AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0001 to sokiciatation number W912LP-17-R-0005, Multiple Aw ard Task Order Contract (MATOC) for the Iow a National Guard is as follow s:

(Continued on Pgae 2)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 02-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912LP-17-R-0005

X 9B. DATED (SEE ITEM 11)

07-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Aug-2017

CODE

USPFO FOR IOWA

7105 NW 70TH AVE

CAMP DODGE

JOHNSTON IA 50131-1824

W912LP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912LP-17-R-0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT 0001

1. The solicitation, plans and specifications are hereby modified to incorporate the changes / clarifications outlined in the three attachment identified below. Offerors shall review each of the attached documents for changes to the solicitation, plans and specifications for the two seed projects.

- Attachment #01 (BLDG 270) is a summary of Architectural changes to the Plans and Specifications for the Des Moines Seed project.

- Attachment #02 (BLDG 270) is a summary of MEP changes to the Plans and Specifications for the Des Moines Seed project.

- Attachment #03 (Solicitation, BLDG 270, and BLDG 261) - is a summary of changes to the solicitation, the Sioux City Seed project (BLDG 261), and the Des Moines Seed project (BLDG 270).

2. The Wage Determination for both seed projects are hereby updated as follows:

- The Wage Determination applicable to the Sioux City Seed Project is updated from General Decision Number IA170148 dated 06/30/2017 to General Decision Number IA170148 dated 07/28/2017 (reference the revised Exhibit D-1 - Sioux City Seed Project Solicitation Wage Determination).

The Wage Determination applicable to the Des Moines Seed Project is updated from General Decision Number IA170142 dated 05/19/2017 to General Decision Number IA170142 dated 07/28/2017 (reference the revised Exhibit D-2 - Des Moines Seed Project Solicitation Wage Determination).

3. The proposal due date remains unchanged (reference block 13 A of the solicitation for the date and time).

4. All other terms and conditions remain unchanged.

Page 1 of 1 ARCHITECTURE / ENGINEERING / INTERIORS

604 EAST GRAND AVENUE

DES MOINES, IOWA 50309

515 288 2000

RENOVATE BUILDING 270 FOR CONTRACTING & MSG

IOWA AIR NATIONAL GUARD

DES MOINES INTERNATIONAL AIRPORT

DES MOINES, IOWA

Project No.: FFAN 162270

ARCHITECT'S FILE NO. 2010207.19

FEH DESIGN

604 East Grand Avenue Des Moines, Iowa 50309

PHONE: (515) 288-2000

DATE ISSUED: AUGUST 1, 2017

TO ALL BIDDING DOCUMENT HOLDERS OF RECORD:

A. REFER TO DRAWINGS

1. Sheet TS:

a. Change ES1.1 to read: ADDITIVE BID ITEM #1 ELECTRICAL SITE PLAN

2. Sheet AD1.1:

a. Change Title of detail 4 to read: SITE PLAN DEMOLITION- ABI 2

END OF AMENDMENT

Attachment #1

12700 West Dodge Road | Omaha, NE 68154 | T 402-330-5900 | farris-usa.com

Date: 08/01/2017

Project Name: Renovate Building 270 for Contracting and

MSG

FE Project No.: 168003

NOTICE: This addendum is applicable to the referenced project and is issued to all known planholders prior to receipt of proposals. The information contained herein shall be fully incorporated into the Bid Contract Documents as though originally incorporated. Failure to acknowledge all amendments may be cause for rejection of the bid.

TO: Bidders and Others Concerned

Changes to the Project Manual

1. SECTION 22 00 00 PLUMBING GENERAL PROVISIONS:

A. Add this section in its entirety.

2. SECTION 23 81 26 DUCTLESS SPLIT-SYSTEM AIR-CONDITIONERS:

A. Add this section in its entirety.

3. SECTION 27 10 10 – TELECOMMUNICATIONS CABLING SYSTEMS:

A. Remove this section in its entirety.

4. SECTION 27 05 27 – TELECOMMUNICATIONS CONDUIT SYSTEM:

A. Add this section in its entirety.

5. UPDATE SPECIFICATION INDEX AS REQUIRED.

Changes to the Drawings

1. SHEET FG0.0 – FIRE SUPPRESION & FIRE ALARM GENERAL NOTES, SCHEDULES, DETAILS, SYMBOL

LEGEND, & SITE PLAN:

A. DELETE NOTE IN LOWER RIGHT CORNER OF SHEET: ALL WORK THIS SHEET SEE ABI-1.

2. SHEET FX1.1 – FIRE SUPPRESION FLOOR PLAN:

A. DELETE NOTE IN LOWER RIGHT CORNER OF SHEET: ALL WORK THIS SHEET SEE ABI-1.

3. SHEET MH1.1 – MECHANICAL FLOOR PLANS:

A. PLAN 3: HVAC FLOOR PLAN – REMOVE DIFFUSERS AND DUCTWORK SERVING COMM 106 AND

ELEC/MECH AS CLOUDED UNDER REVISION 1.

Attachment #2

P a g e | 2

B. PLAN 3: HVAC FLOOR PLAN - ADD FC-1 AND FC-2 IN COMM 106 AND ELEC/MECH 105 RESPECTIVELY

AS CLOUDED UNDER REVISION 1.

C. PLAN 3: HVAC FLOOR PLAN – MOVE EWH-1 FROM COMM 106 TO ELEC/MECH 105 AS CLOUDED

UNDER REVISION 1.

D. PLAN 3: HVAC FLOOR PLAN – ADD DIFFUSER S-1 AS CLOUDED UNDER REVISION 1.

E. PLAN 3: HVAC FLOOR PLAN - BALANCE THE AIRFLOWS TO THOSE CLOUDED UNDER REVISION 1.

F. PLAN 3: HVAC FLOOR PLAN – RELOCATE THERMOSTAT FROM CONTRACTING 104 TO MSG 1 102 AS

CLOUDED UNDER REVISION 1.

G. PLAN 4: HVAC ROOF PLAN – ADD HEAT PUMP ON ROOF AND ROUTE REFRIGERANT LINES DOWN TO

FIRST FLOOR AS CLOUDED UNDER REVISION 1.

H. MECHANICAL KEYNOTES – ADD MECHANICAL KEYNOTES 5 TO 8 AS CLOUDED UNDER REVISION 1.

4. SHEET MH5.1 – MECHANICAL SCHEDULES AND DETAILS:

A. CABINET AND UNIT HEATER SCHEDULE (ELECTRIC) – MAKE CHANGES AS CLOUDED UNDER

REVISION 1.

B. GAS FIRED ROOFTOP UNIT SCHEDULE – MAKE CHANGES AS CLOUDED UNDER REVISION 1.

C. SPLIT SYSTEM UNIT SCHEDULE – ADD SCHEDULE AS CLOUDED UNDER REVISION 1.

D. ELECTRIC FINNED TUBE RADIATION SCHEDULE – MAKE CHANGES AS CLOUDED UNDER REVISION 1.

E. MECHANICAL / ELECTRICAL COORDINATION SCHEDULE – MAKE CHANGES AS CLOUDED UNDER

REVISION 1.

F. REGISTER – GRILLE – DIFFUSER SCHEDULE – MAKE CHANGES AS CLOUDED UNDER REVISION 1

5. SHEET ES1.1 - ADDITIVE BID ITEM #3 ELECTRICAL SITE PLAN:

A. CHANGE SHEET TITLE TO READ: ADDITIVE BID ITEM #1 ELECTRICAL SITE PLAN

B. CHANGE GENERAL NOTE A TO READ: CONTRACTOR TO PERFORM WORK IF OWNER ACCEPTS

ADDITIVE BID ITEM #1.

C. REVISE POLE BASE DETAIL

D. SEE ATTACHED REISSUED SHEET.

6. SHEET EP1.1 – POWER AND SPECIAL SYSTEMS PLANS

A. POWER FLOOR PLAN – RM 105; ADD DISCONNECT TO MECHANICAL EQUIPMENT ‘WH-1’.

B. POWER AND SPECIAL SYSTEMS FLOOR PLAN; MECHANICAL EQUIPMENT ‘EWH-1’ RELOCATED FROM

SHOWER ROOM 107 TO ELEC/MECH ROOM 105.

P a g e | 3

C. POWER AND SPECIAL SYSTEMS FLOOR PLAN; ADDED MECHANICAL EQUIPMENT ‘FC-1’ TO COMM.

ROOM 106 AND ‘FC-2’ TO ELEC/MECH ROOM 105. ADD KEYNOTE 32 AS INDICATED ON REVISED

SHEET.

D. POWER ROOF PLAN; ADDED NEW MECHANICAL EQUIPMENT ‘HP-1’, CIRCUIT TO BE FEED FROM

PANEL B.

E. ELECTRICAL KEYNOTES; ADD KEYNOTE 32 AS FOLLOWS, “CONNECT SPLIT SYSTEM INDOOR UNITS TO OUTDOOR UNIT, CONDUIT AND CABLE PER MANUFACTURER’S INSTALLATION INSTRUCTIONS”.

F. COMMUNICATION NOTES; REVISE NOTE ‘A’ AS FOLLOWS, “DATA DEVICES SHOWN ARE FOR OWNER

INSTALLED CABLE AND DEVICE. CONTRACTOR TO SUPPLY RACEWAY WITH EMPTY BOXES”.

G. COMMUNICATION NOTES; REVISE NOTE ‘B’ AS FOLLOW, “NOTE REMOVED”.

H. SEE ATTACHED REISSUED SHEET.

7. SHEET E6.1 – ELECTRICAL ONE-LINE DIAGRAM & SCHEDULES

A. PANELBOARD B; REVISE CIRCUITS 30, 32 TO ONE 15A/2P BREAKER, ADD DESCRIPTION AS FOLLOWS

“HP-1, FC-1, FC-2”.

B. MAIN SWITCHBOARD MDP; REVISE CIRCUIT 4 TO 25A/3P BREAKER, REVISE WIRE SIZE/CONDUIT SIZE

TO “3-#12, 1-#10 GND, 1” CONDUIT”.

Clarifications

1. NONE

Attachments

1. SECTION 22 00 00 PLUMBING GENERAL PROVISIONS

2. SECTION 23 81 26 DUCTLESS SPLIT-SYSTEM AIR-CONDITIONERS

3. SECTION 27 05 27 TELECOMMUNICATIONS CONDUIT SYSTEM

4. SHEET MH1.1 – MECHANICAL FLOOR PLANS

5. SHEET MH5.1 – MECHANICAL SCHEDULES AND DETAILS

6. SHEET ES1.1 - ADDITIVE BID ITEM #3 ELECTRICAL SITE PLAN (REVISED)

7. SHEET EP1.1 - POWER AND SPECIAL SYSTEMS PLANS (REVISED)

Miscellaneous

1. NONE

-- END --

Renovate Bldg 270 Page 1 of 7

22 00 00

SECTION 22 00 00 - PLUMBING GENERAL PROVISIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This section includes general requirements for plumbing systems.

1.3 CONTRACT DOCUMENT COORDINATION

A. Contract Drawings are diagrammatic in showing certain physical relationships between architectural, structural, plumbing, mechanical and electrical work.

1. Verification and coordination of these relationships is the responsibility of the Contractor.

2. Verify all existing conditions before starting work.

3. Floor plan drawings do not necessarily indicate all required offsets, fittings, valves, etc.

4. Provide all necessary piping, fittings, valves, offsets, and other specialties required without additional cost to the Owner.

B. Should Contract Document requirements appear to make it impossible in providing a complete and operational system, or should discrepancies appear among Contract Documents, Contractor shall request clarification before proceeding with work.

1.4 QUALITY ASSURANCE

A. Comply with all State, and local codes and ordinances.

B. Obtain and pay for all required permits, fees and certificates of inspection of the work.

C. Install equipment and devices to provide required access for servicing and maintenance.

D. Comply with applicable portions of Local, City, and State Plumbing Code pertaining to plumbing materials construction and installation of products.

E. Fabricate and install potable water and natural gas systems in accordance with Local Utility Company requirements.

F. Do not interrupt plumbing services to occupied facilities without written permission from Owner and a minimum three (3) days’ notice.

1.5 SUBMITTALS

A. General:

1. See Division 01 Submittal Procedures.

Renovate Bldg 270 Page 2 of 7

2. Shop Drawing Submittals shall include specially prepared technical data for this project, including drawings, diagrams, performance curves, data sheets, schedules, templates, patterns, reports, calculations, instructions, measurements and similar information.

3. Shop Drawing Submittals may also include product data which includes standard printed information on materials, products and systems; not specially prepared for this project, but with the designation of selections from among available choices for this project clearly identified.

B. Submittal Requirements:

1. Coordination and Sequencing: Coordinate preparation and processing of submittals with performance of the work so that work will not be delayed by submittals. Coordinate and sequence different categories of submittals for same work, and for interfacing units of work, so that one will not be delayed for coordination of Architect/Engineer's review with another.

2. Preparation of Submittals: Provide permanent marking on each submittal to identify project, date, Contractor, Subcontractor, submittal name, specification section and similar information to distinguish it from other submittals.

3. Provide General Contractor’s and Subcontractor’s stamp, signed or initialed certifying that review, approval, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Contract Documents.

Submittals which are received from sources other than through Contractor's office will be returned by Architect/Engineer "Without Action".

4. Items from each specification section shall be prepared as separate submittals, not grouped or bound with other items. Submittals shall clearly indicate the applicable specification section.

C. Alternate Equipment Submittal by Contractor:

1. Equipment of greater or larger dimensions, weight, capacity, or rated performance than that which is specified may be submitted provided all connecting mechanical and electrical services, including ductwork and piping connections, circuit breakers, electrical conduit and conductors, motors, equipment supports, building structure, and equipment spaces are modified as required by the proposed equipment. If performance ratings or efficiencies of the equipment are specified, the equipment must meet or exceed these design requirements as well as any specified commissioning requirements. NO ADDITIONAL COST WILL BE APPROVED FOR ANY SUCH CHANGES

RELATED TO THE ALTERNATE EQUIPMENT.

2. Should proposed alternate equipment involve rearrangement of other designed equipment, a complete layout of the area involved shall be submitted by the Contractor along with the alternate equipment submittal, and shall be approved in writing by the Architect/Engineer prior to ordering, purchasing, delivery or installation of any such items of equipment.

3. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ADDITIONAL EXPENSE AND

COORDINATION WITH OTHER TRADES RESULTING FROM THE SUBSTITUTION OF

EQUIPMENT OTHER THAN THAT SPECIFIED IN THE CONTRACT DOCUMENTS.

Renovate Bldg 270 Page 3 of 7

D. Submittal Review:

1. Review of submittal data is only for general conformance with the design concept of the Project and general compliance with the information given in the Contract Documents. Any action shown is subject to the requirements of the plans and specifications.

2. Review of submittal data does not release the Contractor from further satisfactory equipment operating responsibilities. Equipment shall be approved for final acceptance when installation is completed and all equipment and systems have been operated, tested and adjusted in compliance with the contract documents.

3. Re-submittals: When revised for resubmission, clearly indicate all changes since previous submission. Only those items required to be resubmitted shall be included.

E. Operation and Maintenance (O&M) Manuals:

1. Prepare and submit three copies of operation and maintenance instructions for all Division 22 equipment and fixtures furnished.

a. Provide individual 3-ring binders with a table of contents and tabbed sections for each specification section.

b. Identify equipment and fixtures included in the manuals by the equipment or fixture mark used in the contract drawings.

c. Include emergency instructions, spare parts listing, copies of warranties, wiring diagrams, shop drawings, product data, signed letters of certification of inspection and similar information.

d. Provide documentation that training was performed for each item specified to include Owner training. Include name of Owner’s representative(s) present, date and time of training.

e. Provide a list of manufacturer’s representatives for each item of equipment including company name, address and phone number.

f. Provide documentation that Extra Materials were received by the Owner for each section requiring Extra Materials.

2. All information contained in equipment and fixture manufacturer’s operation and maintenance manual shall be specific to equipment and fixtures provided. Contractor shall mark out or not include all unrelated information.

3. Electronic O&M Manuals: Provide electronic version of project O&M Manuals in pdf format in addition to hardcopy version of the manuals.

F. Contractor shall be responsible for all additional expense and coordination with other trades resulting from the substitution of equipment to that specified in the Contract Documents.

G. Review of shop drawings does not release the Contractor from further satisfactory operating responsibilities.

Material and equipment shall be approved for final acceptance when construction is completed and all equipment and systems have been operated, tested, adjusted and balanced to the satisfaction of the Architect/Engineer. Should proposed approved alternate equipment involve rearrangement of designed

Renovate Bldg 270 Page 4 of 7 equipment, a complete layout of the area involved shall be submitted by the Contractor, and shall be approved in writing before installation of any such items of equipment.

H. Required Submittals List:

1. Shop Drawings shall be submitted for the items listed in each section of the specifications.

Submittals in addition to those listed may be required by the Architect/Engineer.

1.6 RECORD DRAWINGS:

A. See Division 01 “Project Record Documents”.

B. Provide a set of plumbing drawings marked-up with actual as-built conditions for Division 22 work. Record drawings shall include all addenda and change orders.

1.7 UTILITY CONNECTION CHARGES AND UTILITY COSTS

A. Contractor shall pay for all utility connection charges (water, sanitary sewer, storm sewer and gas) and utility cost for services to the building required. Capital facilities utility service charges will be paid directly by the Owner and are not part of the Construction Contract.

1.8 CONTRACT DRAWING FILE REQUESTS

A. As an instrument of service to aid in Shop Drawing Submittals, Farris Engineering (FEI) will provide

AutoCAD drawing files upon request. The files will be sent upon return receipt of the "Request for Drawings" agreement signed by an officer of the requesting firm. FEI does not assure that the drawings represent all changes, addenda items, change orders or modifications that may have occurred. The drawings are simply a tool for use in producing shop drawing submittals. The drawing files will be "cleaned-up" by having the FEI logo, Professional Engineer seal, and all extraneous notes and details removed. FEI must be compensated for this additional service by the requesting firm. A minimum fee of $400.00 for up to eight (8) sheets and $50.00 per sheet for each additional requested drawing will be invoiced to the requesting firm once the signed agreement is received.

1.9 PLUMBING/ELECTRICAL COORDINATION

A. See Division 01 “Multiple Contract Summary”.

B. Plumbing Contractor shall coordinate with Electrical Contractor and verify that proper electrical power connections to plumbing equipment which requires electrical power is provided. Unless specifically shown otherwise Electrical Contractor shall provide power connections to the equipment and Plumbing Contractor shall provide wiring required for start-stop, control and safety interlock functions.

C. If plumbing contractor has proposed alternate equipment to that specified in the contract documents, and such alternate equipment requires modified electrical power connections, mechanical contractor shall coordinate these requirements with electrical contractor prior to ordering, purchasing, delivery or installation of any electrical conduits, conductors, circuit breakers and other electrical devices serving the alternate equipment.

D. Types of work, normally recognized as electrical but provided as plumbing include but are not necessarily limited to the following:

1. Motors for plumbing equipment.

2. Starters for motors of plumbing equipment, but only where specifically indicated to be furnished integrally with equipment.

Renovate Bldg 270 Page 5 of 7

3. Wiring from motors to disconnect switches or junction boxes for motors of plumbing equipment, when specifically indicated to be furnished integrally with equipment.

4. Electrical power connections for plumbing equipment and fixtures that are not indicated on the electrical drawings.

E. Emergency Shutdown Switches: Plumbing Contractor shall coordinate with Electrical Contractor and verify that required shutdown switches to equipment which requires emergency shutdown is provided. Types of equipment provided by plumbing, kitchen or foodservice equipment suppliers that may require emergency shutdown include but is not necessarily limited to the following:

1. Domestic Water Heaters.

2. Electric steam generators.

3. Steam Kettles.

4. Science lab/classroom gas service.

1.10 CLEANING AND PROTECTION

A. During the construction period the Plumbing Contractor shall clean and protect work in progress and adjoining work on a basis of perpetual maintenance.

1.11 FINAL COMPLETION

A. The Plumbing Contractor shall not call for a final completion check until Plumbing Systems have been installed, adjusted, tested and in full and complete satisfactory operation and the following certifications of inspection from equipment suppliers have been completed. Certifications of Inspection are required on the following equipment:

1. Domestic Water Mixing Valves.

2. Plumbing Pumps.

3. Domestic Water Softeners.

4. Sensor Operated Flush Valves and Faucets.

5. Domestic Water Heaters.

B. The Certifications shall consist of letters signed by Factory-Trained and -Authorized Service Personnel stating the following:

1. They have inspected their equipment on the project.

2. They approve the condition of the equipment and its installation.

3. They have checked its operation and certify that it is operating properly.

4. They have noted any problems, conditions or objections that could lead to future operating problems.

C. Documentation of the signed letters of Certification of Inspection shall be furnished in the Operations and Maintenance Manuals, included with the associated equipment.

1.12 GUARANTEE

A. The one year guarantee period shall not start until the project is completed and the Contractor has received the Final Payment and Certificate of Completion.

Renovate Bldg 270 Page 6 of 7

B. Equipment and work shall be guaranteed, parts and labor, for one full year from the date of the Certificate of Completion. Repairs made during this period shall be fully guaranteed for an additional one year period from the date of repairs.

C. Plumbing Contractor has the responsibility to guarantee equipment and work and shall assume responsibility to repair any equipment at his cost that the manufacturer refuses to guarantee.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1 ELECTRICAL WORK PROVIDED BY PLUMBING CONTRACTOR

A. Electrical equipment provided and the wiring and installation of electrical equipment shall be in accordance with the requirements of the equipment manufacturer, this Section, and Division 26.

3.2 PIPE HANGING AND SUPPORT

A. Piping systems shall be supported from building structural systems capable of supporting the applied load.

B. Piping shall not be supported from metal roof decking.

3.3 PAINTING AND FINISHING

A. Painting of exposed plumbing work is specified and performed under other divisions of these specifications, or as indicated on the drawings.

B. Where factory finishes are provided on equipment and no additional field painting is specified, all marred or damaged surfaces shall be touched up or refinished so as to leave a smooth, uniform finish at the time of final inspection.

3.4 WORK IN EXISTING BUILDINGS

A. Work under this Contract includes additions and/or renovations to an existing building. It shall be the responsibility of each Bidder to inform himself of all conditions which affect the work contemplated by these Contract Documents. The submission of proposal by any Bidder will be construed as an admission by him that he has examined and is familiar with the premises and all conditions thereon and adjacent thereto, and has included in this proposal a proper and adequate amount to cover rearrangement of existing work for the proper installation and operation of the new and existing equipment as shown on the drawings or as required by these specifications.

B. Maintain existing plumbing services to occupied areas and operational facilities unless otherwise indicated or when otherwise authorized in writing by Owner and Architect.

C. The operation of existing equipment, fixtures and devices designated to remain shall be maintained. Provide temporary connections and devices as necessary to maintain the operation of the equipment designated to remain as required during construction.

3.5 REBATES

A. Contractor shall assist the Owner with filing of applicable forms to obtain rebates. This shall include but not be limited to determination of qualifying equipment, fixtures and materials and furnishing invoices for equipment, fixtures and materials as required to support the rebate application.

Renovate Bldg 270 Page 7 of 7

END OF SECTION 22 00 00

Renovate Bldg 270 Page 1 of 4 Ductless Split-System Air-Conditioners

23 8126

SECTION 23 81 26 - DUCTLESS SPLIT-SYSTEM AIR-CONDITIONERS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes ductless split-system air-conditioning and heat pump units consisting of separate evaporator-fan and compressor-condenser components.

1.3 SUBMITTALS

A. Shop Drawing Submittals:

1. Product Data: Include rated capacities, furnished specialties, and accessories for each type of product indicated. Include performance data in terms of capacities, outlet velocities, static pressures, sound power characteristics, motor requirements, and electrical characteristics.

B. Closeout Submittals:

1. Operation and Maintenance Data: For ductless split-system air-conditioning units to include in emergency, operation, and maintenance manuals.

2. Warranty: Special warranty specified in this Section.

1.4 QUALITY ASSURANCE

A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction, and marked for intended use.

B. ASHRAE Compliance: Applicable requirements in ASHRAE 62.1-2004, Section 5 - "Systems and

Equipment" and Section 7 - "Construction and Startup."

C. ASHRAE/IESNA 90.1-2004 Compliance: Applicable requirements in ASHRAE/IESNA 90.1-2004, Section 6 - "Heating, Ventilating, and Air-Conditioning."

1.5 ELECTRICAL COORDINATION

A. Refer to Division 26 Sections for the following.

1. Power supply wiring from power source to power connection on ductless split-system air-conditioning units.

Renovate Bldg 270 Page 2 of 4 Ductless Split-System Air-Conditioners

B. Provide the following electrical work as work of this section, complying with requirements of Division

26 Sections:

1. Electrical disconnect switches.

1.6 WARRANTY

A. Special Warranty: Manufacturer's standard form in which manufacturer agrees to repair or replace components of split-system air-conditioning units that fail in materials or workmanship within specified warranty period.

1. Warranty Period: Five (5) years from date of Substantial Completion.

1.7 EXTRA MATERIALS

A. Furnish extra materials described below that match products installed and that are packaged with protective covering for storage and identified with labels describing contents.

1. Filters: One (1) set of filters for each unit.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Manufacturers: Subject to compliance with requirements, provide products by one (1) of the following:

1. Carrier Air Conditioning; Div. of Carrier Corporation.

2. Daikin.

3. Friedrich Air Conditioning Company.

4. Lennox Industries Inc.

5. Mitsubishi Electronics America, Inc.; HVAC Division.

6. Sanyo Fisher (U.S.A.) Corp..

7. Trane Company (The); Unitary Products Group.

2.2 WALL-MOUNTED, EVAPORATOR-FAN COMPONENTS

A. Cabinet: Manufacturer’s standard construction and finish with removable panels on front and ends, and discharge drain pans with drain connection.

1. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in

ASHRAE 62.1-2004.

2. Drain Pan and Drain Connection: Comply with ASHRAE 62.1-2004. Provide integral condensate pump.

B. Refrigerant Coil: Copper tube, with mechanically bonded aluminum fins, complying with

ARI 210/240, and with thermal-expansion valve.

Renovate Bldg 270 Page 3 of 4 Ductless Split-System Air-Conditioners

C. Electric Coil: Helical, nickel-chrome, resistance-wire heating elements with refractory ceramic support bushings; automatic-reset thermal cutout; built-in magnetic contactors; manual-reset thermal cutout;

airflow proving device; and one-time fuses in terminal box for overcurrent protection.

D. Fan: Direct drive, centrifugal fan.

1. Special Fan Motor Features: Multitapped, multispeed with internal thermal protection and permanent lubrication.

E. Filters: Permanent, cleanable or disposable, with ASHRAE 52.2 MERV rating of 6 or higher.

2.3 AIR-COOLED, COMPRESSOR-CONDENSER COMPONENTS

A. Casing: Steel, finished with baked enamel, with removable panels for access to controls, weep holes for water drainage, and mounting holes in base. Provide brass service valves, fittings, and gauge ports on exterior of casing.

B. Compressor: Hermetically sealed with crankcase heater and mounted on vibration isolation.

Compressor motor shall have thermal- and current-sensitive overload devices, start capacitor, relay, and contactor.

1. Manual-reset high-pressure switch and automatic-reset low-pressure switch.

2. Refrigerant: R-407C or R-410A.

C. Refrigerant Coil: Copper tube, with mechanically bonded aluminum fins, complying with

ARI 210/240, and with liquid subcooler.

D. Heat Pump Components: Reversing valve and low-temperature air cut-off thermostat.

E. Fan: Aluminum-propeller type, directly connected to motor.

F. Motor: Permanently lubricated, with integral thermal-overload protection.

G. Low Ambient Kit: Permits operation down to 0° F with all required accessories for low ambient operation.

H. Minimum Energy Efficiency: Comply with ASHRAE/IESNA 90.1-2004, "Energy Standard for

Buildings except Low-Rise Residential Buildings."

PART 3 - EXECUTION

3.1 INSTALLATION

A. Install units level and plumb.

B. Install evaporator-fan components using manufacturer's standard mounting devices securely fastened to building structure.

C. Install ground-mounted, compressor-condenser components on 4-inch thick, reinforced concrete base;

4-inches larger on each side than unit. Coordinate anchor installation with concrete base.

Renovate Bldg 270 Page 4 of 4 Ductless Split-System Air-Conditioners

D. Install roof-mounted compressor-condenser components on equipment support base rails. Anchor units to supports with removable, cadmium-plated fasteners.

E. Install and connect precharged refrigerant tubing to component's quick-connect fittings. Install tubing to allow access to unit.

3.2 CONNECTIONS

A. Install piping adjacent to unit to allow service and maintenance.

B. Electrical: Comply with requirements in Division 26.

3.3 FIELD QUALITY CONTROL

A. Manufacturer's Field Service: Engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including connections. Report results in writing.

B. Perform the following field tests and inspections and prepare test reports:

1. Leak Test: After installation, charge system and test for leaks. Repair leaks and retest until no leaks exist.

2. Operational Test: After electrical circuitry has been energized, start units to confirm proper motor rotation and unit operation.

3. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment.

C. Remove and replace malfunctioning units and retest as specified above.

3.4 STARTUP SERVICE

A. Engage a factory-authorized service representative to perform startup service.

1. Complete installation and startup checks according to manufacturer's written instructions.

3.5 DEMONSTRATION

A. Engage a factory-authorized service representative to train Owner's maintenance personnel to adjust, operate, and maintain units.

END OF SECTION 23 81 26

Renovate Bldg 270 Page 1 of 1 TELECOMMUNICATION CONDUIT SYSTEM

270527

SECTION 270527 - TELECOMMUNICATION CONDUIT SYSTEM

(Added via Addendum 1 – Prepared 2017-05-19)

PART 1 - GENERAL

1.1 SUMMARY

A. These specifications include the furnishing of all labor and materials necessary for the complete installation of a system of conduits and outlet boxes for use of the Telecommunication (Data, Telephone, Paging, Cable TV, & Sound System) System Installers.

PART 2 - PRODUCTS

2.1 EQUIPMENT THAT WILL BE OWNER FURNISHED

A. The Telecommunication equipment and cable will be owner furnished and installed. System will consist of Cat6 data cables and fiber cabling as required.

PART 3 - EXECUTION

3.1 INSTALLATION

A. This installation must be done in accordance with Standard EIA/TIA 569, Commercial Building Standard for

Telecommunication Pathways and Spaces and the general specifications herewith.

B. All wall outlet boxes shall be installed with standard 4-inch square 2-1/8-inches deep box with single gang plaster ring with blank cover. Cover material and finish shall match faceplates for other wiring devices in the same room or space. All telecommunication outlet locations shall be coordinated with Architectural details and elevations.

C. Provide 1-inch minimum conduit (unless noted otherwise) from outlet box to corridor cable tray.

D. All conduits shall be installed with sweep bends only. Minimum radius shall be six (6) times the diameter of the conduit for conduits 2-inches and smaller and 10 times the diameter for conduits larger than 2-inches.

E. Provide all other empty conduits as indicated on the electrical drawings.

F. Provide insulating bushings for both ends of all conduits.

G. Provide pull cord in all conduits.

H. All communications conduits shall be labeled as “communications” ever 10’ on center at every change in direction and at every wall penetration.

END OF SECTION 270527

T

F D

F D

FD

1st Sergeant

Vestibule

Elec/Mech

Comm.

Commander

Shower

Conf/Brk

Contracting

MSG

MSG 1

Circulation

Copier

R-1 R-1

R-1R-1

R-2

S-2

S-2

S-1

S-2

S-4

S-1

8Ø SA

8Ø SA

6/6 SA

6Ø SA

/1

S

A

/1

8Ø SA

/1

FT

FT

FT

EWH

EWH

EF

S-3

MH5.1

(TYP)

MH5.1

(TYP)

MH5.1

(TYP) 4

MH5.1

(TYP)

MH5.1

T-2

T-1

FT-1

RTU-1

T-1

FT-2

FT-3

Storage

S-1

6Ø SA

6Ø SA

FC

FC

1" - CD

RTU

RAIN CAP

HP

6 7

20/10

24/8

/8

/4

/4

12/4 12/6 16/10

/6

/4

10/4

12/6 20/18

/1

/1

12/6

8/4

/4

/6

/4

10/8

/6

10/6

/6

/6

/6

EF

X

HUMIDIFIER

EF

X

MAU

X

EF

X

RTU

X

GENERAL MECHANICAL DEMOLITION NOTES

A. BOLD, DASHED LINES INDICATE EXISTING ITEMS AND ASSOCIATED MATERIALS SHALL BE

REMOVED.

B. DRAWINGS INDICATE APPROXIMATE ROUTING OF PIPING, DUCTWORK AND MAJOR

COMPONENTS AND DO NOT INCLUDE ALL OFFSETS, FITTINGS, VALVES, ETC. CONTRACTOR

SHALL FIELD VERIFY EXACT SIZE AND ROUTING PRIOR TO REMOVAL OR RELOCATION.

CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR REMOVAL OF MISCELLANEOUS

MECHANICAL ITEMS LOCATED ON OR IN ANY WALLS TO BE REMOVED.

C. SEE ARCHITECTURAL PLANS FOR PATCHING OF OPENINGS IN WALLS AND ROOF.

C O

P Y R

IG

H T

T h is d o cu m e n t a n d t h e i n fo rm a ti o n c o n ta in e d m a y n o t b e re p ro d u ce d o r e xc e rp te d f ro m w it h o u t th e e xp re ss w ri tt e n p e rm is si o n o f F a rr is E n g in e e ri n g In c.

U n a u th o ri ze d c o p yi n g d is cl o su re o r co n st ru ct io n u se a re p ro h ib it e d b y th e c o p yr ig h t la w

O M

A H

A

L

IN

C O

LN

D E S M

O

IN

E S

C O

LO

R A

D O

S P R

IN

G S

F A

R R

IS

E N

G

IN

E E R

IN

G fa rr is

-u sa

.c o m

F E

S io u x C it y

IA

(7

-3

D e s M o in e s

IA

(5

-2 w w w .F

E H

D E

S

IG

N .C

O M

F

E H

S h e e t T it le

P ro je c t T it le

Date

Issued

Project Number

Sheet

In A s s o c ia ti o n W it h

D e la fi e ld

W

I

(2

-2

D u b u q u e

IA

(5

-4

D E

S

IG

N

4/26/2017 11:49:20 AM

C R e v it P ro je c ts

\1

C e n tr a l

H

D S

.r v t

A ir C o b ra

D ri v e

D e s M o in e s

IA

MH1.1

2010207.19

12-14-2016

R e n o v a te

B ld g f o r

C o n tr a c ti n g

M S

G

M E

C H

A N

IC

A

L F

L O

O R

P L A

N S

Io w a A ir N a ti o n a l G u a rd

SCALE: 1/4" = 1'-0"3 HVAC FLOOR PLAN

SCALE: 1/4" = 1'-0"4 HVAC ROOF PLAN

N N

PLAN TRUE

N N

PLAN TRUE

SCALE: 1/4" = 1'-0"1 HVAC DEMO FLOOR PLAN

SCALE: 1/4" = 1'-0"2 HVAC DEMO ROOF PLAN

MECHANICAL KEYNOTES

1 REMOVE ALL MECHANICAL ITEMS INSIDE BUILDING INCLUDING DUCTWORK, DIFFUSERS,

HEATERS, CONTROLS, LOUVERS, DAMPER, ETC.

2 REMOVE ALL MECHANICAL ITEMS FROM ROOF. PATCHING BY ROOFING CONTRACTOR.

3 REMOVE EXHAUST FAN ON OUTSIDE OF BUILDING.

4 REMOVE WATER HEATER FLUE PIPE THROUGH ROOF.

5 RL & RS UP TO HP-1 ON ROOF. SIZE AND ROUTE REFRIGERANT PIPING AS PER MANUFACTURER'S

RECOMMENDATIONS. SEE HVAC ROOF PLAN, THIS SHEET, FOR CONTINUATION.

6 RL & RS DOWN TO F-1 IN COMM. 106. SIZE AND ROUTE REFRIGERANT PIPING AS PER

MANUFACTURER'S RECOMMENDATIONS. SEE HVAC FLOOR PLAN, THIS SHEET, FOR

CONTINUATION.

7 RL & RS DOWN TO F-2 IN ELEC/MECH 105. SIZE AND ROUTE REFRIGERANT PIPING AS PER

MANUFACTURER'S RECOMMENDATIONS. SEE HVAC FLOOR PLAN, THIS SHEET, FOR

CONTINUATION.

8 ROUTE 1" CD LINE DOWN TO EXISTING FLOOR DRAIN.

N N

PLAN TRUE

N N

PLAN TRUE

1 ADDENDUM NO. 1 05/19/20173

jasonc Rectangle jasonc Text Box jasonc Rectangle jasonc Text Box jasonc Cloud jasonc Snapshot jasonc Rectangle jasonc Text Box jasonc Cloud jasonc Snapshot

CABINET AND UNIT HEATER SCHEDULE (ELECTRIC)

MARK TYPE ARRANGEMENT CFM

HEATING EXT. FAN MANUFACTURER

REMARKS

CAP. (KW) S.P. RPM & MODEL NO.

EWH-1 CABINET N/A 100 4.8 0.00'' N/A BERKO FRC4024 1, 2, 3, 4

EWH-2 CABINET N/A 100 4.8 0.00'' N/A BERKO FRC4024 1, 2, 3, 4

REMARKS:

1. SEE MECHANICAL/ELECTRICAL COORDINATION SCHEDULE FOR ELECTRICAL DATA.

2. PROVIDE INTEGRAL THERMOSTAT AND DISCONNECT SWITCH.

3. PROVIDE 2" SEMI-RECESSED MOUNTING SLEEVE.

4. PROVIDE 14 GAUGE FRONT COVER.

FAN AND HOOD SCHEDULE

MARK SERVES TYPE CFM

EXT. FAN

DRIVE

MAX VARIABLE MANUFACTURER

REMARKS

S.P. RPM SONES CONTROL & MODEL NO.

EF-1 SHOWER CEILING 100 0.25'' 1100 DIRECT 20.0 NA

GREEENHECK

SP-A125

1, 2

REMARKS:

1. SEE MECHANICAL/ELECTRICAL COORDINATION SCHEDULE FOR ELECTRICAL DATA.

2. CONTROL WITH SWITCH ON WALL.

ELECTRIC FINNED TUBE RADIATION SCHEDULE

MARK

HEATING COVER MANUFACTURER

REMARKS

KW LENGTH DEPTH HEIGHT & MODEL NO.

FT-1 1° F 4' 3" 7" BERKO 2504W 1, 2, 3, 4

FT-2 1° F 4' 3" 7" BERKO 2504W 1, 2, 3, 4

FT-3 1° F 8' 3" 7" BERKO 2508W 1, 2, 3, 5

REMARKS:

1. SEE MECHANICAL/ELECTRICAL COORDINATION SCHEDULE FOR ELECTRICAL DATA.

2. PROVIDE WALL THERMOSTAT.

3. PROVIDE INTEGRAL DISCONNECT SWITCH.

4. 1 KW HEATER.

5. 2 KW HEATER.

REGISTER - GRILLE - DIFFUSER SCHEDULE

MARK FUNCTION TYPE

CFM MAX SIZE BORDER OR MATERIAL

FINISH ACCESS.

MANUFACTURER

REMARKS

RANGE N.C. (INCHES) FRAME ALUM. STEEL & MODEL NO.

R-1 RETURN

PERF. PANEL

24x24 FACE

0 - 500 25 6" Ø

NECK

24 x 24

LAY-IN

X

STND.

WHITE

TITUS PXP 1

R-2 RETURN

PERF. PANEL

24x12 FACE

150 -

8" Ø

NECK

24 x 24

LAY-IN

X

STND.

WHITE

TITUS PXP 1

R-3 RETURN

SINGLE DEFL.

35° BLADE

526 -

25 16 x 10

SURFACE

MOUNT

X

STND.

WHITE

TITUS 350RL 1

S-1 SUPPLY

SQ FACE

NOM. PNL.

75 -

6" Ø

NECK

24 x 24

LAY-IN

X

STND.

WHITE

TITUS TMS 1

S-2 SUPPLY

SQ FACE

NOM. PNL.

170 -

8" Ø

NECK

24 x 24

LAY-IN

X

STND.

WHITE

TITUS TMS 1

S-3 SUPPLY

SQ FACE

NOM. PNL.

170 -

8" Ø

NECK

12 x 12

LAY-IN

X

STND.

WHITE

TITUS TMS 1

S-4 SUPPLY

DOUBLE

DEFLECTION

15 -

25 6 X 6

SURFACE

MOUNT

X

STND.

WHITE

TITUS 300RL 1

S-5 SUPPLY

DOUBLE

DEFLECTION

440 -

25 14 x 10

SURFACE

MOUNT

X

STND.

WHITE

TITUS 300RL 1

REMARKS:

1. PROVIDE SPECIFIC NOISE CRITERIA (NC) DATA FOR EACH LINE ITEM WITH SHOP DRAWINGS.

GAS FIRED ROOFTOP UNIT SCHEDULE

MARK SERVES

TOTAL TOTAL EXT. O.A. COOLING CAP. MBH HEATING CAP. MBH MANUFACTURER

REMARKS

CFM S.P. (WC) S.P. (WC) CFM TOTAL SENSIBLE INPUT OUTPUT & MODEL NO.

RTU-1 BLDG. 270 1,200 --- 0.50'' 200 48.00 35.00 100.00 81.00 DAIKIN MPS-003

1, 2, 3, 4, 5, 6, 7, 8

REMARKS:

1. SEE MECHANICAL/ELECTRICAL COORDINATION SCHEDULE FOR ELECTRICAL DATA.

2. PROVIDE ROOF CURB.

3. PROVIDE DISCONNECT SWITCH AND CONVENIENCE OUTLET.

4. CONTROLS BY BAS CONTRACTOR, RTU SHALL INTEGRATE WITH EXISTING CAMPUS BAS.

5. PROVIDE ENTHALPY CONTROLLED ECONOMIZER DAMPER AND HOOD.

6. PROVIDE THROUGH THE BASE ELECTRICAL CONNECTION.

7. PROVIDE DUCT MOUNTED SMOKE DETECTOR CONNECTED T OFIRE ALARM SYSTEM, COORDINATE WITH ELECTRICAL.

8. SELECTION BASED AT ARI CONDITIONS.

DUCTWORK INSULATION SCHEDULE

DUCTWORK SYSTEM

ACOUSTICAL FLEXIBLE RIGID THICKNESS

REMARKS

LINER FIBERGLASS FIBERGLASS (INCHES)

SUPPLY AIR - CONCEALED X 1 1/2 1

RETURN AIR X 1 1

EXHAUST DUCT FROM FAN TO ROOF X 2 1

TRANSFER X 1 1

REMARKS:

1. SEE SECTION 23 07 00 HVAC INSULATION" FOR OTHER DUCT INSULATION SPECIFICATIONS.

MECHANICAL / ELECTRICAL COORDINATION SCHEDULE

ABBREVIATION:

E ELECTRICAL CONTRACTOR HP HORSEPOWER 4X NEMA 4X V VOLTAGE

M MECHANICAL CONTRACTOR KW KILOWATTS PH PHASE VFD VARIABLE FREQUENCY

I INTEGRAL WITH EQUIPMENT MR PER MANUFACTURER'S RE REVERSING DRIVE

C COMBINATION STARTER AND RECOMMENDATION RV REDUCED VOLTAGE 2S TWO SPEED

SAFETY SWITCH NF NON-FUSED SF FUSE HOLDER WITH SWITCH 3S THREE SPEED

CB CIRCUIT BREAKER NR NON-REVERSING SS SAFETY SWITCH

FV FULL VOLTAGE N1 NEMA 1 SH HP RATED SWITCH

FLA FULL LOAD AMPS 3R NEMA 3R ST THERMAL ELEM. SWITCH

REFER TO SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS

MARK DESCRIPTION

RATING

DISCONNECT MOTOR STARTER NAMEPLATE

REMARKSFURNISH/

INSTALL

BY

TYPE

RATING

(AMPS)

FUSE

SIZE

ENCL.

FURNISH/

INSTALL

BY

TYPE/

NEMA

SIZE

ENCL.

MINIMUM

SCCR

(AMPS)LOAD V PH

EF-1 EXHAUST FAN 20.5W 120 1 E/E SH 15 NF N1 - - - -

EWH-1 CABINET UNIT HEATER 14.4A 208 1 M/M I - - - - - - -

EWH-2 CABINET UNIT HEATER 14.4A 208 1 M/M I - - - - - - -

FT-1

FINNED TUBED

RADIATION

1 KW 208 1 M/M I - - - - - - -

FT-2

FINNED TUBED

RADIATION

1 KW 208 1 M/M I - - - - - - -

FT-3

FINNED TUBED

RADIATION

2 KW 208 1 M/M I - - - - - - -

WH-1 ELECT. WATER HEATER 4 KW 208 3 M/E SS 40 NF N1 - - - 5 K AIC

HP-1,

FC-1&2

DUCTLESS SPLIT

SYSTEM

18.7

MCA

240 1 E/E SS 30 MR 3R M/M - - -

RTU-1 ROOFTOP UNIT

MCA

208 3 M/E SS 40 NF 3R - - - 5 K AIC

GENERAL NOTES:

A. VERIFY/COORDINATE ALL RATINGS FOR EQUIPMENT. WHERE SUCH RATINGS ARE OTHER THAN THAT INDICATED ON MECHANICAL/ELECTRICAL COORDINATION SCHEDULE, PROVIDE DISCONNECTS, MOTOR STARTERS, OVERCURRENT DEVICES AND RELATED REVISIONS ACCORDINGLY. WHERE EQUIPMENT IS PROVIDED WITH RATINGS OTHER THAN THAT INDICATED, CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATION AND ASSOCIATED COSTS FOR REVISIONS.

B. PROVIDE FRACTIONAL HORSEPOWER MOTORS WITH INTEGRAL OVERLOAD PROTECTION.

C. EQUIPMENT LISTED IN SCHEDULE MAY APPEAR IN NUMEROUS LOCATIONS. EQUIPMENT MARKS ARE DESIGNATED BY UNIQUE IDENTIFIERS ON THE PLANS; I.E., HP-1.1, HP-1.2. IN THESE INSTANCES, THE ELECTRICAL REQUIREMENTS DO NOT CHANGE FROM ONE MARK TO THE NEXT, ONLY THE UNIQUE IDENTIFIER CHANGES.

D. HORSEPOWER RATED SWITCHES (SH): FOR 120 V MOTORS LESS THAN 1/2 HP, PROVIDE FUSEHOLDER WITH SWITCH, FUSED PER MANUFACTURER'S RECOMMENDATION AND NEC REQUIREMENTS. FOR 120 V MOTORS RATED 1/2 HP OR 3/4 HP, PROVIDE HP RATED TOGGLE SWITCH (WHERE BRANCH CIRCUIT OVERCURRENT DEVICE MEETS NEC REQUIREMENTS FOR SHORT-CIRCUIT PROTECTION) OR FUSED SAFETY SWITCH.

E. INDUSTRIAL CONTROL PANELS AS DEFINED BY NEC ARTICLE 409, MOTOR CONTROLLERS, HERMETIC REFRIGERANT MOTOR COMPRESSORS AND EQUIPMENT SHALL BE MARKED WITH INFORMATION AS REQUIRED BY THE NATIONAL ELECTRICAL CODE (NEC). MARK IN ACCORDANCE WITH NEC ARTICLE 409.110 FOR INDUSTRIAL CONTROL PANELS, NEC ARTICLE 430.8 FOR CONTROLLERS AND NEC ARTICLE 440.4(B) FOR HERMETIC REFRIGERANT MOTOR COMPRESSORS AND EQUIPMENT. THE MARKED SHORT CIRCUIT CURRENT RATING (SCCR) SHALL BE NO LESS THAN THE VALUE INDICATED ABOVE.

F. FOR MOTORS CONTROLLED BY VARIABLE FREQUENCY DRIVES, PROVIDE FACTORY INSTALLED SHAFT GROUNDING THAT REQUIRES NO MAINTENANCE FOR THE

SERVICE LIFE OF THE MOTOR.

REMARKS:

1. PROVIDE EXHAUST FAN MOTOR FACTORY-WIRED TO WEATHERPROOF JUNCTION BOX INTEGRAL WITH FAN. ELECTRICAL CONTRACTOR TO PROVIDE

WEATHERPROOF HORSEPOWER RATED SWITCH (SEE GENERAL NOTES ABOVE).

2. PROVIDE LOCKABLE DISCONNECT INTEGRAL WITH VFD.

3. ELECTRICAL CONTRACTOR TO PROVIDE DISCONNECT AND STARTER INTEGRAL WITH MOTOR CONTROL CENTER.

SPLIT SYSTEM UNIT SCHEDULE

INDOOR OUTDOOR

CFM

CLG (MBH) HEATING DATA

MANUFACTURER

INDOOR UNIT OUTDOOR UNIT

REMARKS

UNIT MARK UNIT MARK TOTAL CAPACITY BACKUP KW MODEL NO. MODEL NO.

FC-1, 2 HP-1 430 24.0 24.0 N/A DAIKIN FTXS12 3MXS24

1, 2, 3, 4, 5, 6, 7

REMARKS:

1. SEE MECHANICAL/ELECTRICAL COORDINATION SCHEDULE FOR ELECTRICAL DATA.

2. UNIT SHALL BE ABLE TO COOL WITH AMBIENT TEMPERATURES AS HIGH AS 100 DEG.F.

3. PROVIDE INTEGRAL CONDENSATE PUMP, MOUNTING BRACKET, AND OUTDOOR MOUNTING BRACKET AND INSULATED LINE SETS.

4. REFRIGERANT SHALL BE R-410A.

5. UNIT SHALL BE MINIMUM 17.0 SEER AND HAVE A MINIMUM OF THREE INDOOR UNIT CONNECTIONS.

6. PROVIDE THERMOSTAT.

7. EACH INDOOR UNIT SHALL HAVE A CAPACITY OF 12 MBH COOLING AND 12 MBH HEATING.

4024241200-2000T-5

C

A

RETURN AIR TRANSFER

DUCT LINED WITH 1"

ACOUSTICAL DUCT LINER

MARK

T-1

T-2

T-3

T-4 800-1200

500-800

300-500

0-300

CFM

A B

C

DIMENSION (INCHES) *

DUCT DIMENSIONS ARE INSIDE CLEAR

OF LINER & SIZED AT 500-600 FPM.

TRANSFER DUCT SCHEDULE

B

C

B

A

90° INSULATED

SHEET METAL ELBOW

FLEXIBLE DUCT TO ELBOW

(3'-0" MAX. LENGTH)

SUPPLY AIR

DIFFUSER

NOTE:

ALL DUCTWORK TO BE INSULATED DOWN TO AND

INCLUDING DIFFUSER NECK AND BACK OF DIFFUSER.

HIGH EFFICIENCY TAKE-OFF (HETO) WITH INTEGRAL

VOLUME DAMPER. HETO SHALL BE FLANGED AND

FULLY GASKETED ON ALL FLANGES AND CORNERS.

ROUND END OF TAKE-OFF SHALL HAVE ROLL FORMED

BEADING TO ENSURE PROPER SEAL. DAMPER SHALL

BE FACTORY INSTALLED WITH SPRING LOADED

RETRACTABLE BEARINGS AND POSITIVE LOCKING NUT

FOR ADJUSTMENT. PROVIDE 2 INCH EXTENSION ON

DAMPER QUADRANT FOR INSULATED DUCT.

90° INSULATED

SHEET METAL ELBOW

DUCT STRAP

FASTENER (TYP)

INSULATED FLEXIBLE DUCT

(MAXIMUM LENGTH 3'-0")

PLAN

ELEV.

INTEGRAL SQUARE TO

ROUND TRANSITION

S U

P P

L Y

A

IR

F L O

W

SUPPLY AIR DIFFUSER

SUSPENDED

CEILING SYSTEM

NOTES:

ALL DAMPER DUCTWORK TO BE INSULATED

DOWN TO AND INCLUDING DIFFUSER NECK AND

BACK OF DIFFUSER.

SEE DUCT INSULATION SCHEDULE FOR MAIN

DUCT INSULATION REQUIREMENTS.BRANCH DUCT

MAIN DUCT

45° W

L L=1/4 W

(4" MIN.)

EXHAUST

EXHAUST STACK

THRU ROOF

ROOF LINE

EXHAUST AIR DUCT, SEE

HVAC DRAWINGS FOR

SIZE AND LOCATION

CEILING

BACKDRAFT DAMPER

EXHAUST FAN

UTILITY CURB

C O

P Y R

IG

H T

T h is d o cu m e n t a n d t h e i n fo rm a ti o n c o n ta in e d m a y n o t b e re p ro d u ce d o r e xc e rp te d f ro m w it h o u t th e e xp re ss w ri tt e n p e rm is si o n o f F a rr is E n g in e e ri n g In c.

U n a u th o ri ze d c o p yi n g d is cl o su re o r co n st ru ct io n u se a re p ro h ib it e d b y th e c o p yr ig h t la w

O M

A H

A

L

IN

C O

LN

D E S M

O

IN

E S

C O

LO

R A

D O

S P R

IN

G S

F A

R R

IS

E N

G

IN

E E R

IN

G fa rr is

-u sa

.c o m

F E

S io u x C it y

IA

(7

-3

D e s M o in e s

IA

(5

-2 w w w .F

E H

D E

S

IG

N .C

O M

F

E H

S h e e t T it le

P ro je c t T it le

Date

Issued

Project Number

Sheet

In A s s o c ia ti o n W it h

D e la fi e ld

W

I

(2

-2

D u b u q u e

IA

(5

-4

D E

S

IG

N

4/26/2017 11:47:52 AM

C R e v it P ro je c ts

\1

C e n tr a l

H

D S

.r v t

A ir C o b ra

D ri v e

D e s M o in e s

IA

MH5.1

2010207.19

12-14-2016

R e n o v a te

B ld g f o r

C o n tr a c ti n g

M S

G

M E

C H

A N

IC

A

L S

C H

E D

U L E

S

D E

T A

IL

S

Io w a A ir N a ti o n a l G u a rd

NOT TO SCALE1 AIR TRANSFER DUCT DETAIL

NOT TO SCALE2 DIFFUSER CONNECTION DETAIL

NOT TO SCALE3

FLEXIBLE SUPPLY AIR DUCT CONNECTION

TO CEILING SUPPLY AIR DIFFUSER

NOT TO SCALE4 45° BRANCH DUCT TAKEOFF

NOT TO SCALE5 EXHAUST DUCT THRU ROOF

W R

W R

WR

WR

G G

G

G

G

W R

F

F

F

SDSD

SD

F

HD

SD

S

S

S

S

S

S

V

V

SD

DM

SD

SD

SD

SD

SD

4 4

F A

C P

2 P I

P O

G G

,2

J

J

F

HD

J

J

W R

W R

G G

G G

G

G

G

G

G G

G

G G

W R

T

WR

WR

P

J

W,1

,1

,1

W,1

W,1

HD

HD

S

S

S

S

HD

S

HD

HD

HD

S

HD

S

HD

S

HD

HD

S

S

S

S

F

W R

F

F

FACP

F A

A P

1st Sergeant

Vestibule

Elec/Mech

Comm.

Commander

Shower

Conf/Brk

Contracting

MSG

MSG 1

Circulation

Copier

PANEL 'B'

PANEL 'A'

+72"

+72"

+42"

+72"

A-6

B-10

B-16

B-8

A-11

B-18

A-10

A-21

A-14

A-12

A-9

A-7

A-23 A-5

TV

A-16

TV

A-15

+48"

TV

+42"

+42"

+42"

MAIN DISTRIBUTION PANEL 'MDP'

A-13

A-4

A-1

EWH

FT

3 EF

FT

FT

A-8

B-5,7

B-13,15

B-9,11

B-21,23

B-31

A-18

+72"

Storage

+62"

B-12

TVSS

+42"

+42"

A-17

A-19

EP1.1

MIC

A-42

TVSS

FC

FC

GENERAL NOTES

A. IF ADDITIVE BID ITEM #1 IS ACCEPTED BY OWNER, CONTRACTOR SHALL NOT PROVIDE SMOKE DETECTORS IN

ROOMS 103, 104, 107, 109, AND 112.

B. IF ADDITIVE BID ITEM #1 IS ACCEPTED BY OWNER, CONTRACTOR TO PROVIDE AND INSTALL FLOW SWITCH AND

TAMPER SWITCH FOR FIRE SPRINKLER SYSTEM.

C. FURRED WALLS VARY IN DEPTH, SIZE ELECTRICAL BOXES AND DEVICES ACCORDINGLY.

D. COORDINATE TEMPORARY CONSTRUCTION POWER WITH BASE ELECTRICIANS.

COMMUNICATIONS NOTES

A. DATA DEVICES SHOWN ARE FOR OWNER INSTALLED CABLE AND DEVICE. CONTRACTOR TO SUPPLY RACEWAY

WITH EMPTY BOXES.

B. NOTE REMOVED.

C. ALLOCATE CABLES FOR EXISTING CAMERAS, FIRE ALARM CONTROL PANEL, POWER METER COMMUNICATIONS, AND OTHER NECESSARY DATA CONNECTIONS.

D. ALL DATA CONDUIT TO BE 1-1/4" SIZE MINIMUM. SIZE PER NUMBER OF DATA CABLES WITH MAX FILL OF 40%

FIRE ALARM NOTES

A. ALL WIRING TO BE CLASS A WIRING IN RED CONDUIT.

B. PROVIDE RED ON CLEAR LABELS FOR ALL FIRE ALARM DEVICES INDICATING DEVICE ADDRESS.

PVC CLEANOUT BODY & PLUG

12"(305mm) SCHEDULE 80 PVC PIPE

NONSHRINKING GROUT

EXISTING CONCRETE FLOOR

ENGRAVE ID TAG

"GROUND ROD"

GROUND CONDUCTOR

CABLE TO ROD CLAMP

10'(3048mm) LONG X 3/4"(19mm) DIA. GROUND ROD

WH

PANEL 'B'

PANEL 'A'

PANEL 'MDP'

A-3

B-25,27,29

B-28

B-26

A-2

EWH

B-17,19

RTU

MDP-4

B-20

HP

B-30,32

EXISTING XFMR 'EMA'

EXISTING PANEL 'EMA'

1 (TYP)

B-9

A-14

(TYP)3

4 (TYP)

(TYP) 3

(TYP)

(TYP)

(TYP)

(TYP)

EXISTING PANEL 'A'

P

EXISTING MAIN DISTRIBUTION PANEL 'MDP'

EXISTIN…