Sign In Sheet Site Visit.pdf
PDF 127 KB Posted
- Attached to
- Barracks Restoration Project #12 - Bid Abstract Added Federal contract opportunity
- Solicitation number
- W912L9-20-B-0005
- Issued by
- Department of the Army National Guard
About this file
This solicitation notice is for a firm fixed-price construction contract to provide renovation services for Barracks Project 12 at an Army National Guard facility. The project scope includes selective demolition, installation of a new geo-thermal well ground loop system, facility controls and fire suppression systems, and expansion of an existing mechanical room. The contract duration is 240 days with a magnitude between $1-5 million. The NAICS code is 236220 and it is set aside 100% for small businesses. Interested contractors must register in SAM and check the beta.sam website for solicitation details and any amendments. The pre-bid conference and site visit dates are identified in the solicitation. The bid opening is September 9, 2020. Funds are anticipated to become available by September 30, 2020 and the project has been identified as a priority if funding is received within the awardable price range.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID OPENING ABSTRACT.pdf | ||
| Questions and Answers UPDATED 9-2-2020.pdf | ||
| Solicitation Amendment 3 W912L920B00050003.pdf | ||
| Questions and Answers.pdf | ||
| Solicitation Amendment 2 W912L920B00050002.pdf | ||
| Solicitation Amendment 1 W912L9-20-B-0005.pdf | ||
| CAMP ATTERBURY BARRACKS AND BOQ RENOVATION -BP12 - 2020.0820.pdf | ||
| Phase 2 Addendum No 01 BP12.pdf | ||
| 20200819 SITE VISIT PREPROPOSAL CONFERENCE MEETING MINUTES COMBINED.pdf | ||
| 102113.19 FL - Plastic Toilet Compartments.pdf | ||
| eCMRAMemo.pdf | ||
| 003_Phase 2_Project Manual Vol 1of 2_19May20.pdf | ||
| DRAWINGS BP12 20200519.pdf | ||
| W912L9-20-B-0005 PROJECT 12.pdf | ||
| Barracks Statement of Work 05-21-2020 BP-12.pdf | ||
| 007_APNDX-B_CD-REPORT_Pkg 12_216-217.pdf | ||
| 004_Phase 2_Project Manual Vol 2 of 2_19May20.pdf | ||
| AF-66 Submittals_BP12.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .