This document is a solicitation for a firm fixed-price contract to construct a concrete pad for the TASMG AVCRAD facility in Fresno, California. The contractor will install approximately 5,460 square feet of 3,000 psi concrete over 5 inches of aggregate base, slope the concrete to ensure proper drainage, and complete any necessary soil preparation. The contractor is also responsible for filling out real property documents. The solicitation is set aside for small businesses under NAICS code 237310 with a $45 million size standard. The total project cost is anticipated to be between $100,000 and $250,000. Quotes are due by September 19, 2024, and the performance period is 270 calendar days from the notice to proceed. The Department of the Army California Army National Guard is the procuring agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
W912LA24Q0025
USPFO CA PURCHASING AND CONTRACTING
10601 BEAR HOLLOW DR
RANCHO CORDOVA CA 95655
Fresno AVCRAD Concrete Pad
The purpose of this project is to construct a concrete pad (aprox. 5,460 Sq Ft) at Fresno, in accordance with the attached statement of work.
In accordance with FAR 36.204(b) Magnitude of Construction Projects, the price range of this project is anticipated to be between $100,000 and $250,000.
This requirement is being solicited 100% small business set-aside. The NAICS code for this acquisition is 237310 and the Small Business size standard is $45,000,000.00.
Funds are not presently available for this contract. Currently, the Government anticipates funds w ill become available prior to but no later than midnight 30 Sep 2024. This action has been identified on the National Guard priority list for award if funds become available and the prices received are within an awardable range.
See Item 7
W912LA
JACKSON C. WOODS 916-900-9065
06E2427
1 8508/21/2024
9/19/2024
2:00
52.211-10
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
W912LA24Q0025
Section 00 10 00 - Solicitation
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job 1106 AVCRAD Concrete Pad
FFP
The Contractor provide all plant, labor, material, transportation, tools, equipment, appliances , supplies, services, permits, insurance, and supervision to construct a concrete pad IAW UFC 3-250-04 and the included designs outside of building 06B60-12000 located at 5140 Dakota Avenue Fresno, CA. The work will include constructing a 5,460 sq ft pad 3000 psi 5” Portland Cement Concrete over 5” of ¾” aggregate base for butler building. Prep the soil to accept concrete and sub-base in accordance with attached specifications and drawings. Ensure concrete apron has a minimum of ¼” per foot slope. Slope concrete away from the building. All new work will ensure the existing level of safety within the facility is maintained or improved. The contractor is responsible for filling out the real property documents, forms 1354.
FOB: Destination
PSC CD: Y1BZ
NET AMT
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 270 dys. ANP 1 1106 AV GRP AUG TDA
CPT KRYSTAL ALEXANDER
5168 EAST DAKOTA AVE
FRESNO CA 93727
559-347-5502 FOB: Destination
W80RGC
CLAUSES INCORPORATED BY REFERENCE
52.204-6 Unique Entity Identifier OCT 2016 52.204-7 System for Award Management OCT 2018
52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.204-27 Prohibition on a ByteDance Covered Application JUN 2023 52.204-29 Federal Acquisition Supply Chain Security Act Orders--
Representation and Disclosures.
DEC 2023
52.204-30 Federal Acquisition Supply Chain Security Act Orders-- Prohibition.
DEC 2023
52.222-5 Construction Wage Rate Requirements--Secondary Site of the Work
MAY 2014
52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
FEB 1999
52.225-10 Notice of Buy American Requirement--Construction Materials
MAY 2014
52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-21 Specifications and Drawings for Construction FEB 1997 52.236-26 Preconstruction Conference FEB 1995 52.252-5 Authorized Deviations In Provisions NOV 2020 252.204-7016 Covered Defense Telecommunications Equipment or Services
-- Representation
DEC 2019
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.204-7024 Notice on the Use of the Supplier Performance Risk System MAR 2023 252.225-7059 Prohibition on Certain Procurements from the Xinjiang
Uyghur Autonomous Region - Representation
JUN 2023
252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region
JUN 2023
CLAUSES INCORPORATED BY FULL TEXT
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
(End of provision)
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/
(End of clause)
Section 00 21 00 - Instructions
INSTRUCTIONS TO OFFERORS
1.0 Description of the Project:
TASMG AVCRAD at Fresno, CA intends to issue a Request for Quote (RFQ) to award a single firm fixed price (FFP) contract for a concrete pad. Additional details are included in the provided Statement of Work. The contractor is responsible for providing all plant, labor, transportation, materials, tools, equipment, appliances, and supervision necessary.
2.0 Instructions to Offerors
2.1 You are invited to submit a quote to this Request for Quote W912LA24Q0025 – Fresno AVCRAD Concrete Pad.
2.2 As a result of this solicitation, the government intends to award an FFP contract to the offeror whose quotation, conforming to the requirements of the solicitation, will be most advantageous to the government considering only price.
2.3 This solicitation is set aside for small business under the North American Industry Classification Code 237310 With a size standard of $45,000,000.00
3.0 Evaluation for Award
3.1 The selection methodology for award for this solicitation will be made in accordance with FAR
Part 13 – Simplified Acquisition Procedures. The Award shall be made to the lowest priced offeror determined to be responsive to the requirements of the solicitation and whose price can be determined fair and reasonable. The government intends to evaluate quotes and award a contract without interactions with offerors. Therefore, the offerors’ initial quotes should contain the offerors’ best terms from a price standpoint. The government may however, conduct interchanges with one, some, or all offerors at its discretion, if the contracting officer later determines them to be necessary.
4.0 Notice of Site Visit
4.1 Interested parties will be permitted to visit the site prior to the submission of quotes, and an organized site visit has been scheduled for Thursday, August 129th @ 9:00AM PDT (see FAR 52.236-27 Alt I, “Site Visit (Construction)”). All interested parties are welcome to attend. Those who plan on attending should RSVP at least two (2) days prior to allow for adequate planning and coordination. RSVPs will be accomplished via email to jackson.c.woods.civ@army.mil RSVPs shall include the names of the personnel that plan to attend and what organization they represent.
4.2 Location: Visitors will meet at Visitor parking area on E Dakota Ave then all contractors will be escorted to 5168 E Dakota Avenue, Fresno CA 93727
4.3 Vehicles may be allowed on base. Vehicle allowance will be determined on the day of the site visit. Any vehicles allowed on base for site visit attendance will be subject to search. Vehicles may not have weapons or drug paraphernalia (to include marijuana) present as restricted by federal installations. Vehicle Registration, Driver License, and Proof of Insurance for vehicles must be current.
4.4 PLEASE NOTE. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. Questions will not be answered at the site visit. Any questions shall be sent to the contracting officer and will be answered via amendment and posted to SAM.gov. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
5.0 Formal Communications, Offeror Explanations
5.1 Submit all questions to the Contracting Office via email at the addresses shown below. Do NOT contact the Architect-Engineer (A-E) or Civil Engineering personnel directly. Doing so will only delay the response to your question(s). All questions shall be submitted via email and include the following information:
mailto:jackson.c.woods.civ@army.mil
To: jackson.c.woods.civ@army.mil; paul.n.ochs.mil@army.mil CC: ng.ngca.caarng.uspfo-construction@army.mil Subject: 06E2427 - Fresno Concrete Pad RFI
Body: [Inquiry]*
From: [Company Name] Address: [Company Address] Telephone: [Company Telephone]
*Inquiry: Please clearly state your question. If sent via an attachment, Microsoft Word documents are preferred to facilitate posting of answers to the master Q&A document.
5.2 Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their quote.
5.3 All questions and Requests for Information (RFI) should be received NOT LATER THAN 1600 (local) 30 August to ensure adequate time to develop response and draft amendment. Questions received after this date may be answered on a case-by-case basis. OFFERORS ARE STRONGLY
ENCOURAGED TO SUBMIT QUESTIONS EARLY IN THIS PROCESS.
6.0 Wage Determination:
Construction Wage Rates are applicable to this project are CA 20240018 dated 9 August 2024 for Fresno County, California. In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of this solicitation, it is the offeror’s responsibility to ensure the most recent determination is used in preparing the quote. An Amendment will not be issued prior to closing to change Wage Determination dates and/or numbers. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offeror’s that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised quotes solely to amend quotes due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404-5(c) (4) will apply. Applicable wage rates can be found at https://sam.gov/content/home.
7.0 Quote Preparation Expenses and Pre-Contract Costs:
This RFQ does not commit the Government to pay costs incurred in preparation and submission of quotes or for other costs incurred prior to award of a formal contract.
8.0 Removal of Sections at Time of Award:
Sections 00100 and 00600 will be physically removed as a result of an award but will be deemed to be incorporated by reference in that award.
9.0 Disposition of Unsuccessful Quotes
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful quotes.
10.0 Offeror Qualifications
To establish its responsibility, the apparent low offeror may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, their business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.
mailto:jackson.c.woods.civ@army.mil mailto:ng.ngca.caarng.uspfo-construction@army.mil https://sam.gov/content/home
Section 00 45 00 - Representations and Certifications
52.204-8 Annual Representations and Certifications MAY 2024 52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment
NOV 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-26 Covered Telecommunications Equipment or Services-- Representation.
OCT 2020
252.203-7005 Representation Relating to Compensation of Former DoD Officials
SEP 2022
252.204-7007 Alternate A, Annual Representations and Certifications NOV 2023 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
Section 00 70 00 - Conditions of the Contract
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
52.203-19 Prohibition on Requiring Certain Internal Confidentiality
Agreements or Statements
JAN 2017
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
JUN 2020
52.204-12 Unique Entity Identifier Maintenance OCT 2016 52.204-13 System for Award Management Maintenance OCT 2018 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
NOV 2021
52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities
DEC 2023
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.219-28 Post-Award Small Business Program Rerepresentation FEB 2024 52.222-3 Convict Labor JUN 2003 52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and
Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility MAY 2014 52.222-21 Prohibition Of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEP 2016
52.222-27 Affirmative Action Compliance Requirements for Construction
APR 2015
52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-50 Combating Trafficking in Persons NOV 2021 52.222-55 Minimum Wages for Contractor Workers Under Executive
Order 14026
JAN 2022
52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2024 52.223-20 Aerosols MAY 2024 52.225-9 Buy American--Construction Materials OCT 2022 52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 (Dev) Individual Surety--Pledge of Assets (DEVIATION 2020-
O0016)
FEB 2021
52.232-5 Payments under Fixed-Price Construction Contracts MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award
Management
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
MAR 2023
52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.249-1 Termination For Convenience Of The Government (Fixed
Price) (Short Form)
APR 1984
52.249-10 Default (Fixed-Price Construction) APR 1984 52.252-6 Authorized Deviations In Clauses NOV 2020 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors JAN 2023 252.204-7012 Safeguarding Covered Defense Information and Cyber
Incident Reporting
MAY 2024
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
JAN 2023
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2023
252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or
Hazardous Materials
SEP 2014
252.225-7012 Preference For Certain Domestic Commodities APR 2022 252.225-7048 Export-Controlled Items JUN 2013 252.225-7966 (Dev) Prohibition Regarding Russian Fossil Fuel Business
Operations - Representation (Deviation 2024-O0006).
MAR 2024
252.225-7967 (Dev) Prohibition Regarding Russian Fossil Fuel Business Operations (Deviation 2024-O0006).
MAR 2024
252.225-7972 (Dev) Prohibition on the Procurement of Foreign-Made Unmanned Aircraft Systems (DEVIATION 2020-O0015)
MAY 2020
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports
DEC 2018
252.232-7006 Wide Area WorkFlow Payment Instructions JAN 2023 252.232-7010 Levies on Contract Payments DEC 2006 252.236-7000 Modification Proposals-Price Breakdown DEC 1991 252.236-7001 Contract Drawings, and Specifications AUG 2000 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Products or Commercial
Services
NOV 2023
252.244-7000 Subcontracts for Commercial Products or Commercial Services
NOV 2023
252.247-7023 Transportation of Supplies by Sea JAN 2023
CLAUSES INCORPORATED BY FULL TEXT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within ten calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 270 calendar days after notice to proceed.
52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000)
(a) The Contractor shall submit one of the following payment protections:
Payment bond
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
Section 00 73 00 - Supplementary Conditions
ANTI TERRORISM/OPSEC
1. AT Level I training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I Awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 30calendar days after completion of training by all employees and subcontractor personnel. AT level I Awareness training is available at the following website:
http://jko.jten.mil
2. For contractors that do not require CAC, but require access to a DoD facility or installation.
Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (Army Directive 2014‐05/AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative); or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
3. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub‐contractors shall brief all employees on the local iWATCH Army program (training standards provided by the requiring activity ATO). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 30 calendar days after contract award.
4. For contracts that require OPSEC Training. Per AR 530‐1, Operations Security, the contractor employees must complete Level I OPSEC Awareness training. New employees must be trained within 30 calendar days of their reporting for duty and annually thereafter http://jko.jten.mil/
Section 01 00 00 - General Requirements
STATEMENT OF WORK
SCOPE OF WORK
INSTALL CONCRETE APRON
TASMG AVCRAAD
FRESNO, CA
15 AUG 2024
GENERAL INFORMATION:
The contractor shall furnish and install labor and materials to accomplish the work described herein to construct a concrete pad IAW UFC 3-250-04 and the included designs outside of building 06B60- 12000 located at 5140 Dakota Avenue Fresno, CA. The work will include constructing a 5,460 sq ft pad 3000 psi 5” Portland Cement Concrete over 5” of ¾” aggregate base for butler building. Prep the soil to accept concrete and sub-base. Ensure concrete apron has a minimum of ¼” per foot slope.
Slope concrete away from the building. All new work will ensure the existing level of safety within the facility is maintained or improved. The contractor is responsible for filling out the real property documents, forms 1354.
The Contractor shall provide, but is not limited to, the following service task(s):
1. Task (1) – The contractor shall follow attached designs and Install 5,460 square feet of 3000 psi 5” Portland Cement Concrete over 5” of ¾” aggregate base. Prep the soil to accept concrete and subbase. Ensure concrete apron has a minimum of ¼” per foot slope. Slope concrete away from the building.
2. Task (2) – The contractor shall fill out the 1354 real property documents.
3. Appendix A – Concept Drawings and areal map
4. Appendix B – Combined Specifications
The contractor shall submit costs for repairs and wait for approval from the California Military Department, before performing work to correct deficiencies.
Scope timeline for all work required is 270 Calendar Days from Notice to Proceed
END OF SCOPE
WAGE DETERMINATION
"General Decision Number: CA20240018 08/09/2024
Superseded General Decision Number: CA20230018 State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California.
BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY
CONSTRUCTION PROJECTS
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2024. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2024 1 01/12/2024 2 01/19/2024 3 01/26/2024 4 02/09/2024 5 02/16/2024 6 02/23/2024 http://www.dol.gov/whd/govcontracts
7 03/01/2024 8 03/08/2024 9 03/15/2024 10 04/12/2024 11 04/26/2024 12 05/24/2024 13 07/05/2024 14 07/12/2024 15 07/19/2024 16 07/26/2024 17 08/09/2024
ASBE0016-004 01/01/2021
AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN
JOAQUIN, SANTA CRUZ, STANISLAUS & TOULMNE COUNTIES
AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)
Area 1......................$ 30.45 10.60 Area 2......................$ 36.53 9.27
ASBE0016-008 01/01/2024
AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA
CLARA, & SANTA CRUZ
AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN,
STANISLAUS, & TUOLUMNE
Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems)
Area 1......................$ 84.76 25.07 Area 2......................$ 64.56 25.07
BOIL0549-001 01/01/2021
AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO &
SANTA CLARA COUNTIES
AREA 2: REMAINING COUNTIES
BOILERMAKER
Area 1......................$ 49.62 41.27
Area 2......................$ 45.60 38.99
BRCA0003-001 08/01/2023
MARBLE FINISHER..................$ 41.18 18.58
BRCA0003-003 08/01/2023
MARBLE MASON. ............................................ $ 60.20 28.82
BRCA0003-005 05/01/2024
Rates Fringes
BRICKLAYER
( 1) Fresno, Kings, Madera, Mariposa, Merced. ....... $
51.17
25.80
( 7) San Francisco, San Mateo. ................................................. $ 57.02 28.50 ( 8) Alameda, Contra Costa, San Benito, Santa Clara. ................................................. $
56.94
26.28
( 9) Calaveras, San Joaquin, Stanislaus, Toulumne. .......................................... $
52.76
25.01
(16) Monterey, Santa Cruz...$ 54.18 27.82
BRCA0003-008 07/01/2023
Rates Fringes
TERRAZZO FINISHER. .................................. $ 43.90 19.51
TERRAZZO WORKER/SETTER. ....................... $ 59.06 28.31
BRCA0003-011 04/01/2024
AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz
AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne AREA 3: Fresno, Kings, Madera, Mariposa, Merced
TILE FINISHER
Area 1 ................................................. $ 37.75 19.28 Area 2 ................................................. $ 34.76 19.22 Area 3. .............................................. $
Tile Layer Area 1. .............................................. $
32.68
59.92
18.32
22.62 Area 2 ................................................. $ 55.17 22.52
Area 3 ................................................. $ 50.28 22.05
CARP0022-001 07/01/2023
San Francisco County
Carpenters Bridge Builder/Highway Carpenter. ........................................ $
60.39
33.52
Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer. ................................................. $
60.54
33.52
Journeyman Carpenter. ................ $ 60.39 33.52 Millwright. ...................................... $ 60.49 35.11
CARP0034-001 07/01/2021
Rates Fringes
Diver Assistant Tender, ROV Tender/Technician. ....................... $
54.10
34.69
Diver standby. ............................... $ 60.51 34.69 Diver Tender. ................................. $ 59.51 34.69 Diver wet. ........................................ $ Manifold Operator (mixed gas). ................................................... $
103.62
64.51
Manifold Operator (Standby).$ 59.51 34.69
DEPTH PAY
(Surface Diving):
050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot
SATURATION DIVING:
The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours.
DIVING IN ENCLOSURES:
Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot.
WORK IN COMBINATION OF CLASSIFICATIONS:
Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift.
CARP0034-003 07/01/2021
Piledriver.......................$ 54.10 34.69
CARP0035-007 07/01/2020
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties
AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties
Modular Furniture Installer
Area 1 Installer. ...................................... $ 28.76 22.53 Lead Installer. ........................... $ 32.21 23.03 Master Installer. ...................... $ 36.43 23.03
Area 2 Installer. ...................................... $ 26.11 22.53 Lead Installer. ........................... $ 29.08 23.03 Master Installer. ...................... $ 32.71 23.03
Area 3 Installer. ...................................... $ 25.16 22.53 Lead Installer. ........................... $ 27.96 23.03 Master Installer. ...................... $ 31.38 23.03
CARP0035-008 08/01/2020
AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties
AREA 2: Monterey, San Benito, Santa Cruz Counties AREA 3: San Joaquin AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties
Drywall Installers/Lathers:
Area 1. .............................................. $
52.65
31.26
Area 2. .............................................. $ 46.77 31.26 Area 3. .............................................. $ 47.27 31.26 Area 4. .............................................. $
Drywall Stocker/Scrapper
45.92 31.26
Area 1 ................................................ $ 26.33 18.22 Area 2 ................................................ $ 23.39 18.22 Area 3 ................................................ $ 23.64 18.22 Area 4 ................................................ $ 22.97 18.22
CARP0152-001 07/01/2020
Contra Costa County
Carpenters
30.82
Shingler, Power Saw Operator, Steel Scaffold &
52.80
Journeyman Carpenter. ................$ 52.65 30.82 Millwright........................................$ 52.75 32.41
CARP0152-002 07/01/2020
San Joaquin County
Shingler, Power Saw Operator, Steel Scaffold &
46.92
Journeyman Carpenter. ................$ 46.77 30.82 Millwright........................................$ 49.27 32.41
CARP0152-004 07/01/2020
Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties
Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41
CARP0217-001 07/01/2023
San Mateo County
Bridge Builder/Highway Carpenter. .........................................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer. .................................................$ 60.54 33.52 Journeyman Carpenter. ................$ 60.39 33.52 Millwright..................$ 60.49 35.11
CARP0405-001 07/01/2021
Santa Clara County
Rates Fringes
Carpenters
54.85
31.49
Shingler, Power Saw Operator, Steel Scaffold &
55.00
Journeyman Carpenter. ................$ 54.85 31.49 Millwright........................................$ 54.95 33.08
CARP0405-002 07/01/2021
San Benito County
Shingler, Power Saw Operator, Steel Scaffold &
49.12
Journeyman Carpenter. ................$ 48.97 31.49 Millwright........................................$ 51.47 33.08
CARP0505-001 07/01/2021
Santa Cruz County
Shingler, Power Saw Operator, Steel Scaffold &
49.12
Journeyman Carpenter. ................$ 48.97 31.49 Millwright........................................$ 51.47 33.08
CARP0605-001 07/01/2021
Monterey County
Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold &
Filer. ................................................. $ 49.12 31.49 Journeyman Carpenter. ................$ 48.97 31.49 Millwright........................................$ 51.47 33.08
CARP0701-001 07/01/2021
Fresno and Madera Counties
Rates Fringes
Carpenters
Shingler, Power Saw Operator, Steel Scaffold &
47.77
Journeyman Carpenter. ................$ 47.62 31.49 Millwright........................................$ 50.12 33.08
CARP0713-001 07/01/2021
Alameda County
Shingler, Power Saw Operator, Steel Scaffold &
55.00
Journeyman Carpenter. ................$ 54.85 31.49 Millwright........................................$ 54.95 33.08
CARP1109-001 07/01/2021
Kings County
Shingler, Power Saw Operator, Steel Scaffold &
47.77
Journeyman Carpenter. ................$ 47.62 31.49 Millwright........................................$ 50.12 33.08
ELEC0006-004
11/01/2023 SAN
FRANCISCO COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 51.68 3%+24.65 Technician..................$ 59.43 3%+24.65
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0006-007
06/01/2024 SAN
FRANCISCO COUNTY
ELECTRICIAN......................$ 91.25 3%+45.315
ELEC0100-002 06/01/2024
FRESNO, KINGS, AND MADERA COUNTIES
ELECTRICIAN......................$ 45.00 29.15
ELEC0100-005
12/01/2023 FRESNO,
KINGS, MADERA
Rates Fringes
Communications System
Installer...................$ 42.48 27.42 Technician..................$ 48.85 27.42
SCOPE OF WORK
Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems.
A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS
Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems,Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing
C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV
D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment
E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS
THAT ARE INTRINSIC TO
THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems
WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two
(2) conditions apply:
1. The project involves new or major remodel building trades construction.
2. The conductors for the fire alarm system are installed in conduit.
ELEC0234-001 12/25/2023
MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES
ELECTRICIAN
Zone A......................$ 65.16 29.55 Zone B......................$ 71.68 29.75
Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line
Zone B: Any area outside of Zone A
ELEC0234-003 12/01/2021
MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES
Sound & Communications Installer...................$ 47.93 24.09 Technician..................$ 55.12 24.30
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0302-001
02/27/2023 CONTRA COSTA
COUNTY
Rates Fringes
CABLE SPLICER....................$ 68.92 32.67
ELECTRICIAN......................$ 61.26 32.44
ELEC0302-003
12/01/2023 CONTRA COSTA
COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 48.44 27.60 Technician..................$ 55.71 27.82
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0332-001
06/01/2024 SANTA
CLARA COUNTY
Rates Fringes
CABLE SPLICER....................$ 100.25 46.72
ELECTRICIAN......................$ 87.17 46.33
FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay.
Work on structures of 60 ft. or over (as described above): to be paid twice the straight-time rate of pay.
ELEC0332-003
12/01/2023 SANTA
CLARA COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 53.18 27.745 Technician..................$ 61.16 27.985
SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems.
FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician.
ELEC0595-001
06/01/2024 ALAMEDA
COUNTY
Rates Fringes
CABLE SPLICER....................$ 84.18 3%+44.68
ELECTRICIAN......................$ 73.20 3%+44.68
ELEC0595-002 06/01/2024
CALAVERAS AND SAN JOAQUIN COUNTIES
CABLE SPLICER. ...........................................$ 59.34 3%+30.48
ELECTRICIAN
(1) Tunnel work. ........................... $ 51.92 3%+30.48
(2) All other work. ..................$ 49.45 3%+30.48
ELEC0595-006
11/01/2023 ALAMEDA
COUNTY
Rates Fringes
Sound & Communications
Installer...................$ 51.18 3%+24.15 Technician..................$ 58.86 3%+24.15 include control function or power supply; inclusion or exclusion of terminations and testings of conductors…