/2010 Mandatory http://atiam.train.army.mil/
TM 1‐1880‐320‐13&P
High Performance Rescue Hoist
Assembly
8/31/2010 Mandatory http://atiam.train.army.mil/
TM 55‐2835‐209‐23
Gas Turbine Engine (Auxiliary Power
Unit‐APU)
8/31/2010 Mandatory http://atiam.train.army.mil/
5.12 Service Contract Manpower Reporting:
5.12.1 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Virginia National Guard via a secure data collection site.
5.12.2 The contractor shall completely fill in all required data fields using the following web address: https://www.sam.gov. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2019. Contractors may direct questions to the help desk at https://www.sam.gov.
6.0 Applicable Publications: Publications applicable to this PWS are listed below:
Publication (Chapter/Page)
Date of Publication
Mandatory or Advisory
Website
Federal Acquisition Regulation Mandatory https://www.acquisition.gov/?q=browsefar or http://farsite.hill.af.mil/
Defense Federal Acquisition Regulation Supplement
Mandatory http://www.acq.osd.mil/dpap/dars/dfarspgi/current/i ndex.html or http://farsite.hill.af.mil/
DoDM 1000.13‐M‐V1 DoD Identification (ID) Cards (Enclosure 2, paragraph 3.b)
01/23/2014 Mandatory http://www.esd.whs.mil/Directives/issuances/dodm/
Federal Information Processing Standards (FIPS) Publication 201‐2 Personal Identity Verification (PIV) of Federal Employees and Contractors
(paragraph 9)
August 2013 Mandatory http://nvlpubs.nist.gov/nistpubs/FIPS/NIST.FIPS.201‐ 2.pdf
DoDM 5200.2 Regulation 5200.02 Procedures for the DoD Personnel
Security Program (PSP)
04/03/2017 Mandatory http://www.dtic.mil/whs/directives/corres/pub1.html
Army Directive 2014‐05 Policy and Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared
Contractors
03/07/2014 Mandatory http://www.apd.army.mil/ProductMaps/PubForm/Ar myDir.aspx
AR 190‐13
The Army Physical Security Program
02/25/2011 Mandatory http://www.apd.army.mil/ProductMaps/PubForm/AR .aspx
Homeland Security Presidential Directive
(HSPD)‐12
Policy for a Common Identification Standard for Federal Employees and
Contractors
08/27/2004 Mandatory https://www.dhs.gov/homeland‐security‐presidential‐ directive‐12
DoDD 5400.11 Department of Defense Privacy Program
10/29/2014 Mandatory http://www.dtic.mil/whs/directives/corres/dir.html#
DoD 5400.11‐R Department of Defense Privacy Program
05/14/2007 Mandatory http://www.dtic.mil/whs/directives/corres/pub1.html
DoDD 8140.01 Cyberspace Workforce Management
08/11/2015 Mandatory http://www.dtic.mil/whs/directives/corres/dir.html
DoD 8570.01‐M Information Assurance Workforce
Improvement Program
12/19/2005 (Change 4:
11/10/2015)
Mandatory http://www.dtic.mil/whs/directives/corres/pub1.html
AR 25‐2
Information Assurance
10/24/2007 Mandatory http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
AR 530‐1
Operations Security
09/26/2014 Mandatory http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
DoD 5220.22‐M National Industrial Security Program
Operating Manual
02/28/2006 (Change 2:
05/18/2016)
Mandatory http://www.dtic.mil/whs/directives/corres/pub1.html
AR 381‐12
Threat Awareness and Reporting
Program (TARP) (Section II, ¶ 2‐4.b)
06/01/2016 Mandatory http://armypubs.army.mil/ProductMaps/PubForm/AR .aspx
6.1 Applicable Forms: Forms applicable to the PWS are listed below:
Form Date Website
DD 1172‐2
Application for Identification
Card/DEERS Enrollment
Mar 2017 http://www.dtic.mil/whs/directives/forms/index.htm
I‐9 11/14/16 https://www.uscis.gov/sites/default/files/files/form/i‐9.pdf
Employment Eligibility Verification
DD 441
Department of Defense Security
Agreement
Jan 2017…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .