This document is a set of Responses to Site Visit RFIs related to Solicitation W912LA24Q0008 for a CDTF Modular Office Building. The key details are:

The California National Guard Counterdrug Task Force is seeking to lease a 48x60 foot modular office building with associated services and office furniture in Los Alamitos, CA. The contractor shall provide delivery, setup, electrical utility connection, preparation for occupancy, and regular servicing of the modular trailer. There is no preferred building layout, but the modular building must meet the requirements outlined in the Performance Work Statement and be evaluated per Attachment 3. The building will initially use cellular internet, but must have the ability to be hardwired. Electrical utility connection equipment and an unused 3-inch conduit are required. Offers are due by June 14, 2024 at 4:00 PM PT. This is a 100% Small Business Set-aside acquisition.

View the file

Other files

File Type Posted
W912LA24Q0008 ATTACHMENT 6 RESPONSES CLARIFICATIONS 20240719.pdf PDF
W912LA24Q0008 ATTACHMENT 4 PERFORMANCE WORK STATEMENT 20240719.pdf PDF
W912LA24Q0008 COMBIMED SYNOPSIS SOLICITATION COVERSHEET revised 20240718.pdf PDF
W912LA24Q0008 ATTACHMENT 6 RESPONSES CLARIFICATIONS 20240717.pdf PDF
W912LA24Q0008 COMBIMED SYNOPSIS SOLICITATION COVERSHEET revised 20240717.pdf PDF
W912LA24Q0008 ATTACHMENT 4 PERFORMANCE WORK STATEMENT 20240717.pdf PDF
W912LA24Q0008 ATTACHMENT 5 Wage Determination 2015-5645 20240502.pdf PDF
W912LA24Q0008 COMBIMED SYNOPSIS SOLICITATION COVERSHEET 20240710.pdf PDF
W912LA24Q0008 ATTACHMENT 2 ADDENDUM INSTRUCTIONS AND EVALUATION CRITERIA revised 20240702.pdf PDF
W912LA24Q0008 ATTACHMENT 3 OTHER PROVISIONS AND CLAUSES.pdf PDF
W912LA24Q0008 ATTACHMENT 1 CONTRACT LINE ITEMS 20240628.pdf PDF
W912LA24Q0008 ATTACHMENT 4 PERFORMANCE WORK STATEMENT 20240628.pdf PDF
W912LA24Q0008 ATTACHMENT 3 ADDENDUM INSTRUCTIONS AND EVALUATION CRITERIA revised 20240612.pdf PDF
W912LA24Q0008 COMBIMED SYNOPSIS SOLICITATION COVERSHEET revised 20240612.pdf PDF
W912LA24Q0008 ATTACHMENT 5b Technical Exhibits revised 20240606.pdf PDF
W912LA24Q0008 COMBIMED SYNOPSIS SOLICITATION COVERSHEET revised 20240606.pdf PDF
W912LA24Q0008 ATTACHMENT 3 ADDENDUM INSTRUCTIONS AND EVALUATION CRITERIA.pdf PDF
W912LA24Q0008 ATTACHMENT 1 SITE VISIT FORM.docx DOCX document
W912LA24Q0008 COMBIMED SYNOPSIS SOLICITATION COVERSHEET.pdf PDF
W912LA24Q0008 ATTACHMENT 5A PERFORMANCE WORK STATEMENT.pdf PDF
W912LA24Q0008 ATTACHMENT 2 CONTRACT LINE ITEMS.pdf PDF
W912LA24Q0008 ATTACHMENT 5b Technical Exhibits.pdf PDF
W912LA24Q0008 ATTACHMENT 6 WD_Orange County.pdf PDF
W912LA24Q0008 ATTACHMENT 4 OTHER PROVISIONS AND CLAUSES.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912LA24Q0008

Response to Site Visit RFIs

W912LA24Q0008

CDTF JFTB Modular Office Building

Responses to Site Visit RFIs

1. Does the Government have a preferred building layout in mind?

a. Government Response: There is no specific building layout in mind. The PWS outlines specific requirements that the building must meet, Attachment 3 to the solicitation outlines how your quote will be evaluated.

2. Does the Government intend to make a hardwired internet connection to the modular building?

a. Government Response: Initial operational capacity (IOC) of the modular building will rely on cellular-based internet. The modular building must possess the ability to be hardwired to external internet.

3. Clarification: The contractor shall include all electrical utility connection equipment in their quote, existing step-down power transformers identified in Attachment 5b, Power Connection

Installation at the modular office project location do not possess the excess capacity to power the modular office building.

4. Clarification: An unused 3-inch conduit exists from the 480V power supply cabinet to the modular office project location. Attachment 5b, Power Connection Installation, Figure 1 has been updated to reflect this conduit run.