W912LA24Q0025_06E2427_Fresno Concrete Pad_Amend 03.pdf
PDF 163 KB Posted
- Attached to
- Concrete Pad at Fresno 1106th AVCRAD
- Solicitation number
- W912LA24Q0025
About this file
This document is an amendment to a solicitation for a federal contract to construct a concrete pad at a facility in Fresno, California. The key details are:
The purpose of this amendment is to answer questions asked by potential contractors. The questions and the government's responses cover topics such as the location of the new concrete pad, the need for surveying, safety requirements, stormwater pollution prevention plan requirements, and the need for a stabilized construction entrance. The government confirmed that there is no existing concrete pad to be demolished, and that the required work includes constructing a 5,460 square foot concrete pad with 5 inches of aggregate base. The contractor is responsible for filling out real property documents. The solicitation number is W912LA24Q0025 and the project is for the California Army National Guard.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF DEFENSE
NATIONAL GUARD BUREAU
US PROPERTY AND FISCAL OFFICER FOR CALIFORNIA
10601 BEAR HOLLOW DR
GOLD RIVER, CALIFORNIA 95670-6350
17 September 2024
SUBJECT: W912LA24Q0025, 06E2427, Fresno Concrete Pad Amendment 03, Q&A
1. The purpose of this amendment is to answer questions asked by. Questions/comments and the government’s respective responses are listed below.
(1) In order to locate the new slab, what is the distance of the starting point of slab from the existing building from existing building.
(a) Please confirm with stakeholder.
(2) Per section 01-30-00 Section 7.1 Pre-con meeting list survey control. Please confirm that contractor is to provide surveying.
(a) Contractor is responsible for survey.
(3) Per section 01-35-29 Safety section 1.2. Please confirm that the sections listed below all apply to this project1. SD-01 Preconstruction Submittals
(a) Accident Prevention Plan: Yes.
(b) Activity Hazard Analysis (AHA): Yes
(c) Crane Critical Lift Plan: Yes, if crane is to be used
(d) Site Safety Plan: Yes
(4) Per Section 01-35-43 Section 3.1. Please confirm that SWPP is required for this project.
(a) Yes. This project does meet the LID (i.e. Low Impact Development) requirements so minimum SWPP requirements will be applicable. Drain inlet protection and concrete washout plan, etc.
(5) Per Section 03-15-00 Water Stop. Please confirm that water stop in not required for this project or provide typical details. Per Section 31-25-00 3.5.B 3.5 STABILIZED CONSTRUCTION ENTRANCE PAD. Please confirm that this is required for this project. As the site is adjacent to existing paving, we do not feel that this is required. If so, please provide a rough sketch of the construction entrance pad,
(a) Neither the water stop nor he entrance pad are required for this project.
(6) Satellite imagery of the site shows a concrete pad in place. Is the contractor required to demolish existing pad?
(a) There is no concrete pad in place. There are removable pads currently in-place. These pads will be removed by the government prior to construction start.
2. If you have any additional questions, please contact the undersigned at Jackson.c.woods.civ@army.mi.
JACKSON WOODS, DAC, CAARNG
Contracting Officer
| 2024-09-17T10:52:05-0700 | |
| WOODS.JACKSON.CODY.1461618517 |