Attachment 1 - SOW-High Density Mobile Storage v5 Revised.pdf
PDF 214 KB Posted
- Attached to
- High Density Mobile Storage System - Amendment 02 Federal contract opportunity
- Solicitation number
- W912LC-25-Q-0014
About this file
This is a Statement of Work for a high-density mobile storage system to be installed at the Colorado Army National Guard's Field Maintenance Shop 7 (FMS 7) in Watkins, CO. The project requires procurement, delivery, and installation of new storage units that facilitate seamless access, security, filing, and stowage for tools, reparable parts, office supplies, and secure filing.
The system specifications include 12 double-sided mobile carriages and 2 double-sided static platforms, with mechanical assist controls on both ends capable of withstanding 800 lbs per linear foot loading. The installation requires four different elevations of storage units, with specific configurations of shelves, drawers, and lockable roll-up doors. Four units must be lockable with metal rolling security gates and mechanical assist rotating spin handles. Installation must be completed within 10 business days by certified installers, with minimal disruption to facility operations. The vendor must provide a 30-day warranty for improper installation and submit invoices through Wide Area Workflow (WAWF). The facility operates Tuesday to Friday from 0630 to 1700, and site access must be coordinated through on-site Government personnel.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 6 - Illustration of Need_High Density System.pdf | ||
| Attachment 1 - SOW-High Density Mobile Storage v5 Revised.pdf | ||
| Amendment 02_W912LC-25-Q-0014 High Density Mobile Storage Combo.pdf | ||
| Attachment 1 - SOW-High Density Mobile Storage v4 Revised.pdf | ||
| Questions_Answered_W912LC-25-Q-0014.pdf | ||
| Attachment 2 - Q-0014 Clauses and Provisions.docx | DOCX document | |
| Attachment 5 - Site Visit-Instructions.docx | DOCX document | |
| W912LC-25-Q-0014 High Density Mobile Storage Combo.pdf | ||
| Attachment 1 - SOW-High Density Mobile Storage v3.docx | DOCX document | |
| Attachment 4 - Installation Area P1.jpg | JPG image | |
| Attachment 3 - Installation Area P2.jpg | JPG image |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
High Density Mobile Storage System
COLORADO ARMY NATIONAL GUARD
WATKINS, CO | FISCAL YEAR 25
REVISION 5 dated February 5, 2025
PURPOSE STATEMENT
Field Maintenance Shop 7 (FMS 7) located at 5049 Front Range Parkway, Watkins, CO 80137 requires storage units that facilitate seamless access, security, filing, and stowage. Areas that necessitate attention for more unified storage of materials include tools, reparable parts, office supplies, and secure filing. The high-density mobile storage compartments need to be installed with minimal interruption to workflow for the maintenance facility. The maintenance facility will be operational during the installation of the storage unit; however, will accommodate the Contractor during the different phases of the installation. A total shutdown of the maintenance shop should be avoided, if possible.
SCOPE OF WORK
The vendor will develop a quote specific to the available area location at Watkins, CO. As well build, ship, install all equipment, and cleanup of site after installation is completed. A breakdown of required equipment is listed under the “Requirements” and “Salient Characteristics” section. The vendor will warranty their work as required under the “Service and Warranty” section.
PLACE OF PERFORMANCE
FMS 7 is located in a secure, fenced-in facility at 5049 Front Range Parkway, Watkins, CO 80137. Site access will be coordinated prior to any site visits through on-site Government employee. The employee will be responsible for monitoring installation access and monitoring activities during the course of installation. Facility hours are from 0630 to 1700 Tuesday to Friday.
REQUIREMENTS
• Procurement and delivery of all materials required for the completion of this project.
• All labor required for delivery, material offloading, material installation, service work, and warranty work. Labor includes any work required to install storage system.
• All work shall be completed within 10 business days or less, once installation of the storage system begins.
• New Equipment ONLY. NO USED OR REMANUFACTURED PRODUCTS WILL BE ACCEPTED.
• Contractor shall cleanup site after installation is completed.
• The system will be installed onto a concrete floor, surface mounted, not recessed.
• The system will be dual entry (meaning a person can access each carriage aisle from both sides of the storage unit) and need the ability to lock into the concrete on both sides.
• There are no specific seismic requirements or seismic calculations required
SALIENT CHARACTERISTICS
• The carriages of each unit will be operated with mechanical assist controls. Mechanical assist controls shall be on both ends (sides) of the carriages.
• Carriages shall be capable of withstanding loading of at least 800 lbs. per linear foot.
• Quantity 12 double sided mobile carriages
• Quantity 2 double sided static platforms
• Complete mobile storage system should include the following elevations:
ELEVATIONS NEEDED: See Attachment 6
Elevation #1 – Eight (8) each: 76 ¼ high x 48” wide x 15” deep, with:
One shelf that is 11 ¼” high x 48” wide x 15” deep, with dividers One shelf that is 12 ¾” high x 48” wide x 15” deep, with dividers Four 12” drawers One lockable roll-up door 76” high x 96” wide
Elevation #2 - Twenty (20) each: 76 ¼” high x 48” wide x 15” deep, with:
Six shelves that are 9 ¾” high x 48” wide x 15” deep with dividers One shelf that is 11 ¼” high x 48” wide x 15” deep with dividers One lockable roll-up door 76” high x 96” wide
Elevation #3 - Twenty (20) each: 76 ¼” high x 48” wide x 15” deep, with:
One shelf that is 12 ¾” high x 48” wide x 15” deep with dividers One shelf that is 14 ¼” x 48” wide x 15” deep with dividers Three drawers that are 15” x 48” wide x 15” deep One lockable roll-up door 76” high x 96” wide
Elevation #4 - Six (6) each: 76 ¼” high x 48” wide x 30” deep, with:
One shelf that is 9 ¾” x 48” wide x 30” deep with dividers One shelf that is 11 ¼” x 48” wide x 30” deep with dividers Two shelves that are 12 ¾” x 48” wide x 30” deep with dividers One shelf that is 24 ¾” x 48” wide x 30” deep with dividers One lockable roll-up door 76” high by 96” wide
• Four of these storage units need to be lockable (One (1) on elevation #1, one (1) on elevation
#2, one (1) on elevation #3, and one (1) on elevation #4 as shown in attachment 6). The four that are lockable must have metal rolling security gates (tambour doors/shutter doors) on one side of the storage system to limit access to the system. Each of these storage systems must be movable with mechanical assist rotating spin handles. Locking mechanism installed on these storage units via a pin to floor, to prevent the opening of the system while in its closed secure position.
• Service and Warranty o Installation must be accomplished by a certified installer of the product offered to maintain manufacturer’s warranty.
o Vendor will warranty work due to improper installation for a minimum of 30 days after installation.
ACCEPTANCE
• All purchased equipment is to be shipped by the vendor.
• All equipment will be capable of the full range of manufacturer specified capabilities.
• Equipment will be damage free after installation.
PAYMENT
• Vendor must Invoice through Wide Area Workflow (WAWF)
• Vendor must be registered in WAWF to submit an invoice at https://wawf.eb.mil https://wawf.eb.mil/
File details come from the government source that posted it. Updated .