W912L718B7001_Amendment_4.pdf

PDF 135 KB Posted

Attached to
Construct Billeting Office Federal contract opportunity
Solicitation number
W912L7-18-B-7001
Issued by
Department of the Army Tennessee Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Construct Billeting Office, newest first.
File Type Posted
Abstract_of_offers_18B7001_signed.pdf PDF
Addendum_AT_FP_Drawing.pdf PDF
W912L718B7001_Amendment_3.pdf PDF
W912L718B7001_Amendment_2.pdf PDF
W912L718B7001_Amendment_1.pdf PDF
Specifications_Amendment_1.zip ZIP file
Preproposal_minutes_W912L718B7001.pdf PDF
Site_Visit_Slides_20_Apr_2018.pdf PDF
Sign_in_Sheet.pdf PDF
W912L718B7001_8_Apr_2018.pdf PDF
JA-Brand_Name_Simplex.pdf PDF
Specifications.zip ZIP file
21-17007_134th_Billeting_Office_-_Alcoa,_TN.pdf PDF
Drawings.zip ZIP file
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F7X3187324AW01 PSXE132005

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REASON FOR AMENDMENT: To provide question and answ er 16. Provide Addendum Draw ing AT FP. Bid opening date is 16 May 2018, 2:00 P.M. est.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912L7-18-B-7001

X 9B. DATED (SEE ITEM 11)

08-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-May-2018

CODE

134TH TN AIR NATIONAL GUARD

134 MSC CONTRACTING OFFICE - WAWF W912L7

240 BRISCOE DRIVE

LOUISVILLE TN 37777-6227

W912L7 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912L7-18-B-7001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

QUESTION AND ANSWER 16

16. Question: Our Blast Engineer has requested clarifications:

a. Very low level of protection is high damage to the building.

b. Is the Charge Weight actually CW I (other project at McGee Tyson was done at CW II)

c. What is the actual standoff distance for the door?

d. What is the glazing performance requirement? VLL of protection is a GSA 5 but that means the glass will fail into the building.

e. What is the required end rotation? (VLL is 10 degrees)

f. What is the required ductility? (VLL is 10)

16. Answer: Please refer to Standard 10 – Windows and Skylights and Standard 12 – Exterior Doors

a. The building is classified for a “very low” level of protection.

b. Based on UFC 04-010-01, latest edition for standoff distances, a structure less than 200 feet from a controlled perimeter, shall include calculations for explosive weights I & II

c. CCSDI > 86 Feet to the controlled perimeter, the facility is located 93’ from the controlled perimeter.

CCSDII > 30 feet for parking, roadways and trash containers. See attached AT/FP Exhibit.

d. This information can be determined from the UFC documents.

e. Reference response “d” above.

f. Reference response “d” above.

(End of Summary of Changes)

File details come from the government source that posted it.