This document is a set of architectural and engineering plans for constructing a 5,460 square foot concrete pad for a Butler building at 5140 Dakota Avenue in Fresno, California. The work includes preparing the soil, installing a 5-inch aggregate base, and pouring 5-inch thick, 3,000 psi Portland cement concrete with a minimum 1/4-inch per foot slope away from the building. The project is being procured by the Department of the Army California Army National Guard under solicitation number W912LA24Q0025. The contractor will be responsible for filling out real property documents and forms. The plans provide detailed specifications for the concrete work, including requirements for materials, reinforcement, curing, and construction joints.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V1
Architecture & Engineering Section State of California
California Military Department
CMD
10601 BEAR HOLLOW DRIVE
RANCHO CORDOVA, 95670
G1
AS_SHOWN
GENERAL_SHEET
ARARNG
06E2427
N/A
AVCRAD PARTS SHED
CONCRETE PADS
ADDRESS, 5168 EAST DAKOTA
AVENUE
CITY, FRESNO, CALIF
ZIP, 93727
SHEET INDEX
VICINITY MAP
California Military Department
ABBREVIATIONS BUILDING CODE INFORMATION
GENERAL NOTES
SITE PLAN
SCOPE OF WORK
06E2427 AVCRAD PARTS
SHED CONCRETE PAD
1. CONTRACTOR SHALL VISIT SITE AND VERIFY ALL DIMENSIONS AND CONDITIONS OF WORK AREA PRIOR TO
ORDERING OR FABRICATING ANY MATERIALS.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO UTILITIES INCURRED DURING THE PROGRESS OF WORK OF THIS PROJECT. THIS DAMAGE INCLUDES, BUT IS NOT LIMITED TO DAMAGE TO ELECTRICAL RUNS, SEWER, GAS OR WATER PIPING AND CABLE TV WIRES/CABLES. INSPECT ALL SURFACES OF ALL AREAS OF THE
WORK PRIOR TO INITIATING ANY TASKS WHICH MAY RESULT IN SUCH DAMAGE.
3. CONTRACTOR SHALL REVIEW THE PLANS AND SPECIFICATIONS PRIOR TO STARTING ANY WORK ON THIS PROJECT. ANY ERRORS AND/OR OMISSIONS, ERRORS IN DIMENSIONS OR ANY CONDITION WHICH WILL NOT PERMIT CONSTRUCTION OF THE WORK SHOWN ON THESE DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE PROJECT MANAGER. CONTRACTOR SHALL NOT BEGIN WORK UNTIL PROJECT MANAGER HAS
CLARIFIED ALL SUCH CONCERNS TO THE SATISFACTION OF ALL PARTIES.
4. ALL MATERIAL DEMOLISHED AS PART OF THE WORK OF THIS PROJECT SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND ALL LOCAL, STATE
AND FEDERAL REGULATIONS.
5. CONTRACTOR IS RESPONSIBLE TO PROVIDE ADEQUATE PUBLIC SAFETY AND TRAFFIC CONTROL, SAFE VEHICULAR AND PEDESTRIAN ACCESS SHALL BE PROVIDED AT ALL TIMES DURING CONSTRUCTION.
6. THE SCOPE OF WORK DOES NOT ALLEVIATE CONTRACTOR OF HIS/HER RESPONSIBILITY FOR REVIEWING THE CONSTRUCTION DOCUMENTS AND UNDERSTANDING THE EFFORT REQUIRED TO COMPLETE THE PROJECT.
7. CONTRACTOR SHALL COORDINATE WITH PROJECT MANAGER TO COORDINATE THE FOLLOWING
7.1. LAY DOWN AREA
7.2. ACCESS; TEMPORARY ROADS AND SHAKE OUT AREA
7.3. STAGING
8. ALL ACCESS SHALL BE DONE IN A SAFE MANNER AND WITHIN THE OPERATIONAL LIMITS OF THE EQUIPMENT
AND PERSONNEL.
9. DO NOT SCALE DRAWINGS.
10. PROVIDE CONSTRUCTION BARRIERS TO PROTECT PERSONNEL.
11. REPAIR ALL EXISTING SURFACES DAMAGED TO ACCOMMODATE NEW CONSTRUCTION.
A
AB ANCHOR BOLT
ADJ ADJACENT
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
AP ACCESS PANEL
APPROX APPROXIMATE
ASS'Y ASSEMBLY
AUX AUXILIARY
B
BCE BARE COPPER WIRE
BD BOARD
BLDG BUILDING
BLK BLOCK
C
CAP CAPACITY
CERT CERTIFIED
CFM CUBIC FEET PER MINUTE
CI CAST IRON
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLR CLEAR
CM CONTRACTS MANAGER
CMD CALIFORNIA MIL. DEPT.
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CPP CORRUGATED PLASTIC PIPE
CONC CONCRETE
CONST CONSTRUCTION
CTR CENTER
CW COLD WATER
D
DBL DOUBLE
DED DEDICATED
DEG DEGREE
DEMO DEMOLISH, DEMOLITION
DTL DETAIL
DF DRINKING FOUNTAIN
DFT DRY FILM THICKNESS
DIA DIAMETER
DIM DIMENSION
DN DOWN
DS DOWN SPOUT
DWG DRAWING
E
EA
ELECT
EMERG EMERGENCY
(E) EXISTING
EXIST EXISTING
EJ EXPANSION JOINT
EXT EXTERIOR
F
FD FLOOR DRAIN
FF FINISHED FLOOR
FT FEET
FTG FOOTING
G
GA GAUGE
GALV GALVANIZED
GYP GYPSUM
H
HDPE HIGH DENSITY
POLYETHYLENE
HT HEIGHT
HTG HEATING
HVAC HEATING/VENTILATING/
AIR CONDITIONING
I
IN INCHES
INSUL INSULATION
INT INTERIOR
J
JT JOINT
L
L LENGTH
LB POUND
M
MAS MASONRY
MAX MAXIMUM
MECH MECHANICAL
MFG MANUFACTURER
MIN MINIMUM
N
(N) NEW
NIC NOT IN CONTRACT
NTS NOT TO SCALE
O
OC ON CENTER
OH OVERHEAD
P
PNL PANEL
P.O.C. POINT OF CONNECTION
PRV POWER ROOF VENTILATOR
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
Q
QTY QUANTITY
R
RAD RADIUS
RD ROOF DRAIN
REBAR REINFORCING BAR
RECPT RECEPTACLE
REQ'D REQUIRED
REV REVISION/REVISED
S
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SHT SHEET
SIM SIMILAR
SPEC SPECIFICATIONS
SS STAINLESS STEEL
SSPWC STANDARD SPECIFICATIONS
FOR
PUBLIC WORKS
CONSTRUCTION
SQ SQUARE
STL STEEL
T
T&G TONGUE AND GROVE
TBD TO BE DETERMINED0
TEL TELEPHONE
THK THICK
TYP TYPICAL
U
UNO UNLESS NOTED OTHERWISE
UR URINAL
UTIL UTILITY
V
VAR VARIABLE, VARIES
VB VAPOR BARRIER
VERT VERTICAL
VTR VENT THRU ROOF
W
WC WATER CLOSET
WD WOOD
WP WEATHER PROOF
WT WEIGHT
W/ WITH
Y
YD YARD
LOCATION MAP
SITE PLAN
VICINITY MAP
WORK
AREA
BUILDING CONSTRUCTION TYPE N/A
OCCUPANCY CLASSIFICATION U
NUMBER OF STORIES N/A
ACTUAL BUILDING HEIGHT N/A
BUILDING AREA N/A
AREA OF PROJECT N/A
ALLOWABLE AREA PER CBC N/A
AREA / HEIGHT N/A
FIRE SPRINKLED N/A
FIRE ALARM N/A
BUILDING CODES
2024 INTERNATIONAL BUILDING CODE
THE WORK SHALL CONSIST OF:
1. REMOVE, CUT TO THE EXTENT REQUIRED THE SURFACE CONDITIONS TO FACILITATE THE
CONSTRUCTION OF PAD FOUNDATION SYSTEM.
2. CONTRACTOR SHALL INCLUDE THE GPR COSTS TO LOCATE ALL UNDER GROUND UTILITIES, MARKINGS ETC. AND DEVELOP UTILITY AREA PLAN SUBSTANTIAL ENOUGH TO COMPLETE THE CONSTRUCTION WITHOUT UTILITY INTERRUPTION (COORDINATE WITH SITE PERSONNEL AND CONTRACT MANAGER)
2.1 CONTRACTOR (SUBCONTRACTED PARTIES) SHALL TURN OVER PLAN(S) OF THE UTILITIES TO SITE
PERSONNEL AT COMPLETION.
5168 EAST DAKOTA AVENUE,
FRESNO CA, 93727
TABLE OF CONTENTS
SHEET NUMBER SHEET TITLE
G1 GENERAL SHEET
A1 GENERAL NOTES
A2 TYPICAL DETAILS
A3 SITE PLAN
N/A
LEGEND
DETAIL NUMBER
SHEET NUMBER
DETAIL TAG
DETAIL NUMBER
SCALE
NAME
SECTION CUT
DETAIL NUMBER
SHEET NUMBER
1 8.15.24 100% DRAWING
AutoCAD SHX Text
DEL
AutoCAD SHX Text
NORTE
AutoCAD SHX Text
SISKIYOU
AutoCAD SHX Text
MODOC
AutoCAD SHX Text
HUMBOLDT
AutoCAD SHX Text
TRINITY
AutoCAD SHX Text
SHASTA
AutoCAD SHX Text
LASSEN
AutoCAD SHX Text
PLUMAS
AutoCAD SHX Text
TEHAMA
AutoCAD SHX Text
MENDOCINO
AutoCAD SHX Text
GLENN
AutoCAD SHX Text
BUTTE
AutoCAD SHX Text
SIERRA
AutoCAD SHX Text
NEVADA
AutoCAD SHX Text
PLACER
AutoCAD SHX Text
YUBA
AutoCAD SHX Text
SUTTER
AutoCAD SHX Text
COLUSA
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
SONOMA
AutoCAD SHX Text
NAPA
AutoCAD SHX Text
YOLO
AutoCAD SHX Text
EL DORADO
AutoCAD SHX Text
SACRAMENTO
AutoCAD SHX Text
SOLANO
AutoCAD SHX Text
MARIN
AutoCAD SHX Text
SAN FRANCISCO
AutoCAD SHX Text
CONTRA
AutoCAD SHX Text
COSTA
AutoCAD SHX Text
ALAMEDA
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SANTA
AutoCAD SHX Text
CRUZ
AutoCAD SHX Text
SANTA
AutoCAD SHX Text
CLARA
AutoCAD SHX Text
STANISLAUS
AutoCAD SHX Text
SAN
AutoCAD SHX Text
JOAQUIN
AutoCAD SHX Text
AMADOR
AutoCAD SHX Text
CALAVERAS
AutoCAD SHX Text
ALPINE
AutoCAD SHX Text
TOULUMNE
AutoCAD SHX Text
MONO
AutoCAD SHX Text
MARIPOSA
AutoCAD SHX Text
MERCED
AutoCAD SHX Text
MADERA
AutoCAD SHX Text
MONTEREY
AutoCAD SHX Text
SAN
AutoCAD SHX Text
BENITO
AutoCAD SHX Text
FRESNO
AutoCAD SHX Text
INYO
AutoCAD SHX Text
TULARE
AutoCAD SHX Text
KINGS
AutoCAD SHX Text
KERN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
LUIS
AutoCAD SHX Text
OBISPO
AutoCAD SHX Text
SANTA
AutoCAD SHX Text
BARBARA
AutoCAD SHX Text
VENTURA
AutoCAD SHX Text
LOS ANGELES
AutoCAD SHX Text
SAN BERNARDINO
AutoCAD SHX Text
RIVERSIDE
AutoCAD SHX Text
ORANGE
AutoCAD SHX Text
SAN DIEGO
AutoCAD SHX Text
IMPERIAL
AutoCAD SHX Text
MATEO
AutoCAD SHX Text
LOS ANGELES
AutoCAD SHX Text
ORANGE
AutoCAD SHX Text
JOAQUIN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
STANISLAUS
AutoCAD SHX Text
ALAMEDA
AutoCAD SHX Text
COSTA
AutoCAD SHX Text
CONTRA
AutoCAD SHX Text
SAN FRANCISCO
AutoCAD SHX Text
MARIN
AutoCAD SHX Text
SOLANO
AutoCAD SHX Text
NAPA
AutoCAD SHX Text
SONOMA
AutoCAD SHX Text
SANTA
AutoCAD SHX Text
CRUZ
AutoCAD SHX Text
SACRAMENTO
AutoCAD SHX Text
MATEO
AutoCAD SHX Text
SAN
AutoCAD SHX Text
CLARA
AutoCAD SHX Text
SANTA
AutoCAD SHX Text
%%UCALIFORNIA NATIONAL GUARD
AutoCAD SHX Text
SEASIDE
AutoCAD SHX Text (2)
AutoCAD SHX Text
RIFLE RANGE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text 24 X 36
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text Issue
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Description
AutoCAD SHX Text Project
AutoCAD SHX Text DSA App No.
AutoCAD SHX Text Supervisor
AutoCAD SHX Text Sheet Title
AutoCAD SHX Text Designed
AutoCAD SHX Text Sheet Number
AutoCAD SHX Text Sheet Scale
AutoCAD SHX Text Reference North
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text SFM Permit No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RELATIVE BORDER SCALE IN INCHES
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
SCALE: NONE
AutoCAD SHX Text
REF
CONCRETE
1. THE MINIMUM 28-DAY COMPRESSIVE STRENGTH AND TYPE OF CONCRETE SHALL BE AS FOLLOWS:
1.1. FOOTINGS AND FOUNDATIONS, TIE BEAMS, ETC. 150 PCF fc'=4000 PSI F0
1.2. EXTERIOR SLAB - ON - GRADE
1.2.1. INDUSTRIAL SLABS 150 PCF fc'=4500 PSI F3
1.3. INTERIOR SLAB - ON - GRADE 150 PCF fc'=4500 PSI F2
2. ALL CONCRETE SHALL BE READY - MIX CONCRETE AND SHALL BE BATCHED, MIXED AND DELIVERED TO THE SITE IN CONFORMANCE WITH ASTM C94. ALL WORK GOVERNING: DESIGN, REINFORCING, PLACING AND CURING OF STRUCTURAL CONCRETE SHALL ADHERE TO REQUIREMENTS OF "AMERICAN CONCRETE INSTITUTE" (ACI) 318, 301
AND 117 - LATEST EDITIONS.
3. CONTRACTOR SHALL SUBMIT MIX DESIGNS FOR REVIEW BY TESTING LABORATORY AND STRUCTURAL ENGINEER
OF RECORD (SEOR). DO NOT PLACE CONCRETE PRIOR TO REVIEW OF MIX DESIGNS.
4. ALL CEMENTITIOUS MATERIALS SHALL BE INCLUDED IN CALCULATING WATER/CEMENT RATIO OF CONCRETE MIX.
5. CONCRETE MIX DESIGN AND TESTING SHALL MEET THE REQUIREMENTS OF THE CBC. ALL CONCRETE MIXES
SHALL BE DESIGNED, STAMPED AND SEALED BY A LICENSED CALIFORNIA CIVIL ENGINEER.
6. PORTLAND CEMENT SHALL BE TYPE II AND SHALL CONFORM TO ASTM C150, LOW ALKALI.
7. CONCRETE SUPPLIER SHALL FURNISH CERTIFICATION STATEMENTS TO SEOR AND BUILDING AUTHORITY THAT
CEMENT HAS BEEN TESTED IN COMPLIANCE WITH THE REQUIREMENTS OF ASTM C150 AND PROPOSED
ADMIXTURES MEET CLASSIFICATION OF ASTM C618.
8. FLY ASH OR OTHER POZZOLANS CONFORMING TO ASTM C618 CLASS F MAY BE USED AS A PARTIAL SUBSTITUTION FOR PORTLAND CEMENT UP TO A MAXIMUM OF 25% TOTAL CEMENTITIOUS MATERIAL BY WEIGHT IF THE MIX DESIGN IS PROPORTIONED ON THE BASIS OF FIELD EXPERIENCE OR TRIAL MIXTURES. FLY ASH OR OTHER
POZZOLANS MAY ONLY BE SUBSTITUTED FOR USE IN FOUNDATIONS.
9. AGGREGATES IN NORMAL WEIGHT CONCRETE SHALL CONFORM TO ASTM C33. AGGREGATES IN LIGHT WEIGHT
CONCRETE SHALL CONFORM TO ASTM C330.
10. UNLESS OTHERWISE NOTED, WATER USED IN MIX SHALL BE CLEAN AND POTABLE CONFORMING TO ASTM C1602.
11. CALCIUM CHLORIDE OR ADMIXTURES CONTAINING CHLORIDE SHALL NOT BE USED. DO NOT USE CONCRETE OR
GROUT CONTAINING CHLORIDES.
12. CONTROLLED LOW-STRENGTH MATERIAL (CLSM) LEAN CONCRETE, WHERE SPECIFICALLY INDICATED, SHALL
CONTAIN A MINIMUM OF 2 SACKS OF CEMENT PER CUBIC YARD OF CONCRETE.
13. CONTRACTOR SHALL SUBMIT ALL PROPOSED LOCATIONS OF CONSTRUCTION JOINTS FOR REVIEW BY THE
ARCHITECT/SEOR PRIOR TO STARTING CONSTRUCTION.
14. DIMENSION ARE TO THE FACE OF MAIN BARS, TIES, ETC., AND DENOTE CLEAR COVERAGE. THE MINIMUM
CONCRETE COVER SHALL BE AS FOLLOWS UON.
14.1. CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH.................. 3"
14.2. CONCRETE EXPOSED TO EARTH OR WEATHER BUT PLACED IN FORMS:
#5 BARS, W31 OR D31 WIRE AND SMALLER........................................................... 1-1/2"
14.3. CONCRETE NOT EXPOSED TO WEATHER OR IN CONTACT WITH SOIL:
SLABS, WALLS OR JOISTS:
#11 BARS AND SMALLER................................................................................. 3/4"
15. FORMS SHALL BE PROPERLY CONSTRUCTED, CONFORM TO CONCRETE SHAPE AS SHOWN, SUFFICIENTLY TIGHT TO PREVENT LEAKAGE, SUFFICIENTLY STRONG AND BRACED TO MAINTAIN SHAPE AND ALIGNMENT UNTIL NO
LONGER NEEDED TO SUPPORT CONCRETE.
16. FORMS AND SHORING SHALL NOT BE REMOVED UNTIL CONCRETE HAS ATTAINED SUFFICIENT STRENGTH TO
WITHSTAND ALL LOADS IMPOSED WITHOUT EXCESSIVE STRESS, CREEP, OR DEFLECTION.
17. NO PIPES OR DUCTS SHALL BE PLACED IN STRUCTURAL CONCRETE ELEMENTS UNLESS SPECIFICALLY DETAILED.
18. ALL ITEMS TO BE CAST IN CONCRETE SUCH AS REINFORCING STEEL, DOWELS, BOLTS, ANCHOR RODS, PIPES, SLEEVES, EMBEDS, ETC., SHALL BE SECURELY TIED IN POSITION BEFORE CONCRETE PLACEMENT.
19. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING AND COORDINATING WITH ALL TRADES THE LOCATION OF
ALL ITEMS EMBEDDED IN OR PENETRATING CONCRETE ELEMENTS INCLUDING: PIPES, SLEEVES, DUCTS, MOLDS, GROOVES, EMBEDS, ORNAMENTS, GROUNDS, ETC.
20. REINFORCING SHALL BE CLEANED OF LOOSE RUST, OIL, MUD, DIRT, MILL SCALE, ICE OR OTHER COATINGS PRIOR
TO CONCRETE PLACEMENT.
21. ALL DEBRIS; NAILS, MILS. WOOD SCRAP, FOAM, ETC. SHALL BE REMOVED PRIOR TO CONCRETE PLACEMENT.
22. ALL HARDENED SURFACES OF CONSTRUCTION JOINTS SHALL BE CLEANED BY SANDBLASTING, CHIPPING OR
OTHER MEANS TO REMOVE DUST, FLAKES OR OTHER FOREIGN MATTER EXPOSING FIRMLY EMBEDDED
AGGREGATE PRIOR TO CONCRETE PLACEMENT.
23. ALL CONSTRUCTION JOINT SURFACES SHALL BE CLEANED AND LAITANCE REMOVED. JOINTS SHALL BE WETTED
AND STANDING WATER OR ICE REMOVED PRIOR TO CONCRETE PLACEMENT.
24. CONTRACTOR SHALL NOTIFY THE ARCHITECT/SEOR AT LEAST 48 HOURS (2-CALENDAR WEEK DAYS) PRIOR TO
PLACEMENT OF STRUCTURAL CONCRETE.
25. OBTAIN APPROVAL FROM ALL AFFECTED TRADES PRIOR TO PLACING CONCRETE.
26. CONCRETE SHALL BE CONVEYED FROM MIXER TO PLACE OF FINAL DEPOSIT BY METHODS THAT WILL PREVENT
SEPARATION OF MATERIALS. CONCRETE SHALL BE DEPOSITED IN FINAL POSITION IN A MANNER TO AVOID
SEGREGATION.
27. UNLESS OTHERWISE NOTED EXPOSED CORNERS OR SLABS, BEAMS, WALLS, COLUMNS, ETC. SHALL BE FORMED
WITH 3/4" CHAMFER OR TOOLED EDGE (1/2" RADIUS).
28. ALL CONCRETE SHALL BE THOROUGHLY CONSOLIDATED, WORKED AROUND REINFORCING AND EMBEDDED ITEMS
AND INTO CORNERS OF FORMS.
29. CONCRETE SHALL BE MAINTAINED ABOVE 50°F AND IN A MOIST CONDITION FOR A MINIMUM 7 DAYS AFTER
PLACEMENT, UNLESS APPROVED BY SEOR.
30. COLD WEATHER AND HOT WEATHER MEASURES SHALL BE EMPLOYED TO PROTECT CONCRETE DURING
PLACEMENT AND CURING.
REINFORCING STEEL
1. REINFORCING GRADES FOR CONCRETE AND MASONRY:
1.1. ALL BARS EXCEPT THOSE TO BE WELDED ASTM A615, GR 60
1.2. TIES AND STIRRUPS ASTM A615, GR 60
(ALL BARS SHALL BE DEFORMED UON)
2. ALL REINFORCEMENT SHALL BE CLEARLY MARKED TO FACILITATE IDENTIFICATION DURING FINAL IN-PLACE
INSPECTION.
3. ALL REINFORCEMENT SHALL BE BENT COLD PRIOR TO PLACEMENT IN FORMWORK, REINFORCEMENT EMBEDDED
IN SUBSTRATE SHALL NOT BE BENT.
4. REINFORCEMENT SHALL BE TIED OR SECURED IN PLACE BY MANUFACTURED BAR POSITIONERS PRIOR TO GROUT
OR CONCRETE PLACEMENT. CONTRACTOR PROVIDE ALL ACCESSORIES TO SUPPORT REINFORCING IN POSITIONS
SHOWN.
5. ALL DOWELS SET IN CONCRETE SHALL BE TIED IN PLACE PRIOR TO PLACEMENT OF CONCRETE. "WET SETTING"
NOT PERMITTED.
6. MAINTAIN MINIMUM CLEAR FROM FACE OF CONCRETE TO EDGE OF ALL REINFORCEMENT AS REQUIRED IN
AMERICAN CONCRETE INSTITUTE (ACI) 318 - LATEST EDITION.
7. REINFORCEMENT SHALL BE PLACED IN ACCORDANCE WITH THE CONCRETE REINFORCING STEEL INSTITUTE
(CRSI) "MANUAL OF STANDARD PRACTICE".
8. SPLICES NOT INDICATED SHALL BE A CLASS "B" SPLICE. SPLICES IN ADJACENT BARS SHALL NOT BE CLOSER THAN
24" CLEAR MEASURED ALONG THE LENGTH OF THE BAR.
9. LAP ALL HORIZONTAL BARS AT CORNERS AND INTERSECTIONS, STAGGER ALL SPLICES.
10. REINFORCING SPACING SHOWN ARE MAXIMUM ON CENTER AND ALL REINFORCING IS CONTINUOUS.
11. REINFORCING STEEL SHALL BE KEPT CLEAN AND FREE OF RUST, DIRT, OIL, ETC AND OTHER MATERIALS THAT MAY
IMPAIR BOND ABILITY OF REINFORCING.
12. CHAIRS OR SPACERS FOR REINFORCING SHALL BE NON FERROUS OR PLASTIC COATED WHEN RESTING ON
EXPOSED SURFACES. DOBIE BLOCKS SHALL NOT BE USED.
SLAB - ON - GRADE
1. SEE CONCRETE GENERAL NOTES FOR ADDITIONAL INFORMATION.
2. ALL CONCRETE PLACEMENT AND CURING OPERATIONS SHALL BE PERFORMED IN ACCORDANCE WITH ACI 302.1, ACI 302.2, ACI 318 AND ACI 360 - LATEST EDITIONS.
3. UNLESS AN ALTERNATIVE IS ACCEPTED BY ARCHITECT AND STRUCTURAL ENGINEER OR RECORD (SEOR), SLAB
SHALL MOIST CURE. WET CURE SYSTEM SHALL CONSIST OF BURLAP AND CONTINUOUSLY SPRINKLED SYSTEM
FOR MINIMUM 14 DAYS.
4. UNLESS OTHERWISE NOTED, VAPOR PROOFING SHALL MEET OR EXCEED A 6 MILL RETARDER COMPOSED OF
POLY ETHYLENE LAPPED A MINIMUM 6" PLACED UNDER SLAB.
5. CONSTRUCTION JOINTS (CJ) AND SAWCUT (SC) JOINTS IN SLABS SHALL OCCUR WHERE LOCATED ON PLANS AND
DETAILS. CJ'S SHALL HAVE A FORMED POUR STOP.
FOUNDATION
1. NO GEOTECHNICAL REPORT EXISTS FOR THIS PROJECT, CODE MINIMUMS ARE USED.
2. FOUNDATION DESIGN BASED ON SOIL REPORT BY: CODE MIN; ASCE 7, CBC
3. FOUNDATION TYPE: CONVENTIONAL SPREAD AND CONTINUOUS FOOTINGS
3.1. CAPACITIES
VERTICAL LOAD CASE ALLOWABLE BEARING PRESSURE
DL+LL...................................................... 1500 PSF
DL+LL+WIND/SEISMIC.......................... 1500 PSF
LATERAL RESISTANCE
PASSIVE................................................. 150 PCF ( PER FOOT OF DEPTH)
COEFFICIENT OF FRICTION................. 0.30
COHESION.............................................. N/A
4. PRIOR TO FINAL FOUNDATION INSPECTION, CONTRACTOR SHALL PROVIDE WRITTEN STATEMENT TO BUILDING
AUTHORITY STATING:
4.1. BUILDING PAD PREPARED IN ACCORDANCE WITH PLANS.
4.4. FOUNDATION EXCAVATIONS COMPLY WITH PLANS.
4.5. UTILITY TRENCHES PROPERLY BACKFILLED AND COMPACTED.
5. ARCHITECT AND ENGINEER ARE NOT RESPONSIBLE FOR LOCATING EXISTING UNDERGROUND UTILITIES.
LOCATION OF EXISTING UNDERGROUND UTILITIES ASRE NOT SHOWN ON DRAWINGS. CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER WHERE UNFORESEEN CONDITIONS ARE ENCOUNTERED. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGES WHICH MAY RESULT FROM FAILURE TO LOCATE AND PROTECT ALL EXISTING
UNDERGROUND UTILITIES.
6. EXCAVATIONS SHALL BE CLEANED OF ALL DEBRIS, STANDING WATER OR ICE SHALL BE REMOVED PRIOR TO
CONCRETE PLACEMENT.
7. ALL FOUNDATIONS ARE SHOWN AS BEING FORMED. WHERE UNFORMED, HORIZONTAL DIMENSION OF FOOTING
SHALL BE INCREASED 1" EACH SIDE.
8. CONCRETE SHALL BE PLACED TO EXCLUDE FOREIGN MATERIALS TO ENSURE FULL SIZE OF FOUNDATION.
9. FOUNDATIONS SHALL BE PLACED ON UNDISTURBED SOILS, COMPACTED FILL MATERIALS OR CONTROLLED
LOW-STRENGTH MATERIALS. BOTTOM OF FOOTINGS SHOWN ON THE DRAWINGS ARE MINIMUMS AND SHALL BE LOWERED WHERE SOFT OR LOOSE MATERIAL ARE ENCOUNTERED, AT THE DIRECTION OF THE IOR, CONTRACT
MANAGER.
10. FOOTING BACKFILL AND UTILITY TRENCH BACKFILL WITHIN BUILDING AREA SHALL BE MECHANICALLY COMPACTED
IN LAYERS WITH THE APPROVAL OF THE IOR, FLOODING IS NOT PERMITTED.
11. CONSTRUCTION JOINTS IN SLABS AND FOOTINGS NEED NOT OCCUR AT SAME LOCATION.
STRUCTURAL SUBMITTALS
1. REVIEW OF SHOP DRAWINGS AND SUBMITTALS BY THE ENGINEER OF RECORD IS FOR GENERAL COMPLIANCE
WITH THE CONTRACT DOCUMENTS.
2. SHOP DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER OF RECORD FOR REVIEW PRIOR TO FABRICATION. THE
CONTRACTOR WILL REMAIN RESPONSIBLE FOR ALL ERRORS OF DETAILING, FABRICATION AND FOR CORRECT
FITTING OF ALL STRUCTURAL MEMBERS INCLUDING COORDINATION WITH OTHER TRADES.
2.1. SHOP DRAWINGS SHALL BE SUBMITTED TO THE ENGINEER OF RECORD AND SHALL CONSIST OF EITHER ELECTRONIC FILES OR (2) SETS OF HARD COPY (1 FOR RETURN AND 1 FOR RECORD KEEPING). ALLOW FOR A
DURATION OF PROCESSING OF 10 BUSINESS DAYS.
2.2. ENGINEER OF RECORD WILL RETURN THE REPRODUCIBLE SET CLEARLY MARKED WITH COMMENTS. ANY
REQUIRED RECORD SET COPIES SHALL BE MADE FROM THIS RETURNED SET.
2.3. REPRODUCTION OF STRUCTURAL PLANS AND DETAILS FOR SHOP DRAWINGS IS PROHIBITED.
SUBCONTACTOR/FABRICATOR IS TO PROVIDE INDEPENDENTLY CREATED DRAWINGS BASED ON THE
STRUCTURAL PLANS AND DETAILS.
3. SHOP DRAWINGS AND SUBMITTALS DO NOT CONSTITUTE CHANGE ORDERS. ANY PROPOSED CHANGES TO THE STRUCTURAL DOCUMENTS MUST BE SUBMITTED IN WRITING AS A REQUEST FOR SUBSTITUTION TO THE
ARCHITECT AND ENGINEER OF RECORD FOR APPROVAL.
4. THE FOLLOWING LIST SUMMARIZES THE RELEVANT STRUCTURAL SUBMITTALS FOR THIS PROJECT. REFER TO THE
SPECIFICATION FOR A COMPLETE LIST AND ADDITIONAL REQUIREMENTS.
4.1. GENERAL
4.1.1. QUALIFICATION DATA FOR APPROVED INSTALLERS AND FABRICATORS.
4.1.2. CERTIFICATES OF CONFORMANCE FOR PREFABRICATED MEMBERS.
4.1.3. PROVIDE PRODUCT DATA FOR ALL MANUFACTURER STRUCTURAL PRODUCTS AND ACCESSORIES USED.
4.2. DEFORMED BAR REINFORCEMENT
4.2.1. MANUFACTURER'S PRODUCT DATA, SPECIFICATIONS AND INSTALLATION PROCEDURES FOR
PROPRIETARY MATERIALS AND REINFORCEMENT.
4.2.2. STEEL PRODUCER'S CERTIFICATES OF MILL ANALYSIS, TENSILE AND BEND TESTS.
4.2.3. SHOP DRAWINGS FOR FABRICATION, BENDING AND PLACEMENT.
4.3. CAST IN PLACE CONCRETE (CIP)
4.3.1. DESIGN MIX FOR EACH CONCRETE MIX.
4.3.2. MATERIAL TEST REPORTS.
4.3.3. MATERIAL CERTIFICATES FOR CEMENT, AGGREGATES AND ADMIXTURES.
4.3.4. MANUFACTURER'S PRODUCT DATA FOR WATERSTOPS, BONDING AGENTS, VAPOR RETARDERS, JOINT
FILLERS, CURING MATERIALS AND FLOOR TREATMENTS.
4.3.5. SHOP DRAWING FOR PROPOSED LOCATION OF ADDITIONAL CONSTRUCTION, CONTROL JOINTS, SLIP
CONTROL JOINTS AND WEAKENED PLANE JOINTS NOT SHOWN ON THE STRUCTURAL PLANS.
4.3.6. MINUTES FROM PREINSTALLATION CONFERENCE.
STATEMENT OF SPECIAL INSPECTIONS
1. THE OWNER SHALL EMPLOY A TESTING AND INSPECTION AGENCY, ONE OR MORE SPECIAL INSPECTORS TO
PROVIDE INSPECTION DURING CONSTRUCTION.
2. "TESTING AND INSPECTION AGENCY" SHALL BE APPROVED BY THE GOVERNING BUILDING AUTHORITY TO
PERFORM THE SPECIFIC TESTING AND INSPECTION PROGRAM FOR THIS PROJECT. AGENCY SHALL BE INDEPENDENT; OF OWNER, CONTRACTOR(S), ETC., AND DEMONSTRATE TO BUILDING OFFICIAL THE USE OF ADEQUATE TESTING EQUIPMENT AND EMPLOYMENT OF QUALIFIED PERSONNEL FOR INSPECTION OF THE PARTICULAR TYPE OF MATERIAL, CONSTRUCTION OR OPERATION REQUIRING SPECIAL INSPECTIONS.
3. SPECIAL INSPECTOR(S) SHALL PROVIDE WRITTEN DOCUMENTATION TO BUILDING AUTHORITY DEMONSTRATING RELEVANT EXPERIENCE AND TRAINING. INSPECTOR QUALIFICATIONS AND CERTIFICATIONS FOR SUCH INSPECTIONS SHALL BE CURRENT AND MAINTAINED IN GOOD STANDING OVER DURATION OF PROJECT. SPECIAL
INSPECTOR(S) SHALL BE APPROVED BY BUILDING AUTHORITY.
4. APPROVAL ITEMS SHALL BE SUBMITTED TO AND ACCEPTED BY THE STRUCTURAL ENGINEER OF RECORD AND BUILDING AUTHORITY. CONTRACTOR(S) ARE RESPONSIBLE FOR ALL LABELING, INSPECTION AND TESTING, IDENTIFICATION METHODS.
5. CONTRACTOR(S) ARE RESPONSIBLE FOR COORDINATING INSPECTION TIMES, MATERIALS AND AREAS OF REVIEW
FOR INSPECTIONS.
6. JOB SITE VISITS BY STRUCTURAL ENGINEER (STRUCTURAL OBSERVATION) OR BUILDING OFFICIAL DO NOT CONSTITUTE AND ARE NOT A SUBSTITUTE FOR INSPECTION BY SPECIAL INSPECTOR(S). STRUCTURAL
OBSERVATION FREQUENCY AND EXTENT PER SPECIFICATIONS.
7. CONTINUOUS SPECIAL INSPECTION CONSISTS OF FULL TIME INSPECTION, PERIODIC INSPECTION CONSISTS OF PART TIME OR INTERMITTENT INSPECTION. HIERARCHY DEFINITIONS SHALL BE AS FOLLOWS: BUILDING
AUTHORITY SHALL GOVERN OVER CBC, CBC SHALL GOVERN OVER MATERIAL SPECIFIC CODES.
8. INSPECTOR OF RECORD (IOR) IN COORDINATION WITH CONTRACTOR(S) SHALL DETERMINE NUMBER OF INSPECTORS NECESSARY (SUBJECT TO BUILDING AUTHORITY APPROVAL) TO ADEQUATELY PERFORM INSPECTION
PROGRAM.
9. IT IS SOLELY THE CONTRACTOR'S RESPONSIBILITY TO COORDINATE/PERFORM/ENFORCE: INSPECTIONS, OVERSEE REQUIRED SUBMITTALS, ENSURE TESTING AND INSPECTION OPERATIONS ARE PERFORMED TO THE
SATISFACTORY EXTENT OF THE SPECIAL INSPECTION PROGRAM.
INSPECTION OF CONCRETE CONSTRUCTION
VERIFICATION AND INSPECTION CONTINUOUS PERIODIC
1. INSPECTION OF REINFORCING STEEL AND PLACEMENT X
2. VERIFIED USE OF DESIGN MIX X
3. AT TIME OF CONCRETE PLACEMENT SAMPLE FOR STRENGTH TESTS, PERFORM SLUMP, X
AIR TESTS AND DETERMINE THE TEMPERATURE OF THE CONCRETE.
4. INSPECTION OF CONCRETE PLACEMENT FOR PROPER APPLICATION X
5. INSPECTION FOR MAINTENANCE OF SPECIFIED CURING TEMPERATURE AND TECHNIQUES X
6. VERIFICATION OF IN-SITU CONCRETE STRENGTH PRIOR TO REMOVAL OF SHORES X
AND FORMS FROM BEAMS AND STRUCTURAL SLABS.
7. INSPECT FORMWORK FOR SHAPE, LOCATION AND DIMENSIONS OF CONCRETE X
MEMBER BEING FORMED.
STRUCTURAL OBSERVATIONS
1. "STRUCTURAL OBSERVATION" SHALL BE DEFINED AS THE VISUAL OBSERVATION OF ELEMENTS AND
CONNECTIONS OF THE STRUCTURAL SYSTEM.
2. STRUCTURAL OBSERVATIONS ARE FOR GENERAL CONFORMANCE TO THE APPROVED CONTRACT DOCUMENTS.
3. AT A MINIMUM, THE FOLLOWING CONSTRUCTION STAGES REQUIRE STRUCTURAL OBSERVATION BY THE
STRUCTURAL ENGINEER OF RECORD.
3.1. FOUNDATIONS REINFORCING/DOWELS/ANCHORS/EMBEDS
3.2. SLABS REINFORCING/CONSTRUCTION JOINTS/TERMPERATURE PROTECTION
4. STRUCTURAL OBSERVATION SHALL NOT BE CONSIDERED TO REPLACE SPECIAL INSPECTION IN ANY FORM. SITE VISITS, OBSERVATION VISITS DO NOT RELIEVE THE CONTRACTOR(S) FROM THE RESPONSIBILITY TO COMPLY WITH
THE INSPECTIONS REQUIRED IN THE SPECIAL INSPECTION PROGRAM.
SLAB ON GRADE NOTES
1. JOINTS SHALL BE SPACED TO PROVIDE SQUARE OR RECTANGULAR SECTIONS WITH ANY SIDE DIMENSION NOT TO
EXCEED 1 1/2" TIMES ITS ADJACENT SIDE.
2. MAXIMUM JOINT SPACING SHALL NOT EXCEED 10'-0" UON ON PLAN.
3. DEVIATION FROM THE JOINTS SHOWN MUST BE SUBMITTED FOR APPROVAL TO THE STRUCTURAL ENGINEER
PRIOR TO CONSTRUCTION.
4. SLIP CONTROL JTS OR CONTROL JTS REQUIRED, TYP UON.
5. WATER CEMENT RATIO TO BE A MAXIMUM OF 0.45.
6. MOIST CURING REQUIRED FOR A MINIMUM OF 7 DAYS.
7. PROVIDE SAWED CONTROL JT'S PER STANDARD DETAILS.
8. CONCRETE SLAB MIX AT TIME OF PLACEMENT SHALL NOT EXCEED A SLUMP OF 3".
A1
AS_SHOWN
GENERAL_NOTES
ARARNG
XX-X-XXXX-X
V1
Architecture & Engineering Section State of California
California Military Department
CMD
10601 BEAR HOLLOW DRIVE
RANCHO CORDOVA, 95670
06E2427
AVCRAD PARTS SHED
CONCRETE PADS
ADDRESS, 5168 EAST DAKOTA
AVENUE
CITY, FRESNO, CALIF
ZIP, 93727
1 8.15.24 100% DRAWING
AutoCAD SHX Text Sheet Number
AutoCAD SHX Text Sheet Scale
AutoCAD SHX Text SFM Permit No.
AutoCAD SHX Text
OF
AutoCAD SHX Text Issue
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Description
AutoCAD SHX Text Project
AutoCAD SHX Text DSA App No.
AutoCAD SHX Text Supervisor
AutoCAD SHX Text Sheet Title
AutoCAD SHX Text Designed
AutoCAD SHX Text Reference North
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text 24 X 36
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RELATIVE BORDER SCALE IN INCHES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AT CORNERS
2'-0" MIN TYP
HORIZ REINF
TYP
0" TY
P
#4 SEE OTHER
15 MIL (MIN)
VAPOR BARRIER
(@ BLDG ONLY)
SUB-GRADE PREPARED
COMPACTED AB OR
CRUSHED ROCK
SLAB AND REINF
PER PLAN
1/
SL
AB
D
EP
TH
U
O N
SE
E
PL
AN
NATIVE
SECURE DOWELS TO REBAR
DOWELS TO BE PLACED IN
HORIZONTAL POSITION
PERP TO SAWCUT LINE
NOTE
1. DEFORMED REINFORCING SHALL NOT BE CONTINUOUS THRU JOINT.
2. LOCATE JOINTS PER LAYOUT OR APPROVED SUBMITTAL DRAWING.
3. SUPPORT REINFORCING INDEPENDENT OF DOWELS.
4. DOWELS SHOULD BE PLACED NO CLOSER THAN 12" FROM INTERSECTION
OF JOINTS OR SLAB EDGE.
SLAB WITH SINGLE LAYER OF REINFORCING
WRAP OR GREASE
ONE END TYP
APPROVED SEALANT
PER ARCH
EQ
TERMINATE SLAB REINF
1 1/2" FROM JT TYP
NOTE
1. SAW CUTS PERPENDICULAR TO CONSTRUCTION JOINTS SHALL BE MADE WITHIN 4
HOURS OF SLAB POUR.
2. SAW CUTS PARALLEL TO CONSTRUCTION JOINTS SHALL BE MADE WITH IN 8 HOURS OF
SLAB POUR.
3. REINFORCING SHALL BE CONTINUOUS THRU JOINT.
SLAB WITH SINGLE LAYER OF REINFORCING
3/ 4"
"PARALLEL" SHRINKAGE JOINTS
TO BE LOCATED PARALLEL TO
CONSTRUCTION JOINTS.
SPACING SHALL NOT EXCEED
10'-0" OR 2x (SLAB DEPTH)
TYP
"PERPENDICULAR" SHRINKAGE JOINTS
TO BE LOCATED PERPENDICULAR TO
CONSTRUCTION JOINTS.
SPACING SHALL NOT EXCEED
10'-0" OR 2x (SLAB DEPTH)
TYP
1/
SL
AB
D
EP
TH
U
O N
SLAB ON GRADE
SEE PLAN
W
D
SLAB THICKNESS D W R REINF
5" 10" 8" #3 @ 16 (2) # 4 TOP AND BOTT
REINF "R"
"REINF"
36" 8"
CUT AND PATCH AS REQ'D
FOR PAD PREP
SEE PLAN
V1
Architecture & Engineering Section State of California
California Military Department
CMD
A2
AS_SHOWN
TYPICAL_DETAILS
ARARNG
3 4
10601 BEAR HOLLOW DRIVE
RANCHO CORDOVA, 95670
N/AN/A
06E2427
AVCRAD PARTS SHED
CONCRETE PADS
ADDRESS, 5168 EAST DAKOTA
AVENUE
CITY, FRESNO, CALIF
ZIP, 93727
1 8.15.24 100% DRAWING
5 CONCRETE - FTG INTERSECTIONS
1/2" = 1'-0"
3 CONCRETE - SLAB
1" = 1'-0"
2 CONCRETE - SLIP CJ
1" = 1'-0"
1 CONCRETE - WEAKENED PLANE JT
1" = 1'-0"
4 CONCRETE - SLAB THICKENED EDGE
3/4" = 1'-0"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text 24 X 36
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text Issue
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Description
AutoCAD SHX Text Project
AutoCAD SHX Text DSA App No.
AutoCAD SHX Text Supervisor
AutoCAD SHX Text Sheet Title
AutoCAD SHX Text Designed
AutoCAD SHX Text Sheet Number
AutoCAD SHX Text Sheet Scale
AutoCAD SHX Text Reference North
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text SFM Permit No.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RELATIVE BORDER SCALE IN INCHES
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
(E) BUILDING
178'-0"
'-0
'-0
24'-0" 48'-0"64'-0" 42'-0"
'-0
THICKENED EDGE
-1/4"
0"
5" SLAB w/ #4 @ 16 OC/EW o/ 4" CRUSHED ROCK o/ 12" RECOMPACTED EARTH
PAD PREP TO EXTEND 36" BEYOND
CONC
-1/4"
0"
SL
O
PE
SL
O
PE
A3
AS_SHOWN
SITE_PLAN
ARARNG
N/A
V1
Architecture & Engineering Section State of California
California Military Department
CMD
06E2427
AVCRAD PARTS SHED
CONCRETE PADS
ADDRESS, 5168 EAST DAKOTA
AVENUE
CITY, FRESNO, CALIF
ZIP, 93727
1 8.15.24 100% DRAWING
1 SITE PLAN
1" = 20.0'
SLAB ON GRADE NOTES
1. JOINTS SHALL BE SPACED TO PROVIDE SQUARE OR RECTANGULAR SECTIONS WITH ANY SIDE DIMENSION NOT TO
EXCEED 1 1/2" TIMES ITS ADJACENT SIDE.
2. MAXIMUM JOINT SPACING SHALL NOT EXCEED 10'-0" UON ON PLAN.
3. DEVIATION FROM THE JOINTS SHOWN MUST BE SUBMITTED FOR APPROVAL TO THE STRUCTURAL ENGINEER
PRIOR TO CONSTRUCTION.
4. SLIP CONTROL JTS OR CONTROL JTS REQUIRED, TYP UON.
5. WATER CEMENT RATIO TO BE A MAXIMUM OF 0.45.
6. MOIST CURING REQUIRED FOR A MINIMUM OF 7 DAYS.
7. PROVIDE SAWED CONTROL JT'S PER STANDARD DETAILS.
8. CONCRETE SLAB MIX AT TIME OF PLACEMENT SHALL NOT EXCEED A SLUMP OF 3".
10601 BEAR HOLLOW DRIVE
RANCHO CORDOVA, 95670
SITE NOTES
1. SLAB AND FOUNDATION WORK FOR FUTURE METAL
BUILDING SHOWN.
2. REF ELEV 100.0' UNO.
3. METAL BUILDING FOUNDATION, MISC. PLUMBING,
ELECTRICAL ITEMS WILL BE CUT IN AT LATER DATE. (NOT
IN CONTRACT)
A2
AutoCAD SHX Text Sheet Number
AutoCAD SHX Text Sheet Scale
AutoCAD SHX Text SFM Permit No.
AutoCAD SHX Text
OF
AutoCAD SHX Text Issue
AutoCAD SHX Text Date
AutoCAD SHX Text No.
AutoCAD SHX Text Description
AutoCAD SHX Text Project
AutoCAD SHX Text DSA App No.
AutoCAD SHX Text Supervisor
AutoCAD SHX Text Sheet Title
AutoCAD SHX Text Designed
AutoCAD SHX Text Reference North
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text 24 X 36
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text M
AutoCAD SHX Text N
AutoCAD SHX Text O
AutoCAD SHX Text J
AutoCAD SHX Text K
AutoCAD SHX Text L
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RELATIVE BORDER SCALE IN INCHES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
| Sheets and Views |
| G1 GENERAL SHEET |
| A1 GENERAL NOTES |
| NOTES |
| A2 TYPICAL DETAILS |
| CONCRETE - FTG INTERSECTIONS |
| CONCRETE - SLAB |
| CONCRETE - SLIP CJ |
| CONCRETE - WEAKENED PLANE JT |
| CONCRETE - SLAB THICKENED EDGE |
| A3 SITE PLAN |
| SITE PLAN |