Questions and Answers04202023.docx

DOCX document 29 KB Posted

Attached to
National Scout Jamboree, Life Support Services
Solicitation number
W912L8-23-R-0004
Issued by

About this file

This document contains questions and answers related to Solicitation W912L8-23-R-0004 issued by the Department of the Army West Virginia Army National Guard. The solicitation requests life support services for the 2023 National Scout Jamboree to be held in West Virginia. Services include clear span tents, HVAC, generators, doors, egress structures, refrigerated containers, dumpsters, and food services. A site visit will take place on April 12th, and past performance from prime contractor team members will be considered in evaluations. Pricing should be submitted separately by line item with a breakdown. Dimensions for required structures and containers will need to be determined by the offeror based on personnel numbers and service frequencies. "Go for Green" compliance is not mandatory.

View the file

Other files

File Type Posted
Questions and Answers04132023.docx DOCX document
Pre-ProposalSlides 2.pptx PPTX presentation
Maps for Primary Contract_JTK_19DEC22.pptx PPTX presentation
Questions and Answers.docx DOCX document
889 Representation Rev 2.pdf PDF
Solicitation 04042023.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4/20/2023

SOLICITATION W912L8-23-R-0004

National Scout Jamboree, Life Support Services West Virginia, Army National Guard

Requests for Information - Questions and Answers

RFI #
Date
Question
Answer
1.
4/4
In PWS you specified pole or clear span tents. Clear span is a structure that can handle this event with HVAC, Gen, doors, egress etc. Pole tents are less expensive to lease and maintain, but they are not rate for winds and potential fire certs.

Please quote what at least meets the minimum specification of this requirement within the PWS.

The award will be made based on the best overall (i.e. bestvalue) proposal that is determined to be the most beneficial to the Government with the appropriate consideration given to the three evaluation factors: Technical, Past Performance, and Price/Cost. Technical and Past Performance when combined are significantly more important than Cost or Price (Technical and Past Performance are of equal importance).

2.
4/12/2023
Site Visit, 12 APR 2023

· 0930 hrs Mr. Corcoran will be conducting a presentation / PowerPoint in the 77th TC conference room to potential contractors.

· 1000 hrs travel to Victory and MT Jack /Garder Ground

· 1100 hrs travel to RCMA airport

· Lunch

Glen Jean Armory, 409 Wood Mountain Road, Glen Jean, WV 25846

Please send an E-mail to matthew.d.corcoran.civ@army.mil as a reservation

3.
4/13/2023
Will the Government consider Past Performance references from subcontractors on the team?
Yes, they will be considered toward prime contractors Past Performance evaluation
4.
4/13/2023
Do subcontractors need to have Past Performance Questionnaires completed?

Not required, prime contractor is the one that will be evaluated.

5.
4/13/2023
Could the Government clarify the term and number of Past Performances requested? RFP page 76 states "The offeror shall submit information for a total of up to three years (no more than five)..." Does this mean no more than five past performances, or no more than from within the past five years?
Questionnaires up to 3 years are considered recent, no more than a total of 5 each of them.
6.
4/13/2023
Is “Go for the Green” mandatory for this requirement?

No

7.
4/20/2023
The pricing sheet is not included in SAM.Gov for the above solicitation. Can you please send over to me as soon as possible so we can submit our proposal.

not a sheet just for pricing, I would prefer your company just submit your own pricing sheet – Separate pricing for each line item within the solicitation, along with a breakdown of the pricing.

8.
4/20/2023
Do you have a site map with dimensions of the site?

Sorry we do not

9.
4/20/2023
What capacity/size dumpsters are required in section 5.18.

Vendor will need to determine that according to personnel at each site and dumpsters being emptied twice a week, or as often as required to prevent overfilling.

10.
4/20/2023
What dimension refridgerated containers are required for section 5.9

Vendor will need to determine that according to requirements of the PWS

11.
4/20/2023
The PRS and 3.0 proposal content states refrigerated vans but section 5.9 calls for containers. Please clarify whether the Government is requesting containerized units or vans.
Containers

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.