007_APNDX-B_CD-REPORT_Pkg 12_216-217.pdf
PDF 65 KB Posted
- Attached to
- Barracks Restoration Project #12 - Bid Abstract Added Federal contract opportunity
- Solicitation number
- W912L9-20-B-0005
- Issued by
- Department of the Army National Guard
About this file
This solicitation package describes a firm fixed-price contract for barracks renovation services. The selected contractor will provide all labor, materials, equipment, and supervision to complete interior and exterior renovations to Buildings 216 and 217 at an Indiana National Guard base. Renovations include mechanical, electrical, and plumbing system upgrades, selective demolition, installation of a new geothermal well system, fire suppression system, and facility controls. The contractor will also perform site work such as excavation and erosion control. The period of performance is 240 days from notice to proceed. The North American Industry Classification for this opportunity is 236220. The contract value is between $1,000,000 and $5,000,000. The solicitation is set aside 100% for small businesses with a size standard of $39.5 million. Interested contractors should register with SAM and monitor the beta.sam website for solicitation documents and any amendments. The pre-bid conference is scheduled according to the solicitation, with the bid opening on September 9, 2020. Funding is anticipated by September 30, 2020 and the contract is a priority for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID OPENING ABSTRACT.pdf | ||
| Solicitation Amendment 3 W912L920B00050003.pdf | ||
| Questions and Answers UPDATED 9-2-2020.pdf | ||
| Questions and Answers.pdf | ||
| Solicitation Amendment 2 W912L920B00050002.pdf | ||
| Phase 2 Addendum No 01 BP12.pdf | ||
| 20200819 SITE VISIT PREPROPOSAL CONFERENCE MEETING MINUTES COMBINED.pdf | ||
| 102113.19 FL - Plastic Toilet Compartments.pdf | ||
| Solicitation Amendment 1 W912L9-20-B-0005.pdf | ||
| CAMP ATTERBURY BARRACKS AND BOQ RENOVATION -BP12 - 2020.0820.pdf | ||
| Sign In Sheet Site Visit.pdf | ||
| eCMRAMemo.pdf | ||
| 003_Phase 2_Project Manual Vol 1of 2_19May20.pdf | ||
| DRAWINGS BP12 20200519.pdf | ||
| W912L9-20-B-0005 PROJECT 12.pdf | ||
| Barracks Statement of Work 05-21-2020 BP-12.pdf | ||
| 004_Phase 2_Project Manual Vol 2 of 2_19May20.pdf | ||
| AF-66 Submittals_BP12.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NAME and NUMBER
PAY APP NUMBER
LOCATION
DATE
DEBRIS
DIVERTED DIVERTED
FROM FROM
QUANTITY TONS LBS YARDS LANDFILL QUANTITY TONS LBS YARDS LANDFILL
(#) () () () (Y or N) (#) () () () (Y or N)
ABC‐Asphalt OD/I/M ‐ Insulation
ABC‐Brick OD/I/M ‐ OTHER (C&D Other)
ABC‐Concrete OD/I/M ‐ Paper
ABC‐OTHER (C&D Masonry/Asphalt) OD/I/M ‐ Plastic
ABC‐Stone OD/I/M ‐ Siding
Land‐Crushed Stone/Base Recycled C&D Debris
Land‐OTHER (C&D Land Clearing) Wood ‐ Finished
Land‐Soil, Lead‐Tainted, Non‐Hazardous Wood ‐ OTHER (C&D Wood)
Land‐Soil, Petroleum‐Tainted Wood ‐ Structural
Land‐Soil, Subsoil Wood ‐ Treated
Land‐Soil, Top
Land‐Vegetation/Timber (Tree Trunks & Limbs)
Metal‐Aluminum
Metal‐Copper
Metal‐Mixed Metal
Metal‐OTHER (C&D Metal) OTHER:
Metal ‐ Steel OTHER:
OD/I/M ‐ Ceiling Tile OTHER:
OD/I/M ‐ Composition Roof OTHER:
OD/I/M ‐ Doors/Windows/Stairs/Cabinets OTHER:
OD/I/M ‐ Glass OTHER:
OD/I/M ‐ Gypsum/Plaster OTHER:
Project Manager
Construction & Demolition Debris Report PROJECT: 2019‐009 733 & 734 SWA Renovation APPENDIX B