W912LA24Q0008 ATTACHMENT 1 RESPONSES TO SITE VISIT RFIs.pdf
PDF 148 KB Posted
- Attached to
- Re-Solicitation - CDTF Modular Office Building
- Solicitation number
- W912LA24Q0008
About this file
This document is a set of Responses to Site Visit RFIs related to Solicitation W912LA24Q0008 for a CDTF Modular Office Building. The key details are:
The California National Guard Counterdrug Task Force is seeking to lease a 48x60 foot modular office building with associated services and office furniture in Los Alamitos, CA. The contractor shall provide delivery, setup, electrical utility connection, preparation for occupancy, and regular servicing of the modular trailer. There is no preferred building layout, but the modular building must meet the requirements outlined in the Performance Work Statement and be evaluated per Attachment 3. The building will initially use cellular internet, but must have the ability to be hardwired. Electrical utility connection equipment and an unused 3-inch conduit are required. Offers are due by June 14, 2024 at 4:00 PM PT. This is a 100% Small Business Set-aside acquisition.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912LA24Q0008
Response to Site Visit RFIs
W912LA24Q0008
CDTF JFTB Modular Office Building
Responses to Site Visit RFIs
1. Does the Government have a preferred building layout in mind?
a. Government Response: There is no specific building layout in mind. The PWS outlines specific requirements that the building must meet, Attachment 3 to the solicitation outlines how your quote will be evaluated.
2. Does the Government intend to make a hardwired internet connection to the modular building?
a. Government Response: Initial operational capacity (IOC) of the modular building will rely on cellular-based internet. The modular building must possess the ability to be hardwired to external internet.
3. Clarification: The contractor shall include all electrical utility connection equipment in their quote, existing step-down power transformers identified in Attachment 5b, Power Connection
Installation at the modular office project location do not possess the excess capacity to power the modular office building.
4. Clarification: An unused 3-inch conduit exists from the 480V power supply cabinet to the modular office project location. Attachment 5b, Power Connection Installation, Figure 1 has been updated to reflect this conduit run.