RepairB685Specs.pdf
PDF 2 MB Posted
- Attached to
- MULTIPLE AWARD TASK ORDER CONTRACT (MATOC) - MN Federal contract opportunity
- Solicitation number
- W912LM-15-R-0004
About this file
Repair B685 - Specifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EXHIBITEOfferorProposalFormRR.docx | DOCX document | |
| W912LM-15-R-0004-03-Amend03-FY16BasicMATOC.pdf | ||
| EXHIBITEOfferorProposalFormR.docx | DOCX document | |
| Q ADocument.docx | DOCX document | |
| W912LM-15-R-0004-02_-_Amend_02_-_FY16_Basic_MATOC.pdf | ||
| W912LM15R000401Amend0001.docx | DOCX document | |
| EXHIBITAPERFORMANCERELEVANCYQUESTIONNAIRE.docx | DOCX document | |
| EXHIBITDTECHNICALPROPOSALDATAREQUIREMENTS.docx | DOCX document | |
| RepairB685Drawings.pdf | ||
| W912LM15R0004FY15MATOCSolicitation.docx | DOCX document | |
| EXHIBITEOfferorProposalForm.docx | DOCX document | |
| EXHIBITCPASTPERFORMANCEEVALUATION.docx | DOCX document | |
| EXHIBITBINFORMATIONANDCONSENT.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MINNESOTA
AIR NATIONAL GUARD
133rd AW, ST. PAUL, MN
DELIVERY ORDER NO. W912LM-04-D-0001-0028
PROJECT QJKL990116
REPAIR HANGAR & SHOPS
BLDG. 685
TYPE B – FINAL (100%) SUBMITTAL
SPECIFICATIONS
March 5, 2010 - Revised
LHB Project No. 080052
LHB
21 West Superior Street, Ste 500
Duluth, Minnesota 55802
(218) 727-8446
FAX: (218) 727-8456
Foster, Jacobs & Johnson, Inc.
345 Canal Park Drive
Duluth, Minnesota 55802
(218) 722-3060
FAX: (218) 722-1931
MnANG 133rd AW 00 0105 - 1 Repair Hangar & Shops Bldg. 685
QJKL 990116
SECTION 00 0105
CERTIFICATIONS PAGE
CIVIL
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR
UNDER MY DIRECT SUPERVISION AND I AM A DULY LICENSED PROFESSIONAL ENGINEER
UNDER THE LAWS OF THE STATE OF MINNESOTA.
DANIEL G. SHAW, P.E. REGISTRATION #: 41423 DATE: 03/05/10
ARCHITECTURAL
I HEREBY CERTIFY THAT THIS PLAN, SPECIFICATION, OR REPORT WAS PREPARED BY ME OR
UNDER MY DIRECT SUPERVISION AND I AM A DULY LICENSED ARCHITECT UNDER THE
LAWS OF THE STATE OF MINNESOTA.
CYNTHIA I. POIRIER REGISTRATION #: 22021 DATE: 03/05/10
STRUCTURAL
ALAN J. VORDERBRUGGEN, P.E. REGISTRATION #: 20969 DATE: 03/05/10
MECHANICAL
JAMES R. JOHNSON, P.E. REGISTRATION #: 15920 DATE: 03/05/10
ELECTRICAL
TERENCE R. LARSON, P.E. REGISTRATION #: 17136 DATE: 03/05/10
TABLE OF CONTENTS
INTRODUCTORY INFORMATION
00 0105 CERTIFICATIONS PAGE
00 0111 TABLE OF CONTENTS
PROCUREMENT REQUIREMENTS
00 3100 AVAILABLE PROJECT INFORMATION
SUMMARY
01 1000 SUMMARY
PRICE AND PAYMENT PROCEDURES
01 2200 UNIT PRICES
01 2300 BID OPTIONS
ADMINISTRATIVE REQUIREMENTS
01 3000 ADMINISTRATIVE REQUIREMENTS
01 3260 ENVIRONMENTAL REQUIREMENTS
01 3515 SUSTAINABLE DESIGN (SD) REQUIREMENTS
01 3516 SUSTAINABLE DESIGN (SD) SUBMITTAL FORMS
01 3516.01 SUSTAINABLE DESIGN (SD) MATERIAL COST
SUMMARY FORM
01 3516.02 SUSTAINABLE DESIGN (SD) WOOD-CONTAINING
PRODUCT LIST
01 3516.03 SUSTAINABLE DESIGN (SD) METAL-CONTAINING
PRODUCT LIST
01 3516.04 SUSTAINABLE DESIGN (SD) MATERIAL CONTENT
FORM
01 3516.05 SUSTAINABLE DESIGN (SD) NEW PRODUCT SOURCE
FORM
QUALITY REQUIREMENTS
01 4000 QUALITY REQUIREMENTS
TEMPORARY FACILITIES AND CONTROLS
01 5000 TEMPORARY FACILITIES AND CONTROLS
01 5721 INDOOR AIR QUALITY CONTROLS
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
TOC - 1
PRODUCT REQUIREMENTS
01 6000 PRODUCT REQUIREMENTS
01 6116 VOLATILE ORGANIC COMPOUND (VOC) CONTENT
RESTRICTIONS
01 6116.01 ACCESSORY MATERIAL VOC CONTENT
CERTIFICATION FORM
EXECUTION AND CLOSEOUT REQUIREMENTS
01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS
01 7419 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 7800 CLOSEOUT SUBMITTALS
LIFE CYCLE ACTIVITIES
01 9113 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 - EXISTING CONDITIONS
02 4100 MINOR DEMOLITION FOR REMODELING
02 4116 BUILDING DEMOLITION
DIVISION 03 - CONCRETE
03 1000 CONCRETE FORMING AND ACCESSORIES
03 2000 CONCRETE REINFORCING
03 3000 CAST-IN-PLACE CONCRETE
03 3513 HIGH-TOLERANCE CONCRETE FLOOR FINISHING
03 3900 CONCRETE CURING
03 5400 CAST UNDERLAYMENT
DIVISION 04 - MASONRY
04 2001 MASONRY VENEER
04 2731 REINFORCED UNIT MASONRY
DIVISION 05 - METALS
05 1200 STRUCTURAL STEEL FRAMING
05 3100 STEEL DECKING
05 5000 METAL FABRICATIONS
05 5213 PIPE AND TUBE RAILINGS
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
TOC - 2
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 1000 ROUGH CARPENTRY
06 4100 ARCHITECTURAL WOOD CASEWORK
06 6450 FIBERGLASS REINFORCED PLASTIC PANELS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 2100 THERMAL INSULATION
07 2114 SPRAYED FOAM INSULATION FOR BUILDING
ENVELOPE
07 2620 UNDER-SLAB VAPOR RETARDER
07 4213 METAL WALL PANELS
07 6100 SHEET METAL ROOFING, FLASHING & TRIM
07 8400 FIRESTOPPING
07 9005 JOINT SEALERS
DIVISION 08 - OPENINGS
08 1113 HOLLOW METAL DOORS AND FRAMES
08 3100 ACCESS DOORS AND PANELS
08 3323 OVERHEAD COILING DOORS
08 3613 SECTIONAL DOORS
08 4313 ALUMINUM-FRAMED ENTRY
08 4500 TRANSLUCENT WALL AND ROOF ASSEMBLIES
08 5113 ALUMINUM WINDOWS
08 7100 DOOR HARDWARE
08 8000 GLAZING
08 9100 LOUVERS
DIVISION 09 - FINISHES
09 2116 GYPSUM BOARD ASSEMBLIES
09 3000 TILING
09 5100 ACOUSTICAL CEILINGS
09 6500 RESILIENT FLOORING
09 6700 FLUID-APPLIED FLOORING
09 6800 CARPETING
09 6813 TILE CARPETING
09 9000 PAINTING AND COATING
DIVISION 10 - SPECIALTIES
10 1101 VISUAL DISPLAY BOARDS
10 1410 PLASTIC SIGNS
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
TOC - 3
10 2113.19 PLASTIC TOILET COMPARTMENTS
10 2601 WALL AND CORNER GUARDS
10 2815 TOILET ACCESSORIES
10 4400 FIRE PROTECTION SPECIALTIES
10 5120 PLASTIC LOCKERS
DIVISION 11 - EQUIPMENT
11 5213 PROJECTION SCREENS
11 5250 MONITOR MOUNT
DIVISION 12 - FURNISHINGS
12 2116 VERTICAL LOUVER BLINDS
12 3600 COUNTERTOPS
12 4813 ENTRANCE FLOOR MATS AND FRAMES
12 9313 BICYCLE RACKS
DIVISION 14 - CONVEYING EQUIPMENT
14 6400 MONORAIL HOISTS
DIVISION 21 - FIRE SUPPRESSION
21 0501 GENERAL PROVISIONS
21 0504 COMMON WORK FOR FIRE PROTECTION SYSTEMS
21 0510 FIRESTOPPING
21 0553 IDENTIFICATION FOR FIRE SUPPRESSION PIPING
AND EQUIPMENT
21 0800 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
21 1300 FIRE-SUPPRESSION SPRINKLER SYSTEMS
21 2500 WATER BASED HANGAR FIRE SUPPRESSION
SYSTEM
21 3000 FIRE PUMPS
DIVISION 22 - PLUMBING
22 0501 GENERAL PROVISIONS
22 0510 FIRESTOPPING
22 0513 COMMON MOTOR REQUIREMENTS FOR PLUMBING
EQUIPMENT
22 0516 EXPANSION FITTINGS AND LOOPS FOR PLUMBING
PIPING
22 0519 METERS AND GAGES FOR PLUMBING PIPING
22 0553 IDENTIFICATION FOR PLUMBING PIPING AND
EQUIPMENT
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
TOC - 4
22 0719 PLUMBING PIPING INSULATION
22 0800 COMMISSIONING OF PLUMBING SYSTEMS
22 1005 PLUMBING PIPING
22 1006 PLUMBING PIPING SPECIALTIES
22 1500 COMPRESSED-AIR SYSTEMS
22 3000 PLUMBING EQUIPMENT
22 4000 PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING, AND AIR-CONDITIONING (HVAC)
23 0501 GENERAL PROVISIONS
23 0510 FIRESTOPPING
23 0513 COMMON MOTOR REQUIREMENTS FOR HVAC
EQUIPMENT
23 0548 VIBRATION CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 0553 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 0593 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 0713 DUCT INSULATION
23 0719 HVAC PIPING INSULATION
23 0800 COMMISSIONING OF HVAC
23 0913 INSTRUMENTATION AND CONTROL DEVICES FOR
HVAC
23 0923 DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC
23 0993 SEQUENCE OF OPERATIONS FOR HVAC CONTROLS
23 2113 HYDRONIC PIPING
23 2114 HYDRONIC SPECIALTIES
23 2123 HYDRONIC PUMPS
23 2300 REFRIGERANT PIPING
23 3100 HVAC DUCTS AND CASINGS
23 3300 AIR DUCT ACCESSORIES
23 3416 CENTRIFUGAL HVAC FANS
23 3423 HVAC POWER VENTILATORS
23 3514 DUST COLLECTION EQUIPMENT
23 3700 AIR OUTLETS AND INLETS
23 6213 PACKAGED AIR-COOLED REFRIGERANT
CONDENSING UNITS
23 7313 MODULAR INDOOR CENTRAL-STATION
AIR-HANDLING UNITS
23 8101 TERMINAL HEAT TRANSFER UNITS
23 8127 SMALL SPLIT-SYSTEM HEATING AND COOLING
DIVISION 26 - ELECTRICAL
26 0500 BASIC ELECTRICAL REQUIREMENTS
26 0501 MINOR ELECTRICAL DEMOLITION
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
TOC - 5
26 0513 MEDIUM VOLTAGE CABLES
26 0519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS
AND CABLES (600V AND LESS)
26 0526 GROUNDING AND BONDING FOR ELECTRICAL
SYSTEMS
26 0529 HANGERS AND SUPPORTS FOR ELECTRICAL
SYSTEMS
26 0534 CONDUIT
26 0536 CABLE TRAYS FOR ELECTRICAL SYSTEMS
26 0537 BOXES
26 0553 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 0573 OVERCURRENT PROTECTIVE DEVICE
COORDINATION STUDY AND ARC FLASH
ASSESSMENT
26 0914 ELECTRICAL POWER MONITORING
26 0916 ELECTRIC CONTROLS AND RELAYS
26 0919 ENCLOSED CONTACTORS
26 0920 SAFETY SERVICE SYSTEMS
26 0923 LIGHTING CONTROL DEVICES
26 1200 MEDIUM VOLTAGE TRANSFORMERS
26 2200 LOW VOLTAGE TRANSFORMERS
26 2413 SWITCHBOARDS
26 2416 PANELBOARDS
26 2501 FEEDER AND PLUG-IN BUSWAY
26 2701 ELECTRICAL SERVICE ENTRANCE
26 2716 ELECTRICAL CABINETS AND ENCLOSURES
26 2717 EQUIPMENT WIRING
26 2719 CORD REELS
26 2726 WIRING DEVICES
26 2813 FUSES
26 2818 ENCLOSED SWITCHES
26 2913 ENCLOSED CONTROLLERS
26 2923 VARIABLE-FREQUENCY MOTOR CONTROLLERS
26 3543 FREQUENCY CONVERTERS
26 4310 TRANSIENT VOLTAGE PROTECTION
26 5110 LUMINAIRES
26 5600 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 1005 STRUCTURED CABLING FOR VOICE AND DATA -
INSIDE-PLANT
27 5117 PUBLIC ADDRESS SYSTEMS
27 5132 TELEVISION SYSTEMS
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
TOC - 6
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 3100 MASS NOTIFICATION SYSTEM
28 3110 FIRE DETECTION AND ALARM
DIVISION 31 - EARTHWORK
31 1000 SITE CLEARING
31 2200 GRADING
31 2316 EXCAVATION
31 2316.13 TRENCHING
31 2323 FILL
31 3219 GEOTEXTILE SOIL STABILIZATION AND LAYER
SEPARATION
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 1123 AGGREGATE BASE COURSES
32 1216 ASPHALT PAVING
32 1313 CONCRETE PAVING
32 9223 SODDING
32 9300 PLANTS
DIVISION 33 - UTILITIES
33 3111 SITE SANITARY UTILITY SEWERAGE PIPING
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
TOC - 7
SECTION 00 3100
AVAILABLE PROJECT INFORMATION
PART 1 GENERAL (NOT USED)
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
PART 4 FORMS
4.01 TESTING AND INSPECTION FORM
A. Special Structural Testing and Inspection Program Summary Schedule, MnANG Repair Hangar & Shops Bldg 685, 133rd AW/CEC, 612 Militia Drive, St. Paul, MN.
4.02 EXISTING CONDITIONS SURVEY
A. ASBESTOS REPORT
1. A copy of an Asbestos Report is included with this document (9 pages).
2. The Owner is responsible for asbestos removal.
3. This report is for information only and, by its nature, cannot reveal all conditions that exist.
END OF SECTION
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
00 3100 - 1
Q:\08proj\080052\ADMN\F200 Design\F206 Construction Docs\F206-1 Specifications\Revised 100%\Native\080052SI041509 Special Inspection Schedule.doc
Special Structural Testing and Inspection Program Summary Schedule
Project Name MnANG Repair Hangar & Shops Bldg 685, 133rd AW/CEC Project No. 080052 .
Location 612 Militia Drive, St. Paul, MN Permit No. _________________ (1)
IBC Ref. or
Technical (2)
Description (3)
Type of Inspector
(4)
Specific Report Frequency, Unless Noted Otherwise (5)
Assigned Firm (6)
Section Article 1704 7 Verify site preparation TA Per soil report/spec, prior to work 1704 7 Verify fill material and lift thickness TA Per soil report/spec 1704 7 Verify fill compaction density TA Per soil report/spec 1704 4 Verify concrete reinf. Placement TA Periodic 1704 4 Verify concrete mix designs SER Periodic 1704 4 Sample/test concrete TA Slump, air, temp & 4 cylinders per 50 cy 1704 4 Observe concrete placement TA Periodic 1704 4 Observe maintenance of concrete curing SER Periodic 1704 5 Early construction methods verification TA Periodic: mortar and grout mix designs 1704 5 Masonry Inspection Program TA Periodic: anchors, reinf. mat’l., hot/cold plcmt 1704 5 Pre-grouting inspection TA Periodic: obs grout space, reinf. placement 1704 5 Observe grout and mortar placement TA Periodic 1704 5 Observe prep and test grout and prisms TA 3 specimens prior to work and every 5,000 sf 1704 5 Masonry compl. w/ cd’s and submittals SER Periodic 1704 2.1 Steel Fabricator Inspection SER At start of project fabrication 1704 3 Verify bolt, nut, and washer materials TA Periodic 1704 3 Bolts, bearing type TA 100% visual, test 10% 1704 3 Verify structural steel materials TA 1704 3 Verify weld filler materials TA 1704 3 Welds: fillet TA 100% visual, >5/16 cont., otherwise periodic 1704 3 Welds: CP and PP TA 100% UT > 5/16”, 25% MP </= 5/16” 1704 3 Welds: roof and floor deck TA Periodic 1704 3 Steel framing compliance w/ cd’s SER Periodic
(1) Permit No. to be provided by the Building Official
(2) Referenced to the specific technical scope section in the program, or IBC reference.
(3) Use descriptions per IBC Chapter 17, as adopted by Minnesota State Building Code.
(4) SER = Structural Engineer of Record, SI-T = Special Inspector – Technical, TA = Testing Agency, SI-S = Special Inspector – Str’l.
(5) Weekly, monthly, per test/inspection, per floor, etc.
(6) Name of Firm contracted to perform services. If requested by engineer/architect of record or building official, the individual names of all prospective special inspectors and the work they intend to observe shall be identified as an attachment.
ACKNOWLEDGEMENTS (Each appropriate representative shall sign below)
Owner: Firm/Signed: MnANG 133rd AW/CEC Date: _______________
Contractor: Firm/Signed: Date: _______________
Architect: Cynthia I. Poirier, AIA Firm/Signed: LHB, Inc. Date: _______________
SER: Alan J. Vorderbruggen, PE Firm/Signed: LHB, Inc. Date: _______________
SI-S: Firm/Signed: Date: _______________
S.I.T.: Firm/Signed: Date: _______________
TA: TBD Firm/Signed: Date: _______________
Accepted for the Building Department By ______________________________________ Date __________________
/l,®M!:b <I :i'>!i:IIW~I$«tl:o
14"11
~--t:t!rmiYsJ~T.!~ !2~\J~:'!:~f:tr:_@!:-:t:.Jf:?--:->~~~~·-on e-:~--s a rnp l-e---<·-('tt:6-~-4-~0B-t--"d---~~tNtts~=--~~~:t+~:~-r~~r+r~H samp_(~~as tested and was four1~l to be postt1ve w1tl1 1~~ chr-ysot:i·le~-...i:l.Sbc~~3tos~ Ther·e!'or--e, t::he mastic under· the 12><12'' dar~h.
br·o~,o\ln Flour~ "":"ei-J.._:p i:::; con:;~i.::Jer-ec! f-'iCf1_ l-1omogeneou:·; _r~r-(-3'8.-11'6: Tr·an:::;i te wall boar-d ~~\~as found on the hlalJ:.::;~;-~d ~~;-:i~l~i~~SJ--~~.--f~~--(J~~~--~echan ical l~oorn~ Pr-e\;·i ous e><pcr·ience and testing have pr--oven t:h~_:t-s-..Jna·teJ--ial to be asbe~~;i:::os~ Therefor-e~ t:l-le l·\laJl::::; and cei.lins:_l in ·the 'TT2cJ1anical r~oom is consider-ed f-lCf'i_
!3_~_i,~9!l!IQ0L!i~!:.~:J_Os;:XJQD: Since the a~~-.be~S-~C-o$"--,_cont.:lin:in9 nlater--ial !pJa:::;
f=c)lltld ir1 qoc>cl cotldition and docs no·t pas~,~ thr~edt~ no imnJed.iale a.ct:ion is -,~equi.r-e·:::l~ rhe rnater~ia.J should b~"-'-·i--qc:lt_Jc]e.:::J in (:1 r--cc ur·t-- :f. ng p r~evc n live main ten a net': p r-oqt~anl ~·v-het--el)';;~~~ nspec t i a n:::c. a r·e:
ma.de ever--y si>( ntonths or- a:-::, needed~ If tl·1e condit~l-c .... o ·:::!ctet-.iot~ate~3 .. r·epair a;- r~c~nJovaJ ~:::.houJ d be perfot-n!ed~ ------r,~~ovaJ ~-t~::~_-: __ l~e .c:~:IJ·-~:~i':~r-;(~ ~if t:he ar-ea.::~ ar·e ever- i nc_l U<::led in a r·ef5a~ or #@14&t-~-ld--&:-I;N.,~~I<>l--t;;.f::L,}c€-lC.t,_,,..,.__.,.~.J="""-~""~"~-·=-·~~~--~·,~~-"~~·-~~-'"'·-·~'--·~<-~-~,-·~~.,~~~--. __ .,.~"~--~~~-=-~~·
BYil~irrg_~li~: Uuildin0 685 is ·ttle MaitltBJlance 1-langar.
corts·tructed in 1956 ar·td has 36~164 sq ft.
UC2mQgQrJQQ,Y~~J:\c~SL:::-!: The v:isua"l sur~vey resul·ted ir1 the ide~r1tificatiot1 o·f 14 po·tetltial ACM homogeneous areas as identi·tied below:
c -·-
Ma.stic under the 12x12" tan "'ith white floor tile ..
9>c9'' dar~k brown ·floor- tile.
/'iastic under- the 9x9" dark bt'O'"" Floot' tile ..
12x1.2" red with br-OlAin floor tile.
IA,@"'tiMMI:.fu!- ~-~~#, 1\!!>ll,'~lf~ WH"
Mastic under the red with brown floor tile ..
1-llermal insulatior1 fro1n tl1e aircra·ft wasl1 sys·tenl holding tanl< ..
]J)_
J!:l ..
12_
1"/leJ-mal insulatior1 front tl1e floor hea·t expansior1 tan I-<:~ r-11er·n1al insulation on tl1e domestic water- lines ..
MLJdded ther-rnal insulation on t~1e dornestic water·· fittin;Js.
Tiler-mal ir1sulatior1 ·frorn the floor hea·t excl1anger Mtldded ·therrnal insula-tion ·fr-om tl1e aircra-Ft wash systen1 fittinqc> ..
Tht::nnal insulation frcdn the tr-acl\ heat e><Changer_ Tiler-mal insu_latio~ from the track heat expansior1 ·tank ..
U9illQ9~D~2D§_Brgil_l~: One sample (1685-01) was taken. This ~5ample was tested and wos found to be negative for asbes·tos_ Ther·efor·e, the 12x12" tan with white floor tile found in the main Er1trance and tl1roughout tl1e building is considered NON-ACM ..
I
I
I I
I
I I I I I I I I I b. It~
I r¥'1'19
I I I I I
I
I
I
LlQIT!S?~Y~_Qt~ Q!2:L!~UC[~~i __ tl~b ~ 0 nc: :::~Ellflp 1 e ( tt6EI.S--01('t ) hla::_;", t.<J 1~.-.c: r 1 .. r h i. :::·.
sanJtJle was tested at·•d was ~our·td to t)e !Josi·tive with 1% ct·lr··y:sotiJ.E~ t:l::;;be::';to:::_;_ Ther~-e·t or·c}" the rn.J.stic ur·1der· t!·1e 12><l2'' tail l·\1i Lh hi!·1i Lf~ fLoor tilo is cor1sider··ed ACM_
UQOlQ~JQ)J<:::::_Q!ds:.;__~flL~~B.~}l3:
satnplE~ was ·tested ar1d was
One san1plc (~685-02) was taken_ Tl1is tound to be positive wi·tll 3% cl11-ysotile 9><')'' dar"l\ bt~Ol·\'n floor· tiJe four·1d in the f_JQ_IJ19.SJ~~·-n~"'-Q_!.,_!_:~;-~_t:cLS~t.i_~tl~~1: Uno:._': ::;,ample (H6iJ_:)---o:·Jl J l-l!a::·, t.<Jk.c:n_ ThJ-_:5 san1ple was tested ar1d was foLJtld to tJe f)Ositive wiLfl J.~~ cl·lr·-y::.:;oti lc~ <;t:.:'.>bE~:::>L:o::::... r1·1et'c~-t or·e .. fiiCJ.::?,tic under-- tl-1.:-; 9>-:CJ-· dar-~. br·o~.',1r1 r LO()J- ·t~Lle l~:--.::, c::orJ::sider·ed {\Ci1_
IJr,)IJ.lQSJg_;u:_l.q::Q.~.,r:~:: ____ ()LQ.~~~-~li~!)_: CJ ne ::.;;amp 1 e t H-6d 5---o::;, j ~ .... 1;-J::.-:. ta 1--\c-: r1 _ l hi::·-;
san11)le was ·tested ar1d was four1d to l)e tlt~gative for- asbe3tos" Thc~r,efor~e .. the~ l2><J.2'' t-ee! h1ith br·o\.,ln ·floor· t:ilc~ locclt.<::d .in F:uc:·m 140 is considered NDN--ACI1_ l~owever-~ due to cross-ccJrltarninatiotl tt~om Ll1e Old~;-Lic~ tl1e ·tile rrJus·t; aJ_so be treated as ACM.
t-J_~~ffiQ.SJSDS.Q~:!:2~f~r~_{;1~-·t;t"-_(,~: Ut-IE: ::;ample (0(,,']5·--031~'1) t,.,ldS td~\en_ I h1:::·, :;;~a.rnpJ.C: 1,\l<::iS t:e:st_e,j and l.o\I,J.;;:; fOllli(J ·to b;~~ po:c_:;-[ tiVC: With 5::;_ chr·\j2",()·ti l(~ asb(::sto:=._ 1·!-ler-efor·e~ the rJJa:;:;·L_ic under t.t·re 1.2x1./~··· r·ed 1 • .-..1i t:h br·-o!l-.ln r=loot- ti:Le is corlsicler-ed ACM.
~~t:ftoftVl~1fi ~tt~~--!A:q=e CQ:~._:~ !t-z~-;:----/~+--!cJr-ee-~o~s--a-rnp-~1-e--&-<-~·H·h6?J-f).w;.(.)-"~?~~-0--:ir-.,--c-c-a,r-1d~~, .. ()..§"'~~~~= J..ver·e· .. ·---t.:,a.ls__en. All thr~.::--:.:e sample::.:. hler·e t:est:ed and found t~o be nE:ga·t:ive ---:r-o·r:<~~~'.:.be:s·to;::,_ Ther--efor·e~ t!·Jel--rnal insulation on t:he a:ir--cr--aft J..\lash !3Y::--:;·t:e_rn holdinr;1 tanl-z locat:ed in the~ l'iechanica.l Poorn
i. :::. considc~!-ed i._l0~~--¥('·~CY·r:: ··· .. , _____
V..le t"e hli th
UQDJQnQ!JQQ!,J§ __ 0.L~§~_cL~JU2~ Thr-~e· --s-anlples (lt:68~>--07 ~ os~ and 09) tal~er·1. Sample ~685-07- was test~a·-~nd tour1d ·to be f)Ositive 25~': chr-·v:::,ot~ile and .L5% amo::si te asbest:()-~·- One po:::..:.i tive
::;a.mple dec.lar·e::s the:: ent:ir·e__ sy:::.tem positive for a·Sbe""::;-t_o:s ..
Ther-c:"fot-e~ thet--mt;Jl. insulation on th(':"! fJoot-- heat. e><pan~~Tb-n.
U_~,llHS_-_~q~-~.IJ~)_Q_IJ::~~~--()r_e,Q ___ tl2= Thr·ec~ san1plc:~~~ (t!Gt:\5·~10., ll~ d.n<:J ],2) wer-e take11.. Samr)le U685-·l0 was tested anJ foU!l<j to be f)Osi·tive wit~1 5% cl1rysotile asbestos. Otle posi·tive sample declares Ll1e er1tire systen1 I)Ositive ·for asbestos_ l'llerefore~ tl1ermal i11Sulatior1 011 tl1e clonJes·tic water lir1es located in ·tl1e Mectldtlical Roon1 a11d tllr·ougllou·t the building is cot1sidered ACMw
UQiJlQ9QD!f:;_Q1J:2._fJ.CQ§.._[lQ: Three samples (tr68.5~13~ 14~ and 15) we1-e taketl- Sar11ple ~685-13 was tested a11d foutld to be J)Ositive~ w.ith 25% cl1rysotile and 10% amosi·te asbes-tos. One posi·tj_vc sample declat-es ti·Je er1tire sys·tem posi·tive for asbes·tos.
Therefore, mudded tl1et-mal insulation on the domestic water fittii'Jgs located i11 the Mechar1ical Room ar1d throughotJt thE~ building is considered ACM_ A-25
------~--~'D:t?~f: t:t~·s~·!:J§':::tt!::~~;!;~J;~;:-·~--~--T+t F ee·~-efl ff1P"h::s~---~(~tt-6H&-:t-6~-:.~=H~"7~t't~--=l~=) ...
l·\1er·e t:al~?;n:-~,------Ji_:;.a,_ntpJ _ _£__ t/-()[.i~·-""1() was te:::>ted ;-J.n(! four1·:.:J to be po:'::.i t:i.\'E:
\··.Jl-th 2S:':~; chr·vsoti.Le "-"'ili'Jd--±o:{'..;. ___ iJ.[flOSit~e a_:_:~best::o::s" One p(:::<Sitive :::-.<J.mple dc:clar·es ·the: enti r·c: :::~v;~-ce-n-lpcr~;-'i..:t::-i-~.;,c -ror· a::::;bez, t:os ..
Ther·efor-e~ t:her·-rna.l insulat~ior·i on the floor-~--T;·c~y--~e><-chan-::Jer locatecl .J:=rr--=1:::4-+e---~Meeha- rrh+::·H:d:-~-+~-r:::•(9/H~~-i:- s-X·-CG-n-s~i . .:...:k-?o-r~E~.::J~~AG-t'ti~~--~·,··~~-~-M«~~~--~-~~~· ~,---~~==-::.;,:::;;;__;;;;~ l]QLDQ.9£~_D_~C:_•).!J~? __ GLS~l ___ JJJZ ~ rhr--ee :::;arnples ( u-6El.S-~_l <_:,> ~ 20 ~· and 21) l•\IC·~r-c~ taf<,erln f),_L] three :3d!ll!)iC:S ~\IC:re tcst~(:~(j an(/ fOUtld to bC' r1ega·t:ive ·for- asbestos. ·1·1-ter-ct·ore~ n1uJdeJ tller-rtJal ir1su_Latio11 o1·1 the a_ir·cr·aft: l-\ICJ.:;:.!·J ·fi.tt·in·_~J:::; Jocal:E~cl in t~he f1cchatlica1 r-\oo1·t1 and tllt-OI.JQ!lOUt t~1e /)Ui_ldillg is COI-lSider··ed NON-ACM_
~ ---::~~-·f:l ~~trw-;.~l\~:U~7~~~··_t;t:~-:-::~f::!'!::~-~-t::_Jt~k{?_-~----~-- ~·H-1 r-e e -~--s-ct-nt f':rJ-e~_;-,,--·H-t:68-h "'~,;..:c;t:::-. .:'~";2·6y --a.·+-!d·~~;,~A~+~ l.ve/::e-~<t:_~!.l~er·,_ -3d.rnp1c~ f-t-685--.. 2? hla.:_s tested and "foun<:l to be po~-:.i t:ivE::
Hith 35-:r"·c-hc-_ys-::.ot:ilc and 20~.-'. an1o:::~:i_t::;.~ a~-::.be:::·.tos. Onr;:~ po::::--,itivG-_.
:::;arnpic dt:~Clt-:-it:·.--;,~;·s--t__t_te en·t::ir·e :::--,y::>t:ern po-:;ii:.ive for· a·zbes·tos" rher·c~for-e,.. ·ther-maJ-·]·n~i...L~lat·ic)rl on t:he Lr·acl-.:. l'lC~at Q)<Chctrl~Jer· LocJted in 1-::he l'ic:·:cha.nica.l Po(_::.rn _t·s---· .. con:::·, ide:r·e·.::l f-iCH"
---- _-, --:·--,::::---,·-- -, _.,.-. · -.::: c>~·--,-¥·;:-c. ---:-;.< " -- ~ ----:~-- ' U~~~fl!QSJQDQQ!,,_Li. __ f}L~~l._t:LL~l:: 1111 CE. -=-dn!i,~J-~--~-' (_1-tu•.---'- ~--~-·, _.,___,_), at1(./ "'·!)
hlel-e tal-\enn Si'Jmple lt68.5-·2S 1,.\liJ~~, t~e:3t:ed -~;;_··r:l'd·-<tound to be posi.t:::ive ~.,1ith 25% chry:::;otile and :;·o:;; am<:::<:~;ite asbe::;tcis--~-.... .__Ctn~~ positive :s.::lrnple dr2cla.r-t:::<s t~he ~"2:n·tir-e sys·terrr po·:;itive tor a·st·_;·e~tus ..
r/--,er-r:_:~for-e ~ tf·tE~t~ma 1 i. nsulation_ on the tr~acf-;; he-: at: c>-<pan:.::~ion--.. -t.q ___ nl< -±-0-e--a.-t e-ct .. -- :1:-n-----t he t-'ieG han i ca-l R-oom --i--s---(-:;o n-~;--ide-Fe<--:l~AG~+4-:~-,~-~---~~~~·--~~
~~~~~~rum~o~~~-QgtlRa= Since t/1e asbestos containing rnateri~tl was four1d in good cor1dition and does r·rot /)Ose a t/1rea.t~ 110 imrnE~diate t:lction is requir~ed_ T/1e mater-ial sJ-,ould be inc] u·:Jed in a r-ecur·ril19 fJr·eventive mairlte11a11Ce progr~atn wher-eiJy irlspec·tiotl~~ a•··t~ n1ade every six mor1tl1s or as need~~d- If the cor1di'tio11 (ieterio•-ates, re1)air or t-enJoval s~1ould be per·fol-med. Ren1oval n1ust be considered it the areas are ever- inclLided in a repair or constr·uction j)roject_
J;}..u_L1Qlos1~~Q.Q.~ Building 686 1s the Fir-e Station_ constt-ucted in 1955 and has 9~352 sq ft.
HQffiQ9@DgQY§_acQ~§: T/1e visual survey resulted in tl1e identification of 13 potential ACM homogeneous areas as iden-ti-Fied below:
l. Mudded thermal insulation on steam supply fittings.
2. Tl1er-mal ir1sulation 011 steam SU!JPlY lir1es_
3. Mudded thermal insulation on steam return fittings .
4. ·r11ermal insulatio11 on steam return lines.
5. Tl1ern1al insLJla·tion on domestic /1ot water lines_
6. T~lermal insula·tion on donJes·tic cold water lines_
7. Mudded thermal insulation on the domestic hot water httings.
1\1
I
:z:.
" D;:, f) 0~
2!Jd_f:!o~--i i I
I_ --~~-
Its I
.. - ·---------------1
1/ /
·;,. '; rl\ e<
1st Floor iq ,;.:
--- I ' --------~-·--- ·--·-··"-.. ---- ---- I 7~\ lc I h"'
-~ -~-" "'a -~~~~~ol
J //·~-- ,I
- - \""~\ tl __ jl.
_I I I
El ~~ll_lllL~ - .__ ___ _l_j I ;~ I [ [I l- _,____I
~ . ~ s ~~-~ f J ,.If)
,.IJ)
If
BLDG 685 SOUTH HANGER
(aircraft maintenance)
I SCALE: I APPROVED BY
DATE:
DRAWN BY
KOSKINIEMI
Ori_ginal Dec84 Revised 40ct90
DRAWING NUMBER
I'
REPORT DATE 03/28/94 TABLE 1 PAGE 3
HAZARD ASSESSMENT SUMMARY
BLDG HOMO SAMPLE MATERIAL DESCRIPTION DAMAGE EXPOSURE OVERALL HAZARD APPROPRIATE
AREA NO. GRADE TREATMENT
007 14 THERMAL INSULATION BOILER STACK 9 8 9.1533 5 MONITOR
008 17 THERMAL INSULATION DOM WTR LINE 8 8 9.3316 5 MONITOR
009 20 MUDDED THERMAL DOM WTR FITTING 9 8 9.1633 5 MONITOR
010 23 THERMAL INSUALTION HW HEAT LINE 9 8 9.1633 5 MONITOR
011 26 MUDDED THERMAL HW HEAT FITTING 9 8 9.1633 5 MONITOR
012 29 THERMAL INSUALTION LO PRES STM LIN 9 8 9.1633 5 MONITOR
013 32 MUDDED THERMALTION LO PRES STM FIT 8 8 9.3316 5 MONITOR
014 35 THERMAL INSULATION HEATING FUEL LN 9 8 9.1633 5 MONITOR
015 38 MUDDED THERMAL HETNG FUEL FIT 9 8 9.1633 5 MONITOR
017 41A MISCELLANEOUS MASTIC -- -- ******* - NON FRIABLE
683 002 01 MISCELLANEOUS 9X9 BG FLR TILE -- -- ******* - NON FRIABLE
003 01A MISCELLANEOUS MASTIC -- -- ******* - NON FRIABLE
684 001 01 THERMAL INSULATION DOM WTR LINE 7 7 9.6692 5 MONITOR
002 04 MUDDED THERMAL DOM WTR FIT 8 7 9.5009 5 MONITOR
004 08 MISCELLANEOUS 12X12 DK BRN TL -- -- ******* - NON FRIABLE
005 DBA MISCELLANEOUS MASTIC -- -- ******* - NON FRIABLE
68 5 002 01A MISCELLANEOUS MASTIC -- -- ******* - NON FRIABLE
003 02 MISCELLANEOUS 9X9 DK BRN TILE -- -- ******* - NON FRIABLE
004 02A MISCELLANEOUS MASTIC -- -- ******* - NON FRIABLE
006 03A MISCELLANEOUS MASTIC -- -- ******* - NON FRIABLE
008 07 THERMAL INSUALTION FLR HT EXP TANK 8 8 9.3316 5 MONITOR
009 10 THERMAL INSUALTION DOM WTR LINE 7 8 9.4999 5 MONITOR
REPORT DATE 03/28/94 TABLE 1 PAGE 4
HAZARD ASSESSMENT SUMMARY
BLDG HOMO SAMPLE MATERIAL DESCRIPTION DAMAGE EXPOSURE OVERALL HAZARD APPROPRIATE
AREA NO. GRADE TREATMENT
~s.s- 010 13 MUDDED THERMAL DOM WTR FITTING 8 8 9.3316 5 MONITOR
Oll 16 THERMAL INSULATION FLR HEAT EXCHER 8 8 9.3316 5 MONITOR
013 22 THERMAL INSULATION TRACK HEAT EXCR 8 8 9.3316 5 MONITOR
014 25 THERMAL INSULATION TRK HET EXPANTK 7 8 9.4999 5 MONITOR
686 001 01 MUDDED THERMAL STM SUP FITTING 8 8 9.3316 5 MONITOR
002 04 THERMAL INSULATION STM SUP LINE 9 8 9.1633 5 MONITOR
003 07 MUDDED THERMAL STM RET FITTING 8 8 9.3316 5 MONITOR
004 10 THERMAL INSULATION STM RETURN LINE 9 8 9.1633 5 MONITOR
005 13 THERMAL INSULATION DOM HOT WTR LIN 7 8 9.4999 5 MONITOR
006 16 THERMAL INSULATION DOM CLD WTR LIN 7 8 9.4999 5 MONITOR
007 19 MUDDED THERMAL DOM HOT WTR FIT 9 8 9.1633 5 MONITOR
008 22 MUDDED THERMAL DOM CLD WTR FIT 9 8 9.1633 5 MONITOR
00 9 25 MISCELLANEOUS TRANSITE -- -- ******* - NON FRIABLE
01.0 26 MISCELLANEOUS 9X9 ERN FLR TIL -- -- ******* - NON FRIABLE
6 87 004 10 MISCELLANEOUS 12Xl2BG/WH TILE -- -- ******* - NON FRIABLE
005 lOA MISCELLANEOUS MASTIC -- -- ******* - NON FRIABLE
006 11 MISCELLANEOUS 12X12BG/RD TILE -- -- ******* - NON FRIABLE
007 llA MISCELLANEOUS MASTIC -- -- ******* - NON FRIABLE
·~~ M!O"""'""~·"·
REPORT DATE 03/28/94 TABLE2 PAGE 8
SAMPLE SUMMARY BY BUILDING
BLDG HOMO S~~PLE ROOM DESCRIPTION LOCATION SAMPLE RESULTS DAMAGE
AREA NO. NO. CHRYS AMOS CROC
68S 001 01 MAIN ENT l2Xl2 TN/WH TIL BEHIND DOOR ND ND ND NONE
002 OlA MAIN ENT MASTIC UNDER 12X12 TN/WHITE FLR TILE 07 ND ND NONE
003 02 2NDFLLOC 9X9 DK ERN TILE WEST WALL NEAR LOCKERS 03 ND ND NONE
004 02A 2NDFLLOC MASTIC UNDER 9X9 DK ERN FLR TILE 1S ND ND NONE
DOS 03 ROOM 140 12X12 RD/BR TIL HW CORNER OF ROOM ND ND ND NONE
006 03A ROOM 140 MASTIC UNDER 12X12 RED/BRN FLR TILE OS ND ND NONE
007 04 MECH RM AC WASH HOLD TK NORTH END OF TANK ND ND ND NONE
OS .. MECH RM AC WASH HOLD TK SOUTH END OF TANK ND ND ND NONE
06 MECH RM AC WASH HOLD TK SOUTH END OF TANK ND ND ND NONE
008 07 MECH RM FLR HT EXP TANK NORTH END OF T~K 25 1S HD HONE
08 MECH RM FLR HT EXP TANK FRONT OF TANK NA NA NA NONE
09 MECH RM FLR HT EXP TANK SOUTH END OF TANK NA NA NA NONE
009 10 MECH RM DOM WTR LINE NE CORNER OF ROOM 05 ND ND NONE
11 MECH RM DOM WTR LINE SW CORNER OF ROOM NA NA NA NONE
12 MECH RM DOM WTR LINE NE CORNER OF ROOM NA NA NA NONE
010 13 MECH RM DOM WTR FITTING NE CORNER OF ROOM 25 10 ND NONE
14 MECH RM DOM WTR FITTING SW CORNER OF ROOM NA NA NA NONE
15 MECH RM DOM WTR FITTING NE CORNER OF ROOM NA NA NA NONE
011 16 MECH RM FLR HEAT EXCHER WEST WALL 25 10 ND NONE
17 MECH RM FLR HEAT EXCHER WEST WALL NA NA NA NONE
18 MECH RM FLR HEAT EXCHER WEST WALL NA NA NA NONE
012 19 MECH RM AC WASH SYS FIT CENTER OF ROOM ND ND ND NONE
20 MECH RM AC WASH SYS FIT CENTER OF ROOM ND ND ND NONE
21 MECH RM AC WASH SYS FIT CENTER OF ROOM ND ND ND NONE
013 34 MECH RM LO PRES STM FIT SW CORNER OF ROOM NA NA NA NONE
22 MECH RM TRACK HEAT EXCR NW CORNER OF ROOM 30 20 ND NONE
23 MECH RM TRACK HEAT EXCR NW CORNER OF ROOM NA NA NA NONE
24 MECH RM TRACK HEAT EXCR NW CORNER OF ROOM NA NA NA NONE
014 25 MECH RM TRK HET EXPANTK NW CORNER OF ROOM 25 20 ND NONE
26 MECH RM TRK HET EXPANTK NW CORNER OF ROOM NA NA NA NONE
27 MECH RH TRK HET EXPANTK NW CORNER OF ROOM NA NA NA NONE
SKD PROJECT Is 9l-0485.635 CL ID"l' t l:tl >.Ill Mr.IOKAL QDRD
CL Iml'7' P'llOJKC'l' t MlD • -B'r. P ADL UCi1
BLDG 68!1
IWIPLK
"""""" SAMPLE D§SClt!P'fiOR MD LOC'ATIDK
685-01 12 x ll 'Dll vrm w:rr:s I'LOOR fi:l.i:
:mJ8T ~008 VITQUT
685-QU. IWn'IC Bl.A£'X :o:BIBOUS ~
685-02 !iiX9DABJt~F'r
D.lRX llROWlf CDOOITITIOOS NATKiUAL
685-02.8. IW!TIC
liLAC!< """UOUII ~
695-QJ 1lX12 mm vrm lUIOWlf n
'""''""" ~ITIOUB~
605-0JA IWITIC
Bl..ll3. RBBUIOOS ~
GS5-0. WASB ST8TBK .BOLDDCJ ~
WHitt POWDKJr! MATJDU.AL
68!1-07 'DDDI:MAL DBIJI.A!l"'QII J'JOC FLOOR HEM' EXPAliBIOR '!rA!il\; F:t:aa:lOS, POWDKRX
665-10 'l'H.E.RMAL IJISUI.AnOR 011 DCIIXB".fiC WJLrER LD!E7 lmOlOI YI:llROUS JO.l'lmiAL f:i85-ll MlJDDED '.l'llJl:RMAL XBBUI..U'IOR 011 DCHBBTIC 1IU'BR 'Prri'I1fO; J':rBROUB, PCftJDE:RI M•or!'IIUT
685-115 '1'BXRMAL DIBUL.M"IOll QJf FLOOR ImM'
JlaCllAIOQJI:R' FIJJBOOS 1 POWDXRY MM!ERIAL
685-19 )BJ'DDBD ~ Dl~IOK l'RCH AJ:RCMP"l' 1QBB BTB!ID. YrrrtlfQ; """""' """"""" IIHI!liL\lo
685-ll DERMAL t:BHUI..a::rica ncM ~ 1IRAX ~<l<CBU<:l~Jl7 WI'n: POWDERY MATIOUAL
685-l5 mERKUo IJISUL,l!riQII PlQII ttACX :mr.M' KXPDBICll!l D.JIX; l'nlllOUB, POIIDElU' KAniWIL
~~"!?""!": AJil) DKBIGII
- IIi TtU!J U!Jl1190
PXI\CXliTAalt """ 'l'nl. AJil) ' a. Ol'BXR 'n'PE OF ASDBSTOB MA.10R PIDKR TYPES
C!<f.Ll1LOIIl< ( s' )
7> C!IRYSC1rn.E
J' cmrt SOl'J:Lll:
l!'i\ CHRYBO'.l'll.B
5" c:mu: sari I.E cn.r.trLOBll: ( 2 0\ )
:z 5' emU' BC7l'IlJl QLAS8 llOOL ( 5' ) 15\ JJ«lSI'n
5\ CBRYBO'l'IL..i CXLLULOSX (60t.)
lS\ Clil0'80'l'ILX t:EI.I.tJI.OSB ( 5" ) lOt. AHDBITE
2 5\ CHm'SO'riLE I(I:1lDAL WOOL { .5\) 10\ !.!t:)SI'l'X CBI.LULOBB ( 5t.)
<:LABS liCX)L ( 2 5' )
30\ = sariLB CELL l.ILOBR ( .5 \ ) 20\ """"""" 25\ CBRrsortLl! CELLUI.OSX ( 5\ )
20\ AHOSITK
BI~J
D.J!I'1i: RKClUVXDt Ol/l1/!i14 DAD AJU.LYDDt 02/18/!i14 DA'I:K ~t Ol/18/!ild onnm ....,"" mTAL PERCX~r'l:AQE I<ATIOUAL TYJ'l!S WBBI!TOO COII'l'B1I'I
SAlOl, DDiDBR Ji()R:2: DB"''EC'l'liD l!XBDl ' SAHO, BIHIIEll 3
"""rn 15
QUAJ'(.['Z, BIIIDXR HONK DRTKC'!m)
JIBS Ill 5
VERKICUI. ITK,
"""" DE'l'llCTl'W
MICA, PAIR':r, BIMDBR
BDIDXR •o
PA.IR'l', :RXSIR, 5 BIRDK!l
PAIRT, BIHDKR 35
PAIRT 1 BIRDBR 35
PA.nn' 1 BIJiDRR BOllE DB"l'BCTXD
PAINT, BINDKR so
PA.IR'l', .B nmxa ., SMD PROJECT 1: 92-0465~640
CLIENT: ND AIR NATIONAL GUARD
CLIENT PROJECT: MN - ST.PAUL ANG
DUILDING 685
8AMPLE
NUM11ER
605-05
685-06
685-20
685-21
SAMPLE DESCRIPTION AND LOCATION
THE:RKAI. INSULATION - AIRCRAFT WASHING
SYSTEM BOLDING TANK
OFF-WHITE POWDERY MATERIAL
'l'HERMAL INSULATION - AIRCRAFT WASHING
SYSTEM HOLDING TANK
OFF-WBI'l'E POWDERY XATERLAL
MUDDED THERMAL INSULATION ~ AIRCRAFT
WASHING SYSTEM FITTING
OFF-WHITE POWDERY MATERIAL
MUDDED THERXAL INSULATION - AIRCRAFT
WASHING SYSTEM FITTING
OFF-WHITE PoWDERY MATERIAL
SURVEY MANAGEMENT AND DESIGN
2506 35th Avenue Southwest Fargo, Nortb Dakota 58104 Ph. (701) 234-9556 Fax (701) 2BO-l6go
LABORAToRY REPORT
BULK SAMPLE ANALYTICAL RESULTS
TABLE ..1
PAGE ..J.
PERCENTAGE AND
TYPE OF ASDESTOS
TYPE AND \ OF OTHER
MAJOR FIBER TYPES
CELLULOSE 30\
cELLULOSE JO\
GLASS WOOL 25\
CELLULOSE 5%
GLASS WCX)L 25\
CEI.LUI.OSE 5\
DATE RECErvED: 02/23/94
DATE ANALYZED: 02/24/94
DATE REPORTED; 02/24/94
a:rtlER MAJOR TOTAL PERCENTAGE MATERIAL TYl'ES ASDESTO.S CONTENT
DINDER NONE DE'l'ECTliD
VRRM.ICULI'l'E
BINDER NONE DETECTED
VERMICULI'l'E
BINDER NONE DETECTED
BINDRR NONE DETECTED
ANALYST: Dean J'ordheim
I
I I I I I I I I I I
SECTION 01 1000
SUMMARY
PART 1 GENERAL
1.01 PROJECT
A. Project Name: Repair Hangar & Shops, Bldg. 685.
B. Contracting Officer's Representative: Colleen Dalquist.
C. The Project consists the remodeling of an approximately 36,508 SF existing building.
D. Construction includes: demolition, site work, landscaping, concrete, masonry, steel structure, roofing, interior construction and finishes, fire suppression, mechanical systems and electrical systems.
1.02 CONTRACT DESCRIPTION
A. Contract Type: A single prime contract based on a Stipulated Price.
1.03 DESCRIPTION OF WORK
A. The Project consists of remodeling interior areas of the building, replacing exterior windows, refurbishing hangar door and adding fire suppression and detection system.
B. Scope of demolition and removal work is shown on drawings and specified in Section 02223.
C. Scope of alterations work is shown on drawings.
D. Plumbing: Alter existing and add new construction.
E. HVAC: Alter existing and add new construction.
F. Electrical Power and Lighting: Alter existing and add new construction.
G. Fire Suppression Sprinklers: Replace existing system with new construction
H. Fire Alarm: Alter existing and add new construction.
I. Communications: Alter existing and add new construction.
1.04 WORK BY OWNER
A. The Government will remove any known existing hazardous material prior to contractor mobilization and arrange for the removal of any additional hazardous material uncovered during contractor demolition/construction.
B. Items noted GFGI (Government Furnished Government Installed) will be supplied and installed by MNANG before Substantial Completion. Refer to the Equipment noted as GFGI on Plan Sheets.
C. Cable TV, telephone, data wiring and connections.
1.05 OWNER OCCUPANCY
A. Government intends to vacate the Facility prior to the start of construction period.
B. Government intends to occupy the Project upon Final Completion.
C. Cooperate with Contracting Officer's Representative to minimize conflict and to facilitate Contracting Officer's Representative operations.
1.06 CONTRACTOR USE OF SITE AND PREMISES
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
01 1000 - 1
A. Construction Operations: Limited to areas noted on Drawings.
B. Provide access to and from site as required by law and by Contracting Officer's Representative:
C. Existing building spaces may be used for storage.
D. Time Restrictions:
1. Limit conduct of work to the hours of 6:00 a.m. - 5:00 p.m.
E. Limit shutdown of utility services to 2 hours at a time, arranged at least 48 hours in advance with Contracting Officer's Representative's Representative.
1. Schedule outages on Government flex days whenever possible.
2. Prevent accidental disruption of utility services to other facilities.
1.07 WORK SEQUENCE
A. Coordinate construction schedule and operations with Contracting Officer's Representative.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
01 1000 - 2
SECTION 01 2200
UNIT PRICES
PART 1 GENERAL
1.01 SECTION INCLUDES
A. List of unit prices, for use in preparing Bids.
B. Measurement and payment criteria applicable to Work performed under a unit price payment method.
1.02 RELATED SECTIONS
A. Section 03 5400 - Cast Underlayment. Self-Leveling Floor Underlayment floor preparation.
1.03 COSTS INCLUDED
A. Unit Prices included on the Bid Form shall include full compensation for all required labor, products, tools, equipment, plant, transportation, services and incidentals; erection, application or installation of an item of the Work; overhead and profit.
1.04 UNIT QUANTITIES SPECIFIED
A. Quantities indicated in the Bid Form are for bidding and contract purposes only. Quantities and measurements of actual Work will determine the payment amount.
1.05 MEASUREMENT OF QUANTITIES
A. Mark areas selected. Take all measurements and compute quantities. Measurements and quantities will be verified by Contracting Officer's Representative.
B. Measurement by Volume: Measured by cubic dimension using mean length, width and height or thickness.
1.06 PAYMENT
A. Payment for Work governed by unit prices will be made on the basis of the actual measurements and quantities of Work that is incorporated in or made necessary by the Work and accepted by the Contracting Officer, multiplied by the unit price.
B. Payment will not be made for any of the following:
1. Products wasted or disposed of in a manner that is not acceptable.
2. Products determined as unacceptable before or after placement.
3. Products not completely unloaded from the transporting vehicle.
4. Products placed beyond the lines and levels of the required Work.
5. Products remaining on hand after completion of the Work.
6. Loading, hauling, and disposing of rejected Products.
C. Contract sum will be adjusted by Change Order in accordance with the unit prices.
1.07 SCHEDULE OF UNIT PRICES
A. Item: 1; Section 03 5400 - Self-Leveling Underlayment. Unit Price per cubic feet
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
01 2200 - 1
SECTION 01 2300
BID OPTIONS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Description of Base Bid and Bid Options.
1.02 ACCEPTANCE OF BID OPTIONS
A. Bid Options quoted on Bid Forms will be reviewed and accepted or rejected at Contracting Officer's Representative's option. Accepted Bid Options will be identified in the Owner-Contractor Agreement.
B. Coordinate related work and modify surrounding work to integrate the Work of each Bid Option.
1.03 BASE BID WORK
A. All Work not otherwise called for in the Schedule of Bid Options, shall be included in Base Bid.
1.04 SCHEDULE OF BID OPTIONS
A. Bid Option No. 1 - CASEWORK
1. Add upper wall cabinets at rooms 136. Refer to Drawings and Specifications for details and materials
2. Add Shelving at rooms 105A. Refer to Drawings and Specifications for details and materials
3. Window stools to be solid surface material in lieu of plastic laminate. Refer to drawings and Specification Section 06 6500 - Solid Polymer Fabrications.
4. Countertop, room 136 to be solid surface material in lieu of plastic laminate. Refer to drawings and Specification Section 06 6500 - Solid Polymer Fabrications.
B. Bid Option No. 2 - LOCKERS
1. Add Lockers and Locker Benches, rooms 103C and 104A.
2. Refer to Drawings and Specification Section 10 5120.
C. Bid Option No. 3 - FLOOR COATING AND FINISHES
1. Provide Fluid Applied Flooring at Hangar Bay 101. Refer to Finish Schedule and
Specification Section 09 6700.
2. Provide Fluid Applied Flooring at Shops. Refer to Finish Schedule, Sheet A9.01 for locations and Specification Section 09 6700.
3. Provide Rubber Flooring (FAF.4) in Tire Shop. Refer to Finish Schedule, Sheet A9.01 and
Specification Section 09 6700.
4. Provide epoxy paint (PT.7) in lieu of sealed concrete floors. Refer to Finish Schedule Sheet
A9.01.
5. Prepare and paint Hangar Bay 101, walls/structure and ceiling. Refer to Finish Schedule, Sheet A9.01.
D. Bid Option No. 4 - ADDITIONAL WINDOWS
1. Provide additional windows and additional translucent panels. Refer to Drawing A3.01 for locations. Window stools to be solid surface.
2. Provide louver blinds for additional windows. Refer to Specification Section12 2116.
E. Bid Option No. 5 - EQUIPMENT & ACCESSORIES
1. Add Corner Guards. Refer to Drawings and Specification Section 10 2601.
2. Add Visual Display Boards. Refer to Drawings and Specification Section 10 1101.
3. Add Projection Screens. Refer to Drawings and Specification Section 11 5213. Include electric rough-in with Base Bid.
4. Add Plastic Signs. Refer to Specification Section 10 1440.
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
01 2300 - 1
5. Add Vertical louver blinds. Refer to Room Finish Schedule Sheet A9.01 and Specification Section 12 2116.
F. Bid Option No. 6 - LANDSCAPING
1. Provide and install landscaping. Refer to Drawing L1.00 and Specification Section 32 9300.
G. Bid Option No. 7. - VARIABLE SPEED FIRE PUMP CONTROLLER
1. At both fire pumps, replace the soft start controller with variable speed pump controller.
Refer to Drawing Sheet FP1.06 and Specification Section 21 3000.
H. Bid Option No. 8 - COMMUNICATIONS & ELECTRICAL
1. Add Communications Cabling. Refer to Drawing Sheet E2.02 for locations and Specification
Section 27 1034.
2. Provide Monorail Hoist and Trolley. Refer to Drawings and Specification Section 14 6400.
Monorail beam and electrical rough-in to be included in Base Bid. Wiring in Bid Option.
3. Provide and install monitor mounts. Refer to Drawings and Specification Section 11 5250.
Blocking and electrical rough in to be provided in Base Bid.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED
END OF SECTION
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
01 2300 - 2
SECTION 01 3000
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.01 SECTION INCLUDES
A. Preconstruction meeting.
B. Progress meetings.
C. Construction progress schedule.
D. Submittals for review, approval and acceptance:
1. Sections Containing Product Data Submittals Requirements - 2 pages
2. Sections Containing Shop Drawing Requirements - 2 pages
3. Sections Containing Samples Requirements - 1 page
4. Sections Containing Professional Engineer Design Requirements - 1 page
5. Sections Containing Manufacturer Qualifications Requirements - 2 pages
6. Sections Containing Installer Qualifications Requirements - 1 page
7. Sections Containing Special Warranty Requirements - 1 page
8. Sections Containing Mockup Requirements - 1 page
9. Sections Containing Pre-Installation Meeting Requirements - 1 page
10. Sections Containing Extra Materials Requirements - 1 page
11. Sections Containing Field Testing - 1 page
12. Sections Containing Certificate Requirements - 1 page
13. Sections Containing Project Record Documents Requirements - 1 page
14. Sections Containing Operation and Maintenance Data Requirements - 1 page
1.02 PROJECT COORDINATION
A. Project Coordinator: Contracting Officer's Representative.
B. Cooperate with the Contracting Officer in allocation of mobilization areas of site; for field offices and sheds, for access, traffic, and parking facilities.
C. During construction, coordinate use of site and facilities through the Contracting Officer.
D. Comply with Contracting Officer's procedures for intra-project communications; submittals, reports and records, schedules, coordination drawings, and recommendations; and resolution of ambiguities and conflicts.
E. Make the following types of submittals to the Contracting Officer:
1. Requests for interpretation.
2. Requests for substitution.
3. Shop drawings, product data, and samples.
4. Test and inspection reports.
5. Design data.
6. Manufacturer's instructions and field reports.
7. Applications for payment and change order requests.
8. Progress schedules.
9. Coordination drawings.
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION
3.01 PRECONSTRUCTION MEETING
A. Contracting Officer will schedule a meeting after Notice of Award.
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
01 3000 - 1
B. Attendance Required:
1. Contracting Officer's Representative.
2. Architect
3. Contractor.
C. Agenda:
1. Execution of Contracting Officer's Representative-Contractor Agreement.
2. Submission of executed bonds and insurance certificates.
3. Distribution of Contract Documents.
4. Submission of list of Subcontractors, list of Products, schedule of values, and progress schedule.
5. Designation of personnel representing the parties to Contract, MnANG Base
Representatives and Contracting Officer.
6. Procedures and processing of field decisions, submittals, substitutions, applications for payments, proposal request, Change Orders, and Contract closeout procedures.
7. Scheduling.
3.02 PROGRESS MEETINGS
A. Schedule and administer meetings throughout progress of the Work at maximum bi-weekly intervals.
B. Contracting Officer will make arrangements for meetings, prepare agenda with copies for participants, preside at meetings.
C. Attendance Required: Job superintendent, major Subcontractors and suppliers, Contracting Officer's Representative, Architect, as appropriate to agenda topics for each meeting.
D. Agenda:
1. Review minutes of previous meetings.
2. Review of Work progress.
3. Field observations, problems, and decisions.
4. Identification of problems that impede, or will impede, planned progress.
5. Review of submittals schedule and status of submittals.
6. Maintenance of progress schedule.
7. Corrective measures to regain projected schedules.
8. Planned progress during succeeding work period.
9. Maintenance of quality and work standards.
10. Effect of proposed changes on progress schedule and coordination.
11. Other business relating to Work.
3.03 CONSTRUCTION PROGRESS SCHEDULE
A. Within 10 days after date of the Agreement, submit preliminary schedule defining planned operations for the first 60 days of Work, with a general outline for remainder of Work.
1. Schedule to be Contractor prepared and Contractor maintained Critical Path Method (CPM)
Construction Schedule using arrow diagramming method.
B. If preliminary schedule requires revision after review, submit revised schedule within 10 days.
C. Within 20 days after review of preliminary schedule, submit draft of proposed complete schedule for review.
1. Include written certification that major Subcontractors have reviewed and accepted proposed schedule.
D. Submit updated schedule with each Application for Payment.
1. CPM may be used in lieu of AF Form 3064, Construction Progress Schedule, if approved by Contracting Officer with mechanism in place to validate percentage of completion for
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
01 3000 - 2 verifying payment.
3.04 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product data.
2. Shop drawings.
3. Samples for selection.
4. Material Specification
5. Equipment Specification
6. Samples for verification.
7. Certificate of conformance.
8. Warranty
B. Where building components or systems require specific preventative maintenance actions to maintain their warranty those requirements shall be specifically stated by the contractor in a letter. If no requirements exist, the contractor's letter will state that there are no owner preventive maintenance actions necessary to maintain these warranties.
C. A Consolidated List of Submittals is attached to this Document Section.
1. The attached Consolidated List of Submittals is a only a summary of the requirements included within Division 2 through Division 16.
2. In any instance where there is variance between the Consolidated List of Submittals and the requirements contained in Division 2 through Division 16, the requirements contained in the individual specification sections prevail.
3. Division 1 requirements may be superceded by Federal Contracting Requirements.
a. Reference the appropriate Federal Contract Clause for further guidance.
3.05 SUBMITTALS FOR INFORMATION
A. When the following are specified in individual sections, submit them for information:
1. Design data.
2. Sustainable Design submittals and reports.
3. Certificates.
4. Test reports.
5. Inspection reports.
6. Manufacturer's instructions.
7. Manufacturer's field reports.
8. Other types indicated.
B. Submit for Contracting Officer's knowledge as contract administrator or for Contracting Officer's Representative.
3.06 SUBMITTALS FOR PROJECT CLOSEOUT
A. When the following are specified in individual sections, submit them at project closeout:
1. Project record documents.
2. Operation and maintenance data.
3. Warranties.
4. Bonds.
5. Other types as indicated.
B. Submit for Contracting Officer's Representative's benefit during and after project completion.
C. Provide a summary sheet of all extended warranties that differs from the government standard one year warranty
3.07 NUMBER OF COPIES OF SUBMITTALS
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
01 3000 - 3
A. Documents for Review, or Information:
1. Submit in electronic format (pdf) one (1) copy.
2. Where electronic format is not possible, submit in hard copy, the number of copies the contractor requires plus (2) total to be retained by the Contracting Officer and Architect.
B. Documents for Project Closeout: Submit per Section 01 7800.[]
C. Samples: Submit the number specified in individual specification sections; one of which will be retained by Contracting Officer.
1. Retained samples will not be returned to Contractor unless specifically so stated.
3.08 SUBMITTAL PROCEDURES
A. Transmit each submittal with approved form.
B. Sequentially number the transmittal form. Revise submittals with original number and a sequential alphabetic suffix.
C. Identify Project, Contractor, Subcontractor or supplier; pertinent drawing and detail number, and specification section number, as appropriate on each copy.
D. Apply Contractor's stamp, signed or initialed certifying that review, approval, verification of Products required, field dimensions, adjacent construction Work, and coordination of information is in accordance with the requirements of the Work and Contract Documents.
E. Deliver submittals to Contracting Officer at business address.
F. Schedule submittals to expedite the Project, and coordinate submission of related items.
G. For each submittal for review, allow 15 days excluding delivery time to and from the Contractor.
H. Identify variations from Contract Documents and Product or system limitations that may be detrimental to successful performance of the completed Work.
I. Provide space for Contractor and Contracting Officer review stamps.
J. When revised for resubmission, identify all changes made since previous submission.
K. Distribute copies of reviewed submittals as appropriate. Instruct parties to promptly report any inability to comply with requirements.
L. Submittals not requested will not be recognized or processed.
END OF SECTION
MnANG 133rd AW Repair Hangar & Shops Bldg. 685
01 3000 - 4
MnANG Repair Hangar & Shops Bldg 685 Page - 1
SECTIONS CONTAINING SUBMITTALS REQUIREMENTS
Product Shop
Data Drawings Samples
PRODUCT REQUIREMENTS
01 6116 - VOLATILE ORGANIC COMPOUND (VOC) CONTENT
RESTRICTIONS
Y N N
LIFE CYCLE ACTIVITIES
01 9113 - GENERAL COMMISSIONING REQUIREMENTS Y N N
DIVISION 02 – EXISTING CONDITIONS
02 4116 - BUILDING DEMOLITION Y N N
DIVISION 03 - CONCRETE
03 2000 - CONCRETE REINFORCING N Y N
03 3000 - CAST-IN-PLACE CONCRETE Y N N
03 3900 - CONCRETE CURING Y N N
03 5400 - CAST UNDERLAYMENT Y N N
DIVISION 04 - MASONRY
04 2001 - MASONRY VENEER Y N Y
04 2731 - REINFORCED UNIT MASONRY Y Y N
DIVISION 05 - METALS
05 1200 - STRUCTURAL STEEL FRAMING N Y N
05 3100 - STEEL DECKING Y Y N
05 5000 - METAL FABRICATIONS N Y N
05 5213 - PIPE AND TUBE RAILINGS N Y N
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 4100 - ARCHITECTURAL WOOD CASEWORK Y Y Y
06 6450 - FIBERGLASS REINFORCED PLASTIC PANELS Y N Y
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 2100 - THERMAL INSULATION Y N N
07 2114 - SPRAYED FOAM INSULATION FOR BUILDING
ENVELOPE
Y N N
07 2620 - UNDER-SLAB VAPOR RETARDER Y N Y
07 4213 - METAL WALL PANELS Y Y Y
07 6100 - SHEET METAL ROOFING, FLASHING & TRIM Y Y Y
07 8400 - FIRESTOPPING Y N N
07 9005 - JOINT SEALERS Y N N
MnANG Repair Hangar & Shops Bldg 685 Page - 2
DIVISION 08 - OPENINGS
08 1113 - HOLLOW METAL DOORS AND FRAMES Y Y N
08 3100 - ACCESS DOORS AND PANELS Y N N
08 3323 - OVERHEAD COILING DOORS Y Y N
08 3613 - SECTIONAL DOORS Y Y Y
08 4313 - ALUMINUM-FRAMED ENTRY Y Y Y
08 4500 - TRANSLUCENT WALL AND ROOF ASSEMBLIES Y Y N
08 5113 - ALUMINUM WINDOWS Y Y Y
08 7100 - DOOR HARDWARE N Y Y
08 8000 - GLAZING Y N Y
08 9100 - LOUVERS Y Y N
DIVISION 09 -…