BEST VALUE IDIQ CONSTRUCTION SERVICES TASK ORDER CONTRACT

Questions & Responses

Current as of 14 July 2017

Q: It does not look like there is any information requested in the RFP and seed projects for architects/design services. In the description it states design build but we couldn’t find a place for design anywhere else in the document?

A: The Government will not evaluate a contractor’s design / build capabilities at this time. If a task order is issued after award for a design / build project the Government will use procedures outlined in FAR

36.3 with those firms awarded MATOC contracts.

Q: If we are located in Iowa City which is 1 hour 53 minutes from Des Moines, can we just try to get this one contract?

A: Contractor’s will have the option to select the location(s) they wish to be considered for a MATOC contract.

Q: Site remodel restroom, Bldg. 261, Sioux City: Can the structural glazed units be replaced with new, instead of removing and reusing? The cost to reuse will be more than replacing.

A: Yes (sheet A1.1 notes 02 19.B3, 02 41 19.B1, 04 20 00.25 and sheet A2.1 notes 04 20 00.29, 04 20

00.M2 refer to salvaging and reusing existing structural glazed units. Demoing the existing and providing new is acceptable.

Q: What is the deck height over the restroom?

A: The deck height is 10’‐10”.